CN107388910A - 一种地下开采中浅孔装药装置 - Google Patents
一种地下开采中浅孔装药装置 Download PDFInfo
- Publication number
- CN107388910A CN107388910A CN201710619228.2A CN201710619228A CN107388910A CN 107388910 A CN107388910 A CN 107388910A CN 201710619228 A CN201710619228 A CN 201710619228A CN 107388910 A CN107388910 A CN 107388910A
- Authority
- CN
- China
- Prior art keywords
- explosive column
- push rod
- retainer ring
- lateral surface
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
Landscapes
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种地下开采中浅孔装药装置,包括第二炸药柱和顶杆,所述第二炸药柱的外侧面上部通过固定环固定有第一炸药柱,第一炸药柱的外侧面上部通过固定环固定有半球,第二炸药柱的下表面的安装槽中固定有雷管,雷管的下端和导线连接,第二炸药柱的外侧面下部和顶杆上端的连接端通过固定环固定连接,顶杆的下端设有螺孔,顶杆的螺孔和连接杆上端的螺纹螺纹连接,弹性片将第一炸药柱和第二炸药柱固定,防止其产生滑动,影响爆破效果;连接杆和顶杆螺纹连接,方便移动和运输;大大减轻了工人的劳动强度,有效提高了工程进度,其方法简单,操作方便,装药效果好。
Description
技术领域
本发明涉及金矿开采技术领域,具体为一种地下开采中浅孔装药装置。
背景技术
金矿开采中常常会用到爆破技术,合理的填塞长度和良好的填塞质量对炸药爆炸能量的充分利用,爆破质量和安全有很大的影响;在装药操作过程中,由于施工人员素质、技术等方面的差异,都会直接或间接地影响装药质量和时间,使得工程延误和爆破效果不佳,甚至不能引爆,对煤矿安全生产埋下了隐患。
发明内容
本发明要解决的技术问题是克服现有的缺陷,提供一种地下开采中浅孔装药装置,弹性片将第一炸药柱和第二炸药柱固定,防止其产生滑动,影响爆破效果;连接杆和顶杆螺纹连接,方便移动和运输;大大减轻了工人的劳动强度,有效提高了工程进度,其方法简单,操作方便,装药效果好,可以有效解决背景技术中的问题。
为实现上述目的,本发明提供如下技术方案:一种地下开采中浅孔装药装置,包括第二炸药柱和顶杆,所述第二炸药柱的外侧面上部通过固定环固定有第一炸药柱,第一炸药柱的外侧面上部通过固定环固定有半球,第二炸药柱的下表面的安装槽中固定有雷管,雷管的下端和导线连接,第二炸药柱的外侧面下部和顶杆上端的连接端通过固定环固定连接,顶杆的下端设有螺孔,顶杆的螺孔和连接杆上端的螺纹螺纹连接,顶杆和连接杆均中空设置,导线穿过顶杆和连接杆的通孔并延伸至连接杆的下方。
作为本发明的一种优选技术方案,所述固定环的外侧面下部固定有三个弹性片,三个弹性片绕固定环的中心轴线等角度分布。
作为本发明的一种优选技术方案,所述固定环的两端均设有折板,两个折板相对应的位置设有安装孔,两个折板的安装孔固定有螺钉,螺钉的侧面螺纹连接有螺母。
作为本发明的一种优选技术方案,所述连接端上端的直径大于顶杆的直径,且连接端上端的直径比第二炸药柱的直径略小。
作为本发明的一种优选技术方案,所述顶杆的外侧面和连接杆的外侧面均设有刻度。
与现有技术相比,本发明的有益效果是:本地下开采中浅孔装药装置,弹性片将第一炸药柱和第二炸药柱固定,防止其产生滑动,影响爆破效果;连接杆和顶杆螺纹连接,方便移动和运输;大大减轻了工人的劳动强度,有效提高了工程进度,其方法简单,操作方便,装药效果好。
附图说明
图1为本发明主视结构示意图;
图2为本发明主视剖面结构示意图;
图3为本发明连接杆和顶杆结构示意图。
图中:1半球、2折板、3固定环、4弹性片、5第一炸药柱、6螺母、7螺钉、8连接杆、9第二炸药柱、10导线、11雷管、12顶杆、13连接端、14螺纹。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-3,本发明提供一种技术方案:一种地下开采中浅孔装药装置,包括第二炸药柱9和顶杆12,第二炸药柱9的外侧面上部通过固定环3固定有第一炸药柱5,第一炸药柱5的外侧面上部通过固定环3固定有半球1,第二炸药柱9的下表面的安装槽中固定有雷管11,雷管11的下端和导线10连接,第二炸药柱9的外侧面下部和顶杆12上端的连接端13通过固定环3固定连接,顶杆12的外侧面和连接杆8的外侧面均设有刻度,固定环3的外侧面下部固定有三个弹性片4,三个弹性片4绕固定环3的中心轴线等角度分布,固定环3的两端均设有折板2,两个折板2相对应的位置设有安装孔,两个折板2的安装孔固定有螺钉7,螺钉7的侧面螺纹连接有螺母6,连接端13上端的直径大于顶杆12的直径,且连接端13上端的直径比第二炸药柱9的直径略小,顶杆12的下端设有螺孔,顶杆12的螺孔和连接杆8上端的螺纹14螺纹连接,顶杆12和连接杆8均中空设置,导线10穿过顶杆12和连接杆8的通孔并延伸至连接杆8的下方。
