CN107386977A - A kind of interior rig and its construction method - Google Patents

A kind of interior rig and its construction method Download PDF

Info

Publication number
CN107386977A
CN107386977A CN201710598065.4A CN201710598065A CN107386977A CN 107386977 A CN107386977 A CN 107386977A CN 201710598065 A CN201710598065 A CN 201710598065A CN 107386977 A CN107386977 A CN 107386977A
Authority
CN
China
Prior art keywords
pile
drilling
digging
interior
prefabricated hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710598065.4A
Other languages
Chinese (zh)
Other versions
CN107386977B (en
Inventor
张雁
许俊
郭强
毛由田
陈巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Building Materials (jiangsu) Co Ltd
Original Assignee
Jianhua Building Materials (jiangsu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianhua Building Materials (jiangsu) Co Ltd filed Critical Jianhua Building Materials (jiangsu) Co Ltd
Priority to CN201710598065.4A priority Critical patent/CN107386977B/en
Publication of CN107386977A publication Critical patent/CN107386977A/en
Application granted granted Critical
Publication of CN107386977B publication Critical patent/CN107386977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention discloses a kind of interior rig and its construction method.The interior rig includes digging-drilling machine, and digging-drilling machine includes reductor, fixture, drive device and drilling tool, and fixture is arranged on reductor, and through hole is provided with drilling tool, and drilling tool bottom is provided with the outlet of through hole;Drilling tool includes drill bit, drilling rod and helical blade, and drilling rod is connected with reductor;Drilling rod is divided into more piece, and is connected with each other by tool joint;Tool joint uses pin and box sub.The present invention when to precast hollow pile driving construction, can not have to change original machine structure, you can realization is drawn hole, piling while carried out using said apparatus.The interior rig low cost of the present invention, simple in construction, deadweight is relatively light, construct convenient, low noise, low vibration, environmental protection, efficiency high, and it is difficult can effectively to solve the problems, such as that Prefabricated hollow pile is constructed in dense sand stratum geology.

Description

A kind of interior rig and its construction method
Technical field
The present invention relates to building pile foundation technical field, more particularly to a kind of interior rig and its construction method.
Background technology
With the continuous development of industry, all kinds of high-rises and complicated structure type are emerged in an endless stream, and pile foundation is wanted Also more and more higher is sought, various new technologies, the Prefabricated hollow pile of new material gradually substitute traditional pile foundation form, also therefore increasingly It is obvious to find in many engineering projects at home, using existing construction equipment (such as static pressure equipment, hammering equipment) prefabricated It is difficult to during hollow sunk pile through thicker dense sand stratum geology, pile body damages or do not reached design stake when constructing often It is long, lead to not the requirement for meeting engineering.Also there are some other engineering methods at present to solve the Prefabricated hollow pile construction problem occurred, Such as the methods of drawing hole construction, stirring lock pin, although solving above-mentioned produced problem to a certain extent, need on construction ground More construction equipments are additionally launched, cost is higher, and efficiency of construction is more general, have impact on the cycle of engineering.
Patent " drawing hole static pressure enters rock construction technology certainly at hugging pressure type PHC pipe piles end " (CN200610124487.X) is to pass through High-Pressure Water and high pressure draught impact and crushed the hard gravel layer in pile top front end, successively form hole, side punching press.It is this High-pressure rotary-spray (no drilling rod) draws the structure for entering rock construction method, destroying original pile-end soil in hole, and the bearing capacity at stake end is lost Greatly.
Patent application " pipe inside spin draws hole and the progressive static pressure pile-sinking construction technology of static pressure pile-sinking alternatively, sectionally " (CN200910186602.X) a kind of, patent application " dug in static pressure and pressing pile construction method dug in pile press machine and static pressure " (CN201010278241.4), patent " drawing cellular type Static pressure pile driver " (CN201220548408.9) is on existing static pressure machine Fixed frame is installed, drawing hole construction is promoted by hydraulically extensible, first draws pitching pile, the constructing operation of piling behind hole, belongs to Contiuum type Or monoblock type stake machine, this have impact on original machine structure and the use in later stage, the easily collapse hole, and can not accomplish to draw in construction Hole is carried out simultaneously with piling, and does not carry out gas injection construction, need to be installed bigger power set, low construction efficiency, can not be ensured stake The bearing capacity and pile sinking quality at end.
The content of the invention
To overcome problem above, the present invention provides a kind of split type interior rig and its construction method, can effectively solved pre- The technical problem that hollow pile processed runs into when layer of sand is constructed.
The present invention adopts the following technical scheme that:
A kind of interior rig, including digging-drilling machine, the digging-drilling machine include reductor, fixture, drive device and drilling tool, and fixture is set Put on reductor, through hole is provided with drilling tool, drilling tool bottom is provided with the outlet of the through hole;The drilling tool includes drill bit, drilling rod And helical blade, drilling rod are connected with reductor;The drilling rod is divided into more piece, and is connected with each other by tool joint;The drilling rod Joint uses pin and box sub.
Further, the through hole is connected to highly pressurised liquid or gases at high pressure.
Further, the pin and box sub is grafting, clamping, threaded connection or connected by pin-and-hole.
Further, it is additionally provided with hanger on the digging-drilling machine.
Further, the fixture is arranged on the lower section of reductor, and the section of fixture is circular or polygon.
Further, the end of the fixture is in horn-like and is in inwardly inclined-plane.
Further, the section of the pin and box sub is in polygon-shaped.
Further, the exit of the through hole is provided with valve or jam.
A kind of above-mentioned construction method of interior rig of the present invention, is comprised the following steps that:
(1) before to precast hollow pile driving construction, the drilling tool of digging-drilling machine is inserted in the cavity of Prefabricated hollow pile;
(2) stake top of Prefabricated hollow pile is first clamped when constructing with the fixture of digging-drilling machine, then using Static pressure pile driver to prefabricated Hollow pile carries out piling construction, opens the drive device rotary drill rod of digging-drilling machine, while Static pressure pile driver continues down pile sinking;
(3) difficulty being pressed into according to real-time pile sinking, choose whether to need to carry out gas injection or water flooding construction, when pile sinking is stranded When difficult, it is existing to discharge the part of Prefabricated hollow pile internal cavities soil plug that gases at high pressure or water under high pressure are injected into the through hole of drilling tool As being pressed into Prefabricated hollow pile when creeping into digging-drilling machine;
(4) when precast hollow sunk pile arrival certain length need to plug into another Prefabricated hollow pile, Static pressure pile driver stops pressing Digging-drilling machine is simultaneously closed off, unclamps fixture, and drilling rod is fixed after digging-drilling machine is improved, first separates tool joint, then will separation Digging-drilling machine afterwards is connected with drilling rod built-in in another Prefabricated hollow pile by tool joint, by the Prefabricated hollow pile after connection The top of the Prefabricated hollow pile of pile sinking is transported to together with digging-drilling machine, by tool joint first by inside two Prefabricated hollow piles Drilling rod is connected, and reconnects two Prefabricated hollow piles, and the Prefabricated hollow pile stake top plugged into is clamped finally by fixture, continues pile sinking, Repeat step (2) to (3);
(5) when dense sand stratum has been passed through at Prefabricated hollow pile stake bottom, and piling speed is normal and during close to designed elevation, closes Digging-drilling machine simultaneously unclamps fixture, and digging-drilling machine is transported out of to the hollow bulb of Prefabricated hollow pile;
(6) static pressure pile-sinking is continued using Static pressure pile driver, until piling meets that designed elevation and requirement can be completed to construct.
Beneficial effects of the present invention are:
1st, interior rig low cost of the invention, simple in construction, conduct oneself with dignity relatively light, construct convenient, low noise, low vibration, ring Protect, efficiency high, can effectively solve the problems, such as that Prefabricated hollow pile is constructed difficult in dense sand stratum geology, slows down soil compaction effect.
2nd, the present invention uses split type digging-drilling machine, without the mounting and fixing support on original machine, therefore it is former without changing Some stake machine structures;It can be achieved to draw hole, piling while carry out using the device of the present invention, and the present invention can be in factory normalization Processing, realizes resource consolidation, reduces construction costs.
3rd, be provided with through hole on drilling tool of the invention, when running into special geology, in through hole can not gas injection not water flooding construction, Simultaneously when needing to inject certain gases at high pressure or water under high pressure, air compressor machine or water pump can be used to be connected with the through hole, it is real An existing hole uses.
4th, the present invention can set the quantity of drive device (such as motor) according to the needs of engineering, can effectively reduce equipment into This.When dense sand stratum thickness is smaller, 1 motor can be only set, be digging-drilling machine in single-power.When dense sand stratum thickness is larger When, the motor of 2 and the above can be set, realize digging-drilling machine in more power.
5th, due to not changing original Static pressure pile driver equipment, the display and change of pressure value can be seen in Static pressure pile driver OPS Change speed, realize pressure value and final pressure value is controllable.
6th, drilling rod section of the invention is in polygon-shaped that can improve drilling rod when rotated, effective transmission between each pole And rotation.
Brief description of the drawings
Fig. 1 is the structural representation of digging-drilling machine of the present invention;
Fig. 2 be digging-drilling machine of the present invention (a) tool joint box structural representation, (b) fillet of tool joint pins structural representation, (c) sectional view of fillet of tool joint pins;
Fig. 3 is another implementation structural representation of digging-drilling machine of the present invention;
Fig. 4 is the schematic device constructed using the present invention.
In figure, 1- reductors, 2- fixtures, 3- hangers, 4- motors, 5- drilling tools, 6- drill bits, 7- drilling rods, 8- helical blades, 9- Outlet, 10- through holes, 11- fillet of tool joint pins, 12- tool joint boxs, 13- pin-and-holes, 14- digging-drilling machines, 15- Static pressure pile drivers, 16- controls System processed, 17- air compressor machines or high-pressure hydraulic pump, 18- Prefabricated hollow piles, 19- dense sand stratums.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of interior rig of the present embodiment, mainly include digging-drilling machine 14 and control system 16, digging-drilling machine 14 includes reductor 1st, fixture 2, hanger 3, drive device and drilling tool 5, drilling tool 5 include drill bit 6, drilling rod 7, helical blade 8 and tool joint.Wherein, Fixture 2 and drilling rod 7 are arranged on the lower section of reductor 1, and hanger 3 is arranged on the top of reductor 1.Drive device and control system 16 Connection, wherein drive device can use motor or fluid power system, be filled in the present embodiment using motor 4 as driving Put, reductor 1 is connected with motor 4.6 tapered shape of drill bit.
As shown in Fig. 2 the inside center of drilling tool 5 is provided with through hole 10, the through hole 10 is connected with air compressor machine or high-pressure hydraulic pump 17. The quantity of through hole 10 can be one or more, and two are arranged side by side in the present embodiment.The bottom of drilling tool 5 is provided with through hole 10 outlet 9, export and be provided with valve or jam at 9, prevent that soil clogs outlet 9 during pile sinking.
Drilling rod 7 is split type, and more piece drilling rod is connected with each other by tool joint.Tool joint uses pin and box sub.Bore Between bar pin end 11 and tool joint box 12 can by grafting, clamping, screw thread, pin joint or other be mechanically connected. In the present embodiment, pin-and-hole 13 is respectively arranged with fillet of tool joint pins 11 and tool joint box 12, drilling rod 7 is carried out by pin-and-hole 13 Connection.Wherein, in order to preferably transmit torsion, the section of fillet of tool joint pins 11 and tool joint box 12 is in polygon-shaped (see Fig. 2 (c))。
Further, the section of fixture 2 is in polygon or toroidal, is made up of multiple intermediate plates.The end of fixture 2 is in loudspeaker Shape and be in inwardly inclined-plane, the setting of its horn mouth and certain slope is all beneficial to the installation of Prefabricated hollow pile.
Further, the quantity of motor 4 can use multiple, and Fig. 3 gives another bi-motor digging-drilling machine of the present invention Structural representation.
A kind of construction method of interior rig of the present embodiment, is comprised the following steps that:
1st, before being constructed to Prefabricated hollow pile 18, the drilling tool 5 on digging-drilling machine 14 is inserted in the cavity of Prefabricated hollow pile 18;
When the 2nd, constructing, starting control system 16 makes the fixture 2 of digging-drilling machine 14 clamp the stake top of Prefabricated hollow pile 18;Using quiet Pile press machine 15 carries out piling construction to Prefabricated hollow pile 18, and opening control system 16 starts the rotary drill rod 7 of motor 4, while static pressure Stake machine 15 continues down pile sinking;
3rd, difficulty is pressed into according to real-time pile sinking, chooses whether to need gas injection or water flooding construction, when pile sinking difficulty, led to Cross air compressor machine or high-pressure hydraulic pump 17 and gases at high pressure or appropriate water under high pressure are injected into through hole 10, the inside of release Prefabricated hollow pile 18 is empty The part soil plug phenomenon of chamber, Prefabricated hollow pile 18 is pressed into when creeping into digging-drilling machine 14;
4th, when the pile sinking of Prefabricated hollow pile 18 arrival certain depth need to plug into Prefabricated hollow pile, Static pressure pile driver 15 stops pressure simultaneously Digging-drilling machine 14 is closed, unclamps fixture 2, and the position that drilling rod 7 is carried to pin-and-hole 13 higher than 10~100cm of stake top is fixed, and is extracted and is inserted Pin hangs after two section drilling rod separation part above digging-drilling machine 14 and makes itself and drilling rod built-in in another Prefabricated hollow pile Connected by tool joint, the Prefabricated hollow pile and digging-drilling machine 14 1 are lifted to the upper of the Prefabricated hollow pile of pile sinking after connection Tool joint box 12 inside two Prefabricated hollow piles, is first connected, then led to again by side by pin-and-hole 13 with fillet of tool joint pins 11 Cross the modes such as welding and connect two Prefabricated hollow piles, Prefabricated hollow pile stake top is clamped finally by fixture 2, continue to repeat during pile sinking Step 2~3;
5th, when dense sand stratum 19 has been passed through at 18 bottoms of Prefabricated hollow pile, and piling speed is normal and during close to designed elevation, Close digging-drilling machine 14 and unclamp fixture 2, digging-drilling machine 14 is hung into Prefabricated hollow pile hollow bulb with loop wheel machine;
6th, static pressure pile-sinking is continued using Static pressure pile driver 15, until piling meets that designed elevation and requirement can be completed to construct.

Claims (10)

1. a kind of interior rig, including digging-drilling machine, it is characterised in that the digging-drilling machine includes reductor, fixture, drive device and brill Tool, fixture are arranged on reductor, and through hole is provided with drilling tool, and drilling tool bottom is provided with the outlet of the through hole;The drilling tool includes Drill bit, drilling rod and helical blade, drilling rod are connected with reductor;The drilling rod is divided into more piece, and is connected with each other by tool joint; The tool joint uses pin and box sub.
2. a kind of interior rig according to claim 1, it is characterised in that the through hole is connected to highly pressurised liquid or high pressure Gas.
3. a kind of interior rig according to claim 1, it is characterised in that the pin and box sub is grafting, clamping, screw thread company Connect or connected by pin-and-hole.
4. a kind of interior rig according to claim 1, it is characterised in that be additionally provided with hanger on the digging-drilling machine.
5. a kind of interior rig according to claim 1, it is characterised in that the fixture is arranged on the lower section of reductor, folder The section of tool is circular or polygon.
6. a kind of interior rig according to claim 1, it is characterised in that the end of the fixture is in horn-like and is in inwardly Inclined-plane.
7. a kind of interior rig according to claim 1, it is characterised in that the section of the pin and box sub is in polygon-shaped.
A kind of 8. interior rig according to claim 1, it is characterised in that the exit of the through hole be provided with valve or Jam.
9. a kind of construction method of interior rig as claimed in claim 1, it is characterised in that comprise the following steps that:
(1) before to precast hollow pile driving construction, the drilling tool of digging-drilling machine is inserted in the cavity of Prefabricated hollow pile;
(2) stake top of Prefabricated hollow pile is first clamped when constructing with the fixture of digging-drilling machine, then using Static pressure pile driver to precast hollow Stake carries out piling construction, opens the drive device rotary drill rod of digging-drilling machine, while Static pressure pile driver continues down pile sinking;
(3) difficulty being pressed into according to real-time pile sinking, choose whether to need to carry out gas injection or water flooding construction, when pile sinking is difficult When, gases at high pressure or water under high pressure are injected into the through hole of drilling tool to discharge the part of Prefabricated hollow pile internal cavities soil plug phenomenon, Prefabricated hollow pile is pressed into when creeping into digging-drilling machine;
(4) when precast hollow sunk pile arrival certain depth need to plug into another Prefabricated hollow pile, Static pressure pile driver stops pressure simultaneously Digging-drilling machine is closed, unclamps fixture, and drilling rod is fixed after digging-drilling machine is improved, is first separated tool joint, then by after separation Digging-drilling machine is connected with drilling rod built-in in another Prefabricated hollow pile by tool joint, by the Prefabricated hollow pile and pick after connection Rig is transported to the top of the Prefabricated hollow pile of pile sinking together, by tool joint first by the drilling rod inside two Prefabricated hollow piles Connection, two Prefabricated hollow piles are reconnected, the Prefabricated hollow pile stake top plugged into is clamped finally by fixture, continue pile sinking, repeated Step (2) to (3);
(5) when dense sand stratum has been passed through at Prefabricated hollow pile stake bottom, and piling speed is normal and during close to designed elevation, closes pick and bores Machine simultaneously unclamps fixture, and digging-drilling machine is transported out of to the hollow bulb of Prefabricated hollow pile;
(6) static pressure pile-sinking is continued using Static pressure pile driver, until piling meets that designed elevation and requirement can be completed to construct.
10. the construction method of a kind of interior rig according to claim 9, it is characterised in that in step (4), digging-drilling machine carries Up to tool joint is higher than 10~100cm of stake top.
CN201710598065.4A 2017-07-20 2017-07-20 Internal drilling machine and construction method thereof Active CN107386977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598065.4A CN107386977B (en) 2017-07-20 2017-07-20 Internal drilling machine and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598065.4A CN107386977B (en) 2017-07-20 2017-07-20 Internal drilling machine and construction method thereof

Publications (2)

Publication Number Publication Date
CN107386977A true CN107386977A (en) 2017-11-24
CN107386977B CN107386977B (en) 2023-06-20

Family

ID=60336383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598065.4A Active CN107386977B (en) 2017-07-20 2017-07-20 Internal drilling machine and construction method thereof

Country Status (1)

Country Link
CN (1) CN107386977B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643818A (en) * 2018-04-17 2018-10-12 东莞市智配机电科技有限公司 A kind of anti-blocking auger based on hydraulic stem control
CN111058443A (en) * 2019-12-19 2020-04-24 建华建材(中国)有限公司 Precast pile composite foundation construction method for eliminating loess collapsibility
CN112095623A (en) * 2020-09-28 2020-12-18 中国十七冶集团有限公司 Deep foundation pit excavation supporting device and method suitable for sandy soil area
CN113293760A (en) * 2021-06-09 2021-08-24 中铁建预制构件研发咨询(上海)有限公司 Precast pile construction method and precast pile construction equipment
CN113957949A (en) * 2021-11-24 2022-01-21 中建东设岩土工程有限公司 Water circulation system of drilling pump in static pressure pipe pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201460767U (en) * 2009-05-14 2010-05-12 煤炭科学研究总院重庆研究院 Bolt connection-type square-head spiral drill pipe
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN106836202A (en) * 2017-02-17 2017-06-13 建基建设集团有限公司 Bored in efficient pile tube soil, piling, dust, whitewash all-in-one and its construction technology
CN206245369U (en) * 2016-12-05 2017-06-13 国网河南商水县供电公司 A kind of electric pole digging apparatus
CN106854981A (en) * 2016-12-12 2017-06-16 太原理工大学 A kind of double dynamical snap joint auger stem
CN207004430U (en) * 2017-07-20 2018-02-13 建华建材(江苏)有限公司 A kind of interior rig

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201460767U (en) * 2009-05-14 2010-05-12 煤炭科学研究总院重庆研究院 Bolt connection-type square-head spiral drill pipe
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN206245369U (en) * 2016-12-05 2017-06-13 国网河南商水县供电公司 A kind of electric pole digging apparatus
CN106854981A (en) * 2016-12-12 2017-06-16 太原理工大学 A kind of double dynamical snap joint auger stem
CN106836202A (en) * 2017-02-17 2017-06-13 建基建设集团有限公司 Bored in efficient pile tube soil, piling, dust, whitewash all-in-one and its construction technology
CN207004430U (en) * 2017-07-20 2018-02-13 建华建材(江苏)有限公司 A kind of interior rig

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643818A (en) * 2018-04-17 2018-10-12 东莞市智配机电科技有限公司 A kind of anti-blocking auger based on hydraulic stem control
CN111058443A (en) * 2019-12-19 2020-04-24 建华建材(中国)有限公司 Precast pile composite foundation construction method for eliminating loess collapsibility
CN111058443B (en) * 2019-12-19 2021-06-22 建华建材(中国)有限公司 Precast pile composite foundation construction method for eliminating loess collapsibility
CN112095623A (en) * 2020-09-28 2020-12-18 中国十七冶集团有限公司 Deep foundation pit excavation supporting device and method suitable for sandy soil area
CN113293760A (en) * 2021-06-09 2021-08-24 中铁建预制构件研发咨询(上海)有限公司 Precast pile construction method and precast pile construction equipment
CN113957949A (en) * 2021-11-24 2022-01-21 中建东设岩土工程有限公司 Water circulation system of drilling pump in static pressure pipe pile

Also Published As

Publication number Publication date
CN107386977B (en) 2023-06-20

Similar Documents

Publication Publication Date Title
CN107386977A (en) A kind of interior rig and its construction method
CN108149699B (en) Recoverable dewatering well device capable of achieving well fast and construction method thereof
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
JPH06212870A (en) Cement soil device of underground drill
CN105350555B (en) A kind of rapid constructing method of dewatering well
CN110939137A (en) Vibration drainage anchor rod supporting structure for sand soil layer and construction method thereof
CN207004430U (en) A kind of interior rig
CN202323950U (en) Rotary casing connecting structure of rotary pile extractor
CN115263233B (en) Hole sealing method after drilling exploration
CN207485347U (en) Full-sleeve oscillatory type long auger guncreting pile machine
CN101476444A (en) Horizontal radiation pipe construction equipment for vibration-impact type radiation well
KR101345457B1 (en) Driving piles pressure device and using the device driving pile method
CN202730756U (en) Sleeve connection device for drilling cast-in-situ bored pipe construction
CN100412272C (en) Concrete transplanting steel bar cage pile forming technical method of long screw hole drilling and center pump pressure
CN204370413U (en) A kind of steel pile casting
RU2551590C1 (en) Method to produce root piles
CN110939161B (en) Construction method of large-diameter socketed anti-floating anchor rod and drilling tool used in method
CN106836228A (en) Filling type stake hollow drill
KR100937170B1 (en) Straight drilling method of ground for micro-pile construction
CN214247193U (en) Geological drilling rig capable of quickly drilling
CN206599784U (en) Filling type stake hollow drill
CN104532832A (en) Steel retaining cylinder and application method thereof
CN101691753A (en) Pile mould for PCC pile and construction method for overlong PCC pile
CN204780850U (en) High -efficient intubate of precipitation well point pipe machine
CN114703848B (en) Old pile pulling-out method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu

Applicant after: JIANHUA CONSTRUCTION MATERIALS (CHINA) Co.,Ltd.

Address before: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu

Applicant before: JIANHUA CONSTRUCTION MATERIALS (JIANGSU) CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant