CN107419803A - A kind of assembled architecture ultra-high performance concrete post component and its construction method - Google Patents
A kind of assembled architecture ultra-high performance concrete post component and its construction method Download PDFInfo
- Publication number
- CN107419803A CN107419803A CN201710502146.XA CN201710502146A CN107419803A CN 107419803 A CN107419803 A CN 107419803A CN 201710502146 A CN201710502146 A CN 201710502146A CN 107419803 A CN107419803 A CN 107419803A
- Authority
- CN
- China
- Prior art keywords
- ultra
- high performance
- performance concrete
- prefabricated
- steel column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
Abstract
The invention discloses a kind of assembled architecture ultra-high performance concrete post component and its construction method, concrete column component is mutually spliced by more ultra-high performance concrete posts, every ultra-high performance concrete prefabricated post includes prefabricated cylinder and is embedded in the steel column head of its end in advance, there are tenon or groove in the end face of prefabricated cylinder, steel column head comprises at least the end plate for being embedded in prefabricated post body end face in advance, tenon is corresponded in steel column head or groove offers corresponding hole, tenon passes from hole, ribbet is formed by tenon and groove grafting between adjacent ultra-high performance concrete prefabricated post, it is welded as a whole by steel column head.Ribbet is welded with the reinforcing joint connect, has greatly reinforced the intensity of joint, ensures that joint the phenomenon of early-age crack will not occur because intensity is relatively low and Material shrinkage rate is big.Transport is welded again after splicing to scene after concrete column is prefabricated in the factory, and technically possesses good feasibility, speed of application is fast, construction technology is simple, construction quality easily ensures.
Description
Technical field
The present invention relates to a kind of detail structure of assembled architecture, and in particular to a kind of assembled architecture is mixed with very-high performance
Solidifying earth pillar component and its construction method.
Background technology
In steel reinforced concrete assembling building, normal concrete is replaced using new material ultra-high performance concrete, can
The characteristics of giving full play to ultra-high performance concrete high intensity, high tenacity, substantially reduce deadweight and the cracking risk of building structure.
But the self-strength of ultra-high performance concrete is mainly derived from fiber continuously distributed in concrete, and in superelevation
Joint between performance concrete building element, fiber is to disconnect, so the intensity of joint is relatively low;On the other hand, by
It is a kind of fine aggregate material in ultra-high performance concrete, its shrinkage factor is much larger than normal concrete.Above-mentioned two reason causes to surpass
Easily there is early-age crack phenomenon in the joint of high performance concrete building element.
The content of the invention
It is a primary object of the present invention to provide a kind of intensity that both can guarantee that at ultra-high performance concrete column joint, and can
Avoid the ultra-high performance concrete column joint and its construction method of joint early-age crack.
This assembled architecture provided by the invention ultra-high performance concrete post component, by more ultra-high performance concretes
Post is mutually spliced, and every ultra-high performance concrete prefabricated post includes prefabricated cylinder and is embedded in the steel column head of its end in advance,
There are tenon or groove in the end face of prefabricated cylinder, corresponds to tenon in steel column head or groove offers corresponding hole, tenon from
Passed in hole, ribbet is formed by tenon and groove grafting between adjacent ultra-high performance concrete prefabricated post, passes through steel column
Head is welded as a whole.
The shape of cross section of prefabricated cylinder described in a kind of embodiment of above-mentioned technical proposal be rectangle or circle or
Person's cross.
Steel column head described in a kind of embodiment of above-mentioned technical proposal includes the end plate and vertical welding in its periphery
Side plate, side plate coats the end sidewalls of the prefabricated cylinder, the inner wall even distribution of end plate and side plate be equipped be embedded in it is described prefabricated
Built-in fitting in cylinder.
The periphery of end plate described in a kind of embodiment of above-mentioned technical proposal is offered beneficial to the slope for improving welding effect
Mouthful.
In a kind of embodiment of above-mentioned technical proposal, the built-in fitting is WELDING STUDS.
In a kind of embodiment of above-mentioned technical proposal, the bending and tensile strength of the ultra-high performance concrete is in 20MPa
Above, compression strength is in more than 100MPa.
