CN107386523B CN201710645615.3A CN201710645615A CN107386523B CN 107386523 B CN107386523 B CN 107386523B CN 201710645615 A CN201710645615 A CN 201710645615A CN 107386523 B CN107386523 B CN 107386523B
Authority
CN
China
Prior art keywords
steel plate
plate box
lobe wall
insulating
thermal insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710645615.3A
Other languages
Chinese (zh)
Other versions
CN107386523A (en
Inventor
薛永生
来巨峰
蒋小成
苏传朴
邹文勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ludao Construction Engineering Co.,Ltd.
Original Assignee
Shandong High Speed Rail Transit Group Co Ltd Ji'nan Engineering Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong High Speed Rail Transit Group Co Ltd Ji'nan Engineering Branch filed Critical Shandong High Speed Rail Transit Group Co Ltd Ji'nan Engineering Branch
Priority to CN201710645615.3A priority Critical patent/CN107386523B/en
Publication of CN107386523A publication Critical patent/CN107386523A/en
Application granted granted Critical
Publication of CN107386523B publication Critical patent/CN107386523B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7608Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels
    • E04B1/7612Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels in combination with an air space
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of decoration integrated precast concrete external wall panel of structural thermal insulation, including the internal lobe wall, insulating layer and siphonal lobe wall set gradually from inside to outside, further includes steel plate box and socket part;The application is integrally wrapped up organic heat-insulating plate by steel plate box, then several described steel plate boxes are passed through into the insulating layer of the integrated planar structure of welded connecting again, so that whole steel plate boxes is smooth always and is located in the same plane, splicing seams gap between adjacent steel plate box can control to obtain very little, and cold-heat bridge phenomenon seriously weakens;The application is integrally wrapped up organic heat-insulating plate by steel plate box, so that the moisture in moisture and other external environments in wet basis concrete will not penetrate into again in organic insulation board, so that the thermal insulation property of organic heat-insulating plate is no longer reduced because immersion becomes tide, to improve the thermal insulation property of the decoration integrated precast concrete external wall panel of the structural thermal insulation, service life and durability.

Description

A kind of decoration integrated precast concrete external wall panel of structural thermal insulation
Technical field
The present invention relates to assembled architecture technical fields, more particularly, to a kind of decoration integrated concrete of structural thermal insulation Native Side fascia.
Background technique
Building energy conservation is the needs for realizing sustainable development, and building fire protection is the needs of social safety, and the two must be taken into account, It is indispensable.Currently, China is 75% or more energy conservation to the power conservation requirement of exterior walls of buildings, the fire prevention of exterior walls of buildings is wanted Seeking Truth reaches A grades of fire protection requirements.
Precast concrete external wall panel is used for the shear wall of assembled architecture, and the structure overwhelming majority is successively to set from inside to outside Internal lobe wall, insulating layer and the siphonal lobe wall set, insulating layer and siphonal lobe wall pass through the glass fibre specially designed and socket part or stainless Steel sockets part and is fixed on internal lobe wall, and above-mentioned inside and outside three-decker primary pre-formed completion in factory, wherein internal lobe wall exists In prefabrication process can a series of built-in fittings of pre-buried grout sleeve and sleeve reinforcing bar etc. with for the column in assembled architecture And the prefabricated components such as beam are attached, insulating layer majority is spliced by organic heat-insulating plate, and the outer length and width surface of siphonal lobe wall is usual A variety of finishing effects such as clear water, coating, patch block, stone material can be made into precast plant.
Certain domestic assembled architecture project has used a large amount of precast concrete external wall panel, and the structure of one of specification is protected The internal lobe wall of the decoration integrated precast concrete external wall panel of temperature with a thickness of 200mm, insulation layer thickness 80mm, siphonal lobe wall+decorations Furring tile with a thickness of 60mm, main flow prefabricated using back-hand craft are as follows: decorative layer construction-surface construction-insulating layer is applied Work-structure sheaf construction, detailed process are as follows:
Ceramic tile calibrated bolck make-assembles siphonal lobe wall mold-brushing release agent-ceramic tile calibrated bolck horizontal segment installation-porcelain Brick calibrated bolck vertical section installation-siphonal lobe wall horizontal segment, which pours, to vibrate-horizontal segment of mating formation with fixation-siphonal lobe wall installation of embedded parts Insulation board-sockets that vertical section insulation board is installed-mated formation to part and fixation-insulation board pattern install-pours vertical section siphonal lobe Wall-sockets part and install-assembles internal lobe wall mold-brushing interfacial agents-internal lobe wall steel reinforcement cage binding-internal lobe wall built-in fitting peace Dress-internal lobe wall, which pours, to vibrate-plasters-quiet stops-steam-cured-removing mold-component demoulding-flushing-spraying mark-fortune Defeated stacking.
Carefully check above-mentioned detailed process, it should be apparent that, there are the following problems:
1) above-mentioned detailed process include the concreting of front and back twice vibrate, before be once that siphonal lobe wall pours vibration Smash, behind be once that internal lobe wall is poured and vibrated, it is but only once steam-cured, that is, before the also uncured molding of siphonal lobe wall just Mat formation insulation board, then and then pours the one layer of wet basis concrete that vibrate again in the top of insulation board, three-decker belongs on the whole It is assembled in wet basis, then primary steam-cured solidification, it should be apparent that, the siphonal lobe wall concrete and internal lobe wall concrete of wet basis are all viscous Thick pulp-like, during being shakeout with external force, vibrating internal lobe wall concrete, external force, which is propagated downwards, to be easy to mat formation originally At the insulation board of a plane press height is low, it is crooked, cause the insulation board of monolithic no longer smooth, cause most of Insulation board no longer in the same plane so that the globality of insulating layer is destroyed, the splicing seams between adjacent insulation board Gap is excessive, and cold-heat bridge phenomenon is very prominent, leads to the heat insulating ability of the decoration integrated precast concrete external wall panel of the structural thermal insulation It can be poor;
2) thermal insulation property of the organic heat-insulating plate of the existing prevalence of is all relatively good, but this thermal insulation property refers to organic heat-insulating Thermal insulation property of the plate under original drying regime, but organic heat-insulating plate becomes tide once meeting water, thermal insulation property will be greatly reduced, So requiring the water absorption rate of organic heat-insulating plate the smaller the better in the prior art, and in the construction of external thermal insulation system, Filling sealing marine glue at splicing seams in finish coat, to prevent outside water from flowing into from the splicing seams in finish coat and final It penetrates into insulating layer and insulation board is soaked into change tide, reduce the thermal insulation property and durability of insulating layer, still, above-mentioned specific stream The siphonal lobe wall concrete of wet basis and internal lobe wall concrete are all sticky pulp-likes in journey, and a large amount of moisture contained in the two is not Avoidable ground can penetrate into the organic heat-insulating plate mated formation between, so that organic heat-insulating plate is soaked change tide, and further , the later period it is steam-cured during, also to continue to supplement high temperature moisture to siphonal lobe wall concrete and internal lobe wall concrete, unavoidably Ground, the high-temperature water branch of supplement continues to permeate into organic heat-insulating plate, to exacerbate the dampness of organic heat-insulating plate, seriously The thermal insulation property of organic heat-insulating plate is reduced, even if the organic heat-insulating plate that the later period there are the process of drying and dehydrating, was soaked in water Thermal insulation property be also impossible to the thermal insulation property being restored under most original drying regime, just as a piece of paper, after being soaked in water, Even if air-drying, also restore the apperance and quality less than most original.
Summary of the invention
The purpose of the present invention is to provide a kind of decoration integrated precast concrete external wall panel of structural thermal insulation, the concretes Native Side fascia has more reasonable structure, can guarantee whole organic heat-insulating plates in the same plane, and can prevent outer Boundary's water infilters in organic heat-insulating plate.
In order to solve the above technical problems, technical solution provided by the invention are as follows:
A kind of decoration integrated precast concrete external wall panel of structural thermal insulation, including set gradually from inside to outside internal lobe wall, Insulating layer and siphonal lobe wall are provided with finish coat on the outer length and width surface of the siphonal lobe wall, further include steel plate box and socket part;
The steel plate box is thin rectangular-shape shape, and the steel plate box includes interior bottom and outer case lid, and the interior bottom It is connected by a snap with outer case lid, and the junction of the interior bottom and outer case lid is provided with sealing rubber ring, and the interior bottom There is a sealant with the outer application of the junction of outer case lid, and the inner cavity of the steel plate box is vacuum tightness cavity, and the steel Four angles of plate case are 1/4 discount vibram outlet mouth structure;
One block of organic heat-insulating plate is set in the inner cavity of each steel plate box, and the length of the organic heat-insulating plate is equal to institute The interior length of the inner cavity of steel plate box is stated, and the width of the organic heat-insulating plate is equal to the insied width of the inner cavity of the steel plate box, and The thickness of the organic heat-insulating plate is less than the interior thickness of the inner cavity of the steel plate box;
The insulating layer is by steel plate box described in several by being welded to connect integrated planar structure, and adjacent four Corresponding four adjacent angles of the steel plate box are combined into a full circle through-hole;
The part that sockets includes external thread rod, several nuts and several anchoring caps, and the external thread rod is from described It passes through in full circle through-hole and is fixed in the full circle through-hole by inside and outside two nuts, on the inner end of the external thread rod It is provided at least one described anchoring cap, at least one described anchoring cap is provided on the outer end of the external thread rod, it is described outer The inner end of threaded rod and anchoring cap thereon are embedded in the internal lobe wall, the outer end of the external thread rod and anchoring cap thereon It is embedded in the siphonal lobe wall;
Steel reinforcement cage in the internal lobe wall is welded on the interior length and width surface of the steel plate box.
Preferably, the organic heat-insulating plate is hard polyurethane foam insulation board.
Preferably, steel plate used in the steel plate box with a thickness of 1mm.
Preferably, the finish coat is coating, ceramic tile, stone plate, cement plate or aluminium-plastic panel.
Preferably, it is coated in the outer metallic surface of the external thread rod, anchoring cap and nut contacted with concrete One layer of heat-insulated plastic layer formed after being solidified by the adhesive with heat insulating function.
The present invention provides a kind of decoration integrated precast concrete external wall panels of structural thermal insulation, including successively set from inside to outside Internal lobe wall, insulating layer and the siphonal lobe wall set are provided with finish coat on the outer length and width surface of the siphonal lobe wall, further include steel plate box And socket part;The application is integrally wrapped up organic heat-insulating plate by steel plate box, then again by several steel plate boxes By being welded to connect the insulating layer of integrated planar structure, the insulating layer of integral type planar structure is made in casting concrete For the intermediate mold that internal lobe wall concrete and siphonal lobe wall concrete pour simultaneously, since insulating layer itself is integral structure and guarantor Warm layer can be fixed as intermediate mold with extraneous fixing piece, therefore when pour wet basis concrete, will not be again insulation board Press height is low, it is crooked so that whole steel plate boxes is smooth always and is located in the same plane, adjacent steel plate box it Between splicing seams gap can control to obtain very little, cold-heat bridge phenomenon seriously weakens, ensure that significantly the structural thermal insulation decoration one The thermal insulation property of body precast concrete external wall panel;Inner cavity in steel plate box is vacuum tightness cavity, so that the steel plate box is constituted One vacuum insulation structure, the thermal insulation property of the vacuum insulation structure is more preferable than the thermal insulation property of organic heat-insulating plate, the two is strong Strong joint, improves the thermal insulation property of the decoration integrated precast concrete external wall panel of the structural thermal insulation significantly;The application passes through Steel plate box integrally wraps up organic heat-insulating plate, since steel plate will not seep water, when pouring wet basis concrete, and wet basis The moisture in moisture and other external environments in concrete will not penetrate into again in organic insulation board, so that organic heat-insulating plate The drying regime that can muchly keep its original, so that its thermal insulation property is no longer reduced because immersion becomes tide, to improve The service life and durability of organic heat-insulating plate, improve the heat preservation of the decoration integrated precast concrete external wall panel of the structural thermal insulation Performance, service life and durability.
Detailed description of the invention
Fig. 1 is the structural representation of the decoration integrated precast concrete external wall panel of structural thermal insulation provided in an embodiment of the present invention Figure;
Fig. 2 is the main view of the steel plate box in Fig. 1.
In figure: 1 internal lobe wall, 101 steel reinforcement cages, 2 siphonal lobe walls, 3 steel plate boxes, bottom in 301,302 outer case lids, 303 sealants Circle, 3041/4 discount vibram outlet mouth structure, 4 organic heat-insulating plates, 5 socket part, 501 external thread rods, 502 nuts, 503 anchoring caps.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " center ", " axial direction ", " radial direction ", " longitudinal direction ", " transverse direction ", " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outside", " clockwise ", " inverse The orientation or positional relationship of the instructions such as hour hands ", "vertical", "horizontal" is to be based on the orientation or positional relationship shown in the drawings, and is only For the convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning must have specific side Position is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower", It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is in the surface and oblique upper of second feature, or is merely representative of first feature horizontal height higher than second feature.First is special Sign includes fisrt feature in the underface and obliquely downward of second feature under the second feature " below ", " below " and " below ", or only Only indicate that first feature horizontal height is less than second feature.
Referring to Fig.1~Fig. 2, Fig. 1 are the decoration integrated precast concrete exterior wall of structural thermal insulation provided in an embodiment of the present invention The structural schematic diagram of plate;Fig. 2 is the main view of the steel plate box in Fig. 1.
This application provides a kind of decoration integrated precast concrete external wall panels of structural thermal insulation, including successively set from inside to outside Internal lobe wall 1, insulating layer and the siphonal lobe wall 2 set are provided with finish coat on the outer length and width surface of the siphonal lobe wall 2, further include steel Plate case 3 and socket part 5;
The steel plate box 3 is thin rectangular-shape shape, and the steel plate box 3 includes interior bottom 301 and outer case lid 302, and institute Interior bottom 301 is stated to be connected by a snap with outer case lid 302, and the junction of the interior bottom 301 and outer case lid 302 be provided with it is close Sealing rubber ring 303, and the outer application of the junction of the interior bottom 301 and outer case lid 302 has sealant, and the steel plate box 3 Inner cavity be vacuum tightness cavity, and four angles of the steel plate box 3 are 1/4 discount vibram outlet mouth structure 304;
One block of organic heat-insulating plate 4, and the length etc. of the organic heat-insulating plate 4 are set in the inner cavity of each steel plate box 3 Interior length in the inner cavity of the steel plate box 3, and the width of the organic heat-insulating plate 4 is equal to the interior of the inner cavity of the steel plate box 3 Width, and the thickness of the organic heat-insulating plate 4 is less than the interior thickness of the inner cavity of the steel plate box 3;
The insulating layer is by steel plate box 3 described in several by being welded to connect integrated planar structure, and adjacent four Corresponding four adjacent angles of a steel plate box 3 are combined into a full circle through-hole;
The part 5 that sockets includes external thread rod 501, several nuts 502 and several anchoring caps 503, the outer spiral shell Rasp bar 501 is described from passing through in the full circle through-hole and be fixed in the full circle through-hole by inside and outside two nuts 502 It is provided at least one described anchoring cap 503 on the inner end of external thread rod 501, is provided on the outer end of the external thread rod 501 At least one described anchoring cap 503, the inner end of the external thread rod 501 and anchoring cap 503 thereon are embedded in the internal lobe wall 1 In, the outer end of the external thread rod 501 and anchoring cap 503 thereon are embedded in the siphonal lobe wall 2;
Steel reinforcement cage 101 in the internal lobe wall 1 is welded on the interior length and width surface of the steel plate box 3.
In the application, it is both for shape that the interior bottom 301 and the junction of outer case lid 302, which are provided with sealing rubber ring 303, At sealing, and formation is heat-insulated, and the heat transfer between interior bottom 301 and outer case lid 302 is disconnected, and improves the heat insulating ability of steel plate box 3 Energy;
In steel plate box 3, it is preferably also placed with getter, to absorb during being used for a long time inevitably, the more Enter the gas and moisture in the vacuum tightness cavity in steel plate box 3 less less, guarantees the vacuum degree in vacuum tightness cavity;
The external thread rod 501 passes through from the full circle through-hole and is fixed on institute by inside and outside two nuts 502 It states in full circle through-hole, is in order to which the insulating layer of integral type planar structure is fixed on internal lobe wall 1 by several external thread rods 501 On;
Anchoring cap 503, which is connected through a screw thread, to be screwed on above-mentioned external thread rod 501;
Steel reinforcement cage 101 in the internal lobe wall 1 is welded on the interior length and width surface of the steel plate box 3, so that steel reinforcement cage 101 It can roll, be then directly welded on steel plate box 3 in advance, and increase the company between integral heat preservation layer and internal lobe wall 1 Intensity is connect, and facilitates the fixation of steel reinforcement cage 101, does not have to be fixed with other dedicated fixing pieces again when casting concrete Steel reinforcement cage 101.
The present invention provides a kind of decoration integrated precast concrete external wall panels of structural thermal insulation, including successively set from inside to outside Internal lobe wall 1, insulating layer and the siphonal lobe wall 2 set are provided with finish coat on the outer length and width surface of the siphonal lobe wall 2, further include steel Plate case 3 and socket part 5;The application is wrapped up 4 entirety of organic heat-insulating plate by steel plate box 3, then again by several institutes Steel plate box 3 is stated by the insulating layer of the integrated planar structure of welded connecting, in casting concrete by integral type planar structure The intermediate mold that is poured simultaneously as internal lobe wall concrete and siphonal lobe wall concrete of insulating layer, since insulating layer itself is one Formula structure and insulating layer can be fixed as intermediate mold with extraneous fixing piece, therefore when pour wet basis concrete, it will not Again insulation board press height is low, it is crooked so that whole steel plate boxes 3 is smooth always and is located in the same plane, Splicing seams gap between adjacent steel plate box 3 can control to obtain very little, and cold-heat bridge phenomenon seriously weakens, and ensure that the knot significantly The thermal insulation property of structure heat preservation decoration integrative precast concrete external wall panel;Inner cavity in steel plate box 3 is vacuum tightness cavity, so that The steel plate box 3 constitutes a vacuum insulation structure, the heat insulating ability of the thermal insulation property of the vacuum insulation structure than organic heat-insulating plate 4 Can be more preferable, the two combination among the strong ones improves the heat insulating ability of the decoration integrated precast concrete external wall panel of the structural thermal insulation significantly Energy;The application is wrapped up 4 entirety of organic heat-insulating plate by steel plate box 3, and since steel plate will not seep water, it is mixed to pour wet basis When solidifying soil, the moisture in wet basis concrete and the moisture in other external environments will not penetrate into organic insulation board 4 again In, the drying regime for allowing organic heat-insulating plate 4 muchly to keep its original, so that its thermal insulation property is no longer because immersion becomes tide And reduce, to improve the service life and durability of organic heat-insulating plate 4, it is decoration integrated prefabricated to improve the structural thermal insulation Thermal insulation property, service life and the durability of concrete external wall panel.
In one embodiment of the invention, the organic heat-insulating plate 4 is hard polyurethane foam insulation board.
In one embodiment of the invention, steel plate used in the steel plate box 3 with a thickness of 1mm.
In one embodiment of the invention, the finish coat is coating, ceramic tile, stone plate, cement plate or aluminium-plastic panel.
It is conducted produced by heat to reduce the external thread rod 501 along metal material, anchoring cap 503 and nut 502 Cold-heat bridge phenomenon, in one embodiment of the invention, the external thread rod 501, anchoring cap 503 and nut 502 with One layer of heat-insulated plastic cement formed after being solidified by the adhesive with heat insulating function is coated in the outer metallic surface of concrete contact The external thread rod 501 of metal material, anchoring cap 503 and nut 502 and concrete are carried out thermal isolation by layer.
Present invention also provides a kind of preparation method of above structure heat preservation decoration integrative precast concrete external wall panel, Finish coat uses stone plate, comprising the following steps:
1) produce steel plate box 3: the steel plate box 3 is thin rectangular-shape shape, the steel plate box 3 include interior bottom 301 with Outer case lid 302, and the interior bottom 301 is connected by a snap with outer case lid 302, and the interior bottom 301 and outer case lid 302 Junction is provided with sealing rubber ring 303, and four angles of the steel plate box 3 are 1/4 discount vibram outlet mouth structure;
2) it assembles insulating layer: one block of organic heat-insulating plate 4 being set first in the inner cavity of each interior bottom 301, and is controlled Make the organic heat-insulating plate 4 length be equal to the interior bottom 301 inner cavity interior length, and the width of the organic heat-insulating plate 4 Degree is equal to the insied width of the inner cavity of the interior bottom 301, and the thickness of the organic heat-insulating plate 4 is less than the interior of the steel plate box 3 The interior thickness of chamber;
Then the interior bottom 301 is connected by a snap with outer case lid 302, then in the interior bottom 301 and outer container The outer application sealant of the junction of lid 302;
Then aspirating hole is opened up on the tank wall of the interior bottom 301, then connects the aspirating hole in the interior bottom 301 Logical vacuum pump extracts vacuum, after the vacuum degree in the inner cavity of the steel plate box 3 is up to standard, is sealed aspirating hole using sealing processing So that the inner cavity of the steel plate box 3 is vacuum tightness cavity;
Then several described steel plate boxes 3 are formed into insulating layer by being welded to connect integrated planar structure, and adjacent Corresponding four adjacent angles of four steel plate boxes 3 be combined into a full circle through-hole;
3) produce first and socket part 5, it is described socket part 5 include external thread rod 501, several nuts 502 and several Anchor cap 503;
Then the external thread rod 501 is passed through from the full circle through-hole and is consolidated by inside and outside two nuts 502 It is scheduled in the full circle through-hole;
Then at least one described anchoring cap 503 is set on the inner end of the external thread rod 501, in the external thread rod At least one described anchoring cap 503 is set on 501 outer end;
Then steel reinforcement cage 101 in the internal lobe wall 1 is welded on by binding for the steel reinforcement cage 101 in the internal lobe wall 1 On the interior length and width surface of the steel plate box 3;
4) insulating layer obtained after step 3) assembling is erected into holding vertical state, then in the insulating layer The internal lobe wall mold for pouring internal lobe wall concrete is installed in side, and installs in the outside of the insulating layer for pouring siphonal lobe wall The siphonal lobe wall mold of concrete, and first it is fixed for the stone plate of facing on the inner surface of the siphonal lobe wall mold before;
Then the internal lobe wall concrete that vibrates is poured into the cavity between the internal lobe wall mold and the insulating layer, to institute It states and pours the siphonal lobe wall concrete that vibrates in the cavity between siphonal lobe wall mold and the insulating layer;
Then steam-cured;
Then internal lobe wall mold and siphonal lobe wall mold are removed, the decoration integrated precast concrete exterior wall of structural thermal insulation is made Plate.
In above-mentioned preparation method, sealing processing is used to seal aspirating hole so that the inner cavity of the steel plate box 3 is close for vacuum Cavity is closed, sealing processing herein is that the vacuum tightness cavity in the prior art, such as stainless-steel vacuum vacuum cup just uses nothing Tail seals processing technique and carries out vacuum sealing, and due to being the prior art, this is no longer explained in detail in the application;
And first it is fixed for the stone plate of facing on the inner surface of the siphonal lobe wall mold before, it is prefabricated in the prior art Side fascia is simultaneously not all planar structure, further includes the special-shaped prefabricated outer wall panel of L tee section, and the abnormal shape of L tee section herein is prefabricated Side fascia is whether poured using which kind of mold, and can all have a face is vertical state, can all have a face that formwork erection is needed to pour It builds, just needs elder generation that stone plate is fixed on formwork erection when formwork erection pours and pour on the inner surface with mold, made of back-hand craft Therefore stone plate is fixed on the inner surface that formwork erection is poured with siphonal lobe wall mold by the special-shaped prefabricated outer wall panel of the L tee section Technology is the prior art, and the application is no longer described in detail.
The method and apparatus of the not detailed description of the present invention are the prior art, are repeated no more.
Principle and implementation of the present invention are described for specific embodiment used herein, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention.It should be pointed out that for the common skill of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for art personnel, these change It is also fallen within the protection scope of the claims of the present invention into modification.

Claims (1)

1. a kind of decoration integrated precast concrete external wall panel of structural thermal insulation, including set gradually from inside to outside internal lobe wall, protect Warm layer and siphonal lobe wall are provided with finish coat on the outer length and width surface of the siphonal lobe wall, which is characterized in that further include steel plate box with And socket part;
The steel plate box is rectangular-shape shape, and the steel plate box includes interior bottom and outer case lid, and the interior bottom and outer container Lid is connected by a snap, and the junction of the interior bottom and outer case lid is provided with sealing rubber ring, and the interior bottom and outer container The outer application of the junction of lid has a sealant, and the inner cavity of the steel plate box is vacuum tightness cavity, and the steel plate box Four angles are 1/4 discount vibram outlet mouth structure;
One block of organic heat-insulating plate is set in the inner cavity of each steel plate box, and the length of the organic heat-insulating plate is equal to the steel The interior length of the inner cavity of plate case, and the width of the organic heat-insulating plate is equal to the insied width of the inner cavity of the steel plate box, and described The thickness of organic heat-insulating plate is less than the interior thickness of the inner cavity of the steel plate box;
The insulating layer is passed through by steel plate box described in several is welded to connect integrated planar structure, and described in adjacent four Corresponding four adjacent angles of steel plate box are combined into a full circle through-hole;
The part that sockets includes external thread rod, several nuts and several anchoring caps, and the external thread rod is from the full circle It passes through in through-hole and is fixed in the full circle through-hole by inside and outside two nuts, is arranged on the inner end of the external thread rod There is at least one described anchoring cap, at least one described anchoring cap, the external screw thread are provided on the outer end of the external thread rod The inner end of bar and anchoring cap thereon are embedded in the internal lobe wall, and the outer end of the external thread rod and anchoring cap thereon are pre-buried In the siphonal lobe wall;
Steel reinforcement cage in the internal lobe wall is welded on the interior length and width surface of the steel plate box;
The organic heat-insulating plate is hard polyurethane foam insulation board;
Steel plate used in the steel plate box with a thickness of 1mm;
The finish coat is coating, ceramic tile, stone plate, cement plate or aluminium-plastic panel;
One layer is coated in the outer metallic surface that the external thread rod, anchoring cap and nut are contacted with concrete by with heat-insulated The heat-insulated plastic layer that the adhesive of function is formed after solidifying;
The preparation method of the decoration integrated precast concrete external wall panel of structural thermal insulation, finish coat use stone plate, including Following steps:
1) produce steel plate box: the steel plate box is thin rectangular-shape shape, and the steel plate box includes interior bottom and outer case lid, and institute It states interior bottom to be connected by a snap with outer case lid, and the junction of the interior bottom and outer case lid is provided with sealing rubber ring, and institute Four angles for stating steel plate box are 1/4 discount vibram outlet mouth structure;
2) it assembles insulating layer: one block of organic heat-insulating plate being set first in the inner cavity of each interior bottom, and is had described in control The length of machine insulation board is equal to the interior length of the inner cavity of the interior bottom, and the width of the organic heat-insulating plate is equal to the interior case The insied width of the inner cavity at bottom, and the thickness of the organic heat-insulating plate is less than the interior thickness of the inner cavity of the steel plate box;
Then the interior bottom is connected by a snap with outer case lid, then in the outer of the junction of the interior bottom and outer case lid Side coats sealant;
Then aspirating hole is opened up on the tank wall of the interior bottom, the aspirating hole in the interior bottom is then connected to vacuum pumping Vacuum is taken, after the vacuum degree in the inner cavity of the steel plate box is up to standard, is sealed aspirating hole so that the steel using sealing processing The inner cavity of plate case is vacuum tightness cavity;
Then several described steel plate boxes are formed into insulating layer, and adjacent four by being welded to connect integrated planar structure Corresponding four adjacent angles of the steel plate box are combined into a full circle through-hole;
3) it produces first and sockets part, the part that sockets includes external thread rod, several nuts and several anchoring caps;
Then the external thread rod is passed through from the full circle through-hole and is fixed on by inside and outside two nuts described whole In round tube hole;
Then at least one described anchoring cap is set on the inner end of the external thread rod, set on the outer end of the external thread rod Set at least one described anchoring cap;
Then steel reinforcement cage in the internal lobe wall is welded on the steel plate box for the steel reinforcement cage in the internal lobe wall by binding On interior length and width surface;
4) insulating layer obtained after step 3) assembling is erected into holding vertical state, then pacified in the inside of the insulating layer The internal lobe wall mold for pouring internal lobe wall concrete is filled, and is installed in the outside of the insulating layer for pouring siphonal lobe wall coagulation The siphonal lobe wall mold of soil, and first it is fixed for the stone plate of facing on the inner surface of the siphonal lobe wall mold before;
Then the internal lobe wall concrete that vibrates is poured into the cavity between the internal lobe wall mold and the insulating layer, to outside described The siphonal lobe wall concrete that vibrates is poured in cavity between leaf wall mold and the insulating layer;
Then steam-cured;
Then internal lobe wall mold and siphonal lobe wall mold are removed, the decoration integrated precast concrete external wall panel of structural thermal insulation is made.
CN201710645615.3A 2017-08-01 2017-08-01 A kind of decoration integrated precast concrete external wall panel of structural thermal insulation Active CN107386523B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710645615.3A CN107386523B (en) 2017-08-01 2017-08-01 A kind of decoration integrated precast concrete external wall panel of structural thermal insulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710645615.3A CN107386523B (en) 2017-08-01 2017-08-01 A kind of decoration integrated precast concrete external wall panel of structural thermal insulation

Publications (2)

Publication Number Publication Date
CN107386523A CN107386523A (en) 2017-11-24
CN107386523B true CN107386523B (en) 2019-10-25

Family

ID=60344539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710645615.3A Active CN107386523B (en) 2017-08-01 2017-08-01 A kind of decoration integrated precast concrete external wall panel of structural thermal insulation

Country Status (1)

Country Link
CN (1) CN107386523B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277923B (en) * 2018-03-27 2023-09-12 长春工程学院 Novel combined heat-insulating composite wallboard
CN110629929B (en) * 2019-09-25 2021-05-28 吉林建筑大学 Block assembled building side fascia of steel cold bridge
CN112726849A (en) * 2021-02-06 2021-04-30 许勇宏 Heat insulation method for realizing low energy consumption of building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201620484U (en) * 2010-03-19 2010-11-03 周先林 Thermal insulation and decoration integrated plate
CN102425239A (en) * 2011-08-26 2012-04-25 谭树存 Tongue-and-groove type full-package fireproof insulation and decoration integrated outer wall insulation system
CN202500285U (en) * 2012-01-19 2012-10-24 济南城通保温工程有限公司 Inorganic composite thermal insulation decorative integrated board
CN204098402U (en) * 2014-09-12 2015-01-14 江苏新大洋保温墙板有限公司 A kind of heat preservation decoration integrative wallboard of metal face-piece parcel insulation layer
CN104594512A (en) * 2015-02-04 2015-05-06 王胜怀 Vacuum heat insulation and preservation layer used for building and provided with steel mesh, heat preservation system and construction method
CN106759989A (en) * 2016-12-09 2017-05-31 中民筑友科技投资有限公司 Warming plate and insulation board fabrication method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2298297Y (en) * 1997-03-19 1998-11-25 王小宁 Sandwich composite board with metal membrance heat insulation for building
CN2595914Y (en) * 2003-02-11 2003-12-31 李义 Light composite heat insulation outer wall plate
CN201343793Y (en) * 2008-12-17 2009-11-11 中国建筑东北设计研究院有限公司 Energy-saving sandwich composite wall steel tie
CN103669641A (en) * 2012-09-13 2014-03-26 孙大勇 Tying structure of sandwich thermal-insulating wall
CN204850142U (en) * 2015-08-03 2015-12-09 文登蓝岛建筑工程有限公司 Outer wall body drawknot device
CN105756209B (en) * 2016-04-26 2018-02-02 刘传伟 A kind of sandwich thermal insulated construction composite plate of external wall
CN206053106U (en) * 2016-07-25 2017-03-29 山东建筑大学 A kind of precast concrete external wall panel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201620484U (en) * 2010-03-19 2010-11-03 周先林 Thermal insulation and decoration integrated plate
CN102425239A (en) * 2011-08-26 2012-04-25 谭树存 Tongue-and-groove type full-package fireproof insulation and decoration integrated outer wall insulation system
CN202500285U (en) * 2012-01-19 2012-10-24 济南城通保温工程有限公司 Inorganic composite thermal insulation decorative integrated board
CN204098402U (en) * 2014-09-12 2015-01-14 江苏新大洋保温墙板有限公司 A kind of heat preservation decoration integrative wallboard of metal face-piece parcel insulation layer
CN104594512A (en) * 2015-02-04 2015-05-06 王胜怀 Vacuum heat insulation and preservation layer used for building and provided with steel mesh, heat preservation system and construction method
CN106759989A (en) * 2016-12-09 2017-05-31 中民筑友科技投资有限公司 Warming plate and insulation board fabrication method

Also Published As

Publication number Publication date
CN107386523A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN102031866B (en) A kind of disassembly-free heat-insulation decoration formwork and installation method thereof
CN107386523B (en) A kind of decoration integrated precast concrete external wall panel of structural thermal insulation
CN107363969B (en) A kind of preparation method of the decoration integrated precast concrete external wall panel of structural thermal insulation
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN105714962B (en) The cast-in-place external wall system and construction method for building prefabricated overall assembling insulation exterior sheathing free of demolition
CN209040360U (en) The cast-in-situ thermal-insulated decorating wall of non-dismantling formwork is made of decoration panel and keel
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN108589975A (en) Assembling cladding and construction technology
CN207846751U (en) A kind of prefabricated assembled concrete shear wall outer insulated wall plate
CN108590017B (en) A kind of fabric concrete segment and preparation method
CN109267695A (en) A kind of prefabricated wallboard of lightweight with connection structure and its installation method
CN104405097B (en) Heat-insulating decorative template integrated structure and structural wall comprising heat-insulating decorative template integrated structure
CN207646954U (en) Cast-in-place concrete compound external mold plate body system
CN206829427U (en) A kind of two-chamber square bar restrains heat-preserving wall component
CN215471902U (en) Exempt from to demolish sandwich heat preservation superimposed shear wall door and window entrance to a cave side form structure
CN207260352U (en) A kind of exterior-wall heat insulation template
CN103758256B (en) A kind of decorative heat preservation composite wall and preparation method thereof
CN207194226U (en) A kind of assembled integral shear wall connecting node
CN114718226A (en) Prefabricated composite external wall panel with decorative concrete surface layer and manufacturing method
CN205502377U (en) Hanging wallboard is partly inlayed to unit -installment light
CN106193431A (en) Wall board and preparation method thereof, building construction and method of construction thereof
CN208668645U (en) A kind of assembled architecture sealed waterproof device
CN110409655A (en) A kind of cast-in-place concrete exempts to tear composite shuttering heat-insulation system and its construction technology open
JPS5947784B2 (en) Structure of external walls in concrete buildings
CN101560798A (en) Cast-in-place light solid composite wall body of light steel truss structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220107

Address after: 250000 room 1718, 17th floor, building 2, Sanqing Qisheng Plaza, No. 1666, Xinluo street, Jinan area, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province

Patentee after: Shandong Ludao Construction Engineering Co.,Ltd.

Address before: 250101 room 207, unit 7, building 10, No. 750, Xinyu Road, high tech Zone, Jinan, Shandong

Patentee before: JINAN ENGINEERING BRANCH OF SHANDONG HIGH-SPEED RAIL TRANSIT GROUP CO.,LTD.