CN107386275A - A kind of pile foundation casting method and pile foundation casting system - Google Patents

A kind of pile foundation casting method and pile foundation casting system Download PDF

Info

Publication number
CN107386275A
CN107386275A CN201710790195.8A CN201710790195A CN107386275A CN 107386275 A CN107386275 A CN 107386275A CN 201710790195 A CN201710790195 A CN 201710790195A CN 107386275 A CN107386275 A CN 107386275A
Authority
CN
China
Prior art keywords
pile foundation
concrete
hole
conduit
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710790195.8A
Other languages
Chinese (zh)
Inventor
骆小红
苏昌茂
傅郁健
刘拓益
罗剑虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hua Chuan Highway Construction Group Co Ltd
Original Assignee
Chengdu Hua Chuan Highway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hua Chuan Highway Construction Group Co Ltd filed Critical Chengdu Hua Chuan Highway Construction Group Co Ltd
Priority to CN201710790195.8A priority Critical patent/CN107386275A/en
Publication of CN107386275A publication Critical patent/CN107386275A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of pile foundation casting method and pile foundation casting system, it is related to technical field of buildings, by carrying out mechanical hole building in pile foundation casting area, form pile foundation hole, conduit will be poured again to be arranged in pile foundation hole and positioned by hanging apparatus, by pouring conduit casting concrete and tube drawing operation is carried out into pile foundation hole, conduit is poured until extracting, and first layer casting concrete is formed in pile foundation hole, finally poured in pile foundation hole in the enterprising pedestrian's work of first layer casting concrete and form second layer casting concrete, second layer casting concrete is manually vibrated.Without artificial lower opening operation during whole operation, while pour and work well, step is simple, is very suitable for pouring for bridge pile foundation.Compared to prior art, a kind of pile foundation casting method provided by the invention, poured by pouring conduit, pour and work well, step is simple, and safe, is poured without artificial lower opening.