在使用时:将钻孔清空,可以在第一炸药柱5和第二炸药柱9之间增加炸药柱,将导线10穿过顶杆12和连接杆8的通孔,连接杆8上端的螺纹与顶杆12下表面的螺孔螺纹连接,将第一炸药柱5和第二炸药柱9插入到钻孔中,弹性片4将第一炸药柱5和第二炸药柱9固定在钻孔中,将连接端13插入到第二炸药柱9外侧面下部的固定环3中,移动顶杆12使得第一炸药柱5和第二炸药柱9移动,通过观察顶杆12和连接杆8外侧面的刻度测算出第一炸药柱5和第二炸药柱9在钻孔的位置,连接杆8的下表面设有螺孔,根据具体情况将多个连接杆8螺纹连接,将第一炸药柱5和第二炸药柱9推到预定位置,弹性片4将第一炸药柱5和第二炸药柱9固定。
本发明,弹性片4将第一炸药柱5和第二炸药柱9固定,防止其产生滑动,影响爆破效果;连接杆8和顶杆12螺纹连接,方便移动和运输;大大减轻了工人的劳动强度,有效提高了工程进度,其方法简单,操作方便,装药效果好。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (5)
1.一种地下开采中浅孔装药装置,包括第二炸药柱(9)和顶杆(12),其特征在于:所述第二炸药柱(9)的外侧面上部通过固定环(3)固定有第一炸药柱(5),第一炸药柱(5)的外侧面上部通过固定环(3)固定有半球(1),第二炸药柱(9)的下表面的安装槽中固定有雷管(11),雷管(11)的下端和导线(10)连接,第二炸药柱(9)的外侧面下部和顶杆(12)上端的连接端(13)通过固定环(3)固定连接,顶杆(12)的下端设有螺孔,顶杆(12)的螺孔和连接杆(8)上端的螺纹(14)螺纹连接,顶杆(12)和连接杆(8)均中空设置,导线(10)穿过顶杆(12)和连接杆(8)的通孔并延伸至连接杆(8)的下方。
2.根据权利要求1所述的一种地下开采中浅孔装药装置,其特征在于:所述固定环(3)的外侧面下部固定有三个弹性片(4),三个弹性片(4)绕固定环(3)的中心轴线等角度分布。
3.根据权利要求1所述的一种地下开采中浅孔装药装置,其特征在于:所述固定环(3)的两端均设有折板(2),两个折板(2)相对应的位置设有安装孔,两个折板(2)的安装孔固定有螺钉(7),螺钉(7)的侧面螺纹连接有螺母(6)。
4.根据权利要求1所述的一种地下开采中浅孔装药装置,其特征在于:所述连接端(13)上端的直径大于顶杆(12)的直径,且连接端(13)上端的直径比第二炸药柱(9)的直径略小。
5.根据权利要求1所述的一种地下开采中浅孔装药装置,其特征在于:所述顶杆(12)的外侧面和连接杆(8)的外侧面均设有刻度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619228.2A CN107388910A (zh) | 2017-07-26 | 2017-07-26 | 一种地下开采中浅孔装药装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619228.2A CN107388910A (zh) | 2017-07-26 | 2017-07-26 | 一种地下开采中浅孔装药装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107388910A true CN107388910A (zh) | 2017-11-24 |
Family
ID=60341132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710619228.2A Pending CN107388910A (zh) | 2017-07-26 | 2017-07-26 | 一种地下开采中浅孔装药装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107388910A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109000517A (zh) * | 2018-07-27 | 2018-12-14 | 中国矿业大学 | 一种深孔爆破的爆破筒 |
WO2020000058A1 (en) * | 2018-06-29 | 2020-01-02 | Newcrest Mining Limited | A booster assembly |
WO2020000057A1 (en) * | 2018-06-29 | 2020-01-02 | Newcrest Mining Limited | A mining vehicle |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2529763A (en) * | 1946-11-22 | 1950-11-14 | Lloyd R Deputy | Geophysical safety catch |
WO1999046556A1 (en) * | 1998-03-10 | 1999-09-16 | Orica Explosives Technology Pty Ltd | Cartridged explosives |
CN201672888U (zh) * | 2010-05-31 | 2010-12-15 | 申圳 | 矿用装药器 |
AU2009203062A1 (en) * | 2009-07-29 | 2011-02-17 | Johnson Hi-Tech (Australia) Pty Ltd | Device for locating an explosives package in a borehole |
CN204085345U (zh) * | 2014-09-30 | 2015-01-07 | 安徽理工大学 | 一种新型炮孔装药分隔器 |
CN105627848A (zh) * | 2016-03-22 | 2016-06-01 | 中煤科工集团淮北爆破技术研究院有限公司 | 一种光爆孔内可定位双线性聚能爆破装置及爆破方法 |
-
2017
- 2017-07-26 CN CN201710619228.2A patent/CN107388910A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2529763A (en) * | 1946-11-22 | 1950-11-14 | Lloyd R Deputy | Geophysical safety catch |
WO1999046556A1 (en) * | 1998-03-10 | 1999-09-16 | Orica Explosives Technology Pty Ltd | Cartridged explosives |
AU2009203062A1 (en) * | 2009-07-29 | 2011-02-17 | Johnson Hi-Tech (Australia) Pty Ltd | Device for locating an explosives package in a borehole |
CN201672888U (zh) * | 2010-05-31 | 2010-12-15 | 申圳 | 矿用装药器 |
CN204085345U (zh) * | 2014-09-30 | 2015-01-07 | 安徽理工大学 | 一种新型炮孔装药分隔器 |
CN105627848A (zh) * | 2016-03-22 | 2016-06-01 | 中煤科工集团淮北爆破技术研究院有限公司 | 一种光爆孔内可定位双线性聚能爆破装置及爆破方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020000058A1 (en) * | 2018-06-29 | 2020-01-02 | Newcrest Mining Limited | A booster assembly |
WO2020000057A1 (en) * | 2018-06-29 | 2020-01-02 | Newcrest Mining Limited | A mining vehicle |
US11835329B2 (en) | 2018-06-29 | 2023-12-05 | Olitek Pty Ltd | Mining vehicle |
CN109000517A (zh) * | 2018-07-27 | 2018-12-14 | 中国矿业大学 | 一种深孔爆破的爆破筒 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107388910A (zh) | 一种地下开采中浅孔装药装置 | |
CN103061764B (zh) | 急倾斜煤层柔性掩护支架采空区矸石充填采煤法 | |
CN102536239A (zh) | 一种长壁工作面无煤柱开采方法 | |
CN104763427B (zh) | 一种超临界co2预裂煤矿厚硬难垮顶板的方法 | |
CN104405436B (zh) | 一种提高矿体充填接顶率的方法 | |
CN110374600A (zh) | 一种极近距离煤层群回采巷道无错距式布置方法 | |
CN102080545B (zh) | 高危矿柱露天深孔协同回采方法 | |
CN109870084B (zh) | 一种vcr采矿法免扫孔爆破装药结构及其施工方法 | |
CN110500926A (zh) | 一种深孔爆破间隔装药方法 | |
CN106440981A (zh) | 节理裂隙发育花岗岩矿山提高大块产率的深孔爆破方法 | |
CN114353608B (zh) | 一种矿石安全开采方法 | |
CN106121644B (zh) | 基于煤岩钻孔平面交联孔网结构的充水承压爆破卸压和支护补强方法 | |
CN110500925B (zh) | 一种穿越溶腔的深孔爆破装药方法及溶腔探测装置 | |
CN102261874A (zh) | 一种岩巷大断面一次性爆破方法 | |
CN104879128B (zh) | 基于顶煤超前预爆弱化的急倾斜特厚煤层采煤工艺 | |
CN116696342A (zh) | 一种用于煤层气井的前舱式二次爆炸复合射孔方法 | |
CN112483085B (zh) | 基于复合射孔在小煤柱或无煤柱切顶卸压的开采工艺 | |
CN113482618B (zh) | 辅助崩落的采矿方法 | |
CN110671108A (zh) | 一种可定向液压式破岩装置及方法 | |
CN109141150A (zh) | 一种煤层深孔预裂爆破装药结构和安装方法 | |
CN110671979A (zh) | 一种深孔挤压爆破形成切割井的控制爆破方法 | |
CN113738361B (zh) | 一种急倾斜煤层综放工作面圆弧段冲击地压的防治方法 | |
CN115478893A (zh) | 一种集综采工作面采空区及离层的注浆充填方法 | |
CN209131526U (zh) | 一种煤层深孔预裂爆破装药结构 | |
CN108506001A (zh) | 一种高效提高低渗透性煤层块煤率的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |