CN107387158A CN201710819379.2A CN201710819379A CN107387158A CN 107387158 A CN107387158 A CN 107387158A CN 201710819379 A CN201710819379 A CN 201710819379A CN 107387158 A CN107387158 A CN 107387158A
Authority
CN
China
Prior art keywords
lotion
equipment
belt
siccative
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710819379.2A
Other languages
Chinese (zh)
Other versions
CN107387158B (en
Inventor
郑忠友
朱磊
韩刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Energy Research Institute Co Ltd
Original Assignee
China Coal Energy Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Energy Research Institute Co Ltd filed Critical China Coal Energy Research Institute Co Ltd
Priority to CN201710819379.2A priority Critical patent/CN107387158B/en
Publication of CN107387158A publication Critical patent/CN107387158A/en
Application granted granted Critical
Publication of CN107387158B publication Critical patent/CN107387158B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B18/00Use of agglomerated or waste materials or refuse as fillers for mortars, concrete or artificial stone; Treatment of agglomerated or waste materials or refuse, specially adapted to enhance their filling properties in mortars, concrete or artificial stone
    • C04B18/04Waste materials; Refuse
    • C04B18/12Waste materials; Refuse from quarries, mining or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The invention discloses a kind of coal mine down-hole splited formula lotion preparation and conveying device, station, lotion conveyor train are prepared including siccative travelling belt, underground lotion, wherein, siccative travelling belt is arranged in spoil main haulage roadway, the preparation technology of lotion and lotion conveying technique are used into split type setting, underground lotion prepares station and is fixedly installed in spoil main haulage roadway, and lotion conveyor train is positioned in tailentry on the steel track at coal-face 100m~300m.As coal mining activity is persistently carried out, working face constantly promotes, and using the drawing hoist of coal-face or other underground pulling equipment traction lotion conveyor trains, realizes that lotion conveyor train follows the propulsion of coal-face closely and moved.

Description

A kind of coal mine down-hole splited formula lotion prepares and conveying device
Technical field
The invention belongs to mining engineering technology and apparatus field, and in particular to a kind of coal mine down-hole splited formula lotion prepare with Conveying device.
Background technology
Underground mine is being built and can produce substantial amounts of spoil in production process, and traditional mode is directly to be stacked at ground Table, the spoil of accumulation on ground surface form hillock, very big harm are brought to mining area ecological environment, while there is also larger safety Hidden danger.Spoil underground filling technology has been the important technology research direction of modern mine Green Sustainable.
At this stage, coal mine paste filling is mostly using by the way of surface construction cream station, after lotion prepares on ground, Using the filling pump for being arranged on ground, lotion is passed through in pipeline to work face goaf.This kind of mode is in Practical Project Problems be present:
1. because lotion control equipment is arranged on the ground, it is necessary to by pipeline that lotion long distance delivery is mined out to working face Area, fed distance generally add cement up to several kilometers in lotion, long distance delivery easily causes serious plugging thing Therefore once plugging is cleared up, it is necessary to put into a large amount of manpower physics in the short time, otherwise pipeline will largely be scrapped.
2. lotion long distance delivery requires that filling pump group outlet pressure is larger, lotion is put using vertical blanking underground in addition To underground, underground lotion conveyance conduit is necessarily caused to be in high pressure conditions, the existing filling using lotion long distance delivery is opened Dig up mine well, pressure is mostly more than 20MPa, serious threat personnel in the pit's life security in lotion conveyance conduit.
, it is necessary to set multiple filling pumps to carry out intermediate haulage in crossheading, with work when 3. return airway length is longer Make face propulsion, the dismantlement work of large equipment is frequent, and field worker labor intensity is big.
4. lotion is prepared on ground, mixer is directly overlapped on above filling pump group feed hopper, such a mode equipment Setting height(from bottom) is big, and underground lotion prepares and directly uses this mode, certainly will cause underworkings excessive height (charging quantity 350t/h When, equipment setting height(from bottom) 4650mm, head-room should be greater than 4950mm), greatly increase tunnelling engineering amount;Secondly, mine When paste body filling exploitation needs larger charging quantity, by underworkings height limitation, mixer is directly overlapped on filling pump group and entered Mode above hopper can not also realize that lotion preparation system follows the propulsion of coal-face closely and moved.
To solve problem above, lotion can be prepared relevant device and be integrated on equipment train, using portable lotion system The arrangement of standby device, system form as shown in Figure 1.Specific implementation step is:No.1 mixer 3 and siccative are reprinted into belt 2 are arranged on No.1 equipment train 10, and No. two mixers 4 and skirt rim belt type conveying 5 are arranged on No. two equipment trains 11, No.1 is filled into pump group 7 and bottom-dump drag conveyor 6 is arranged on No. three equipment trains 12, No. two filling pump groups 8 are installed On No. four equipment trains 13.It is connected between each equipment train with steel chain, each equipment train is arranged in underground close to coal-getter Make on the steel track 9 in the 100m~300m crossheadings of face.During work, first on the ground by spoil broken rear and cement, fine coal Grey and a small amount of water, which stirs, is made mixed tide material, and is transported to underground, and siccative ribbon conveyer 1 is utilized in underground by mixed tide material It is transported to siccative to reprint on belt 2, siccative reprints belt 2 and mixed tide material is transported into (now No.1 mixer 3 in No. two mixers In stand-by state), add water stirring that lotion is made, lotion is delivered to bottom-dump drag conveyor 6 by skirt rim belt type conveying 5 On, then (now No.1 filling pump group 7 is in stand-by state) is unloaded to the hopper of No. two filling pump groups 8, by No. two filling pump groups 8 Paste pump is sent into goaf.
Problems be present in aforesaid way:
Skirt rim belt type conveying and the conveying of bottom-dump scraper plate are employed between pump group and mixer 1. being filled in aforesaid way Machine is engaged, and to realize the transport of lotion, reduces equipment setting height(from bottom);In paste body filling amount about 300t/h needed for mine, Relevant device setting height(from bottom) is positively retained within 3.9m, can realize that lotion prepares system in tunnel of the height more than or equal to 4.2m System follows the propulsion of coal-face closely and moved.But for coal seam thickness less than 3.5m girdle, the mine of medium-thickness seam, by It is often relatively low in crossheading height, it can not realize that lotion preparation system follows the propulsion of coal-face closely and moved, therefore aforesaid way Application is limited.
2. because relevant device setting height(from bottom) is larger in aforesaid way, cause crossheading excavation work amount relatively large, in coal Thickness degree less than 3.5m girdle, medium-thickness seam mine in apply when, economic benefit unobvious.
The content of the invention
It is an object of the invention to provide a kind of coal mine down-hole splited formula lotion preparation and conveying device, reducing over long distances Pipeline jam accident occurrence risk caused by pipeline, avoid underground lotion conveyance conduit from being in high pressure conditions and reduce live work While people's labor intensity, relevant device setting height(from bottom) is reduced as far as possible, reduces crossheading excavation work amount so that system adapts to Scope is more wide.
To reach above-mentioned purpose, the present invention is adopted the following technical scheme that to realize:
A kind of coal mine down-hole splited formula lotion prepares and conveying device, including siccative travelling belt, underground lotion preparation station, Lotion conveyor train and the steel track being arranged in tailentry;Wherein,
Siccative travelling belt is arranged in spoil main haulage roadway, and siccative travelling belt head prepares station with underground lotion Siccative reprints belt machine end overlap joint;
Underground lotion, which prepares station, includes siccative reprinting belt, steel structure support, No.1 mixer, No. two mixers, No.1s Feed pipe and No. two feed pipes;
Siccative is reprinted belt and is fixed on entirely through steel structure support on the roadway floor of spoil main haulage roadway;No.1 stirs Machine and No. two mixers are arranged on the lower section that siccative reprints belt upper level section, and No.1 mixer and No. two mixers are logical Steel structure support is crossed to be fixed on spoil main haulage roadway roadway floor;
Skirt rim belt type conveying, skirt rim belt type conveying installation are provided with below No.1 mixer and No. two mixers On the roadway floor of spoil main haulage roadway, and skirt rim belt type conveying tail is located at immediately below No.1 mixer;Stirred in No.1 The machine feed end of mixing is provided with No.1 feed pipe, and No. two mixer feed ends are provided with No. two feed pipes;
Skirt rim belt type conveying is used to the lotion that underground lotion preparation station is stirred being delivered to lotion conveyor train;Lotion Conveyor train includes shirt rim and reprints ribbon conveyer, bottom-dump drag conveyor, No.1 filling pump group, No. two filling pump groups, one Number equipment train, No. two equipment trains, No. three equipment trains and No. four equipment trains;No.1 equipment train, No. two equipment trains, What No. three equipment trains and No. four equipment trains were sequentially connected from right to left is arranged on steel track;
Skirt rim belt type conveying head reprints belt conveyor tail overlap joint with shirt rim, and shirt rim is reprinted ribbon conveyer and utilized Steel structure support is fixed on No.1 equipment train and No. two equipment trains;Reprint belt conveyer head and scraped with bottom-dump in shirt rim Plate conveyer tail overlaps;Bottom-dump drag conveyor is fixed on No. three equipment trains by steel structure support, and bottom-dump is scraped Electro-hydraulic bulkhgead gate is provided with plate conveyer;No.1 filling pump group, No.1 filling are provided with below bottom-dump drag conveyor Pump group is fixed on No. three equipment trains, and it is in have a down dip that bottom-dump drag conveyor is filled above the pump housing in No.1 fills pump group Tiltedly arrangement;
No. two filling pump groups are fixed on No. four equipment trains, and bottom-dump handpiece of scraper conveyer is positioned at No. two filling pump groups Above feed hopper.
Further improve of the invention is that siccative is reprinted belt and integrally arranged in " Z " font, including is transported positioned at siccative Lower horizontal below belt, the upper level section above No.1 mixer and No. two mixers, and connection two The tilting section of horizontal segment.
Further improve of the invention is that the angle of inclination of bottom-dump drag conveyor is 1 °~3 °.
Further improve of the invention is that shirt rim reprinting belt conveyor tail is taken with skirt rim belt type conveying head Spreading degree is more than the daily advance distance of coal-face.
Further improve of the invention is that underground lotion, which prepares station, also includes belt plow, and it is located at No.1 stirring The top of machine feed end;Siccative reprints belt conveyer head positioned at the top of No. two mixer feed ends.
Further improve of the invention is that No.1 feed pipe is being provided with No.1 flowmeter and No.1 electricity at the mouth of pipe Magnet valve, No. two feed pipes are being provided with No. two flowmeters and No. two magnetic valves at the mouth of pipe, and No.1 feed pipe and No. two are given Water pipe existing with underground fire-fighting sprinkling pipeline or discharge pipe line are connected.
Further improve of the invention is that No.1 equipment train, No. two equipment trains, No. three equipment trains and No. four are set Connected between standby train using steel chain, and crash bar is set in junction, crash bar is shorter 10cm than steel chain;
No.1 equipment train, No. two equipment trains, No. three equipment trains and No. four equipment trains use split-type structural, Equipment train entirety is reassembled into again by the way that multiple splits are transported to behind underground.
Further improve of the invention is that No.1 equipment train front end is provided with traction steel chain;With pushing away for working face Enter, adjust the position of each equipment train in time, lotion conveyor train is maintained at apart from coal-face in 100m~300m.
Further improve of the invention is, has been equidistantly positioned sleeper below steel track, steel track length is more than The connected length of each equipment train and the summation of the daily advance distance of coal-face.
Further improve of the invention is, in addition to the well that feeds intake, storage bin and lotion conveyance conduit;
During work, manufactured mixed tide material is stirred through feeding intake with cement, flyash and water by the spoil after broken Well is thrown to underground storage bin, and the siccative that the mixed tide material in the storage bin of underground is transported to lotion preparation station by siccative travelling belt turns Carry on belt;
Lotion is made in mixed tide material and water after No. two mixers stir, and lotion is given to skirt by the discharging opening of No. two mixers On the ribbon conveyer of side, then through skirt rim belt type conveying, shirt rim reprint ribbon conveyer be delivered on bottom-dump drag conveyor, Lotion is fallen into No. two filling pump group feed hoppers, and is delivered to through lotion conveyance conduit in the goaf at coal-face rear, Realize mine paste body filling operation.
The present invention at least possesses following beneficial effect:
A kind of coal mine down-hole splited formula lotion provided by the invention prepares and conveying device, including the well that feeds intake, storage bin, dry Expect that travelling belt, underground lotion prepare station, skirt rim belt type conveying, lotion conveyor train, lotion conveyance conduit etc..By lotion Preparation technology uses split type setting with lotion conveying technique, and underground lotion prepares station and is fixedly installed in spoil main haulage roadway, Lotion conveyor train is positioned in tailentry at coal-face 100m~300m, as coal mining activity is adjusted in time The position of whole lotion conveyor train.During work, spoil broken rear and cement, flyash and a small amount of water are stirred on the ground first Mixed tide material uniformly is made, is thrown through the well that feeds intake to underground storage bin, siccative travelling belt is by the mixed tide material in the storage bin of underground Lotion is transported to prepare on the siccative reprinting belt at station.Under normal circumstances, belt plow is in opening, and mixed tide material falls In to No. two mixers (now No.1 mixer is in stand-by state), add water that lotion is made after stirring, through shirt rim belt conveying Machine, shirt rim are reprinted ribbon conveyer and are delivered on bottom-dump drag conveyor, and under normal circumstances, electro-hydraulic bulkhgead gate, which is in, to be opened State (now No.1 filling pump group is in stand-by state), lotion are fallen into No. two filling pump group feed hoppers, and lotion is defeated through lotion Send in pipeline to the goaf at coal-face rear.
Specifically, the present invention has following advantage:
1. because lotion preparation section and equipment are arranged in underground in coal-face 100m~300m crossheading, lotion Piping feeding distance greatly reduces, and pipeline system simplifies, and reduces pipeline jam accident probability of happening and accident treatment time.This Outside, underground realizes the long distance delivery of mixed tide material using siccative travelling belt, realizes the visualization of long range conveying, once Transportation system is also easy to remove material after breaking down.
2. lotion preparation section and equipment be arranged in underground in coal-face 100m~300m crossheading, it is necessary to gram The friction loss value for taking lotion pipeline is smaller so that filling pump group outlet pressure maintains 4.0MPa or so can be real Now work the paste body filling of face goaf, effectively prevent casualties risk caused by the lotion conveyance conduit high pressure of underground.
3. lotion conveying relevant device is integrated on equipment train, ribbon conveyer is reprinted in skirt rim belt type conveying and shirt rim The lap of splice is more than the daily advance distance of coal-face, such lotion prepare relevant device can with the propulsion of coal-face and It is mobile in real time, siccative travelling belt length is increased or decreased within daily maintenance crew's activity duration, avoids large equipment Frequent dismounting, reduce field worker labor intensity.
4. prepared by the higher lotion of equipment setting height(from bottom) into relevant device in the present invention is fixedly installed on spoil main haulage roadway Interior, the relatively low lotion conveying equipment of setting height(from bottom) is arranged on the equipment train in tailentry;Secondly, bottom-dump scraper plate Conveyer is in tilted layout in the case where being in above the filling pump housing during No.1 fills pump group, and angle of inclination is 1 °~3 °, reduces shirt rim and turns Setting height(from bottom) at tape carrier conveyer head;Therefore the overall installation height reduction of the mobile device in tailentry, phase That answers reduces the height of required tailentry, reduces tunnelling amount.
In paste body filling amount about 300t/h needed for mine, a kind of coal mine down-hole splited formula lotion system disclosed in this invention The standby overall installation with mobile device in conveying device (i.e. lotion conveyor train part) is highly positively retained within 2.65m, can To realize that lotion conveyor train follows the propulsion of coal-face closely and moves, the party in tunnel of the height more than or equal to 2.95m Formula is suitable for the paste body filling of girdle, medium-thickness seam mine or the larger mine of required charging quantity.
5. being connected in the present invention between each equipment train using steel chain, and crash bar is set in junction, in this way, on the one hand It may insure to be separated from each other between each equipment train, prevent discontinuity when equipment train is longer and damage;On the other hand it is each Steel chain between equipment train can realize that equipment train is mutually drawn, and crash bar 10cm shorter than steel chain or so, ensure each equipment Train is little away from change in traveling time, prevents siccative from can not fall into mixer or filling pump group.
Brief description of the drawings
Fig. 1 is that portable lotion is prepared and transmission device system composition schematic diagram.
Fig. 2 is the system arrangement overall schematic in the present invention.
Fig. 3 is that the underground lotion in the present invention prepares station schematic diagram.
Fig. 4 is the lotion conveyor train schematic diagram in the present invention.
Fig. 5 is skirt rim belt type conveying and shirt rim reprinting ribbon conveyer overlap joint schematic diagram in the present invention.
Fig. 6 is connected mode schematic diagram between No.1 equipment train and No. two equipment trains.
In figure:1st, siccative travelling belt;2nd, siccative reprints belt;3rd, No.1 mixer;4th, No. two mixers;5th, walled belt Formula conveyer;6th, bottom-dump drag conveyor;7th, No.1 filling pump group;8th, No. two filling pump groups;9th, steel track;10th, No.1 Equipment train;11st, No. two equipment trains;12nd, No. three equipment trains;13rd, No. four equipment trains;14th, steel chain is drawn;15th, lotion Conveyance conduit;16th, feed intake well;17th, storage bin;18th, underground lotion prepares station;19th, spoil main haulage roadway;20th, working face return air Lane;21st, lotion conveyor train;22nd, siccative travelling belt head;23rd, siccative reprints belt machine end;24th, steel structure support;25、 No.1 feed pipe;26th, No.1 flowmeter;27th, No.1 magnetic valve;28th, No. two feed pipes;29th, No. two flowmeters;30th, No. two electricity Magnet valve;31st, belt plow;32nd, siccative reprints belt conveyer head;33rd, skirt rim belt type conveying tail;34th, belt is reprinted in shirt rim Conveyer;35th, belt conveyor tail is reprinted in shirt rim;36th, skirt rim belt type conveying head;37th, ribbon conveyer is reprinted in shirt rim Head;38th, electro-hydraulic bulkhgead gate;39th, bottom-dump scraper conveyor tail;40th, bottom-dump handpiece of scraper conveyer;41st, sleeper; 42nd, split;43rd, steel chain;44th, crash bar.
Embodiment
The concrete technical scheme of the present invention is described in detail below in conjunction with accompanying drawing, but this does not imply that to this hair Bright protection domain is any limitation as.
As shown in Figure 2 and Figure 3, siccative travelling belt 1 is arranged in downhole gangue main haulage roadway 19, siccative equipment of conveyer The first 22 siccative reprinting belt machine ends 23 that station 18 is prepared with underground lotion overlap.
As shown in figure 3, underground lotion, which prepares station 18, includes siccative reprinting belt 2, steel structure support 24, belt plow 31st, 27, No. two 3, No. two mixers 4 of No.1 mixer, No.1 feed pipe 25, No.1 flowmeter 26, No.1 magnetic valve feed pipes 28th, No. two flowmeters 29 and No. two magnetic valves 30;After siccative reprints the segment distance of 2 horizontal feed of belt one, climbed with larger angle, Switch to horizontal feed again, it is overall to be arranged in " Z " font;Siccative reprints belt 2 and is fixed on spoil entirely through steel structure support 24 On the roadway floor of main haulage roadway 19;No.1 mixer 3 and No. two mixers 4 are arranged on siccative and reprint the upper level section of belt 2 Lower section;No.1 mixer 3 and No. two mixers 4 are fixed on the roadway floor of spoil main haulage roadway 19 by steel structure support 24 On;Skirt rim belt type conveying 5 is provided with the lower section of No.1 mixer 3 and No. two mixers 4, skirt rim belt type conveying 5 is installed On roadway floor, skirt rim belt type conveying tail 33 is located at immediately below No.1 mixer 3;In the feed end of No.1 mixer 3 No.1 feed pipe 25, No.1 flowmeter 26 and No.1 magnetic valve 27 are provided with, the feed end of No. two mixers 4 is provided with No. two 28, No. two flowmeters 29 of feed pipe and No. two magnetic valves 30.
Siccative is reprinted and is provided with a belt plow 31 on belt 2, positioned at the top of the feed end of No.1 mixer 3;It is dry Material reprints belt conveyer head 32 positioned at the top of No. two feed ends of mixer 4;No.1 feed pipe 25 and No. two feed pipes 28 are and well Under existing fire-fighting sprinkling pipeline or discharge pipe line be connected.
As shown in Figure 2, Figure 4 shows, lotion is prepared 18 lotions being stirred of standing and is delivered to lotion conveying by skirt rim belt type conveying 5 Train 21;Lotion conveyor train 21 includes shirt rim and reprints ribbon conveyer 34, bottom-dump drag conveyor 6, No.1 filling pump group 7th, No. two filling pump groups 8, the equipment train 12 of equipment train 11, three of No.1 equipment train 10, two and No. four equipment trains 13; Skirt rim belt type conveying head 36 is reprinted belt conveyor tail 35 with shirt rim and overlapped, and shirt rim reprints ribbon conveyer 34 and utilizes steel Structure stand is fixed on No.1 equipment train 10 and No. two equipment trains 11;Reprint belt conveyer head 37 and unloaded the bottom of with shirt rim Formula scraper conveyor tail 39 overlaps;Bottom-dump drag conveyor 6 is fixed on No. three equipment trains 12 by steel structure support 24 On, bottom-dump drag conveyor 6 No.1 fill pump group 7 in fill the pump housing above be under be in tilted layout, angle of inclination be 1 °~ 3 °, electro-hydraulic bulkhgead gate 6 is provided with bottom-dump drag conveyor 6;The lower section of bottom-dump drag conveyor 6 is provided with No.1 filling Pump group 7, No.1 7 groups of pump of filling are fixed on No. three equipment trains 12.No. two filling pump groups 8 are fixed on No. four equipment trains 13 On, bottom-dump handpiece of scraper conveyer 40 is above the feed hopper of No. two filling pump groups 8.No.1 equipment train 10, two is set The standby equipment train 12 of equipment train 12, four of train 11, three is both placed on the steel track 9 in tailentry 20.
Overlapped as shown in figure 5, ribbon conveyer 34 is reprinted in shirt rim with the phase of skirt rim belt type conveying 5, the lap of splice, which is more than, adopts The daily advance distance of coal working face;Tunnel bottom in tailentry 20 in the range of coal-face 100m~300m On plate, sleeper 41 is laid at a certain distance, and steel track 9 is placed in the top of sleeper 41, and each equipment train is on steel track 9 It is mobile;The length of steel track 9 should be greater than the connected length of each equipment train and the summation of the daily advance distance of coal-face.
As shown in fig. 6,12, No. four equipment trains 13 of equipment train of equipment train 11, three of No.1 equipment train 10, two Between using steel chain connect.Illustrate the connection side between each equipment train by taking No.1 equipment train and No. two equipment trains as an example Formula, connected using steel chain 43 between 10, No. two equipment trains 11 of No.1 equipment train, and crash bar 44 is set in junction, prevented Lance 44 is than 43 short 10cm of steel chain or so;Each equipment train uses split-type structural, and each split 42 is transported to behind underground again again It is assembled into equipment train entirety;The front end of No.1 equipment train 10 is provided with traction steel chain 14;With the propulsion of working face, adjust in time The position of whole each equipment train, makes lotion conveyor train be maintained at apart from coal-face in 100m~300m.
The present invention operation principle be:
The preparation technology of lotion and lotion conveying technique are used into split type setting, underground lotion prepares station and is fixedly installed on In spoil main haulage roadway, lotion conveyor train is positioned in tailentry at coal-face 100m~300m, with The position that coal mining activity adjusts lotion conveyor train in time.During work, first on the ground by spoil broken rear and cement, powder Coal ash and a small amount of water, which stir, is made mixed tide material, is thrown through the well 16 that feeds intake to underground storage bin 17, and siccative travelling belt 1 is by well Mixed tide material in lower storage bin 17 is transported to lotion and prepared on the siccative reprinting belt 2 at station 18.Under normal circumstances, plough discharging Device 31 is in opening, and mixed tide material is dropped down onto in No. two mixers 4 (now No.1 mixer 3 is in stand-by state), meanwhile, Open No. two magnetic valves 30, control system fed back to by No. two metered service amounts of flowmeter 29, and by signal, control system according to The closure degree of No. two magnetic valves 30 of lotion burden control, to realize the accurate control of confluent;Mixed tide material and water are through No. two Lotion is made in mixer 4 after stirring, lotion is given to skirt rim belt type conveying 5 by the discharging opening of No. two mixers 4, then through shirt rim Ribbon conveyer 5, shirt rim are reprinted ribbon conveyer 34 and are delivered on bottom-dump drag conveyor 40, under normal circumstances, electro-hydraulic flat Plate gate 38 is in opening (now No.1 filling pump group 7 is in stand-by state), and lotion falls into No. two filling pump groups 8 and fed In bucket, lotion is delivered to through lotion conveyance conduit 15 in the goaf at coal-face rear, realizes mine paste body filling operation.
As coal mining activity is persistently carried out, working face constantly promotes, using the drawing hoist of coal-face or other Underground pulling equipment pulls each equipment train in steel track 9 by being fixed on the traction steel chain 14 of the front end of No.1 equipment train 10 Upper movement, realize that lotion preparation system follows the propulsion of coal-face closely and moved.

Claims (10)

1. a kind of coal mine down-hole splited formula lotion prepares and conveying device, it is characterised in that including siccative travelling belt (1), well Lower lotion prepares station (18), lotion conveyor train (21) and the steel track (9) being arranged in tailentry (20);Its In,
Siccative travelling belt (1) is arranged in spoil main haulage roadway (19), and siccative travelling belt head (22) and underground lotion The siccative for preparing station (18) reprints belt machine end (23) overlap joint;
Underground lotion prepares station (18) and stirred including siccative reprinting belt (2), steel structure support (24), No.1 mixer (3), No. two Mix machine (4), No.1 feed pipe (25) and No. two feed pipes (28);
Siccative is reprinted belt (2) and is fixed on entirely through steel structure support (24) on the roadway floor of spoil main haulage roadway (19); No.1 mixer (3) and No. two mixers (4) are arranged on the lower section that siccative reprints belt (2) upper level section, and No.1 stirs Machine (3) and No. two mixers (4) are fixed on spoil main haulage roadway (19) roadway floor by steel structure support (24);
Skirt rim belt type conveying (5), shirt rim belt conveying are provided with below No.1 mixer (3) and No. two mixers (4) Machine (5) is arranged on the roadway floor of spoil main haulage roadway (19), and skirt rim belt type conveying tail (33) is located at No.1 stirring Immediately below machine (3);In No.1 mixer (3), feed end is provided with No.1 feed pipe (25), is set in No. two mixer (4) feed ends It is equipped with No. two feed pipes (28);
Skirt rim belt type conveying (5) is used to the lotion that underground lotion preparation station (18) is stirred being delivered to lotion conveyor train (21);Lotion conveyor train (21) includes shirt rim and reprints ribbon conveyer (34), bottom-dump drag conveyor (6), No.1 filling Pump group (7), No. two filling pump groups (8), No.1 equipment train (10), No. two equipment trains (11), No. three equipment trains (12) and No. four equipment trains (13);No.1 equipment train (10), No. two equipment trains (11), No. three equipment trains (12) and No. four equipment What train (13) was sequentially connected from right to left is arranged on steel track (9);
Skirt rim belt type conveying head (36) is reprinted belt conveyor tail (35) with shirt rim and overlapped, and ribbon conveyer is reprinted in shirt rim (34) it is fixed on using steel structure support (24) on No.1 equipment train (10) and No. two equipment trains (11);Reprint belt in shirt rim Conveyer head (37) overlaps with bottom-dump scraper conveyor tail (39);Bottom-dump drag conveyor (6) passes through steel construction branch Frame is fixed on No. three equipment trains (12), and electro-hydraulic bulkhgead gate (38) is provided with bottom-dump drag conveyor (6);Bottom-dump No.1 filling pump group (7) is provided with below drag conveyor (6), No.1 filling pump group (7) is fixed on No. three equipment trains (12) On, and bottom-dump drag conveyor (6) is filled under being in above the pump housing in No.1 filling pump group (7) and is in tilted layout;
No. two filling pump groups (8) are fixed on No. four equipment trains (13), and bottom-dump handpiece of scraper conveyer (40) is located at No. two Fill above pump group (8) feed hopper.
2. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that siccative Belt (2) is reprinted integrally to arrange in " Z " font, including the lower horizontal below siccative travelling belt (1), positioned at No.1 Upper level section above mixer (3) and No. two mixers (4), and the tilting section of two horizontal segments of connection.
3. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that unloads at bottom The angle of inclination of formula drag conveyor (6) is 1 °~3 °.
4. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that shirt rim The lap of splice for reprinting belt conveyor tail (35) and skirt rim belt type conveying head (36) pushes away daily more than coal-face Enter distance.
5. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that underground Lotion, which prepares station (18), also includes belt plow (31), and it is located at the top of No.1 mixer (3) feed end;Siccative reprints skin With head (32) positioned at the top of No. two mixer (4) feed ends.
6. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that No.1 Feed pipe (25) is being provided with No.1 flowmeter (26) and No.1 magnetic valve (27) at the mouth of pipe, No. two feed pipes (28) by No. two flowmeters (29) and No. two magnetic valves (30), and No.1 feed pipe (25) and No. two feed pipes (28) are provided with the nearly mouth of pipe The fire-fighting sprinkling pipeline existing with underground or discharge pipe line are connected.
7. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that No.1 Steel chain is used between equipment train (10), No. two equipment trains (11), No. three equipment trains (12) and No. four equipment trains (13) (43) connect, and crash bar (44) is set in junction, crash bar (44) is shorter 10cm than steel chain (43);
No.1 equipment train (10), No. two equipment trains (11), No. three equipment trains (12) and No. four equipment trains (13) are adopted With split-type structural, equipment train entirety is reassembled into again by the way that multiple splits (42) are transported to behind underground.
8. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that No.1 Equipment train (10) front end is provided with traction steel chain (14);With the propulsion of working face, the position of each equipment train is adjusted in time, Lotion conveyor train (21) is set to be maintained at apart from coal-face in 100m~300m.
9. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that steel Sleeper (41) is equidistantly positioned below track (9), steel track (9) length is more than the connected length of each equipment train and coal-getter Make the summation of the daily advance distance in face.
10. a kind of coal mine down-hole splited formula lotion according to claim 1 prepares and conveying device, it is characterised in that also Including the well that feeds intake (16), storage bin (17) and lotion conveyance conduit (15);
During work, manufactured mixed tide material is stirred through the well that feeds intake with cement, flyash and water by the spoil after broken (16) throw to underground storage bin (17), siccative travelling belt (1) and the mixed tide material in underground storage bin (17) is transported to lotion The siccative for preparing station (18) is reprinted on belt (2);
Lotion is made in mixed tide material and water after No. two mixers (4) are stirred, and lotion is by the discharging opening of No. two mixers (4) to extremely On skirt rim belt type conveying (5), then reprint ribbon conveyer (34) through skirt rim belt type conveying (5), shirt rim and be delivered to bottom-dump On drag conveyor (40), lotion is fallen into No. two filling pump group (8) feed hoppers, and is delivered to and is adopted through lotion conveyance conduit (15) In the goaf at coal working face rear, mine paste body filling operation is realized.
CN201710819379.2A 2017-09-12 2017-09-12 Coal mine underground split paste preparation and conveying device Active CN107387158B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710819379.2A CN107387158B (en) 2017-09-12 2017-09-12 Coal mine underground split paste preparation and conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710819379.2A CN107387158B (en) 2017-09-12 2017-09-12 Coal mine underground split paste preparation and conveying device

Publications (2)

Publication Number Publication Date
CN107387158A true CN107387158A (en) 2017-11-24
CN107387158B CN107387158B (en) 2023-02-28

Family

ID=60351203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710819379.2A Active CN107387158B (en) 2017-09-12 2017-09-12 Coal mine underground split paste preparation and conveying device

Country Status (1)

Country Link
CN (1) CN107387158B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110007591A (en) * 2019-04-04 2019-07-12 三一汽车制造有限公司 Multi-joint control method, computer equipment and readable storage medium storing program for executing

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015161771A1 (en) * 2014-04-25 2015-10-29 中国矿业大学 Matching method for equipment for solid-filling coal face of coal mine
CN106194252A (en) * 2016-09-29 2016-12-07 路彬 A kind of coal mining totipotency end pipeline conveying Paste-filling System and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015161771A1 (en) * 2014-04-25 2015-10-29 中国矿业大学 Matching method for equipment for solid-filling coal face of coal mine
CN106194252A (en) * 2016-09-29 2016-12-07 路彬 A kind of coal mining totipotency end pipeline conveying Paste-filling System and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王国际等: "井下泵送矸石似膏体充填开采技术研究", 《能源技术与管理》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110007591A (en) * 2019-04-04 2019-07-12 三一汽车制造有限公司 Multi-joint control method, computer equipment and readable storage medium storing program for executing
CN110007591B (en) * 2019-04-04 2022-08-05 三一汽车制造有限公司 Multi-connection control method, computer equipment and readable storage medium

Also Published As

Publication number Publication date
CN107387158B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
WO2018176892A1 (en) Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control
CN102305069B (en) Technology and equipment for separating coal and gangue and refilling gangue
CN102230396A (en) Filling method capable of exploring while filling coal mine goaf
CN109826665A (en) A kind of spoil and high-water material mixed filling method
CN210530835U (en) Short-distance originating wellhead shield tunneling machine muck conveying device
CN101418690A (en) Flat coal deposit large open pit mine end-slope transport technological process
CN108952733A (en) Separate launching shield technique application construction method in municipal sewerage engineering
CN104314129A (en) Filling and dredging mud adding stirring machine for constructional engineering and construction method thereof
CN106065782A (en) A kind of big flow high concentration structure stream full tail sand cemented filling technique
CN202266260U (en) Technical equipment for separating coal from gangue and backfilling gangue
CN110130979A (en) Aerodynamic force spoil combines device for filling and coal-mining method
CN207122323U (en) A kind of coal mine underground mobile lotion prepares and conveying device
CN107387158A (en) A kind of coal mine down-hole splited formula lotion prepares and conveying device
CN107131000B (en) Intelligent jet filling mining equipment for underground coal mine
CN109505604B (en) Slope ramp arrangement method applied to stope adopting upward layered filling mining method
CN106368715B (en) A kind of slag tapping method constructed during double-shielded TBM assembling
CN116291447A (en) Green and efficient mining system and method for continuous mining and continuous charging of three-coal-loss continuous mining
Brannon et al. Development of and production update for the Grasberg Block Cave mine–PT Freeport Indonesia
CN102979532A (en) Development method of transportation through auxiliary slope ramp matched with rubber belt inclined shaft
CN116378750A (en) Underground dynamic filling method for gangue paste
CN111173537B (en) Large-scale supplementary grouting method between duct piece and surrounding rock for tunnel construction by TBM method
CN104948223B (en) Down-hole gob-side roadway filling system and method
CN105626140B (en) Solid lotion combination filling system and placement method
CN112855182A (en) Duct piece back gap filling system device for shield and method thereof
CN203756196U (en) Underground vehicle-mounted slip casting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant