CN107435510A - Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation - Google Patents

Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation Download PDF

Info

Publication number
CN107435510A
CN107435510A CN201710764652.6A CN201710764652A CN107435510A CN 107435510 A CN107435510 A CN 107435510A CN 201710764652 A CN201710764652 A CN 201710764652A CN 107435510 A CN107435510 A CN 107435510A
Authority
CN
China
Prior art keywords
corridor
swash plate
flood
end panel
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710764652.6A
Other languages
Chinese (zh)
Inventor
李成国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lishui Chong Zhi Guo Technology Co Ltd
Original Assignee
Lishui Chong Zhi Guo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lishui Chong Zhi Guo Technology Co Ltd filed Critical Lishui Chong Zhi Guo Technology Co Ltd
Priority to CN201710764652.6A priority Critical patent/CN107435510A/en
Publication of CN107435510A publication Critical patent/CN107435510A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • E02B3/108Temporary dykes with a filling, e.g. filled by water or sand
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B2009/007Flood panels

Abstract

Residential building corridor or corridor during a kind of flood flood situation can adjust locking device, be related to a kind of baffle device for water, front panel(12)Connect side swash plate(9), side swash plate and a side end panel(6)Connection, is provided with side flexible board on the exterior face of a side end panel(7);Front panel(12)The other end connection opposite side swash plate(14), opposite side swash plate and another side end panel(17)Connection, is provided with opposite side flexible board on the exterior face of another side end panel(18);In a side end panel and another side end panel to being provided with width adjusting jacking mechanism between opposite;Rubber slab is wrapped on the exterior face of aforementioned panels;The U-frame frame of the invention formed by the side swash plate of front panel both sides, a side end panel, opposite side swash plate and another side end panel and the fixation for adapting to corridor or corridor different in width come U-frame frame by width adjusting jacking mechanism, the rainwater poured into by rubber slab closure, obtain the demand for preventing water from entering room.

Description

Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation
【Technical field】
The present invention relates to a kind of baffle device for water, residential building corridor or corridor adjustable sealing during more particularly, to a kind of flood flood situation Close device.
【Background technology】
Known, China is vast in territory, can all occur in annual rainy season the Changjiang river in flood situation, especially this year, Huaihe River, Haihe River, There is rain condition flood situation one after another in the basins such as loose the Liao Dynasty, are entering the flood control most critical period " on seven times eight ", the most of river in south Position continues higher, and national reservoir filling total amount is on the high side nearly 2 one-tenth, as northern lift is stretched in main rain band west, rain belt will cover the Changjiang river, Huaihe River, Multiple basins such as Haihe River, loose the Liao Dynasty, more ground flood situation may be caused to volley.Southern area has met with more wheel heavy showers processes, and soil contains Water saturation, flood control works damaged or destroyed by flood is serious, and manpower and materials consumption is larger, and flood causes calamity risk further to increase.Northern area river Flood production stream in river is fast, and the oncoming force is violent, and Flood Control System is relatively weak, more prominent the problem of light rain terrible disaster.
Many cities are built according to river, more have many building constructions in the lakeside of river, when there is flood situation, coastal, edge River or tourist attraction, especially Low land area safe flood, the corridor of office space, the corridor porch content of residential building Easily water inlet, the current that rainwater is formed will cause any property loss, current method is to use sandbag, and sandbag is not only once entering Difficult, and the gap of sandbag still can flow into water, and practical function is limited, and this turns into one of hard defects of work of flood prevention.
【The content of the invention】
In order to overcome the shortcomings of in background technology, residential building corridor or corridor when the present invention discloses a kind of flood flood situation can adjust Locking device, the U-frame formed by the side swash plate of front panel both sides, a side end panel, opposite side swash plate and another side end panel Frame and the fixation that corridor or corridor different in width are adapted to by width adjusting jacking mechanism, the rain poured into by rubber slab closure Water, obtain the demand for preventing water from entering room.
For achieving the above object, the present invention adopts the following technical scheme that:
Residential building corridor or corridor during a kind of flood flood situation can adjust locking device, including front panel, side swash plate, a side Plate, side flexible board, opposite side swash plate, another side end panel, opposite side flexible board, rubber slab and width adjusting jacking mechanism, it is preceding One end of portion's plate is articulated and connected one end of side swash plate, and the other end of side swash plate is articulated and connected with a side end panel, in a side The exterior face of plate is provided with side flexible board;The other end of front panel is articulated and connected one end of opposite side swash plate, opposite side swash plate The other end be articulated and connected with another side end panel, opposite side flexible board is provided with the exterior face of another side end panel;In a side Plate and another side end panel to being provided with width adjusting jacking mechanism between opposite;Rubber slab be wrapped in full front panel, side swash plate, On the exterior face of side flexible board, opposite side swash plate and opposite side flexible board.
Residential building corridor or corridor during described flood flood situation can adjust locking device, be set in the rear portion lower end of front panel There is Weight plate.
Residential building corridor or corridor during described flood flood situation can adjust locking device, and sand is provided with the Weight plate The counterweight that bag or fragment of brick are formed.
Residential building corridor or corridor during described flood flood situation can adjust locking device, be set on the inner face of a side end panel There is side square tube, opposite side square tube is provided with the inner face of another side end panel, the both ends of width adjusting bar are respectively arranged with positive silk The external screw thread formed with anti-silk, the positive silk external screw thread and anti-silk external screw thread that width adjusting bar both ends are set respectively connect side respectively The screw set in square tube and opposite side square tube opposite face, the middle part of the width adjusting bar, which is provided with, controls positive silk external screw thread and anti- The screw device of silk external screw thread rotation.
Residential building corridor or corridor during described flood flood situation can adjust locking device, be set in the middle part of width adjusting bar There are six aspects, obtaining the screw device for controlling positive silk external screw thread and anti-silk external screw thread to be formed by the aspect of spanner control six rotates;Or More are set to screw bar on the middle part outer edge surface of width adjusting bar, screwing bar by described more controls positive silk external screw thread and anti-silk The screw device rotation that external screw thread is formed.
Residential building corridor or corridor during described flood flood situation can adjust locking device, be set in the middle part of width adjusting bar There is sleeve pipe, the more inner intervals for screwing bar are fixedly connected on the outer edge surface of sleeve pipe.
Residential building corridor or corridor during described flood flood situation can adjust locking device, and described more screw any of bar One is connected with one end of static line, and the other end of the static line is connected on the ring set on Weight plate.
Residential building corridor or corridor during described flood flood situation can adjust locking device, the side flexible board and another Side flexible board is tabular sponge or elastic rubber slab.
Residential building corridor or corridor during described flood flood situation can adjust locking device, at the rear both ends of front panel Hinge B and hinge C are respectively equipped with, the hinge B of front panel is connected with one end rear of side swash plate;The other end of side swash plate It is connected by hinge A with the front end of a side end panel;The rear portion that the other end rear portion of front panel passes through hinge C connection opposite side swash plates Face one end, the other end of opposite side swash plate are connected by hinge D with the front end of another side end panel.
Residential building corridor or corridor during described flood flood situation can adjust locking device, in front panel, side swash plate, one The flexible strip of sponge or elastic rubber strip formation is respectively equipped with the lower surface of side end panel, opposite side swash plate and another side end panel, The rubber slab lower end of monoblock is wrapped in front panel, side swash plate, a side end panel, opposite side swash plate and another side end panel lower surface On flexible strip.
Due to using technical scheme as described above, the present invention has the advantages that:
Residential building corridor or corridor during flood flood situation of the present invention can adjust locking device, by by front panel, side Swash plate, a side end panel, opposite side swash plate and another side end panel connect the funnel-shaped structure to form vertical view by hinge, are adjusted by width The positive silk external screw thread and anti-silk external screw thread at pole control both ends and the screw set in side square tube and opposite side square tube opposite face Broadening is relatively rotated, rubber slab will block current, kicking for wall lower end is adapted to by side flexible board and opposite side flexible board The change width that payment to a porter is brought obtains closure completely;The present invention changes traditional sandbag dash pattern, during use not only more It is light, and dash effect is clearly, is realized as flood fighting materials and takes up an area purpose that is small and easily laying in.
【Brief description of the drawings】
Fig. 1 is the dimensional structure diagram of the present invention;
Fig. 2 is the overlooking the structure diagram of the present invention;
Fig. 3 is the width adjusting bar structural representation of the present invention;
Fig. 4 is the front panel of the present invention and the position relationship schematic diagram of Weight plate;
Fig. 5 is installation site structural representation of the present invention in corridor or corridor;
In figure:1st, bar is screwed;2nd, sleeve pipe;3rd, width adjusting bar;4th, external screw thread;5th, side square tube;6th, a side end panel;7th, side is soft Property plate;8th, hinge A;9th, side swash plate;10th, hinge B;11st, rubber slab;12nd, front panel;13rd, hinge C;14th, opposite side swash plate; 15th, opposite side square tube;16th, hinge D;17th, another side end panel;18th, opposite side flexible board;19th, Weight plate;20th, flexible strip;21、 Corridor or corridor;22nd, counterweight;23rd, wall;24th, ring;25th, static line.
【Embodiment】
The present invention can be explained in more detail by the following examples, the open purpose of the present invention is intended to protect the scope of the invention All interior changes and improvements, the invention is not limited in the following examples;
Residential building corridor or corridor during flood flood situation with reference to described in accompanying drawing 1~4 can adjust locking device, including front panel 12nd, side swash plate 9, a side end panel 6, side flexible board 7, opposite side swash plate 14, another side end panel 17, opposite side flexible board 18, Rubber slab 11 and width adjusting jacking mechanism, hinge B10 and hinge C13 is respectively equipped with the rear both ends of front panel 12, it is preceding The hinge B10 of portion's plate 12 is connected with one end rear of side swash plate 9;The other end of side swash plate 9 passes through hinge A8 and side The front end connection of end plate 6, is provided with side flexible board 7 on the exterior face of a side end panel 6;The other end rear portion of front panel 12 passes through Rear one end of hinge C13 connection opposite sides swash plate 14, the other end of opposite side swash plate 14 pass through hinge D16 and another side The front end connection of plate 17, is provided with opposite side flexible board 18 on the exterior face of another side end panel 17;In front panel 12, side swash plate 9th, it is respectively equipped with sponge on the lower surface of a side end panel 6, opposite side swash plate 14 and another side end panel 17 or elastic rubber strip is formed Flexible strip 20, the lower end of rubber slab 11 of monoblock is wrapped in front panel 12, side swash plate 9, a side end panel 6, opposite side swash plate 14 On the flexible strip 20 of another lower surface of side end panel 17, Weight plate 19 is provided with the rear portion lower end of front panel 12, in the counterweight Plate 19 is provided with the counterweight 22 that sandbag or fragment of brick are formed, and the side flexible board 7 is tabular sponge or elastic rubber slab;, it is described Opposite side flexible board 18 is tabular sponge or elastic rubber slab;Side square tube 5 is provided with the inner face of a side end panel 6, another The inner face of side end panel 17 is provided with opposite side square tube 15, and the both ends of width adjusting bar 3 are respectively arranged with positive silk and anti-silk formed External screw thread 4, the positive silk external screw thread 4 and anti-silk external screw thread 4 that the both ends of width adjusting bar 3 are set respectively connect the He of side square tube 5 respectively The screw set on the opposite face of opposite side square tube 15, the middle part of the width adjusting bar 3, which is provided with, controls positive silk external screw thread 4 and anti-silk The screw device that external screw thread 4 rotates;Wherein screw device may be configured as the following two kinds form, and a kind of is in width adjusting bar 3 Middle part is provided with six aspects, and the screw device for controlling positive silk external screw thread 4 and anti-silk external screw thread 4 to be formed is obtained by the aspect of spanner control six Rotation;Another kind is that sleeve pipe 2 is provided with the middle part of width adjusting bar 3, and the more inner intervals for screwing bar 1 are fixedly connected on sleeve pipe On 2 outer edge surface, by the described more screw device rotations for screwing bar 1 and controlling positive silk external screw thread 4 and anti-silk external screw thread 4 to be formed; Described more screw bar 1 any one are connected with one end of static line 25, and the other end of the static line 25 is connected to counterweight On the ring 24 set on plate 19;Rubber slab 11 is wrapped in front panel 12, side swash plate 9, side flexible board 7, opposite side swash plate entirely 14 and opposite side flexible board 18 exterior face on.
Residential building corridor or corridor when implementing flood flood situation of the present invention can adjust locking device, with reference to accompanying drawing 1 ~5, in use, rubber slab 11 is placed in corridor or corridor 21 towards inflow direction, and use one outside a side end panel 6 The rubber slab 11 outside opposite side flexible board 18 outside side flexible board 7 and another side end panel 17 withstands on corridor or the both sides of corridor 21 Wall 23 opposite face on, rotated using bar 1 is screwed, at this moment acted on by positive and negative silk by force, the outer spiral shell of width adjusting bar 3 Line 4 promotes side square tube 5 and opposite side square tube 15 to extend out, and at this moment should press the front panel 12 of the present invention, side swash plate 9 and another Side swash plate 14, the flexible strip 20 of front panel 12, side swash plate 9 and the lower end of opposite side swash plate 14 is set to compress corridor or corridor 21 Ground " can also place the counterweight 22 " of the weight such as sandbag or fragment of brick formation, wherein one outside a side end panel 6 on Weight plate 19 The adaptive metope for being adjacent to wall 23 has obtained respectively for opposite side flexible board 18 outside side flexible board 7 and another side end panel 17 Full closure.
Part not in the detailed description of the invention is prior art.

Claims (10)

1. the residential building corridor or corridor during a kind of flood flood situation can adjust locking device, including front panel(12), side swash plate (9), a side end panel(6), side flexible board(7), opposite side swash plate(14), another side end panel(17), opposite side flexible board(18)、 Rubber slab(11)With width adjusting jacking mechanism, it is characterized in that:Front panel(12)One end be articulated and connected side swash plate(9)One End, side swash plate(9)The other end and a side end panel(6)It is articulated and connected, in a side end panel(6)Exterior face be provided with side it is soft Property plate(7);Front panel(12)The other end be articulated and connected opposite side swash plate(14)One end, opposite side swash plate(14)The other end With another side end panel(17)It is articulated and connected, in another side end panel(17)Exterior face be provided with opposite side flexible board(18);One Side end panel(6)With another side end panel(17)To being provided with width adjusting jacking mechanism between opposite;Rubber slab(11)It is wrapped in entirely Front panel(12), side swash plate(9), side flexible board(7), opposite side swash plate(14)With opposite side flexible board(18)Exterior face On.
2. the residential building corridor or corridor during flood flood situation according to claim 1 can adjust locking device, it is characterized in that: In front panel(12)Rear portion lower end be provided with Weight plate(19).
3. the residential building corridor or corridor during flood flood situation according to claim 2 can adjust locking device, it is characterized in that: In the Weight plate(19)It is provided with the counterweight that sandbag or fragment of brick are formed(22).
4. the residential building corridor or corridor during flood flood situation according to claim 1 can adjust locking device, it is characterized in that: In a side end panel(6)Inner face be provided with side square tube(5), in another side end panel(17)Inner face be provided with opposite side square tube (15), width adjusting bar(3)Both ends be respectively arranged with the external screw thread that positive silk and anti-silk are formed(4), width adjusting bar(3)Both ends The positive silk external screw thread set respectively(4)With anti-silk external screw thread(4)Side square tube is connected respectively(5)With opposite side square tube(15)Relatively The screw set on face, the width adjusting bar(3)Middle part be provided with and control positive silk external screw thread(4)With anti-silk external screw thread(4)Rotation The screw device turned.
5. the residential building corridor or corridor during flood flood situation according to claim 4 can adjust locking device, it is characterized in that: In width adjusting bar(3)Middle part be provided with six aspects, obtained by the aspect of spanner control six and control positive silk external screw threads(4)Outside anti-silk Screw thread(4)The screw device rotation of formation;Or in width adjusting bar(3)Middle part outer edge surface on set more to screw bar(1), by Described more screw bar(1)Control positive silk external screw thread(4)With anti-silk external screw thread(4)The screw device rotation of formation.
6. the residential building corridor or corridor during flood flood situation according to claim 5 can adjust locking device, it is characterized in that: In width adjusting bar(3)Middle part be provided with sleeve pipe(2), more screw bar(1)Inner interval be fixedly connected on sleeve pipe(2)It is outer On edge face.
7. the residential building corridor or corridor during flood flood situation according to claim 5 can adjust locking device, it is characterized in that: Described more screw bar(1)Any one and static line(25)One end connection, the static line(25)The other end connection In Weight plate(19)The ring of upper setting(24)On.
8. the residential building corridor or corridor during flood flood situation according to claim 1 can adjust locking device, it is characterized in that: The side flexible board(7)With opposite side flexible board(18)For tabular sponge or elastic rubber slab.
9. the residential building corridor or corridor during flood flood situation according to claim 1 can adjust locking device, it is characterized in that: In front panel(12)Rear both ends be respectively equipped with hinge B(10)With hinge C(13), front panel(12)Hinge B(10)With Side swash plate(9)The connection of one end rear;Side swash plate(9)The other end pass through hinge A(8)With a side end panel(6)Before End connection;Front panel(12)Other end rear portion pass through hinge C(13)Connect opposite side swash plate(14)Rear one end, it is another Skew back plate(14)The other end pass through hinge D(16)With another side end panel(17)Front end connection.
10. the residential building corridor or corridor during flood flood situation according to claim 1 can adjust locking device, its feature It is:In front panel(12), side swash plate(9), a side end panel(6), opposite side swash plate(14)With another side end panel(17)Lower end The flexible strip of sponge or elastic rubber strip formation is respectively equipped with face(20), the rubber slab of monoblock(11)Lower end is wrapped in front panel (12), side swash plate(9), a side end panel(6), opposite side swash plate(14)With another side end panel(17)The flexible strip of lower surface(20) On.
CN201710764652.6A 2017-08-30 2017-08-30 Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation Withdrawn CN107435510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710764652.6A CN107435510A (en) 2017-08-30 2017-08-30 Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710764652.6A CN107435510A (en) 2017-08-30 2017-08-30 Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation

Publications (1)

Publication Number Publication Date
CN107435510A true CN107435510A (en) 2017-12-05

Family

ID=60460775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710764652.6A Withdrawn CN107435510A (en) 2017-08-30 2017-08-30 Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation

Country Status (1)

Country Link
CN (1) CN107435510A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019123989A (en) * 2018-01-11 2019-07-25 文化シヤッター株式会社 Opening portion waterproof device
CN111877261A (en) * 2020-07-29 2020-11-03 何海丽 Water retaining water bag with adjustable length and bendable

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019123989A (en) * 2018-01-11 2019-07-25 文化シヤッター株式会社 Opening portion waterproof device
JP7004578B2 (en) 2018-01-11 2022-01-21 文化シヤッター株式会社 Waterproofing device for openings
CN111877261A (en) * 2020-07-29 2020-11-03 何海丽 Water retaining water bag with adjustable length and bendable
CN111877261B (en) * 2020-07-29 2022-11-04 池州市金实自然资源管理服务有限公司 Water retaining water bag with adjustable length and bendable

Similar Documents

Publication Publication Date Title
CN107460848A (en) A kind of flood situation comes interim corridor or the baffle device for water in corridor
CN107604877A (en) A kind of door flood situation carrys out the baffle plate of interim water-tight device
CN107435510A (en) Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation
CN201627355U (en) Safety protection barrier for building construction scaffolds
CN107366256A (en) Flood situation carrys out interim water-tight device at a kind of suitable door
CN206053156U (en) A kind of architectural design roof cornice waterproof structure
CN205977020U (en) During using, endures building door and window structure with hidden drainage structures
CN207686574U (en) A kind of residential building corridor when flood flood situation or corridor adjustable sealing block apparatus
CN207348015U (en) A kind of W-shaped corridor or corridor waterproof enter device
CN207348014U (en) A kind of flood situation comes interim corridor or the baffle device for water in corridor
CN107386935A (en) A kind of door flood situation carrys out the indoor haulage gear of interim water-tight device
CN107653834A (en) A kind of W shapes corridor or corridor waterproof enter device
CN107447726A (en) A kind of passage waterproof plugging device during rainwater flood situation
CN206448751U (en) A kind of flood prevention water retaining gate structure
CN206016096U (en) A kind of steel-structure factory building rain cover
CN107366500A (en) A kind of baffle device for water of corridor entrance
CN205399343U (en) Reinforcement type waterproof and anti -seepage bank protection
CN202611139U (en) Supporting device for glass awning
CN207176622U (en) Portable anti-flood wall and its column agency
CN208184195U (en) A kind of architectural engineering scaffold
CN207393077U (en) A kind of flood situation carrys out interim window plugging device
CN207646681U (en) A kind of door flood situation carrys out the baffle of interim water-tight device
CN208309358U (en) A kind of non-motorized lane applied to pontic
CN107386929A (en) A kind of automatic rising rain-proof window enclosed construction before rainwater flood irrigation
CN205894330U (en) Plug into waterproof board device of position department of curtain first floor and structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171205