Present invention also offers a kind of construction method of above-mentioned assembled architecture ultra-high performance concrete post component, including
Following steps:
(1) steel column head is made in factory, WELDING STUDS is arranged in each plate inwall of steel column head;
(2) steel column head is respectively arranged in the tip inside of two kinds of prefabricated pillar forms, poured using ultra-high performance concrete
Shaping, which forms end face, has the prefabricated post of tenon and groove;
(3) adjacent ultra-high performance concrete prefabricated post is formed into ribbet with tenon and groove grafting at the construction field (site);
(4) end plate of two steel column heads at each ribbet is welded as a whole.
The present invention sets connected structure tenon and groove in the both ends of the surface of ultra-high performance concrete prefabricated post respectively, while
The pre-buried steel column head in end, adjacent ultra-high performance concrete prefabricated post pass through steel after forming ribbet by tenon and groove grafting
Column cap is welded as a whole.Ribbet is welded with the reinforcing joint connect, has greatly reinforced the intensity of joint, ensures that joint will not be first
In other positions are cracking or breakoff phenomenon.The present invention technically possesses good feasibility, while has speed of application
It hurry up, the characteristics of construction technology is simple, construction quality easily ensures.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described.It should be evident that drawings in the following description are the present invention
Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
These accompanying drawings obtain other accompanying drawings.
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is the structural representation of downside ultra-high performance concrete post in Fig. 1.
Fig. 3 is the structural representation of upside ultra-high performance concrete post in Fig. 1.
Fig. 4 is the vertical view enlarged diagram of steel column head.
Fig. 5 is the C-C schematic diagrames in Fig. 4.
Fig. 6 is the A-A enlarged diagrams (not drawing reinforcing bar in post) in Fig. 2.
Fig. 7 is the B-B enlarged diagrams (not drawing reinforcing bar in post) in Fig. 3.
Lack marginal data
Embodiment
For the ease of understanding the present invention, the present invention is made below in conjunction with Figure of description and preferred embodiment more complete
Face, careful description, but protection scope of the present invention is not limited to embodiment in detail below.
Unless otherwise defined, the implication that all technical terms used hereinafter are generally understood that with those skilled in the art
It is identical.Technical term used herein is intended merely to describe the purpose of specific embodiment, is not intended to the limitation present invention
Protection domain.
The ultra-high performance concrete post component of this assembled architecture disclosed in the present embodiment, by more very-high performance coagulations
Earth pillar is mutually spliced, mainly as the pillar of steel reinforced concrete assembling building.The present embodiment selects two very-high performances
Concrete column splices, and other embodiments can be selected according to the height of building using two or more root ultra-high performance concrete posts
It is spliced into single piece.For the ease of description, " ultra-high performance concrete post " is referred to as " concrete column " by herein below.
As shown in figure 1, this concrete column component is spliced by downside concrete column 1 and upside concrete column 2.
Prefabricated cylinder 11 under downside concrete column 1 includes is can be seen that with reference to Fig. 2 and Fig. 6 and is embedded in the steel of its end in advance
Column cap GZT, under the end face of prefabricated cylinder 11 have the tenon 111 stretched out in outside steel column head GZT
Can be seen that upside concrete column 2 with reference to Fig. 3 and Fig. 7 includes upper prefabricated cylinder 21 and is embedded in the steel of its end in advance
There is shape groove 211 corresponding with tenon 111 column cap GZT, the end face of upper prefabricated cylinder 21.
Steel column head GZT is can be seen that with reference to Fig. 1 to Fig. 7 to be welded by end plate GZT1 and side plate GZT2.The present embodiment
Upper prefabricated cylinder 21 shape of cross section of prefabricated cylinder 11 with is rectangle, steel column head GZT shape and the shape of prefabricated cylinder
Matching, end plate GZT1 center position offer with 211 corresponding mounting hole of tenon 111 and groove, side plate GZT2 will be prefabricated
The end sidewalls cladding of cylinder.The inner wall even distribution of end plate and side plate is equipped with WELDING STUDS JLD.The prefabricated cylinder of certain other embodiments
Shape can be circular or other shapes.
Upper prefabricated cylinder prefabricated cylinder with uses bending and tensile strength in more than 20MPa, compression strength in 100MPa
Ultra-high performance concrete above is prefabricated.When prefabricated cylinder is prefabricated, WELDING STUDS is embedded in ultra-high performance concrete in advance.
As shown in figure 1, pass through tenon 111 and the grafting shape of groove 211 between downside concrete column 1 and upside concrete column 2
Into after ribbet, two steel column head GZT end plate GZT1 is welded as a whole, in order to ensure improve welding after concrete component by
Power performance, groove is opened up in the periphery of end plate.
This component sets connected structure tenon and groove in the end face of ultra-high performance concrete prefabricated post respectively, while is holding
The pre-buried steel column head in portion, adjacent ultra-high performance concrete prefabricated post pass through steel again after forming ribbet by tenon and groove grafting
Column cap is welded as a whole.This ribbet is welded with the reinforcing joint connect, has greatly reinforced the intensity of joint, has avoided superelevation
There is the phenomenon of early-age crack because intensity is relatively low and Material shrinkage rate is big in energy concrete prefabricated column joint.
The construction method of the present embodiment is as follows:
(1) steel column head of respective shapes is made according to the design shape of prefabricated cylinder in factory
The hole passed through for tenon is opened up in the center position of steel column head end plate, is opened up in the periphery of end plate beneficial to raising weldering
The inwall vertical welding WELDING STUDS of the groove of performance, end plate and each side plate is connect, end plate and each plate-side plate welding are finally integrated shape
Into steel column head;
(2) steel column head is respectively arranged in the both ends of prefabricated pillar forms, using bending and tensile strength more than 20MPa,
For compression strength in more than 100MPa ultra-high performance concrete pouring molding, forming end face has the coagulation of tenon and/or groove
Native prefabricated post;
(3) ultra-high performance concrete prefabricated post is formed into ribbet with tenon and groove grafting at the construction field (site);
(4) end plate of each steel column head of ribbet two is welded as a whole.
Claims (7)
- A kind of 1. assembled architecture ultra-high performance concrete post component, it is characterised in that:The joint is mixed by more very-high performances Coagulate native prefabricated post to be mutually spliced, every ultra-high performance concrete prefabricated post includes prefabricated cylinder and is embedded in its end in advance There are tenon or groove in steel column head, the end face of prefabricated cylinder, and tenon is corresponded in steel column head or groove offers corresponding hole, Tenon passes from hole, leads to after forming ribbet by tenon and groove grafting between adjacent ultra-high performance concrete prefabricated post Steel column head is crossed to be welded as a whole.
- 2. assembled architecture as claimed in claim 1 ultra-high performance concrete post component, it is characterised in that:The prefabricated post The shape of cross section of body is rectangle or circle or cross.
- 3. assembled architecture as claimed in claim 2 ultra-high performance concrete post component, it is characterised in that:The steel column head The end sidewalls of the prefabricated cylinder are coated in the side plate of its periphery, side plate including end plate and vertical welding, end plate and side plate Inner wall even distribution be equipped with the built-in fitting being embedded in the prefabricated cylinder.
- 4. assembled architecture as claimed in claim 3 ultra-high performance concrete post component, it is characterised in that:The end plate Periphery is offered beneficial to the groove for improving welding effect.
- 5. assembled architecture as claimed in claim 3 ultra-high performance concrete post component, it is characterised in that:The built-in fitting For WELDING STUDS.
- 6. assembled architecture as claimed in claim 2 ultra-high performance concrete post component, it is characterised in that:The superelevation The bending and tensile strength of energy concrete is in more than 20MPa, compression strength in more than 100MPa.
- 7. a kind of construction method of the assembled architecture ultra-high performance concrete post component described in claim 5, including it is following Step:(1) steel column head is made in factory, WELDING STUDS is arranged in each plate inwall of steel column head;(2) steel column head is respectively arranged in the both ends of prefabricated pillar forms, using ultra-high performance concrete pouring molding, forms end Face has the prefabricated post of tenon and/or groove;(3) adjacent ultra-high performance concrete prefabricated post is formed into ribbet with tenon and groove grafting at the construction field (site);(4) will be each The end plate of ribbet both sides steel column head is welded as a whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502146.XA CN107419803B (en) | 2017-06-27 | 2017-06-27 | Ultra-high performance concrete column member for fabricated building and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502146.XA CN107419803B (en) | 2017-06-27 | 2017-06-27 | Ultra-high performance concrete column member for fabricated building and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107419803A true CN107419803A (en) | 2017-12-01 |
CN107419803B CN107419803B (en) | 2021-09-07 |
Family
ID=60427686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710502146.XA Active CN107419803B (en) | 2017-06-27 | 2017-06-27 | Ultra-high performance concrete column member for fabricated building and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107419803B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102906352A (en) * | 2010-04-19 | 2013-01-30 | 杨卫红 | Bolted steel connections with 3-D jacket plates and tension rods |
JP5318298B1 (en) * | 2013-05-29 | 2013-10-16 | 等 塩原 | Beam joint structure |
CN203755443U (en) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | Assembly integrated type overlapping frame structure |
CN106381925A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Prefabricated reinforced concrete column and column splice joint with sleeves |
CN207277546U (en) * | 2017-06-27 | 2018-04-27 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete column component |
-
2017
- 2017-06-27 CN CN201710502146.XA patent/CN107419803B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102906352A (en) * | 2010-04-19 | 2013-01-30 | 杨卫红 | Bolted steel connections with 3-D jacket plates and tension rods |
JP5318298B1 (en) * | 2013-05-29 | 2013-10-16 | 等 塩原 | Beam joint structure |
CN203755443U (en) * | 2014-02-18 | 2014-08-06 | 沈阳远大科技创业园有限公司 | Assembly integrated type overlapping frame structure |
CN106381925A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Prefabricated reinforced concrete column and column splice joint with sleeves |
CN207277546U (en) * | 2017-06-27 | 2018-04-27 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete column component |
Also Published As
Publication number | Publication date |
---|---|
CN107419803B (en) | 2021-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649203B (en) | Precast prestressed concrete frame bean column node with U-shaped muscle and sleeve | |
CN207277546U (en) | A kind of assembled architecture ultra-high performance concrete column component | |
CN105908638B (en) | It is a kind of to turn rigid frame bridge steel box-girder and the construction method of concrete pier consolidation | |
CN210458914U (en) | Connecting structure of prefabricated bridge pier stud and capping beam | |
CN108331181A (en) | The wet seam connection structure of precast concrete beam | |
CN107419803A (en) | A kind of assembled architecture ultra-high performance concrete post component and its construction method | |
CN100553914C (en) | A kind of die-shell component forming die | |
CN208917672U (en) | A kind of prefabricated-cast-in-place combined reinforced bar concrete pier | |
CN108755936A (en) | The node joinery and its construction and method of square steel tube structure and girder with rolled steel section en cased in concrete | |
CN207419858U (en) | Bar connecting component and assembly concrete component | |
CN105625571B (en) | The precast concrete bean column node of strength prestressed muscle in a kind of use | |
CN109024251A (en) | A kind of prefabrication and assembly construction folded type reinforced concrete bridge pier structure | |
CN209891405U (en) | Combined connection bamboo-concrete combined beam | |
CN208346973U (en) | Concrete-filled steel tubular hollow steel structure technique and steel construction | |
CN109838088A (en) | The cast-in-place column construction method of big punching block | |
CN103643633A (en) | Manufacturing method for ribbed FRP members | |
CN209637142U (en) | Steel concrete combines the light-duty assembled stair of flat underside | |
CN207110299U (en) | A kind of decorative cover is counter to beat connector | |
CN103924728B (en) | End soap-free emulsion polymeization variable strength reinforced beam | |
CN208857985U (en) | The wet seam connection structure of precast concrete beam | |
CN208777190U (en) | A kind of ruggedized construction of slab bridge hinge seam | |
CN106481109B (en) | A kind of cooling tower X inclined struts segmentation self-balancing construction method | |
CN208023553U (en) | A kind of compatibility of deformation Guan Liang | |
CN207879017U (en) | Reinforcing bar clamp, concrete tower | |
KR20170137324A (en) | Manufacturing by the dry method for cover common duct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |