CN107423958A - A kind of method settled accounts and paid the bill for engineering project class - Google Patents
A kind of method settled accounts and paid the bill for engineering project class Download PDFInfo
- Publication number
- CN107423958A CN107423958A CN201710622820.8A CN201710622820A CN107423958A CN 107423958 A CN107423958 A CN 107423958A CN 201710622820 A CN201710622820 A CN 201710622820A CN 107423958 A CN107423958 A CN 107423958A
- Authority
- CN
- China
- Prior art keywords
- node
- supervision platform
- platform side
- engineering
- labour cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000010276 construction Methods 0.000 claims abstract description 37
- 239000000463 material Substances 0.000 claims description 34
- 238000012423 maintenance Methods 0.000 claims description 22
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims description 21
- 239000010931 gold Substances 0.000 claims description 21
- 229910052737 gold Inorganic materials 0.000 claims description 21
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000007726 management method Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012011 method of payment Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/02—Payment architectures, schemes or protocols involving a neutral party, e.g. certification authority, notary or trusted third party [TTP]
- G06Q20/023—Payment architectures, schemes or protocols involving a neutral party, e.g. certification authority, notary or trusted third party [TTP] the neutral party being a clearing house
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Computer Security & Cryptography (AREA)
- Accounting & Taxation (AREA)
- Data Mining & Analysis (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The invention discloses a kind of a kind of method settled accounts and paid the bill for engineering project class.Including multiple node divisions, it includes worker's node, construction team's node and supplier's node, and contractor's node and developer's node, remove beyond developer's node, each node forms a undertaker and tripartite's supervisory network of consigner and computer supervision platform side with its upper level unit, and multiple small tripartite's supervisory networks are formed as described above, and the upper level of construction team's node and supplier's node belongs to contractor's node together.The present invention has advantages below:1. the fund between contractor and the investor can be avoided, which to be broken caused engineering, can not continue rotten tail of living;2. avoiding the occurrence of employing unit wage for workmen is in arrears with problem;3. avoid because the engineering in follow-up build because of capital chain rupture or it is not smooth caused by successive projects Quality Down;4. avoiding lower node unit from being constrained without personnel and loosen construction quality and check on, the appearance of improper works is avoided.
Description
Technical field
The present invention relates to a kind of mode of payment, is especially a kind of one kind side for settling accounts and paying the bill for engineering project class
Method.
Background technology
Settled accounts in engineering funds and payment field, existing engineering funds clearing have various disadvantages, it is mainly reflected in engineering
The granting of money can not management and control, can not fully trust between undertaker and consigner, the project payment of consigner can not timely payment,
The project progress of undertaker and examination can not ensure;Furthermore at present when cash flow goes wrong, majority is padded by undertaker
Pay, such a drawback is easy to node or the fracture of interim cash flow occur, causes engineering can not continue or artificially by engineering
Material quality degrades, and to reduce cost payout, the final result for the drawbacks of above operates is to cause project progress to be delayed or work
Cheng Zhiliang can not ensure, or even cause the rotten tail of engineering, because consigner fund fracture and cause undertaker pay for first engineering funds without
Method is steam again, and causes city gate to catch fire the effect brought disaster to the fish in the moat.
The content of the invention
The technical problem to be solved in the present invention be to provide it is a kind of have third party it is existing be used for the clearing of engineering project class and
A kind of method of payment.
The technical solution of the present invention is to provide a kind of a kind of method settled accounts and paid the bill for engineering project class, bag
Multiple node divisions are included, it includes worker's node, construction team's node and supplier's node, and contractor's node and developer's section
Point, remove beyond developer's node, each node forms a undertaker and consigner with its upper level unit and computer is supervised
Superintend and direct tripartite's supervisory network of platform side, the upper level of described construction team's node and supplier's node belongs to contractor's node together;
Described initial node of the invention is configured to developer and contractor and computer supervision platform side, contractor with
After developer reaches an agreement, whole investment computer supervision platform sides needed for engineering are formed a tripartite by developer
Supervisory network;
Described developer forms tripartite's supervisory network with contractor and computer supervision platform side, and construction team is with holding
Concessionaire and computer supervision platform side form tripartite's supervisory network, and supplier and contractor and supervision platform side difference are respective
Tripartite's supervisory network is formed, in the process, construction team and supplier are the brother of node;Construction team is Bao Qinggong states
When, what it is by construction team's reception is only labour cost;When construction team is whole bag-like state, construction team can receive labour cost and fee of material.
