CN107395717A - A kind of method that free time time-out applied to O&M auditing system disconnects automatically - Google Patents
A kind of method that free time time-out applied to O&M auditing system disconnects automatically Download PDFInfo
- Publication number
- CN107395717A CN107395717A CN201710593256.1A CN201710593256A CN107395717A CN 107395717 A CN107395717 A CN 107395717A CN 201710593256 A CN201710593256 A CN 201710593256A CN 107395717 A CN107395717 A CN 107395717A
- Authority
- CN
- China
- Prior art keywords
- auditing system
- time
- server
- user
- free time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/14—Session management
- H04L67/143—Termination or inactivation of sessions, e.g. event-controlled end of session
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0876—Network utilisation, e.g. volume of load or congestion level
- H04L43/0894—Packet rate
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/16—Threshold monitoring
Abstract
The invention discloses a kind of method that free time time-out applied to O&M auditing system disconnects automatically, including:S1) user logs in O&M auditing system;S2) user sets free time length in O&M auditing system;S3) O&M auditing system connection client and server, server resource is accessed by O&M auditing system for user;S4) the customer flow monitoring module monitors of O&M auditing system flow through the flow of O&M auditing system;S5) O&M auditing system is judged in setting free time length, if has flow, if so, connection is then kept, if it is not, disconnecting the connection of client and server automatically.Automatically the connection of client and server is disconnected when the present invention realizes the free time, avoids user from forgetting to log off and cause occupancy and the waste of system resource, avoids user's long time no operations from influenceing O&M form accuracy.To replace the invalid session of manual-lock automatically, management cost is saved, has improved operating efficiency.
Description
Technical field
The present invention relates to O&M audit technique field, is to surpass a kind of free time applied to O&M auditing system specifically
The method that Shi Zidong disconnects.
Background technology
In the prior art, abbreviation O&M is safeguarded to computer software and hardware system operation.O&M auditing system be it is a kind of towards
One of the system, its most important function of the central controlled O&M security audit pattern of user is central access control.User
Access target equipment can be gone by O&M auditing system using equipment account in client, O&M auditing system is then according to user
In the connection that the equipment account that client uses is established between client and corresponding target device, so that user can pass through client
Target device corresponding to the access of end, therefore, O&M auditing system act as the role of " go-between ", i.e. user passes through client
Operation data is forwarded to corresponding target device by O&M auditing system, while the data that target device returns are examined also by O&M
Meter systems are transmitted to corresponding client.In this process, O&M auditing system maintains and client and and target simultaneously
The connection of equipment.O&M auditing system of the prior art, due to O&M auditing system remain client and target device it
Between connection, when operation maintenance personnel occur it is away from keyboard or for a long time do not return and forget to exit when, session does not have
Disconnection can operate server by other people, cause unsafe factor, and because operation maintenance personnel is not operated for a long time, and O&M
The auditing system moment is keeping in touch, and causes occupancy and the waste of O&M auditing system resource and the resource of target device.
The content of the invention
It is an object of the invention to provide a kind of method that free time time-out applied to O&M auditing system disconnects automatically, use
In solving in the prior art, the state that operation maintenance personnel long time no operations and O&M auditing system are still within connection causes resource
Occupancy and the problem of waste.
In order to achieve the above object, the present invention is achieved through the following technical solutions:
A kind of method that free time time-out applied to O&M auditing system disconnects automatically, including:
S1) user logs in O&M auditing system;
S2) user sets free time length in O&M auditing system;
S3) O&M auditing system connection client and server, server is accessed by O&M auditing system for user
Resource;
S4) the customer flow monitoring module monitors of O&M auditing system flow through the flow of O&M auditing system;
S5) O&M auditing system is judged in setting free time length, if there is flow, if so, connection is then kept, if
No, then the connection of client and server is disconnected automatically.
User is that operation maintenance personnel logs in O&M auditing system, set in O&M auditing system allow user and server without
The maximum time of data interaction is free time length.O&M auditing system establishes the company of client and server as proxy server
Connect, user accesses the resource of server by O&M auditing system.Customer flow monitoring module monitors in O&M auditing system
The data of server are flowed to from client and from server flows to the data of client, if monitoring, user and server there are data
Interaction, then keep connection.If customer flow monitoring modular does not monitor that the time of data interaction reaches the free time length of setting,
O&M auditing system sends and disconnects signal, the automatic connection for disconnecting server and client, after avoiding user's end of operation
Forget to disconnect and cause occupying system resources and unnecessary resource overhead, reduce keeper's operation, save human cost
And the time, improve operating efficiency.
Preferably, the step S3) in user access server resource mode include graphics protocols access and character association
View accesses two ways.
When user logs in O&M auditing system with graphics protocols or character protocols, the data of O&M auditing system are flowed through,
Parse, the operation data of user and the heartbeat signal of client and server can be made a distinction via O&M auditing system,
The interference of heartbeat signal is excluded, therefore can accurately distinguish the free time of O&M auditing system, in time by free time
Connection more than setting duration disconnects.
Preferably, the step S4) in customer flow monitoring module monitors flow through O&M auditing system flow include figure
The flow and character protocols of user input data during shape protocol access services device resource access user during server resource
The flow of input data and the flow of server output data.
When user logs in O&M auditing system with graphics protocols, the customer flow monitoring module monitors in O&M auditing system
To the graphics protocols data of user's input, and as timing node, start timing.If in the free time length of setting,
Do not monitor that the graphics protocols data of user's input flow through O&M auditing system, then O&M auditing system sends and disconnects letter
Number, client and server are disconnected.After if user logs in O&M auditing system with graphics protocols, customer flow monitoring
Module monitors the graphics protocols data of user's input again, then the graphics protocols data last time of user's input is flowed through into fortune
The time of dimension auditing system is updated to timing node, restarts timing.If user is to log in O&M audit with character protocols
System, the character protocols data for being not only user's input of the customer flow monitoring system monitoring in O&M auditing system, is also wrapped
The character protocols data of server output are included, when customer flow monitoring modular is except the user monitored in process of user login
The character protocols data of character protocols data and the server output of input, in the free time length of setting, do not monitor word
When symbol protocol data flows through O&M auditing system, then cut-off signal is sent by O&M auditing system, client and server are broken
Open connection.When the character protocols data that customer flow monitoring module monitors to user input and the character for monitoring server output
Protocol data, then segmentum intercalaris when the time that the character protocols data last time exported server flows through O&M auditing system is
Point, restarts timing, and when timing time reaches the free time length of user's setting, then O&M auditing system sends and disconnected
Signal, client and server are disconnected.
Preferably, the step S5) concretely comprise the following steps:
S5.1) the customer flow monitoring module monitors will supervise to when having user input data or server output data
The time that the data last time measured flows through O&M auditing system is sent to the renewal time stamp module of O&M auditing system;
S5.2) renewal time stamp module by the data received last time flow through O&M auditing system when
Between as new timestamp, restart timing;
S5.3) the computation-free time module of O&M auditing system calls the timestamp in the renewal time stamp module,
And present system time and timestamp are done into subtraction, obtain difference and send the difference to O&M auditing system;
S5.4) O&M auditing system, if difference >=free time length, is transported by the difference compared with the free time length set
Tie up auditing system disconnection and the connection of server;If difference < free time lengths, return to step S4).
Customer flow monitoring modular, often monitor that a user input data or server output data flow through O&M audit
During system, current system time is recorded, and this time was sent to renewal time and stabs module.Renewal time stamp module receives
The time that customer flow monitoring modular is sent, and the time record of last time is covered, therefore only retain in renewal time stamp module
There are a time record, i.e., the timing node that current O&M auditing system computation-free starts, i.e. timestamp.O&M auditing system
In computation-free time module, current system time and timestamp are done into subtraction, obtained difference is current fortune
It is the idle time that auditing system user, which is tieed up, without operation, this difference is compared with the free time length set, if difference >=sky
Idle is grown, and O&M auditing system disconnects the connection of client and server automatically, realizes the free time time-out of O&M auditing system certainly
The function that dynamic circuit breaker is opened.If difference < free time lengths, monitoring is continued by customer flow monitoring modular and flows through O&M auditing system
Data, until monitor user input data or server output data make renewal time stamp action or reach
The free time length of setting, the automatic module that disconnects of O&M auditing system disconnect the connection of client and server.
Preferably, the step S2) in user O&M auditing system setting free time length specifically include:
S2.1 the configuration item of O&M auditing system) is opened;
S2.2 " limitation of O&M duration " in configuration item) is chosen, opens the idle automatic Disconnected mode of time-out, and set the free time
Duration.
The configuration item of O&M auditing system is opened, chooses " limitation of O&M duration " in configuration item, opens idle time-out certainly
Dynamic circuit breaker on-mode, and the free time length of setting is inserted in " free time length exceedes _ _ minute " space after configuration item, represent to use
Disconnected automatically when family reaches free time length without the operating time.It is RDP associations when user's login O&M auditing system, and with graphics protocols
When view accesses server resource, in user's operating process, O&M auditing system normally connects, when user is without graphics protocols data
When the time of input reaches the free time length of setting, even if now monitoring the data of server output, client and server
Connection still disconnected automatically by O&M auditing system.When user log in O&M auditing system, and by O&M auditing system with
When character protocols are SSH protocol entry servers, in user's operating process, O&M auditing system normally connects.When monitoring not
During to user's character protocols data input, server output character protocol data is monitored whether, only as user both NULI character
Protocol data inputs, and time of server NULI character protocol data output when reaching the free time length of setting, O&M audit system
System disconnects automatically.
Preferably, the user input data of the customer flow monitoring module monitors includes the input of mouse, keyboard, described
The server output data of customer flow monitoring module monitors is the data of application layer.
That is detected in customer flow monitoring modular includes data of the user using the input of the input equipments such as keyboard, mouse, with
And the data of server application layer, the heartbeat signal of flow caused by the operation of user and server can be made a distinction, kept away
The interference of the data such as heartbeat signal is exempted from.
The present invention compared with prior art, has advantages below and beneficial effect:
(1) present invention realizes O&M auditing system when user interacts with access equipment no data using setting free time length
The automatic connection for disconnecting client and server, avoids occupancy and wave that user forgets system resource caused by logging off
Take, avoid user's long time no operations from influenceing O&M form accuracy, realize to replace the invalid session of manual-lock automatically, save
Management cost, improves operating efficiency.Meanwhile it also avoid O&M auditing system after operation maintenance personnel is left and do not disconnect
The server that does not disconnect easily is operated by other people, the problem of causing security of system low.
(2) user input data monitored in the present invention includes but is not limited to the input of mouse, keyboard, the output of server
Data are the data of application layer, avoid the interference of the data such as server and the heartbeat signal of client.
Brief description of the drawings
Fig. 1 is the flow chart of the present invention;
Fig. 2 is the theory diagram that the free time time-out of O&M auditing system disconnects automatically.
Embodiment
Before being described in detail to the specific embodiment of the present invention, first to present document relates to technical term give and solve
Release:
RDP agreements:In order to which graphic terminal operation behavior is audited and monitored, LanSecS (Bastion Host) interior keyholed back plate
Platform can be acted on behalf of to the agreement that graphic terminal uses, and realize the audit of multi-platform a variety of graphic terminal operations, such as
The RDP modes graphic terminal operation of windows platform, the XWindow modes graphic terminal operation of Linux/Unix platforms.
The present invention is described in further detail with reference to embodiment, but the implementation of the present invention is not limited to this.
Embodiment 1:
With reference to shown in accompanying drawing 1, a kind of overtime method disconnected automatically of free time applied to O&M auditing system, including:
S1) user logs in O&M auditing system;
S2) user sets free time length in O&M auditing system;
S3) O&M auditing system connection client and server, server is accessed by O&M auditing system for user
Resource;
S4) the customer flow monitoring module monitors of O&M auditing system flow through the flow of O&M auditing system;
S5) O&M auditing system is judged in setting free time length, if there is flow, if so, connection is then kept, if
No, then the connection of client and server is disconnected automatically.
User logs in O&M auditing system, and being set in O&M auditing system allows what user interacted with server no data
Maximum time is free time length.O&M auditing system establishes the connection of client and server, Yong Hutong as proxy server
The resource that O&M auditing system accesses server is crossed, here, O&M auditing system can also establish client as proxy server
Connection between end and target device, facilitates user to pass through the resource in O&M auditing system access target equipment.O&M is audited
Customer flow monitoring module monitors in system flow to the data of server and from server flows to the number of client from client
According to if monitoring, user and server have data interaction, keep connection.If customer flow monitoring modular does not monitor data
The interactive time reaches the free time length of setting, and O&M auditing system sends and disconnects signal, automatic to disconnect server and visitor
The connection at family end, avoid forgetting to disconnect after user's end of operation causing occupying system resources and unnecessary resource overhead,
Reduce keeper's operation, save human cost and time, improve operating efficiency.
Embodiment 2:
On the basis of embodiment 1, with reference to shown in accompanying drawing 1, the step S3) in user access server resource mode
Accessed including graphics protocols and character protocols access two ways.
When user logs in O&M auditing system with graphics protocols or character protocols, the data of O&M auditing system are flowed through,
Parse, the operation data of user and the heartbeat signal of client and server can be made a distinction via O&M auditing system,
The interference of heartbeat signal is excluded, therefore can accurately distinguish the free time of O&M auditing system, in time by free time
Connection more than setting duration disconnects.
Preferably, the step S4) in customer flow monitoring module monitors flow through O&M auditing system flow include figure
The flow and character protocols of user input data during shape protocol access services device resource access user during server resource
The flow of input data and the flow of server output data.
When user logs in O&M auditing system with graphics protocols, the customer flow monitoring module monitors in O&M auditing system
To the graphics protocols data of user's input, and as timing node, start timing.If in the free time length of setting,
Do not monitor that the graphics protocols data of user's input flow through O&M auditing system, then O&M auditing system sends and disconnects letter
Number, client and server are disconnected.After if user logs in O&M auditing system with graphics protocols, customer flow monitoring
Module monitors the graphics protocols data of user's input again, then the graphics protocols data last time of user's input is flowed through into fortune
The time of dimension auditing system is updated to timing node, restarts timing.If user is to log in O&M audit with character protocols
System, the character protocols data for being not only user's input of the customer flow monitoring system monitoring in O&M auditing system, is also wrapped
The character protocols data of server output are included, when customer flow monitoring modular is except the user monitored in process of user login
The character protocols data of character protocols data and the server output of input, in the free time length of setting, do not monitor word
When symbol protocol data flows through O&M auditing system, then cut-off signal is sent by O&M auditing system, client and server are broken
Open connection.When the character protocols data that customer flow monitoring module monitors to user input and the character for monitoring server output
Protocol data, then segmentum intercalaris when the time that the character protocols data last time exported server flows through O&M auditing system is
Point, restarts timing, and when timing time reaches the free time length of user's setting, then O&M auditing system sends and disconnected
Signal, client and server are disconnected.
Embodiment 3:
On the basis of embodiment 2, with reference to shown in accompanying drawing 1 and Fig. 2, the step S5) concretely comprise the following steps:
S5.1) the customer flow monitoring module monitors will supervise to when having user input data or server output data
The time that the data last time measured flows through O&M auditing system is sent to the renewal time stamp module of O&M auditing system;
S5.2) renewal time stamp module by the data received last time flow through O&M auditing system when
Between as new timestamp, restart timing;
S5.3) the computation-free time module of O&M auditing system calls the timestamp in the renewal time stamp module,
And present system time and timestamp are done into subtraction, obtain difference and send the difference to O&M auditing system;
S5.4) O&M auditing system, if difference >=free time length, is transported by the difference compared with the free time length set
Tie up auditing system disconnection and the connection of server;If difference < free time lengths, return to step S4).
Customer flow monitoring modular, often monitor that a user input data or server output data flow through O&M audit
During system, current system time is recorded, and this time was sent to renewal time and stabs module.Renewal time stamp module receives
The time that customer flow monitoring modular is sent, and the time record of last time is covered, therefore only retain in renewal time stamp module
There are a time record, i.e., the timing node that current O&M auditing system computation-free starts, i.e. timestamp.O&M auditing system
In computation-free time module, current system time and timestamp are done into subtraction, obtained difference is current fortune
It is the idle time that auditing system user, which is tieed up, without operation, this difference is compared with the free time length set, if difference >=sky
Idle is grown, and O&M auditing system disconnects the connection of client and server automatically, realizes the free time time-out of O&M auditing system certainly
The function that dynamic circuit breaker is opened.If difference < free time lengths, monitoring is continued by customer flow monitoring modular and flows through O&M auditing system
Data, until monitor user input data or server output data make renewal time stamp action or reach
The free time length of setting, the automatic module that disconnects of O&M auditing system disconnect the connection of client and server.
Embodiment 4:
On the basis of above example, with reference to shown in accompanying drawing 1 and Fig. 2, the step S2) in user audited in O&M and be
System setting free time length specifically includes:
S2.1 the configuration item of O&M auditing system) is opened;
S2.2 " limitation of O&M duration " in configuration item) is chosen, opens the idle automatic Disconnected mode of time-out, and set the free time
Duration.
The configuration item of O&M auditing system is opened, chooses " limitation of O&M duration " in configuration item, opens idle time-out certainly
Dynamic circuit breaker on-mode, and the free time length of setting is inserted in " free time length exceedes _ _ minute " space after configuration item, represent to use
Disconnected automatically when family reaches free time length without the operating time.It is RDP associations when user's login O&M auditing system, and with graphics protocols
When view accesses server resource, in user's operating process, O&M auditing system normally connects, when user is without graphics protocols data
When the time of input reaches the free time length of setting, even if now monitoring the data of server output, client and server
Connection still disconnected automatically by O&M auditing system.When user log in O&M auditing system, and by O&M auditing system with
Character protocols are SSH protocol entry main frames, carry out O&M operation, and now connection is normal.When monitoring is assisted less than the character of user
When discussing data input, the output character protocol data of server is monitored whether, only when user both NULI character protocol data is defeated
Enter, and the time of server NULI character protocol data output, when reaching the free time length of setting, O&M auditing system disconnects automatically
Connection.
Preferably, the user input data of the customer flow monitoring module monitors includes the input of mouse, keyboard, described
The server output data of customer flow monitoring module monitors is the data of application layer.
That is detected in customer flow monitoring modular includes data of the user using the input of the input equipments such as keyboard, mouse, with
And the data of server application layer, the heartbeat signal of flow caused by the operation of user and server can be made a distinction, kept away
The interference of the data such as heartbeat signal is exempted from.
It is described above, be only presently preferred embodiments of the present invention, any formal limitation not done to the present invention, it is every according to
Any simply modification, the equivalent variations made according to the technical spirit of the present invention to above example, each fall within the protection of the present invention
Within the scope of.
Claims (6)
1. a kind of method that free time time-out applied to O&M auditing system disconnects automatically, it is characterised in that including:
S1) user logs in O&M auditing system;
S2) user sets free time length in O&M auditing system;
S3) O&M auditing system connection client and server, server resource is accessed by O&M auditing system for user;
S4) the customer flow monitoring module monitors of O&M auditing system flow through the flow of O&M auditing system;
S5) O&M auditing system is judged in setting free time length, if has flow, if so, connection is then kept, if do not had
Have, then disconnect the connection of client and server automatically.
2. the method that a kind of free time time-out applied to O&M auditing system according to claim 1 disconnects automatically, it is special
Sign is, the step S3) in the mode of user access server resource include that graphics protocols access and character protocols access two
Kind mode.
3. the method that a kind of free time time-out applied to O&M auditing system according to claim 2 disconnects automatically, it is special
Sign is, the step S4) in customer flow monitoring module monitors flow through the flow of O&M auditing system and include graphics protocols and visit
The flow and character protocols of user input data when asking server resource access user input data during server resource
Flow and server output data flow.
4. the method that a kind of free time time-out applied to O&M auditing system according to claim 3 disconnects automatically, it is special
Sign is, the step S5) concretely comprise the following steps:
S5.1) the customer flow monitoring module monitors will monitor to when having user input data or server output data
Data last time flow through O&M auditing system time send to O&M auditing system renewal time stab module;
S5.2) time that the renewal time stamp module flows through the data received last time O&M auditing system is made
For new timestamp, restart timing;
S5.3) the computation-free time module of O&M auditing system calls the timestamp in the renewal time stamp module, and will
Present system time does subtraction with timestamp, obtains difference and sends the difference to O&M auditing system;
S5.4) O&M auditing system by the difference with set free time length compared with, if difference >=free time length, O&M are examined
Meter systems disconnect the connection with server;If difference < free time lengths, return to step S4).
A kind of 5. automatic disconnection of free time time-out applied to O&M auditing system according to any one in claim 1-4
Method, it is characterised in that the step S2) in user O&M auditing system setting free time length specifically include:
S2.1 the configuration item of O&M auditing system) is opened;
S2.2 " limitation of O&M duration " in configuration item) is chosen, when opening the idle automatic Disconnected mode of time-out, and setting the free time
It is long.
A kind of 6. automatic disconnection of free time time-out applied to O&M auditing system according to any one in claim 1-4
Method, it is characterised in that the user input data of the customer flow monitoring module monitors includes the input of mouse, keyboard,
The server output data of the customer flow monitoring module monitors is the data of application layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710593256.1A CN107395717A (en) | 2017-07-20 | 2017-07-20 | A kind of method that free time time-out applied to O&M auditing system disconnects automatically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710593256.1A CN107395717A (en) | 2017-07-20 | 2017-07-20 | A kind of method that free time time-out applied to O&M auditing system disconnects automatically |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107395717A true CN107395717A (en) | 2017-11-24 |
Family
ID=60337171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710593256.1A Pending CN107395717A (en) | 2017-07-20 | 2017-07-20 | A kind of method that free time time-out applied to O&M auditing system disconnects automatically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107395717A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108173930A (en) * | 2017-12-26 | 2018-06-15 | 郑州云海信息技术有限公司 | A kind of page time-out configuration warning device and method |
CN108345226A (en) * | 2018-01-16 | 2018-07-31 | 广州多喝水环保科技有限公司 | A kind of water fountain effluent control method and device |
CN109189523A (en) * | 2018-08-08 | 2019-01-11 | 广东微云科技股份有限公司 | A kind of method, system and the method for closing virtual machine of judgement idle virtual machine |
CN110532322A (en) * | 2019-08-20 | 2019-12-03 | 腾讯云计算(北京)有限责任公司 | O&M exchange method, system, computer readable storage medium and equipment |
CN111949361A (en) * | 2020-09-15 | 2020-11-17 | 山东钢铁集团日照有限公司 | Remote control method based on WINDOWS operating system kernel |
CN110532322B (en) * | 2019-08-20 | 2024-04-30 | 腾讯云计算(北京)有限责任公司 | Operation and maintenance interaction method, system, computer readable storage medium and equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040190493A1 (en) * | 2003-03-26 | 2004-09-30 | Jie Yao | Managing wireless packet service resources |
CN102546465A (en) * | 2011-12-22 | 2012-07-04 | 苏州阔地网络科技有限公司 | Method and device for removing failed connection |
CN102882708A (en) * | 2012-09-05 | 2013-01-16 | 北京神州绿盟信息安全科技股份有限公司 | Operation and maintenance auditing method, device and system |
CN103167028A (en) * | 2013-02-21 | 2013-06-19 | 胡凤兵 | User convergence method capable of saving transmission bandwidth and increasing concurrency |
CN104954508A (en) * | 2015-06-24 | 2015-09-30 | 北京网瑞达科技有限公司 | System for DHCP (dynamic host configuration protocol) auxiliary accounting and auxiliary accounting method of system |
CN106935007A (en) * | 2015-12-29 | 2017-07-07 | 深圳长城开发科技股份有限公司 | The method of the up connection management of mobile network's meter |
-
2017
- 2017-07-20 CN CN201710593256.1A patent/CN107395717A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040190493A1 (en) * | 2003-03-26 | 2004-09-30 | Jie Yao | Managing wireless packet service resources |
CN102546465A (en) * | 2011-12-22 | 2012-07-04 | 苏州阔地网络科技有限公司 | Method and device for removing failed connection |
CN102882708A (en) * | 2012-09-05 | 2013-01-16 | 北京神州绿盟信息安全科技股份有限公司 | Operation and maintenance auditing method, device and system |
CN103167028A (en) * | 2013-02-21 | 2013-06-19 | 胡凤兵 | User convergence method capable of saving transmission bandwidth and increasing concurrency |
CN104954508A (en) * | 2015-06-24 | 2015-09-30 | 北京网瑞达科技有限公司 | System for DHCP (dynamic host configuration protocol) auxiliary accounting and auxiliary accounting method of system |
CN106935007A (en) * | 2015-12-29 | 2017-07-07 | 深圳长城开发科技股份有限公司 | The method of the up connection management of mobile network's meter |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108173930A (en) * | 2017-12-26 | 2018-06-15 | 郑州云海信息技术有限公司 | A kind of page time-out configuration warning device and method |
CN108345226A (en) * | 2018-01-16 | 2018-07-31 | 广州多喝水环保科技有限公司 | A kind of water fountain effluent control method and device |
CN108345226B (en) * | 2018-01-16 | 2020-02-28 | 广州多喝水环保科技有限公司 | Water outlet control method and device for water dispenser |
CN109189523A (en) * | 2018-08-08 | 2019-01-11 | 广东微云科技股份有限公司 | A kind of method, system and the method for closing virtual machine of judgement idle virtual machine |
CN109189523B (en) * | 2018-08-08 | 2022-03-15 | 广东微云科技股份有限公司 | Method and system for judging idle virtual machine and method for closing virtual machine |
CN110532322A (en) * | 2019-08-20 | 2019-12-03 | 腾讯云计算(北京)有限责任公司 | O&M exchange method, system, computer readable storage medium and equipment |
CN110532322B (en) * | 2019-08-20 | 2024-04-30 | 腾讯云计算(北京)有限责任公司 | Operation and maintenance interaction method, system, computer readable storage medium and equipment |
CN111949361A (en) * | 2020-09-15 | 2020-11-17 | 山东钢铁集团日照有限公司 | Remote control method based on WINDOWS operating system kernel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107395717A (en) | A kind of method that free time time-out applied to O&M auditing system disconnects automatically | |
US8051207B2 (en) | Inferring server state in s stateless communication protocol | |
CN101282333B (en) | Method for switching information of distributed multiprotocol proxy and center system | |
US8554980B2 (en) | Triggered notification | |
CN107612736A (en) | A kind of web browser operation audit method based on container | |
CN108390881A (en) | A kind of distribution high concurrent real-time messages method for pushing and system | |
US10511618B2 (en) | Website information extraction device, system website information extraction method, and website information extraction program | |
US20080162690A1 (en) | Application Management System | |
CN106357609A (en) | User creation method and system, public network server and private cloud equipment | |
CN112187491A (en) | Server management method, device and equipment | |
CN112437047A (en) | Remote server management method, system and related device | |
CN109819053A (en) | Applied to the springboard machine system and its control method under mixing cloud environment | |
WO2016086755A1 (en) | Packet processing method and transparent proxy server | |
CN106789413B (en) | Method and device for detecting proxy internet surfing | |
CN107566396A (en) | A kind of method based on dynamic password enhancing server VPN protocol securitys | |
CN110740197A (en) | core network equipment, core network system and communication method | |
CN103078865A (en) | Network server communication model based on transmission control protocol (TCP) | |
CN114760083B (en) | Method, device and storage medium for issuing attack detection file | |
CN111193700A (en) | Safety protection method, safety protection device and storage medium | |
CN113778709B (en) | Interface calling method, device, server and storage medium | |
EP4030691A1 (en) | Data processing method, device, and system | |
CN115695218A (en) | Operation and maintenance management method and device based on zero trust mechanism and related equipment | |
CN115941766A (en) | Operation and maintenance data processing method and device | |
CN206181087U (en) | Active leak detecting system towards industrial control system | |
CN109150666B (en) | Method for preventing website downtime |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |