CN107419899A - A kind of fast joint structure of construction support for shuttering - Google Patents
A kind of fast joint structure of construction support for shuttering Download PDFInfo
- Publication number
- CN107419899A CN107419899A CN201710395001.4A CN201710395001A CN107419899A CN 107419899 A CN107419899 A CN 107419899A CN 201710395001 A CN201710395001 A CN 201710395001A CN 107419899 A CN107419899 A CN 107419899A
- Authority
- CN
- China
- Prior art keywords
- fixed cover
- limit plug
- vertical rod
- hole
- projection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
Abstract
Description
Claims (5)
- A kind of 1. fast joint structure of construction support for shuttering, it is characterised in that:It includes vertical rod(1)And locating clip(2); The vertical rod(1)Both ends be respectively arranged with fixed cover(101)And limit plug(102);The fixed cover(101)One end is in sealing Shape;The limit plug(102)With fixed cover(101)Match;The limit plug(102)Thickness be equal to fixed cover(101)It is interior The depth of chamber;The vertical rod(1)The limit plug of one end(102)It is inserted into another vertical rod(1)Fixed cover(101)It is interior;It is described Limit plug(102)Pass through locating clip(2)It is locked in fixed cover(101)Inside;The fixed cover(101)Madial wall on It is provided with projection(101a);The limit plug(102)Side wall on be provided with and projection(101a)The guide groove to match (102a);The projection(101a)It is inserted into guide groove(102a)It is interior.
- A kind of 2. fast joint structure of construction support for shuttering according to claim 1, it is characterised in that:The positioning Folder(2)By two unilateral folders(201)And extension spring(202)Composition;The unilateral folder(201)Side wall on be provided with hole clipping (201d);The hole clipping(201d)Height for hole height(H);The hole height(H)Equal to fixed cover(101)Height;Institute State fixed cover(101)The left and right sides be inserted respectively into two hole clippings(201d)It is interior;The hole clipping(201d)Inner roof wall and interior Bottom wall is respectively upper hole face(201d1)With lower hole face(201d2);The upper hole face(201d1)It is pressed on limit plug(102)It is upper Surface;The lower hole face(201d2)It is pressed on fixed cover(101)Seal face on;The unilateral folder(201)By articulated slab(201a), connecting plate(201b)And casing board(201c)Composition;The connecting plate (201b)One end and casing board(201c)One end is mutually fixedly connected;Described sleeve pipe plate(201c)Medial surface be in arc surface shape; Described sleeve pipe plate(201c)Inner circle radius be equal to vertical rod(1)Radius;Described sleeve pipe plate(201c)Inner round wall be pressed on it is vertical Bar(1)Cylindrical wall on;The connecting plate(201b)The other end and articulated slab(201a)One end is mutually fixedly connected;Same positioning Folder(2)On two articulated slabs(201a)It is hinged;The extension spring(202)Both ends respectively with same locating clip(2) On two connecting plates(201b)Mutually it is fixedly connected.
- A kind of 3. fast joint structure of construction support for shuttering according to claim 2, it is characterised in that:It is described be hinged Plate(201a)On be provided with handle(4);The handle(4)On be provided with grip hole(401).
- A kind of 4. fast joint structure of construction support for shuttering according to claim 2, it is characterised in that:Described sleeve pipe Plate(201c)End be provided with guide plate(201c1);Two guide plates(201c1)Between the angle that is formed be inclination angle (α);The inclination angle(α)It is arranged between 30 degree to 80 degree.
- A kind of 5. fast joint structure of construction support for shuttering according to claim 1, it is characterised in that:The positioning Folder(2)On be fixed with cable wire(3);Cable wire(3)End be fixed on vertical rod(1)Shaft on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710395001.4A CN107419899B (en) | 2017-05-30 | 2017-05-30 | A kind of fast joint structure of construction support for shuttering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710395001.4A CN107419899B (en) | 2017-05-30 | 2017-05-30 | A kind of fast joint structure of construction support for shuttering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107419899A true CN107419899A (en) | 2017-12-01 |
CN107419899B CN107419899B (en) | 2019-09-24 |
Family
ID=60428445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710395001.4A Active CN107419899B (en) | 2017-05-30 | 2017-05-30 | A kind of fast joint structure of construction support for shuttering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107419899B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219463A (en) * | 2019-07-02 | 2019-09-10 | 南京工业职业技术学院 | A kind of concreting bracket |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2065257A (en) * | 1979-12-14 | 1981-06-24 | Press Components Co Ltd | Sleeve coupling for a pair of scaffolding members |
EP0595853B1 (en) * | 1991-07-12 | 1996-09-25 | LUBINSKI, Ronald | Aluminum scaffold system |
CN201241466Y (en) * | 2008-07-12 | 2009-05-20 | 刘维俊 | Novel combined portable scaffold joint buckle |
CN203347216U (en) * | 2013-06-03 | 2013-12-18 | 吴江市三达五金工具厂 | Additional pipe with variable length |
CN204311727U (en) * | 2014-11-18 | 2015-05-06 | 赖永荣 | The scaffold Rapid fastening structure of pipe fitting end |
-
2017
- 2017-05-30 CN CN201710395001.4A patent/CN107419899B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2065257A (en) * | 1979-12-14 | 1981-06-24 | Press Components Co Ltd | Sleeve coupling for a pair of scaffolding members |
EP0595853B1 (en) * | 1991-07-12 | 1996-09-25 | LUBINSKI, Ronald | Aluminum scaffold system |
CN201241466Y (en) * | 2008-07-12 | 2009-05-20 | 刘维俊 | Novel combined portable scaffold joint buckle |
CN203347216U (en) * | 2013-06-03 | 2013-12-18 | 吴江市三达五金工具厂 | Additional pipe with variable length |
CN204311727U (en) * | 2014-11-18 | 2015-05-06 | 赖永荣 | The scaffold Rapid fastening structure of pipe fitting end |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219463A (en) * | 2019-07-02 | 2019-09-10 | 南京工业职业技术学院 | A kind of concreting bracket |
Also Published As
Publication number | Publication date |
---|---|
CN107419899B (en) | 2019-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153555B (en) | The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit | |
CN104947719A (en) | Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof | |
CN107419899A (en) | A kind of fast joint structure of construction support for shuttering | |
CN208918007U (en) | One kind can prefabricated connection structure for mortar leakage prevention in steel building | |
CN209025297U (en) | A kind of Thistle board ceiling suspended ceiling | |
CN104372923B (en) | Scaffolding | |
CN207122081U (en) | A kind of dried hanging hang structure and finishing systems | |
CN211923193U (en) | Convenient keel structure of furred ceiling board | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN106351402A (en) | Arch steel frame | |
CN102392534B (en) | Aluminum alloy building template assembly | |
CN209556351U (en) | A kind of readily removable section construction aluminum alloy pattern plate | |
CN107642232A (en) | The horizontal connection structure and system and construction method of a kind of shuttering supporting | |
CN210887736U (en) | Ceiling assembled metal keel structure | |
CN211596362U (en) | Bailey frame for Bailey bridge | |
CN102720288A (en) | Method for connecting solderless curtain wall dry pendant | |
CN210597814U (en) | Anti-bearing structure for architectural decoration | |
CN214144741U (en) | Split type steel form reinforcing apparatus | |
CN210888042U (en) | Shear wall template supporting structure | |
CN216007813U (en) | Cantilever structure erecting template | |
CN218406201U (en) | Ceramic tile top hanging installation assembly | |
CN213268534U (en) | Splice formula fossil fragments gallows for architectural decoration | |
CN209397623U (en) | A kind of Guan Ji of water supply drainage pipeline | |
CN217268726U (en) | Inclined plane is hung futilely and is used work platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190812 Address after: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province Applicant after: Hefei dragon totem Information Technology Co., Ltd. Address before: 528429 No. 32 Zhongxing Road, Huangpu Town, Zhongshan City, Guangdong Province Applicant before: Lin Zaiyi |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190902 Address after: 315812 Room 1514, No. 275 Xintuo Road, Daxie Development Zone, Ningbo City, Zhejiang Province Applicant after: Longyuan Mingzhu Science and Technology Co., Ltd. Address before: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province Applicant before: Hefei dragon totem Information Technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200507 Address after: 453400 shop 2001, unit a, Central Business District, East Hongli Avenue and North Caibei Avenue, Changyuan City, Xinxiang City, Henan Province Patentee after: Henan Zhonghe Green Building Technology Co., Ltd Address before: 315812 Room 1514, No. 275 Xintuo Road, Daxie Development Zone, Ningbo City, Zhejiang Province Patentee before: Longyuan Mingzhu Science and Technology Co.,Ltd. |