CN107403278A - A kind of Engineering Settlement Whole Process Cost dynamic management approach and system - Google Patents
A kind of Engineering Settlement Whole Process Cost dynamic management approach and system Download PDFInfo
- Publication number
- CN107403278A CN107403278A CN201710649849.5A CN201710649849A CN107403278A CN 107403278 A CN107403278 A CN 107403278A CN 201710649849 A CN201710649849 A CN 201710649849A CN 107403278 A CN107403278 A CN 107403278A
- Authority
- CN
- China
- Prior art keywords
- project
- engineering
- whole process
- construction
- process cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of Engineering Settlement Whole Process Cost dynamic management approach and system, pass through Dynamic comparison, analysis, cost plan actual expenses are compared item by item, and analysis deviation, find out deviation place and its reason, satisfactory after correcting is taken according to analysis result, ensures that big deviation will not occur for actual building cost;Engineering is tracked, and Site visa-an important chain system is performed when change in the work occurs, it is ensured that construction quality standard.
Description
Technical field
The present invention relates to Engineering Settlement technical field, specifically a kind of Engineering Settlement Whole Process Cost dynamic management approach and
System.
Background technology
Engineering Settlement is directly connected to the vital interests of construction unit and unit in charge of construction.During the editing of clearing due to
Status, position residing for editing personnel and purpose are different, and edit and revise the working level of personnel there is also difference, thus edit and revise knot
It is sheerly normal different degrees of gap to be present in fruit.But difference is too big, just forces down cost or the possibility of exorbitant estimation and calculation intentionally.
Cost Management is content important in Engineering Settlement, due to total project cost activity it is more, involve a wide range of knowledge, influence because
Element is more, only goes analyzing influence factor with system, comprehensive, dynamic viewpoint, and influence factor is implemented to control, can be only achieved
The target of engineering construction cost Control pipe, it is rational to determine cost and efficiently control cost.Therefore, the present invention proposes to be directed to item
Mesh builds the pricing management of overall process, in the hope of more reasonably carrying out comprehensively, effectively managing to total project cost.
The content of the invention
It is an object of the invention to provide a kind of Engineering Settlement Whole Process Cost dynamic management approach and system, with solution
State the problem of being proposed in background technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of Engineering Settlement Whole Process Cost dynamic management approach, comprises the following steps:
S1, predetermined engineering project planned amount invested, and listed subdivision project in the form of form;
S2, investment actual value is contrasted with planned value;
S3, judge that investing actual value and planned value whether there is deviation, if so, then return to step S1, predetermined engineering again
Project plan investment, if it is not, then performing step S4;
S4, analysis deviation reason, and use satisfactory after correcting;
S5, follow the trail of project progress;
S6, collect investment actual expenses data;
S7, judge whether invest actual expenses data and planned amount invested has deviation, if so, then performing change examination & approval journey
Sequence, if without deviation, carry out project decision.
As the further scheme of the present invention:The change examination and approval procedures are realized by following steps:
The project content for needing visa is reported unit in charge of construction by S91, construction party after construction completion and by self-test;
S92, job site confirms visa project content, and reports engineering management department and project supervision;
S93, project signature list (three parts) is made a report on by unit in charge of construction, and report unit in charge of construction;
S94, project signature list is checked, perform step S95 if confirmation is errorless, otherwise return to step S92, again
Confirm visa action and change;
S95, examination & verification is finished to project signature list Unified number, registration, backup, and transfers to unit in charge of construction, engineering management department
With each portion of project supervision.
As the further scheme of the present invention:In step S94, by engineering management department and project supervision simultaneously to engineering label
Card is singly checked.
As the further scheme of the present invention:After engineering management department and project supervision are simultaneously errorless to the review of project signature list
Should be signed confirmation respectively, and be affixed one's seal.
A kind of Engineering Settlement Whole Process Cost dynamic management system, including following four:Organiztion measure, economic measure, skill
Art measure and contract measures, the organiztion measure are used for people, task and the function that cost Control is implemented in project management group
The division of labor;
The economic measure be used for Dynamic comparison cost planned value and actual value, in work progress carry out cost with
Track;
The technical measures are used to carry out arrangement and method for construction technical economic analysis, and close scrutiny supervises the design in each stage;
The contract measures provide construction of contract, and the claim for that may occur provides foundation.
As the further scheme of the present invention:The organiztion measure also include be used for work out the cost Control plan of this stage and
Workflow.
As the further scheme of the present invention:The economic measure is based on market competitive bidding comprehensive unit price establishment use of funds meter
Draw, it is determined that decomposing control targe, basis is provided for dynamic contrast.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, Dynamic comparison, analysis, cost plan actual expenses are compared item by item, and analysis deviation, find out deviation institute
And its reason, satisfactory after correcting is taken according to analysis result, ensures that big deviation will not occur for actual building cost;
2nd, engineering is tracked, and Site visa-an important chain system is performed when change in the work occurs, it is ensured that construction quality mark
It is accurate.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet of Engineering Settlement Whole Process Cost dynamic management approach.
Fig. 2 is the schematic flow sheet that examination and approval procedures are changed in a kind of Engineering Settlement Whole Process Cost dynamic management approach.
Fig. 3 is a kind of principle schematic of Engineering Settlement Whole Process Cost dynamic management system.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Refer to Fig. 1~2, in the embodiment of the present invention, a kind of Engineering Settlement Whole Process Cost dynamic management approach, including with
Lower step:
S1, predetermined engineering project planned amount invested, and listed subdivision project in the form of form;
S2, investment actual value is contrasted with planned value;
S3, judge that investing actual value and planned value whether there is deviation, if so, then return to step S1, predetermined engineering again
Project plan investment, if it is not, then performing step S4;
S4, analysis deviation reason, and use satisfactory after correcting;
S5, follow the trail of project progress;
S6, collect investment actual expenses data;
S7, judge whether invest actual expenses data and planned amount invested has deviation, if so, then performing change examination & approval journey
Sequence, if without deviation, carry out project decision.
Change examination and approval procedures are realized by following steps:
The project content for needing visa is reported unit in charge of construction by S91, construction party after construction completion and by self-test;
S92, job site confirms visa project content, and reports engineering management department and project supervision;
S93, project signature list (three parts) is made a report on by unit in charge of construction, and report unit in charge of construction;
S94, project signature list is checked, perform step S95 if confirmation is errorless, otherwise return to step S92, again
Confirm visa action and change;
S95, examination & verification is finished to project signature list Unified number, registration, backup, and transfers to unit in charge of construction, engineering management department
With each portion of project supervision.
In step S94, project signature list is checked simultaneously by engineering management department and project supervision.
Should sign confirmation respectively after engineering management department and project supervision are simultaneously errorless to the review of project signature list, and affix one's seal.
Refering to Fig. 3,
A kind of Engineering Settlement Whole Process Cost dynamic management system, including following four:Organiztion measure 1, economic measure 2,
Technical measures 3 and contract measures 4, the organiztion measure 1 be used to implementing in project management group the people of cost Control, task and
Functional division;
Economic measure 2 is used for the planned value and actual value of Dynamic comparison cost, and cost tracking is carried out in work progress;
Technical measures 3 are used to carry out arrangement and method for construction technical economic analysis, and close scrutiny supervises the design in each stage;
Contract measures 4 provide construction of contract, and the claim for that may occur provides foundation.
Organiztion measure 1 also includes being used to work out the cost Control plan of this stage and workflow.
Economic measure 2 is based on market competitive bidding comprehensive unit price establishment fund using plan, it is determined that control targe is decomposed, for dynamic
Contrast provides basis.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (7)
1. a kind of Engineering Settlement Whole Process Cost dynamic management approach, it is characterised in that comprise the following steps:
S1, predetermined engineering project planned amount invested, and listed subdivision project in the form of form;
S2, investment actual value is contrasted with planned value;
S3, judge that investing actual value and planned value whether there is deviation, if so, then return to step S1, predetermined engineering project again
Planned amount invested, if it is not, then performing step S4;
S4, analysis deviation reason, and use satisfactory after correcting;
S5, follow the trail of project progress;
S6, collect investment actual expenses data;
S7, judge whether invest actual expenses data and planned amount invested has deviation, if so, change examination and approval procedures are then performed, if
There is no deviation, then carry out project decision.
A kind of 2. Engineering Settlement Whole Process Cost dynamic management approach according to claim 1, it is characterised in that the change
More examination and approval procedures are realized by following steps:
The project content for needing visa is reported unit in charge of construction by S91, construction party after construction completion and by self-test;
S92, job site confirms visa project content, and reports engineering management department and project supervision;
S93, project signature list (three parts) is made a report on by unit in charge of construction, and report unit in charge of construction;
S94, project signature list is checked, perform step S95 if confirmation is errorless, otherwise return to step S92, reaffirm
Visa action is simultaneously changed;
S95, examination & verification is finished to project signature list Unified number, registration, backup, and transfers to unit in charge of construction, engineering management department and work
Each portion of journey management.
A kind of 3. Engineering Settlement Whole Process Cost dynamic management approach according to claim 2, it is characterised in that:In step
In S94, project signature list is checked simultaneously by engineering management department and project supervision.
A kind of 4. Engineering Settlement Whole Process Cost dynamic management approach according to claim 3, it is characterised in that:Engineering pipe
Should sign confirmation respectively after reason portion and project supervision are simultaneously errorless to the review of project signature list, and affix one's seal.
5. a kind of Engineering Settlement Whole Process Cost dynamic management system, it is characterised in that including following four:Organiztion measure (1),
Economic measure (2), technical measures (3) and contract measures (4), the organiztion measure (1) are used to implement in project management group
People, task and the Functional division of cost Control;
The economic measure (2) is used for the planned value and actual value of Dynamic comparison cost, and cost tracking is carried out in work progress;
The technical measures (3) are used to carry out arrangement and method for construction technical economic analysis, and close scrutiny supervises the design in each stage;
The contract measures (4) provide construction of contract, and the claim for that may occur provides foundation.
A kind of 6. Engineering Settlement Whole Process Cost dynamic management system according to claim 5, it is characterised in that:Described group
Knitting measure (1) also includes being used to work out the cost Control plan of this stage and workflow.
A kind of 7. Engineering Settlement Whole Process Cost dynamic management system according to claim 5, it is characterised in that:The warp
Ji measure (2) is based on market competitive bidding comprehensive unit price establishment fund using plan, it is determined that decomposing control targe, is provided for dynamic contrast
Basis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710649849.5A CN107403278A (en) | 2017-08-02 | 2017-08-02 | A kind of Engineering Settlement Whole Process Cost dynamic management approach and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710649849.5A CN107403278A (en) | 2017-08-02 | 2017-08-02 | A kind of Engineering Settlement Whole Process Cost dynamic management approach and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107403278A true CN107403278A (en) | 2017-11-28 |
Family
ID=60402570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710649849.5A Pending CN107403278A (en) | 2017-08-02 | 2017-08-02 | A kind of Engineering Settlement Whole Process Cost dynamic management approach and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107403278A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108256821A (en) * | 2017-12-14 | 2018-07-06 | 中国航空规划设计研究总院有限公司 | A kind of management method of construction project overall process various dimensions cost management system |
CN111080239A (en) * | 2019-11-29 | 2020-04-28 | 中国电力企业联合会电力建设技术经济咨询中心 | Real-time dynamic tracking method and device for construction cost |
CN111523928A (en) * | 2019-03-21 | 2020-08-11 | 广州翔实工程咨询有限公司 | Automatic pre-settlement system and method for single-party settlement |
CN111724141A (en) * | 2020-06-29 | 2020-09-29 | 张群 | Dynamic management method for construction cost in whole process of engineering cost settlement |
CN112036815A (en) * | 2020-08-20 | 2020-12-04 | 湖北四位元电力有限公司 | Method for establishing power distribution network engineering cost index system |
-
2017
- 2017-08-02 CN CN201710649849.5A patent/CN107403278A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108256821A (en) * | 2017-12-14 | 2018-07-06 | 中国航空规划设计研究总院有限公司 | A kind of management method of construction project overall process various dimensions cost management system |
CN111523928A (en) * | 2019-03-21 | 2020-08-11 | 广州翔实工程咨询有限公司 | Automatic pre-settlement system and method for single-party settlement |
CN111080239A (en) * | 2019-11-29 | 2020-04-28 | 中国电力企业联合会电力建设技术经济咨询中心 | Real-time dynamic tracking method and device for construction cost |
CN111080239B (en) * | 2019-11-29 | 2021-03-26 | 中国电力企业联合会电力建设技术经济咨询中心 | Real-time dynamic tracking method and device for construction cost |
CN111724141A (en) * | 2020-06-29 | 2020-09-29 | 张群 | Dynamic management method for construction cost in whole process of engineering cost settlement |
CN112036815A (en) * | 2020-08-20 | 2020-12-04 | 湖北四位元电力有限公司 | Method for establishing power distribution network engineering cost index system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107403278A (en) | A kind of Engineering Settlement Whole Process Cost dynamic management approach and system | |
CN114493213A (en) | Carbon emission data acquisition and processing method based on Internet of things | |
Franks et al. | Cumulative social impacts | |
CN108537519A (en) | A kind of architectural design method based on BIM | |
CN107169709A (en) | The one-stop management method of building trade and its management platform | |
CN113112233A (en) | BIM-based intelligent management method and platform for full life cycle of wind power project | |
Gade | A proposed solution to the problem of construction industry overruns: lean construction techniques and linear programming | |
Liu | Research on the management system of enterprises using modern logistics supply chain theory | |
CN105512814A (en) | Online data analysis method for material supply chain | |
Alotabi et al. | Identification of social responsibility factors within mega construction projects | |
CN117078209A (en) | Method, system and device for managing supervision project and computer storage medium | |
Nhung et al. | Deepening Analysis on Internal Control Procedures of Cost Estimation Design in Road and Bridge Construction Units-and the Relation with Internal Audit | |
Paucar et al. | Development of a Lean Manufacturing and SLP-based System for a Footwear Company | |
Saad et al. | Fundamentals of construction project management | |
Kamalan et al. | Root Cause Analysis of Delays in Dam Construction (Case Studies: Karun-3, Marun, Shafaroud and Jamishan Dams) | |
Weng et al. | Quality data collection and management technology of aerospace complex product assembly process | |
Ali et al. | Evaluating risk management practices in the pakistani construction industry: The current state of play | |
Ostadi et al. | A practical self-assessment framework for evaluation of maintenance management system based on RAMS model and maintenance standards | |
Brander et al. | Greenhouse gas emissions and infrastructure investment decisions | |
Khoa et al. | Investigating the impact of social capital on SC resilience and SC performance. | |
Vijayan et al. | A Study of Implementing Lean & Fast Tracking in Construction Project Management | |
Furtado et al. | Improving the production process for a medical device manufacturing company using Monte Carlo simulation | |
Borkowski | A framework for risk analysis in infrastructure projects | |
Koppenhoefer et al. | Managing and Controlling Decentralized Corporate Energy Systems-Transferring Best-practice Methods to the Energy Domain | |
Jayadi et al. | The Development of 4D BIM Based Infrastructure Construction Time Planning Standard Operating Procedure to Enhance Communication Quality from Infrastructure Contractor Perspective |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171128 |