After contractor reaches an agreement with developer, labour cost is set to the a% of whole funds, fee of material is set to whole moneys
The b% of gold;Further, remaining cost division is as follows:Administration fee is set to the c% of whole funds, and quality guarantee gold is set to whole funds
D%, maintenance guarantee fund is set to the e% of whole funds, while the f% of whole funds is set to the fortune of computer supervision platform side
Working cost, the summation of described above percentage are the 100% of whole funds;
When described administration fee is distributed or got, mode is received in administration fee:The upper level supervisor that receiver need to be passed through is same
Meaning, at most point 15 batches are got to computer supervision platform side after the execution of contract, are got total cost and be must not exceed whole funds
C%;
When described quality guarantee gold is distributed or got, quality guarantee golden collar's mode:After the completion of node engineering, it need to pass through receiver's
One or more upper level supervisor agrees to, can disposably be got to computer supervision platform side;
When described maintenance guarantee fund distributes or got, maintenance guarantee fund receives mode:After the completion of node engineering, need by
One or more upper level supervisor of receiver agrees to, can disposably be got to computer supervision platform side;
After the completion of described node engineering, while receiver applies for quality guarantee gold or maintenance guarantee fund, through receiver
One or more upper level supervisor agree to, can disposably be got to computer supervision platform side all remaining administration fees,
Labour cost, fee of material.
After described construction team reaches an agreement with worker, actual labour cost is set to the g% of labour cost, primary management is taken
It is set to the h% of labour cost, primary quality guarantee gold is set to the i% of labour cost, and primary maintenance guarantee fund is set to the j% of labour cost, simultaneously
The k% of labour cost is set to the running cost of computer supervision platform side, the summation of described above percentage is labour cost
100%;
When described primary management expense is distributed or got, primary management expense receives mode:Upper the one of receiver need to be passed through
Level supervisor agrees to that at most point 15 batches are got to computer supervision platform side after the execution of contract, are got total cost and be must not exceed
The h% of labour cost;
When described primary quality guarantee gold is distributed or got, primary quality guarantee golden collar mode:After the completion of node engineering, need by
One or more upper level supervisor of receiver agrees to, can disposably be got to computer supervision platform side;
When described primary maintenance guarantee fund distributes or got, primary maintenance guarantee fund receives mode:Node engineering is completed
Afterwards, the j% that both sides determine guarantee time and primary maintenance guarantee fund is labour cost, both sides must need after guarantee time terminates
It is responsible for and agrees to by one or more upper level of receiver, can be disposably got to computer supervision platform side;
After the completion of described node engineering, apply for primary quality guarantee gold simultaneously in receiver, one through receiver or more
Individual upper level supervisor agrees to, it is artificial that all remaining primary management expenses, reality can be disposably got to computer supervision platform side
Take;
When described real material money is distributed or got, real material money receives mode:After material is signed for, computer supervision
Platform side makes loans from trend supplier, but this fund is in frozen state, need to be confirmed by material information it is errorless after, through consignee one
Individual or multiple upper level supervisors agree to that computer supervision platform side makes loans automatically in three days.
After described supplier reaches an agreement with contractor, described real material money is set to the L% of fee of material, fee of material
M% be set to the running cost of computer supervision platform side, the summation of described above percentage is the 100% of fee of material.
The cost of living is set to the n% of actual labour cost by described worker when getting actual labour cost, and wage is set into reality
The p% of border labour cost, while the q% of actual labour cost is set to the running cost of computer supervision platform side, it is described more than
The summation of percentage is the 100% of actual labour cost;
For described worker when getting the cost of living, the cost of living receives mode:Worker can only apply for that the n% of actual labour cost makees
For the cost of living, remaining is frozen;
For described worker when getting wage, wage receives mode:Worker can be after the completion of node engineering, through receiver's
One or more upper level supervisor agrees to, and is not complained in seven days, computer supervision platform side and automatic hair on the 8th
Put, if computer supervision platform side receives complaint, wage will be frozen, after both sides are adjusted, be started in next day, the 7th work
Day after discharge.
Described computer supervision platform side is third party Fund Supervision side, and it is by the fund management system inside bank
Form, described a%~q% can be adjusted according to actual conditions, artificial by being carried out in the terminal of fund management system
Adjustment, described each percent data is all artificially to adjust, can be clear and definite.
Described node engineering is the engineering end point in this stage.
Beneficial effects of the present invention:The present invention is by above method, and compared with prior art, the present invention has following excellent
Point:1. the engineering caused by can avoiding the fracture of the fund between contractor and the investor can not continue or rotten tail;2. avoid the occurrence of
Employing unit wage for workmen is in arrears with problem;3. avoid because the engineering in follow-up build because of capital chain rupture or it is not smooth caused by
Successive projects Quality Down;4. avoiding lower node unit from being constrained without personnel and loosen construction quality and check on, improper works are avoided
Appearance.
Brief description of the drawings
The shared accompanying drawing 2 of the present invention is opened, wherein:
Fig. 1 is Fund Supervision schematic diagram of the present invention;
Fig. 2 is funds release schematic diagram of the present invention;
Embodiment
The present invention is further described through below in conjunction with the accompanying drawings.As shown in drawings,
As shown in figure 1, the present invention technical solution be to provide it is a kind of for engineering project class settle accounts and pay the bill one
Kind method, including multiple node divisions, it includes worker's node, construction team's node and supplier's node, and contractor's node
With developer's node, remove beyond developer's node, each node forms a undertaker and consigner with its upper level unit
With tripartite's supervisory network of computer supervision platform side, multiple small tripartite's supervisory networks form payment process as described above,
The upper level of construction team's node and supplier's node belongs to contractor's node together.
As shown in Fig. 2 described initial node of the invention is configured to developer and contractor and computer supervision platform
Side, after contractor and developer reach an agreement, developer is by whole investment computer supervision platform sides needed for engineering, shape
Into tripartite's supervisory network.
Described developer forms tripartite's supervisory network with contractor and computer supervision platform side, and construction team is with holding
Concessionaire and computer supervision platform side form tripartite's supervisory network, and supplier and contractor and supervision platform side difference are respective
Tripartite's supervisory network is formed, in the process, construction team and supplier are the brother of node;Construction team is Bao Qinggong states
When, what it is by construction team's reception is only labour cost;When construction team is whole bag-like state, construction team can receive labour cost and fee of material.
After described construction team and supplier reach an agreement with contractor, labour cost is set to the 32.5% of whole funds,
Fee of material is set to the 32.5% of whole funds;Further, the division of described remaining cost is as follows:Administration fee is set to whole moneys
The 15% of gold, quality guarantee gold are set to the 7% of whole funds, and maintenance guarantee fund is set to the 5% of whole funds, while by whole funds
8% is set to the running cost of computer supervision platform side, and the summation of described above percentage is the 100% of whole funds;
When described administration fee is distributed or got, the upper level supervisor that need to pass through receiver agrees to, after the execution of contract
At most point 15 batches are got to computer supervision platform side, get total cost must not exceed whole funds 15%;
Described quality guarantee gold distribution or when getting, after the engineering in this stage terminates, one of receiver or more need to be passed through
Individual upper level supervisor agrees to, can disposably be got to computer supervision platform side;
Described maintenance guarantee fund distribution or when getting, after the engineering in this stage terminates, need to pass through one of receiver or
The multiple upper level supervisors of person agree to, can disposably be got to computer supervision platform side;
After the engineering in this described stage terminates, while receiver applies for quality guarantee gold or maintenance guarantee fund, through neck
One or more upper level supervisor of taker agrees to, all remaining management can be disposably got to computer supervision platform side
Take.
Described construction team and supplier collectively form tripartite's supervisory network with worker and computer supervision platform side,
In the process, construction team and supplier are the brother of node, and construction team and supplier can exist in two forms, i.e. Bao Qinggong
State and whole bag-like state, when Bao Qinggong states, what it is by construction team's reception is only labour cost;When whole bag-like state, construction team can
Receive labour cost and fee of material.