Description

A kind of pile foundation casting method and pile foundation casting system
Technical field
The present invention relates to technical field of buildings, pours in particular to a kind of pile foundation casting method and pile foundation and is System.
Background technology
In Bored Pile of Bridge construction, the construction method in conventional area is using manually or mechanically pore-forming, using common mixed Solidifying native casting craft or underwater concreting technique completes Bored Pile of Bridge construction, and this construction method can solve commonly substantially Geology construction problem.
Investigate and find through inventor, if Bored Pile of Bridge depth is excessive, can not manually meet casting concrete under hole, together If when soil property it is more loose in the case of, casting concrete considerably increases the possibility of casualties under hole.It is same with this When, by geological conditions is limited, water resource lacks, and can not carry out pile foundation using underwater concreting method for some areas Plinth is constructed, and adds difficulty of construction.
In view of this, design and a kind of without casting concrete under hole and be applicable the wider pile foundation of geology scope and pour Building method is particularly important.
The content of the invention
It is an object of the invention to provide a kind of pile foundation casting method, concrete is extruded by gravity extruding, nothing Casting concrete under hole is needed, has ensured the security of construction.
Another object of the present invention is to provide a kind of pile foundation casting system, concrete is squeezed by gravity extruding Pressure, without casting concrete under hole, the security of construction is ensured
The present invention is realized using following technical scheme.
A kind of pile foundation casting method, comprises the following steps:
Mechanical hole building is carried out in pile foundation casting area, forms pile foundation hole;
Conduit will be poured in pile foundation hole and positioned;
Casting concrete and tube drawing operation is carried out into pile foundation hole by pouring conduit, conduit is poured until extracting, and First layer casting concrete is formed in pile foundation hole;And
Poured in pile foundation hole in the enterprising pedestrian's work of first layer casting concrete and form second layer casting concrete, it is right Second layer casting concrete manually vibrates.
Further, the step of carrying out mechanical hole building in pile foundation casting area, forming pile foundation hole includes:
Pile foundation hole is dug out in pile foundation casting area by Spiral digging machine;
Pile foundation pore-forming inspection is carried out to pile foundation hole.
Further, the step of carrying out pile foundation pore-forming inspection to pile foundation hole includes:
The parameter of pile foundation hole is measured, obtains measured value, and measured value is compared with standard figures;
Judge whether measured value matches with standard figures;
When measured value matches with standard figures, the step that will be poured conduit in pile foundation hole and positioned is performed Suddenly;
When measured value and standard figures mismatch, continue executing with and dug out by Spiral digging machine in pile foundation casting area again The step of pile foundation hole.
Further, before it will pour conduit in the pile foundation hole and carry out positioning step, pile foundation casting method is also Including:
Steel reinforcement cage is arranged in pile foundation hole, and positioned by human assistance, it is ensured that the perpendicularity of steel reinforcement cage.
Further, will pour conduit includes in pile foundation hole and the step of positioning:
Calculate the length for pouring conduit and splicing pours the first paragraph of conduit;
First paragraph is drawn in pile foundation hole and splicing and pour the second segment of conduit.
Further, pouring conduit includes storage bin hopper and direct current conduit, has indwelling mouth on storage bin hopper, direct current conduit can Releasably it is connected to the bottom of storage bin hopper and is connected with indwelling mouth, is gone forward side by side by pouring conduit casting concrete into pile foundation hole Row tube drawing operating procedure includes:
Concrete is poured into after storage bin hopper and pulls open indwelling mouth, continuous placing is carried out by penetration concrete;
Direct current conduit is constantly extracted into concrete while casting concrete so that direct current conduit is away from storage bin hopper The distance for the concrete that one end is stretched into pile foundation hole is less than or equal to 3m;
When concrete in pile foundation hole is less than or equal to 2m apart from the aperture of pile foundation hole, stop pouring into storage bin hopper Concrete, extract direct current conduit.
Further, the distance for the concrete that the one end of direct current conduit away from storage bin hopper is stretched into pile foundation hole is maintained at Between 2.5m-3m.
Further, the concrete in pile foundation hole stops into storage bin hopper apart from the aperture of pile foundation mouth during 1.5m-2m Penetration concrete, extract direct current conduit.
Further, the side for continuing to pour and being shaken by manually smashing according to mode is manually poured after conduit is poured in extraction After formula makes concrete compaction step, ultrasound examination is carried out to the concrete after the completion of hardening.
A kind of pile foundation casting system, suitable for above-mentioned pile foundation casting method, pile foundation casting system is used to pour pile foundation, Including Spiral digging machine, conduit, concrete casting machine and hanging apparatus are poured, wherein,
Spiral digging machine is used to carry out mechanical hole building in pile foundation casting area, forms pile foundation hole;
Hanging apparatus, which is used to pour conduit in pile foundation hole and extracted, pours conduit;
Concrete casting machine is used for by pouring conduit casting concrete into pile foundation hole.
The invention has the advantages that:
A kind of pile foundation casting method provided by the invention, by carrying out mechanical hole building in pile foundation casting area, form pile foundation Hole, then conduit will be poured and be arranged in pile foundation hole and positioned by hanging apparatus, poured by pouring conduit into pile foundation hole Build concrete and carry out tube drawing operation, conduit is poured until extracting, and first layer casting concrete is formed in pile foundation hole, most Poured afterwards in pile foundation hole in the enterprising pedestrian's work of first layer casting concrete and form second layer casting concrete, to the second layer Casting concrete manually vibrates.Without artificial lower opening operation during whole operation, while pouring and work well, step is simple, It is very suitable for pouring for bridge pile foundation.Compared to prior art, a kind of pile foundation casting method provided by the invention, by pouring Build conduit to be poured, pour and work well, step is simple, and safe, is poured without artificial lower opening.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, it will use below required in embodiment Accompanying drawing is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not to be seen as It is the restriction to scope, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other related accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the pile foundation casting system that the specific embodiment of the invention provides;
Fig. 2 is the step block diagram for the pile foundation casting method that the specific embodiment of the invention provides;
Fig. 3 is the step block diagram of S110 in Fig. 2;
Fig. 4 is the step block diagram of S150 in Fig. 2.
Icon:100- pile foundation casting systems;110- pours conduit;111- storage bin hoppers;113- draws valve module;115- direct currents Conduit;130- concrete casting machines;150- hanging apparatus.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be configured to arrange and design with a variety of.
Therefore, the detailed description of the embodiments of the invention to providing in the accompanying drawings is not intended to limit requirement guarantor below The scope of the present invention of shield, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention, this area The every other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to guarantor of the present invention The scope of shield.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain item exists It is defined, then it further need not be defined and explained in subsequent accompanying drawing in one accompanying drawing.
In the description of the invention, it is necessary to explanation, term " on ", " vertical ", " interior ", the orientation of the instruction such as " outer " Or position relationship be based on orientation shown in the drawings or position relationship, or the invention product using when the side usually put Position or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or the device or member that imply meaning Part must have specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.This Outside, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " connected ", " installation ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, can be understood with concrete condition The concrete meaning of above-mentioned term in the present invention.
Below in conjunction with the accompanying drawings, some embodiments of the present invention are elaborated.It is following in the case where not conflicting Embodiment in feature can be mutually combined.
Referring to Fig. 1, the present embodiment provides a kind of pile foundation casting system 100, suitable for above-mentioned pile foundation casting method, stake Base casting system 100 is used to pour pile foundation, including Spiral digging machine (not shown), pour conduit 110, concrete casting machine 130 and Hanging apparatus 150, wherein, Spiral digging machine is used to carry out mechanical hole building in pile foundation casting area, forms pile foundation hole, hanging apparatus 150 For that will pour conduit 110 in pile foundation hole and be positioned, hanging apparatus 150 is additionally operable to extraction and pours conduit 110, Concrete casting machine 130 is used for by pouring the casting concrete into pile foundation hole of conduit 110, and first is formed in pile foundation hole Layer casting concrete.
In the present embodiment, pouring conduit 110 includes storage bin hopper 111, draws valve module 113 and direct current conduit 115, storage The bottom of hopper 111 offers an indwelling mouth, and direct current conduit 115 includes transition conduit and multiple connection straight tubes, multiple connection straight tubes Head and the tail connect and form a concrete path, and concrete path is for stretching into pile foundation hole and injecting concrete, and the one of transition conduit End is removably attachable to storage bin hopper 111 and connected with indwelling mouth, and the connection straight tube positioned at concrete path one end is detachable Ground is connected to the one end of transition conduit away from storage bin hopper 111, draws valve module 113 to be connected to the bottom of storage bin hopper 111, for opening Or close indwelling mouth.
The casting system that the present embodiment provides, is operated without artificial lower opening, has greatly ensured the safety of construction Property.
Referring to Fig. 2, the present embodiment additionally provides a kind of pile foundation casting method, comprises the following steps:
S110:Mechanical hole building is carried out in pile foundation casting area, forms pile foundation hole.
Referring to Fig. 3, in the present embodiment, wrapped in the step of pile foundation casting area progress mechanical hole building, formation pile foundation hole Include:
S111:Pile foundation hole is dug out in pile foundation casting area by Spiral digging machine.
S113:Pile foundation pore-forming inspection is carried out to pile foundation hole after pile foundation hole is dug out.
Specifically, it is, it is necessary to measured to the parameter of pile foundation hole carrying out pile foundation pore-forming inspection to pile foundation hole, obtains To measured value, and measured value is compared with standard figures and judges whether measured value matches with standard figures.
When measured value matches with standard figures, step S130 is performed.
When measured value and standard figures mismatch, step S111 is continued executing with again.
In the present embodiment, the parameter of pile foundation hole is measured including to the depth of pile foundation hole, diameter and perpendicularity point Do not measure and be compared with standard figures, it is whether qualified with detection of pier foundation hole.
Also include continuing with referring to Fig. 2, pile foundation casting method:
S130:Conduit 110 will be poured in pile foundation hole and positioned.
In the present embodiment, will pour conduit 110 includes in pile foundation hole and the step of positioning:Calculating is poured Build the length of conduit 110 and splicing pours the first paragraph of conduit 110;First paragraph is drawn in pile foundation hole and splicing to pour and lead The second segment of pipe 110.
Specifically, the splicing for pouring and first paragraph being carried out after the length of conduit 110 is calculated, by hanging after the completion of splicing First paragraph is drawn in pile foundation hole by assembling device 150 continues splicing completion second segment, so as to complete the peace to pouring conduit 110 Dress.
In the present embodiment, before it will pour conduit 110 in the pile foundation hole and carry out positioning step, pile foundation is poured Building method also includes:Steel reinforcement cage is arranged in pile foundation hole, and positioned by human assistance, it is ensured that the perpendicularity of steel reinforcement cage.
S150:Casting concrete and tube drawing operation is carried out into pile foundation hole by pouring conduit 110, poured until extracting Conduit 110, and first layer casting concrete is formed in pile foundation hole.
Specifically, pouring conduit 110 includes storage bin hopper and direct current conduit, has indwelling mouth, direct current conduit on storage bin hopper It is removably attachable to the bottom of storage bin hopper and is connected with indwelling mouth.
Referring to Fig. 4, casting concrete and carry out tube drawing operating procedure into pile foundation hole by pouring conduit 110 and include:
S151:Concrete is poured into after storage bin hopper and pulls open indwelling mouth, continuous placing is carried out by penetration concrete.
S153:Direct current conduit is constantly extracted into concrete while casting concrete so that direct current conduit is away from storing The distance for the concrete that one end of bucket is stretched into pile foundation hole is less than or equal to 3m.
S155:When concrete in pile foundation hole is less than or equal to 2m apart from the aperture of pile foundation hole, stop into storage bin hopper Penetration concrete, extract direct current conduit.
In the present embodiment, the distance for the concrete that the one end of direct current conduit away from storage bin hopper is stretched into pile foundation hole is kept Between 2.5m-3m.Specifically, the direct current conduit depth of burying can be measured by lining rope.
It is worth noting that, the distance that direct current conduit is stretched into pile foundation hole herein can be according to the actual coagulability of concrete Matter determines, is herein not especially limited.
In the present embodiment, the concrete in pile foundation hole stops to storing apart from the aperture of pile foundation mouth during 1.5m-2m Penetration concrete in bucket, extract direct current conduit.
It is worth noting that, stop herein the aperture of concrete and the pile foundation mouth during penetration concrete in pile foundation hole away from From can also be determined according to the actual solidification property of concrete, it is not especially limited herein.
Also include continuing with referring to Fig. 2, pile foundation casting method:
S170:Pour in the enterprising pedestrian's work of first layer casting concrete in pile foundation hole and form the second layer and pour coagulation Soil, second layer casting concrete is manually vibrated.
Specifically, continue to pour and shaken by manually smashing according to manually pouring mode after conduit 110 extracting to pour Mode makes concrete compaction step afterwards, it is necessary to carry out ultrasound examination to the concrete after the completion of hardening, detects qualified rear Next step construction can be carried out.
In summary, a kind of pile foundation casting method provided by the invention, by pile foundation casting area carry out machinery into Hole, pile foundation hole is formed, then conduit 110 will be poured and be arranged in pile foundation hole and positioned by hanging apparatus 150, by pouring Build conduit 110 and casting concrete and carry out tube drawing operation into pile foundation hole, conduit 110 is poured until extracting, and in pile foundation hole First layer casting concrete is formed, is finally poured in pile foundation hole in the enterprising pedestrian's work of first layer casting concrete and forms the Two layers of casting concrete, manually vibrate to second layer casting concrete.Without artificial lower opening operation during whole operation, together When pour and work well, step is simple, is very suitable for pouring for bridge pile foundation.It is provided by the invention compared to prior art A kind of pile foundation casting method, being poured by pouring conduit 110, pour and work well, step is simple, and safe, Poured without artificial lower opening.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made is any Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of pile foundation casting method, it is characterised in that comprise the following steps:
Mechanical hole building is carried out in pile foundation casting area, forms pile foundation hole;
Conduit will be poured in the pile foundation hole and positioned;
Pour conduit by described into the pile foundation hole and casting concrete and carry out tube drawing operation, led until being poured described in extracting Pipe, and first layer casting concrete is formed in the pile foundation hole;And
Poured in the pile foundation hole in the enterprising pedestrian's work of the first layer casting concrete and form second layer casting concrete, The second layer casting concrete is manually vibrated.
2. pile foundation casting method according to claim 1, it is characterised in that it is described pile foundation casting area carry out machinery into Hole, formed pile foundation hole the step of include:
The pile foundation hole is dug out in pile foundation casting area by Spiral digging machine;
Pile foundation pore-forming inspection is carried out to the pile foundation hole.
3. pile foundation casting method according to claim 2, it is characterised in that it is described to the pile foundation hole carry out pile foundation into The step of hole checks includes:
The parameter of the pile foundation hole is measured, obtains measured value, and the measured value is compared with standard figures;
Judge whether the measured value matches with the standard figures;
When the measured value matches with the standard figures, perform the conduit that will pour and gone forward side by side in the pile foundation hole The step of row positioning;
When the measured value and the standard figures mismatch, continue executing with again it is described by Spiral digging machine in pile foundation pouring area Dig out the step of pile foundation hole in domain.
4. pile foundation casting method according to claim 1, it is characterised in that be arranged on the stake in the conduit that will pour In datum hole and before carrying out positioning step, the pile foundation casting method also includes:
Steel reinforcement cage is arranged in the pile foundation hole, and positioned by human assistance, it is ensured that the perpendicularity of the steel reinforcement cage.
5. pile foundation casting method according to claim 4, it is characterised in that the conduit that will pour is arranged on the pile foundation In hole and carry out positioning step and include:
The first paragraph that conduit is poured described in the length of conduit and splicing is poured described in calculating;
The first paragraph is drawn to the second segment that conduit is poured in the pile foundation hole and described in splicing.
6. pile foundation casting method according to claim 4, it is characterised in that the conduit that pours includes storage bin hopper and direct current Conduit, has indwelling mouth on the storage bin hopper, the direct current conduit be removably attachable to the bottom of the storage bin hopper and with institute State the connection of indwelling mouth, it is described to pour conduit by described into the pile foundation hole and casting concrete and carry out tube drawing operating procedure bag Include:
The concrete is poured into after the storage bin hopper and pulls open the indwelling mouth, is continuously poured by pouring into the concrete Build;
The direct current conduit is constantly extracted into the concrete while concrete is poured so that the direct current conduit is remote One end from the storage bin hopper is stretched into and is less than or equal to 3m with a distance from the concrete in the pile foundation hole;
When the concrete in the pile foundation hole is less than or equal to 2m apart from the aperture of the pile foundation hole, stop to the storage The concrete is poured into hopper, extracts the direct current conduit.
7. pile foundation casting method according to claim 6, it is characterised in that the direct current conduit is away from the storage bin hopper The distance for the concrete that one end is stretched into the pile foundation hole is maintained between 2.5m-3m.
8. pile foundation casting method according to claim 6, it is characterised in that the concrete in the pile foundation hole away from From the pile foundation hole aperture 1.5m-2m when, stop pouring into the concrete into the storage bin hopper, extract the direct current and lead Pipe.
9. pile foundation casting method according to claim 1, it is characterised in that it is described in the pile foundation hole described The enterprising pedestrian's work of one layer of casting concrete pours and forms second layer casting concrete, artificial to the second layer casting concrete After the step of vibrating, ultrasound examination is carried out to the concrete after the completion of hardening.
A kind of 10. pile foundation casting system, suitable for the pile foundation casting method as described in claim any one of 1-9, the pile foundation Casting system is used to pour pile foundation, it is characterised in that including Spiral digging machine, conduit, concrete casting machine and hanging apparatus are poured, Wherein,
The Spiral digging machine is used to carry out mechanical hole building in pile foundation casting area, forms pile foundation hole;
The hanging apparatus is used to pour conduit by described in the pile foundation hole and pour conduit described in extracting;
The concrete casting machine is used to pour conduit casting concrete into the pile foundation hole by described.
CN201710790195.8A 2017-09-05 2017-09-05 A kind of pile foundation casting method and pile foundation casting system Pending CN107386275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710790195.8A CN107386275A (en) 2017-09-05 2017-09-05 A kind of pile foundation casting method and pile foundation casting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710790195.8A CN107386275A (en) 2017-09-05 2017-09-05 A kind of pile foundation casting method and pile foundation casting system

Publications (1)

Publication Number Publication Date
CN107386275A true CN107386275A (en) 2017-11-24

Family

ID=60349191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710790195.8A Pending CN107386275A (en) 2017-09-05 2017-09-05 A kind of pile foundation casting method and pile foundation casting system

Country Status (1)

Country Link
CN (1) CN107386275A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179752A (en) * 2017-12-27 2018-06-19 张成瑞 Immediate processing method after bored concrete pile card pipe
CN112144531A (en) * 2020-09-10 2020-12-29 芜湖质达设计有限公司 Bridge pile foundation construction is with pouring equipment based on drift sand geology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011068329A2 (en) * 2009-12-03 2011-06-09 대한기초엔지니어링 주식회사 Beam penetrating after lower part casting type cast-in-place pile method
CN104110028A (en) * 2014-07-07 2014-10-22 河北省水利工程局 Grouting pile construction method for dry operation drilling and waterless pouring of concrete
CN106013094A (en) * 2016-06-17 2016-10-12 四川公路桥梁建设集团有限公司 Method applicable to pouring of concrete for artificial excavating pile body

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011068329A2 (en) * 2009-12-03 2011-06-09 대한기초엔지니어링 주식회사 Beam penetrating after lower part casting type cast-in-place pile method
CN104110028A (en) * 2014-07-07 2014-10-22 河北省水利工程局 Grouting pile construction method for dry operation drilling and waterless pouring of concrete
CN106013094A (en) * 2016-06-17 2016-10-12 四川公路桥梁建设集团有限公司 Method applicable to pouring of concrete for artificial excavating pile body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
单炳骥等: ""山区大孔径超深挖孔桩施工技术"", 《江西建材》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179752A (en) * 2017-12-27 2018-06-19 张成瑞 Immediate processing method after bored concrete pile card pipe
CN112144531A (en) * 2020-09-10 2020-12-29 芜湖质达设计有限公司 Bridge pile foundation construction is with pouring equipment based on drift sand geology
CN112144531B (en) * 2020-09-10 2021-12-31 黄民 Bridge pile foundation construction is with pouring equipment based on drift sand geology

Similar Documents

Publication Publication Date Title
CN106193042B (en) Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer
CN105275381B (en) Impact drill drilling construction method in rich water pebble layer
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN106836206A (en) Casing rotary digging bore forming method
CN107386275A (en) A kind of pile foundation casting method and pile foundation casting system
CN110017171A (en) One kind being used for tunnel structure health Life cycle real-time monitoring system
CN105672250B (en) A kind of diaphram wall and underwater concrete tongue and groove bindiny mechanism and construction method
CN110258550A (en) A kind of concrete prefabricated retaining wall of artificial digging pile and construction method
CN106545326A (en) A kind of long-spiral drilling machine construction monitoring system
CN208105272U (en) One kind preventing superfilled device
CN210104753U (en) Ultra-deep karst grouting device
CN110455915A (en) Tunnel Second Lining supplements grouting method
CN104278677A (en) Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN108360524A (en) One kind preventing superfilled device and its application method
CN206034513U (en) Pre -buried type stake end foundation detecting system
CN206311600U (en) A kind of geological stress changes liquid-phase detection device
CN206581282U (en) Diaphram wall Ω type milling joints
CN205839724U (en) The supporting bracing means of inclinometer pipe is buried in a kind of boring underground
CN209585019U (en) A kind of cast-in-situ bored pile pile crown reinforcing bar protective device
CN105926568A (en) Matched strengthening device and method for inclinometer pipe embedded through drilling
CN107620387A (en) The detection method of assembled architecture component branch sleeve internal flaw
CN106948388A (en) A kind of magnet ring type test excavation of foundation pit causes the device and method that ground swells
CN207907854U (en) A kind of monitoring device for Underground Construction
CN205857172U (en) Compacted effect static pressure pile pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124