After described construction team and supplier reach an agreement with worker, actual labour cost is set to the 62% of labour cost, entered
One step, the division of described remaining cost is as follows:Primary management expense is set to the 10% of labour cost, primary quality guarantee gold is set to manually
10% taken, primary maintenance guarantee fund is set to the 10% of labour cost, while is set to computer supervision platform side by the 8% of labour cost
Running cost, the summation of described above percentage is the 100% of labour cost;
Described real material money is set to the 92% of fee of material, and remaining 8% is set to the operation of computer supervision platform side
Expense, the summation of described above percentage are the 100% of fee of material;
When described primary management expense is distributed or got, the upper level supervisor that need to pass through receiver agrees to, is given birth in contract
At most point 15 batches are got to computer supervision platform side after effect, get total cost must not exceed labour cost 15%;
Described primary quality guarantee gold distribution or when getting, after the engineering in this stage terminates, need to pass through one of receiver or
The multiple upper level supervisors of person agree to, can disposably be got to computer supervision platform side;
Described primary maintenance guarantee fund distribution or when getting, after the engineering in this stage terminates, both sides determine guarantee time
For 1 year, primary maintenance guarantee fund was the 10% of labour cost, and both sides must need to pass through the one of receiver after guarantee time terminates
Individual or multiple upper level supervisors agree to, can disposably be got to computer supervision platform side;
After the engineering in this described stage terminates, apply for that primary quality guarantee gold or primary repair the same of guarantee fund in receiver
When, one or more upper level supervisor through receiver agrees to, can disposably be got to computer supervision platform side all surplus
Remaining primary management is taken;
Described real material money distribution or when getting, after material is signed for, computer supervision platform side is from trend supplier
Make loans, but this fund is in frozen state, then by material information confirm it is errorless after, through consignee one or more upper level master
Pipe agrees to that computer supervision platform side makes loans automatically in three days, and amount of making loans is the 92% of material money, and frozen fraction, which is withdrawn deposit, to be needed together
When meet:1 acceptance of materials is qualified;2. a layer entirely reaches Practical Completion and acceptance(check) with top-ranking.
Described worker is set to the 15% of actual labour cost when getting actual labour cost, by worker's cost of living, by wage
It is set to the 77% of actual labour cost, while by the 8% of the actual labour cost running cost for being set to computer supervision platform side, it is described
Above percentage summation be actual labour cost 100%;
For described worker when getting the cost of living, worker can only apply for that the 15% of actual labour cost is used as the cost of living, remaining
It is frozen, avoid worker from arbitrarily getting or spend freely, frozen fraction, which is withdrawn deposit, to be needed to meet:1. a minor node Practical Completion and examination conjunction
Lattice;2;This layer entirely reaches Practical Completion and acceptance(check) with top-ranking.
Described worker when getting wage, worker can after the engineering in this stage terminates, one through receiver or
Multiple upper level supervisors agree to, and are not complained in seven days, computer supervision platform side and automatic granting on the 8th, if receiving
Complain, wage will be frozen, after both sides are adjusted, be started in next day, the 7th working day after discharge.
Described computer supervision platform side is third party Fund Supervision side, and it is by the fund management system structure inside bank
Into described a%~q% can be adjusted according to actual conditions, artificially be adjusted by the terminal in fund management system
Whole, described each percent data is all artificially to adjust, can be clear and definite.
One or more families in preferably four big row of described bank.
Further, the real data of selected a%~q% in above-described embodiment is exemplary, when needed,
This percentage can be made by oneself by computer supervision platform root according to multiple practical experiences, can also pass through undertaker and consigner
Tripartite's agreement is carried out with computer supervision platform side, each node percentage is arranged, clearly with actual conditions.
The explanation of described foregoing exemplary is the clearing and payment progress around construction-engineering project, basic herein
On, the method disclosed in the present can be applied in other engineering intermediate items, need it is emphasized that above example is not
Constraint to the application of case of the present invention.
Claims (6)
1. a kind of a kind of method settled accounts and paid the bill for engineering project class, including multiple node divisions, it is characterised in that:It is wrapped
Include worker's node, construction team's node and supplier's node, and contractor's node and developer's node, remove developer's node with
Outside, each node forms a undertaker and consigner with its upper level unit and the tripartite of computer supervision platform side supervises net
The upper level of network, described construction team's node and supplier's node belongs to contractor's node together;
Described initial node of the invention is configured to developer and contractor and computer supervision platform side, contractor and exploitation
After business reaches an agreement, developer supervises whole investment computer supervision platform sides needed for engineering, one tripartite of formation
Network;
Described developer forms tripartite's supervisory network, construction team and contractor with contractor and computer supervision platform side
Tripartite's supervisory network is formed with computer supervision platform side, supplier is each formed respectively with contractor and supervision platform side
One tripartite's supervisory network, in the process, construction team and supplier are the brother of node;When construction team is Bao Qinggong states, by
What construction team received is only labour cost;When construction team is whole bag-like state, construction team can receive labour cost and fee of material.
A kind of 2. method according to claim 1 settled accounts and paid the bill for engineering project class, it is characterised in that:Contractor
After reaching an agreement with developer, labour cost is set to the a% of whole funds, fee of material is set to the b% of whole funds;Further
, remaining cost division is as follows:Administration fee is set to the c% of whole funds, and quality guarantee gold is set to the d% of whole funds, and maintenance ensures
Gold is set to the e% of whole funds, while the f% of whole funds is set to the running cost of computer supervision platform side, described
The summation of above percentage is the 100% of whole funds;
When described administration fee is distributed or got, mode is received in administration fee:Upper level supervisor's agreement of receiver need to be passed through, in
At most point 15 batches are got to computer supervision platform side after the execution of contract, get the c% that total cost must not exceed whole funds;
When described quality guarantee gold is distributed or got, quality guarantee golden collar's mode:After the completion of node engineering, one of receiver need to be passed through
Or multiple upper level supervisors agree to, can disposably be got to computer supervision platform side;
When described maintenance guarantee fund distributes or got, maintenance guarantee fund receives mode:After the completion of node engineering, need to through and getting
One or more upper level supervisor of person agrees to, can disposably be got to computer supervision platform side;
After the completion of described node engineering, while receiver applies for quality guarantee gold or maintenance guarantee fund, one through receiver
Individual or multiple upper levels supervisor agrees to, all remaining administration fees, artificial can be disposably got to computer supervision platform side
Take, fee of material.
A kind of 3. method according to claim 1 settled accounts and paid the bill for engineering project class, it is characterised in that:Described
After construction team reaches an agreement with worker, actual labour cost is set to the g% of labour cost, primary management expense is set to labour cost
H%, primary quality guarantee gold are set to the i% of labour cost, and primary maintenance guarantee fund is set to the j% of labour cost, while by the k% of labour cost
It is set to the running cost of computer supervision platform side, the summation of described above percentage is the 100% of labour cost;
When described primary management expense is distributed or got, primary management expense receives mode:The upper level master of receiver need to be passed through
Pipe agrees to that at most point 15 batches are got to computer supervision platform side after the execution of contract, are got total cost and be must not exceed manually
The h% taken;
When described primary quality guarantee gold is distributed or got, primary quality guarantee golden collar mode:After the completion of node engineering, need to through and getting
One or more upper level supervisor of person agrees to, can disposably be got to computer supervision platform side;
When described primary maintenance guarantee fund distributes or got, primary maintenance guarantee fund receives mode:It is double after the completion of node engineering
The j% that side determines guarantee time and primary maintenance guarantee fund is labour cost, both sides must need to pass through neck after guarantee time terminates
One or more upper level supervisor of taker agrees to, can disposably be got to computer supervision platform side;
After the completion of described node engineering, apply for primary quality guarantee gold simultaneously in receiver, on one or more through receiver
Tier-1 supervisor agrees to, all remaining primary management expenses, actual labour cost can be disposably got to computer supervision platform side;
When described real material money is distributed or got, real material money receives mode:After material is signed for, computer supervision platform
Side makes loans from trend supplier, but this fund is in frozen state, need to be confirmed by material information it is errorless after, through consignee one or
The multiple upper level supervisors of person agree to that computer supervision platform side makes loans automatically in three days.
A kind of 4. method according to claim 1 settled accounts and paid the bill for engineering project class, it is characterised in that:Described
After supplier reaches an agreement with contractor, described real material money is set to the L% of fee of material, and the m% of fee of material is set to calculating
Machine supervises the running cost of platform side, and the summation of described above percentage is the 100% of fee of material.
A kind of 5. method according to claim 1 settled accounts and paid the bill for engineering project class, it is characterised in that:Described
The cost of living is set to the n% of actual labour cost by worker when getting actual labour cost, and wage is set to the p% of actual labour cost,
The q% of actual labour cost is set to the running cost of computer supervision platform side simultaneously, the summation of described above percentage is
The 100% of actual labour cost;
For described worker when getting the cost of living, the cost of living receives mode:Worker can only apply the n% of actual labour cost as life
Work takes, and remaining is frozen;
For described worker when getting wage, wage receives mode:Worker can be after the completion of node engineering, one through receiver
Or multiple upper level supervisors agree to, and do not complained in seven days, computer supervision platform side and automatic granting on the 8th, if
Computer supervision platform side receives complaint, and wage will be frozen, after both sides are adjusted, be started in next day, after the 7th working day
Provide.
A kind of 6. method according to claim 1 settled accounts and paid the bill for engineering project class, it is characterised in that:Described
Computer supervision platform side be third party Fund Supervision side, it is made up of the fund management system inside bank, described a%
~q% can be adjusted according to actual conditions, artificially be adjusted by the terminal in fund management system, described is each
Percent data is all artificially to adjust, can be clear and definite.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710622820.8A CN107423958A (en) | 2017-07-19 | 2017-07-19 | A kind of method settled accounts and paid the bill for engineering project class |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710622820.8A CN107423958A (en) | 2017-07-19 | 2017-07-19 | A kind of method settled accounts and paid the bill for engineering project class |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107423958A true CN107423958A (en) | 2017-12-01 |
Family
ID=60430243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710622820.8A Pending CN107423958A (en) | 2017-07-19 | 2017-07-19 | A kind of method settled accounts and paid the bill for engineering project class |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107423958A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108550026A (en) * | 2018-04-20 | 2018-09-18 | 四川民工加网络科技有限公司 | A kind of job contract side's credit worthiness ranking method |
CN108898517A (en) * | 2018-07-24 | 2018-11-27 | 万翼科技有限公司 | Claim gold calculation method, server and the storage medium of real estate |
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109146485A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | The settlement method and its device and computer readable storage medium of engineering funds |
WO2019242151A1 (en) * | 2018-06-21 | 2019-12-26 | 平安科技(深圳)有限公司 | Data determining method and apparatus, and electronic device and storage medium |
CN111539680A (en) * | 2020-04-08 | 2020-08-14 | 江苏众享金联科技有限公司 | Supply chain financial system and method based on block chain |
-
2017
- 2017-07-19 CN CN201710622820.8A patent/CN107423958A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108550026A (en) * | 2018-04-20 | 2018-09-18 | 四川民工加网络科技有限公司 | A kind of job contract side's credit worthiness ranking method |
CN108550026B (en) * | 2018-04-20 | 2022-04-12 | 四川亚东世纪科技有限公司 | Delinquent payroll monitoring method |
WO2019242151A1 (en) * | 2018-06-21 | 2019-12-26 | 平安科技(深圳)有限公司 | Data determining method and apparatus, and electronic device and storage medium |
CN108898517A (en) * | 2018-07-24 | 2018-11-27 | 万翼科技有限公司 | Claim gold calculation method, server and the storage medium of real estate |
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109146485A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | The settlement method and its device and computer readable storage medium of engineering funds |
CN111539680A (en) * | 2020-04-08 | 2020-08-14 | 江苏众享金联科技有限公司 | Supply chain financial system and method based on block chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107423958A (en) | A kind of method settled accounts and paid the bill for engineering project class | |
CN104408559B (en) | A kind of engineering information management system | |
CN108229981A (en) | A kind of anti-fake source tracing method of supply chain finance based on block chain | |
Gibbon | Free competition without sustainable development? Tanzanian cotton sector liberalisation, 1994/95 to 1997/98 | |
Cao | Chinese privatization: Between plan and market | |
CN107169709A (en) | The one-stop management method of building trade and its management platform | |
Chai et al. | Social capital, institutional change, and adaptive governance of the 50-year-old Wang hilltop pond irrigation system in Guangdong, China | |
EP1396803A1 (en) | System and method for handling a trade between execution and settlement | |
Aryeetey | Regional Integration in West Africa | |
Tornell | Privatizing the privatized | |
CN108256991A (en) | A kind of banking management system applied to construction project | |
CN108197887A (en) | A kind of banking management system applied to construction project | |
Egorov et al. | Transforming the post-soviet research systems through incubating technological entrepreneurship | |
CN110264075A (en) | A kind of highway workflow management control method and system | |
CN109345053A (en) | A kind of electricity power engineering credit requirement methodology | |
Bossi | The participation of the restoration companies into the Preventive and Planned Conservation (PPC): Strengths and weaknesses of the strategies after ten years monitoring | |
Montes | Industrialization, inequality and sustainability: What kind of industry policy do we need? | |
CN108764846A (en) | A kind of team's grade Project Management System | |
Shapiro | Foreign direct investments in developing nations: Issues in telecommunications and the modernization of Poland | |
Trad et al. | The business transformation and enterprise architecture framework the London interchange banking-the proof of concept | |
Soederberg | The international dimensions of the Argentine default: The case of the sovereign debt restructuring mechanism | |
US20100318388A1 (en) | Native American Indian Compliant Financial Services Methodology | |
Ocampo et al. | The labour market and income distribution in Colombia in the 1990s | |
CN108510088A (en) | A kind of information system O&M closed loop management system and method | |
Javits | Last Chance for a Common market |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171201 |