CN107386193A - River storehouse bank slope ecological safeguard structure service behaviour analogue means and method - Google Patents

River storehouse bank slope ecological safeguard structure service behaviour analogue means and method Download PDF

Info

Publication number
CN107386193A
CN107386193A CN201710593802.1A CN201710593802A CN107386193A CN 107386193 A CN107386193 A CN 107386193A CN 201710593802 A CN201710593802 A CN 201710593802A CN 107386193 A CN107386193 A CN 107386193A
Authority
CN
China
Prior art keywords
physical model
hinged
framed bent
unstability
fix bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710593802.1A
Other languages
Chinese (zh)
Other versions
CN107386193B (en
Inventor
王俊杰
陈大伟
邱珍锋
赵天龙
赵迪
汪魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dragon Totem Technology Hefei Co ltd
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201710593802.1A priority Critical patent/CN107386193B/en
Publication of CN107386193A publication Critical patent/CN107386193A/en
Application granted granted Critical
Publication of CN107386193B publication Critical patent/CN107386193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/02Hydraulic models

Abstract

The present invention discloses a kind of river storehouse bank slope ecological safeguard structure service behaviour analogue means and method.Device part includes being used to determine the slip unstability analyzer that bulk solid physical model slides the unstability gradient, fixed mount for the fixed slip unstability analyzer for sliding unstability analyzer, for limiting the shot block stone physical model installing structure of bulk solid physical model surrounding and lower edge, for the supporting structure for the analogue means varied angle for changing shot block stone model installing structure angle, for the base for the analogue means for other structures being fixed and being realized shot block stone model installing structure angle change, for fixing plant stake physical model and realizing the entopic plant stake physical model installing structure of plant stake physical model.Can be to the different bank slope gradients, river, the stability of bank slopes maintenance structure are studied under the different planting densities of different shot block stone types and plant stake, arrangement mode.Sufficient test basis is provided for the design and construction in river, bank slopes maintenance structure.

Description

River storehouse bank slope ecological safeguard structure service behaviour analogue means and method
Technical field
The present invention relates to indoor simulation device and the experiment in a kind of river, storehouse bank ecological safeguard structure stabilization and working property Method field, more particularly to river storehouse bank slope ecological safeguard structure service behaviour analogue means and method.
Background technology
River, the ecological safeguard structure of storehouse bank are related to the stabilization and river, the ecological problem of reservoir of river storehouse bank slope.So And at this stage largely using materials such as the chain brick of open-cell concrete, steel wire (GSZ) gabion gauze pad, eco-concretes River storehouse bank slope protection technology, although meeting the requirement of protection, it is considered as " ecological vestige ".But actually their ecology Effect is poor.From the ecological of material, the artificial material such as concrete, earth working material in use there may be Some have the material of pollution to water quality of river, and material is not ecological enough in itself;From price and security, these materials The general higher, intensity of price easily decays with the time, the reasons such as aging and corrosion occurs, these technologies also exist construction costs compared with High, the shortcomings that long-term safety performance is poor;From using energy source, produce these artificial materials and usually require to consume more energy Source, or even more serious ground contamination environment, the theory of sustainable development is not met.
With the enhancing of Public environmental attitude, river is improved, the ecological of bank slopes maintenance technology is increasingly becoming main flow.How The natural materials such as plant, natural block stone are applied in actual river, bank slopes maintenance engineering to be increasingly becoming and are engaged in shore protection neck Scholar the problem of extremely paying close attention to of domain research, because these natural materials are inherently ecological first, the compatibility with environment It is good, produce good ecological effect for slope protection works and establish important basis;Secondly, have material source extensively, engineering makes The advantages that valency is low, construction technology is simple;Furthermore the good endurance of slope protection works.Because the natural block stone selected all is hard Firmly, the strong rock of weatherability, the factor of building stones strength retrogression can not be considered in the engineering services time limit, moreover, Plant haulm growth is thicker and plant division effect will make plant to further enhance the restriction effect of block stone displacement, causes domatic anti- The general safety stability increase of watch box system.
Optimal protection effect can be played for how the materials such as the natural block stone of research, plant combine, generally use It is field test method, field test typically has the shortcomings that the test period is long, experiment input is high, and in by natural environment The influence of the external force such as wind load, freeze thawing is big, it is difficult to obtains live data.In order to overcome the shortcomings of field test method, the present invention carries Go out the indoor simulation device and test method in a kind of river, storehouse bank ecological safeguard structure stabilization and working property.
The content of the invention
It is an object of the invention to provide a kind of river storehouse bank slope ecological safeguard structure service behaviour analogue means and method.
To realize that the technical scheme that the object of the invention uses is a kind of such, river storehouse bank slope ecological safeguard structure work Performance simulation device and method, it is characterised in that:It is main to include sliding unstability analyzer, fixed mount, shot block stone physical model Installing system, supporting structure, base and plant stake physical model installing system.
The shot block stone physical model installing system includes limiting side plate, rubber blanket with holes, bottom plate and spigot-and-socket restriction Side plate.
In the plate face of the bottom plate, several strip through-holes are provided with.The both ends of the bottom plate be separately installed with hinged pipe I and Hinged pipe II.Hinged pipe III is fixed with below the bottom plate.Three blocks of restriction side plates and one piece of spigot-and-socket limit side plate and enclosed Rectangular frame.Three blocks of side plates that limit are fixed in the plate face of bottom plate.The both ends that spigot-and-socket limits side plate are plugged on restriction side The inwall of plate.Spigot-and-socket limits side plate relative to hinged pipe II, closer to hinged pipe I.The rubber blanket with holes is covered in described In the plate face of bottom plate.The rubber blanket with holes is provided with through hole corresponding with several strip through-holes.
The base has a horizontal upper surface.The base has two walking tracks being parallel to each other.Base Adjacent two angle on, be respectively provided with vertical be hinged thick stick.The two be hinged thick sticks are in the end of walking track.
The supporting structure includes moving trolley and two support rods.The moving trolley is located on track.Driven by leading screw Moving trolley slides along walking track.One end of the support rod is hinged on moving trolley, the other end is hinged on the two of hinged pipe III Head.
Plant stake physical model installing system includes some upper framed bent fix bars, lower framed bent fix bar, plant stake physics mould Type fixing pipe, upper framed bent latch and lower framed bent latch
On the body of rod of the upper framed bent fix bar and lower framed bent fix bar, some hinge holes are respectively provided with.The upper framed bent is consolidated The both ends of fixed pole and the both ends of lower framed bent fix bar, are welded with hollow hinged pipe.
The lower end of the plant stake physical model fixing pipe, has neck.The plant stake physical model fixing pipe it is upper End, has jack.The side of the plant stake physical model fixing pipe, there is upper and lower two through holes.The two through holes are equal Through neck.
Some necks for taking root in thing stake physical model fixing pipe clamp a upper framed bent fix bar and a lower framed bent is fixed Bar.The hinge hole inserted using latch in through hole and upper and lower framed bent fix bar so that a upper framed bent fix bar, under one Framed bent fix bar and some plant stake physical model fixing pipes are hinged.
The be hinged thick stick has three pin joints from top to bottom.Hinged pipe I both ends are hinged on the interface point of the top.If The hollow be hinged tube side-by-side of dry upper framed bent fix bar one end is hinged on the pin joint of centre.The sky of some lower framed bent fix bar one end The heart is hinged the pin joint that tube side-by-side is hinged on bottom.
The both ends of the hinged pipe II are respectively hinged in a hinge strip.Some upper other end of skies of framed bent fix bar The heart is hinged tube side-by-side and is hinged in hinge strip.Some other end of hollow be hinged tube side-by-sides of lower framed bent fix bar are hinged on be hinged On bar.
The fixed mount includes cantilever, fixed column and power supply.
The fixed column lower end is fixed on the side of shot block stone physical model installing system.The fixed column is relative to hinge Adapter I, closer to hinged pipe II.One end of the cantilever is fixed in fixed column, and height adjustable.The other end of the cantilever Positioned at the top of bottom plate.
The slip unstability analyzer, conductive contact, slide unstability gauge head, indicator lamp, fastening bayonet socket, wire and clamp.
In its natural state, branch A and branch B are separated the clamp.The inner side of the branch A and branch B have conduction Contact.In a compressed state, when bulk solid physical model glides, branch A and branch B are close, until the conduction of the two Contact combines.The indicator lamp is powered by power supply.A piece wire of indicator lamp disconnects, the both ends of disconnection connect respectively branch A and Conductive contact on branch B.
Treat branch A and be fixed on by fastening bayonet socket on the cantilever.The branch B lower ends are installed by fix bar.It is described solid Fixed pole lower end, which is fixed with, slides unstability gauge head.The slip unstability gauge head is sheet.During experiment, slide described in the embedment of unstability gauge head In shot block stone above bottom plate.
Invention additionally discloses a kind of experimental method based on said apparatus, it is characterised in that comprises the following steps:
1) assembled device, the plant stake physical model for needing quantity is plugged in plant stake physical model fixing pipe, planted The selection of thing stake physical model need to have certain rigidity, can bear the sliding force of bulk solid physical model, and not deform, such as From galvanized wire.Moving trolley is driven by adjusting screw so that shot block stone physical model installing system is horizontal.By shot The uniform spreading of block stone physical model is into the rectangle frame of shot block stone physical model installing system.
2) functional reliability for sliding unstability analyzer is examined.
3) screw mandrel driving moving trolley movement so that shot block stone physical model installing system tilts.When it is tilted to necessarily During angle, bulk solid physical model occurs that overall or local downslide unstability or particle tumble phenomenon, now, in bulk solid thing Unstability gauge head is slided in the presence of managing model sliding force, in above-mentioned slip unstability analyzer to be promoted, and then makes two conductions Contact touches together, and power supply forms path, and indicator lamp lights, and can now be used cooperatively horizon rule and protractor measures shot The domatic slip angle of body physical model.
The solution have the advantages that unquestionable:
(1) multiple analog material can be put into shot block stone physical model installing structure, can be to different designs situation Under river, storehouse bank ecological safeguard structure is stable and working property is simulated.
(2) because plant stake physical model installing structure is rotatable part, therefore can be under actual conditions, plant exists The direction of growth on bank slope is simulated, and is advantageous to the authenticity of simulation.
(3) analogue means simple structure, it is easy to operate.
Brief description of the drawings
Fig. 1 is a kind of river proposed by the present invention, storehouse bank ecological safeguard structure is stable and the lab simulation of working property fills The structural representation put;
Fig. 2 is the structural representation that unstability analyzer is slided in the present invention;
Fig. 3 is the structural representation for the fixed mount for sliding unstability analyzer;
Fig. 4 is the structural representation of shot block stone physical model installing structure;
Fig. 5 is the structural representation of rubber blanket with holes in shot block stone physical model installing structure;
Fig. 6 is the structural representation of shot block stone physical model installing structure bottom plate;
Fig. 7 is the structural representation that spigot-and-socket limits side plate in shot block stone physical model installing structure;
Fig. 8 is the structural representation of the supporting structure of analogue means varied angle;
Fig. 9 is the structural representation of the base of analogue means;
Figure 10 is the structural representation of plant stake physical model installing structure;
Figure 11 is plant stake physical model fixed form schematic diagram.
In figure:Slip unstability analyzer (110), conductive contact (111), slip unstability gauge head (112), indicator lamp (113), Fasten bayonet socket (114), wire (115), clamp (116)
Fixed mount (120), cantilever (121), fixed column (122), power supply (123)
Shot block stone physical model installing system (130), limit side plate (131), rubber blanket with holes (132), bottom plate (133), hinged pipe I (1331), hinged pipe II (1332), hinged pipe III (1333), strip through-hole (1334), spigot-and-socket limit Side plate (134)
Supporting structure (140), support rod (141), moving trolley (142)
Base (150), screw mandrel (151), be hinged thick stick (152), walking track (153)
Plant stake physical model installing system (160), upper framed bent fix bar (161), lower framed bent fix bar (162), plant Stake physical model fixing pipe (163), latch (164), hinge strip (165), hollow hinged pipe (166), plant stake physical model (167)。
Embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, all should be included within the scope of the present invention.
Embodiment 1:
The present embodiment discloses a kind of river storehouse bank slope ecological safeguard structure service behaviour analogue means and method, main to include sliding Dynamic unstability analyzer 110, fixed mount 120, shot block stone physical model installing system 130, supporting structure 140, base 150 and plant Thing stake physical model installing system 160.
The shot block stone physical model installing system 130 includes limiting side plate 131, rubber blanket with holes 132, bottom plate 133 Side plate 134 is limited with spigot-and-socket.
In the plate face of the bottom plate 133, several strip through-holes 1334 are provided with.Install respectively at the both ends of the bottom plate 133 There are hinged pipe 1331 and hinged pipe 1332.The lower section of the bottom plate 133 is fixed with hinged pipe 1333.Three blocks of restriction side plates 131 and one piece of spigot-and-socket limit side plate 134 and surround rectangle frame.Three pieces of plate faces for limiting side plate 131 and being fixed on bottom plate 133 On.The both ends that spigot-and-socket limits side plate 134 are plugged on the inwall for limiting side plate 131.Spigot-and-socket limits side plate 134 relative to be hinged Pipe 1332, closer to hinged pipe 1331.The rubber blanket with holes 132 is covered in the plate face of the bottom plate 133.The rubber with holes Rubber cushion 132 is provided with through hole 1321 corresponding with several strip through-holes 1334.
The base 150 has a horizontal upper surface.The base 150 has two walking tracks being parallel to each other 153.On adjacent two angle of base 150, vertical be hinged thick stick 152 is respectively provided with.The two be hinged thick sticks 152 are in walking track 153 end.
The supporting structure 140 includes moving trolley 142 and two support rods 141.The moving trolley 142 is located at track 153 On.Moving trolley 142 is driven to be slided along walking track 153 by leading screw 151.One end of the support rod 141 is hinged on moving trolley On 142, the other end be hinged on two of hinged pipe 1333.
Plant stake physical model installing system 160 includes some upper framed bent fix bars 161, lower framed bent fix bar 162, plant Stake physical model fixing pipe 163, upper framed bent latch 164 and lower framed bent latch 165
On the body of rod of the upper framed bent fix bar 161 and lower framed bent fix bar 162, some hinge holes are respectively provided with.On described The both ends of framed bent fix bar 161 and the both ends of lower framed bent fix bar 162, are welded with hollow hinged pipe 166.
The lower end of the plant stake physical model fixing pipe 163, there is neck 1631.The plant stake physical model is fixed The upper end of pipe 163, there is jack 1633.The side of the plant stake physical model fixing pipe 163, there is upper and lower two through holes 1632.The two through holes 1632 both pass through neck 1631.
Some necks 1631 for taking root in thing stake physical model fixing pipe 163 clamp a upper framed bent fix bar 161 and one Lower framed bent fix bar 162.The hinge hole inserted using latch 164 on through hole 1632 and upper and lower framed bent fix bar so that one Upper 161, lower framed bent fix bars 162 of framed bent fix bar and some plant stake physical model fixing pipes 163 are hinged.
The be hinged thick stick 152 has three pin joints from top to bottom.The both ends of hinged pipe 1331 are hinged on the friendship of the top Contact.The hollow hinged pipe 166 of some upper one end of framed bent fix bar 161 is hinged on the pin joint of centre side by side.Some lower framed bents The hollow hinged pipe 166 of the one end of fix bar 162 is hinged on the pin joint of bottom side by side.
The both ends of the hinged pipe 1332 are respectively hinged in a hinge strip 165.Some upper framed bent fix bars 161 are in addition The hollow hinged pipe 166 of one end is hinged in hinge strip 165 side by side.Some other end of hollow hinges of lower framed bent fix bar 162 Adapter 166 is hinged in hinge strip 165 side by side.
The fixed mount 120 includes cantilever 121, fixed column 122 and power supply 123.
The lower end of fixed column 122 is fixed on the side of shot block stone physical model installing system 130.The fixed column 122 relative to hinged pipe 1331, closer to hinged pipe 1332.One end of the cantilever 121 is fixed in fixed column 122, and high Spend adjustable.The other end of the cantilever 121 is located at the top of bottom plate 133.
The slip unstability analyzer 110, conductive contact 111, slide unstability gauge head 112, indicator lamp 113, fasten bayonet socket 114th, wire 115 and clamp 116.
In its natural state, branch A and branch B are separated the clamp 116.The inner side of the branch A and branch B, which have, leads Electric contact.In a compressed state, when bulk solid physical model glides, branch A and branch B are close, until the two is led Electric contact combines.The indicator lamp 113 is powered by power supply 123.A piece wire 115 of indicator lamp 113 disconnects, the both ends point of disconnection Conductive contact that Lian Jie be on branch A and branch B.
Treat branch A and be fixed on by fastening bayonet socket 114 on the cantilever 121.The branch B lower ends are installed by fix bar 117.The lower end of fix bar 117, which is fixed with, slides unstability gauge head 112.The slip unstability gauge head 112 is sheet.During experiment, Unstability gauge head 112 is slided to be embedded in the shot block stone of the top of bottom plate 133.
Embodiment 2:
The primary structure of the present embodiment is with embodiment 1, further:
Unstability analyzer is slided to be used to determine the slip that bulk solid physical model occurs in bank slope protection structure physical model Unstable failure.Fixed by the fixed mount for sliding unstability analyzer with shot block stone physical model installing structure.
It is bell and spigot frame to slide unstability analyzer fixed mount, and its installation is to arrange ecological bank slope protection structure physics mould Carried out after type, so can be in order to the arrangement of physical model.
Shot block stone physical model installing structure includes limiting plate, rubber blanket with holes and bottom plate, itself and analogue means angle Supporting structure, the plant stake physical model installing structure of degree are connected with the base of analogue means;Shot block stone physical model disposes Shot block stone physical model limiting plate in structure is in the superiors of shot block stone physical model installing structure, and it includes limiting Side plate, limit lower shoe and spigot-and-socket restriction side plate.
The size for limiting lower shoe in limiting plate is 500 × 500mm, and its surface is provided with 289 through holes, through hole Flat shape is two semicircles (radius 5mm) plus a rectangle (5 × 10mm), and the centre of form of each through hole is away from being 25mm.
It is affixed with limiting lower shoe to limit side plate, it is 450 × 450mm that it, which encloses the size in region, is highly 50mm.
Spigot-and-socket limits side plate as movable part, and its height can carry out cutting adjustment according to the experiment under different operating modes, Adjusting range is between 0~50mm.
Rubber blanket with holes, its planar dimension are 500 × 500mm, thickness 2mm.Surface is provided with 289 circular through holes, Aperture is 1mm.The position of circular through hole is opened with restriction bottom plate surface in above-mentioned shot block stone physical model limiting plate to be passed through The centre of form of perforation is consistent.
Except with addition to the fixing axle of the base of analogue means and the supporting structure of analogue means varied angle, the planar dimension of bottom plate For 500 × 500mm, surface is provided with 289 through holes, and the flat shape of through hole is two semicircles (radius 5mm) plus one long Square (5 × 10mm), the centre of form of each through hole is away from being 25mm.
In addition, shot block stone physical model installing structure is provided with 18 through holes, each 9 of both sides, it is symmetric, is used for Limiting plate, rubber blanket with holes and bottom plate in above-mentioned shot block stone physical model installing structure is fixed as an entirety.
Plant stake physical model installing structure is located at shot block stone physical model installing structure bottom, itself and shot block stone thing Reason model installing structure is connected with base, and it is rotary structure, including plant stake physical model fixing pipe and two block-shaped big Small consistent framed bent.Plant stake physical model fixing pipe upper end is provided with a non-through hole, aperture 1mm.Two block-shaped sizes Consistent framed bent, every piece of framed bent is in addition to the fixing axle that both sides are connected with base, including 17 take root in thing stake physical model fixing pipe Fix bar, the cross sectional thickness of every fix bar can ensure the plant stake physics in above-mentioned plant stake physical model installing structure The insertion and fixation of model fixing pipe.
The supporting structure of analogue means varied angle is located at plant stake physical model installing structure bottom, itself and shot block stone thing Reason model installing structure is connected with base;The supporting structure of analogue means varied angle includes moving trolley and support rod, and support rod is Rotary structure.
Base is located at the bottom of whole analogue means, plays a part of connection and fixed whole analogue means, it includes silk Bar, other structures fixed column, the limited post of moving trolley and the track of moving trolley of above-mentioned analogue means varied angle supporting structure.
Embodiment 3:
The present embodiment discloses a kind of experimental method based on the described device of embodiment 1, it is characterised in that including following step Suddenly:
1) assembled device, the plant stake physical model for needing quantity is plugged in plant stake physical model fixing pipe, planted The selection of thing stake physical model need to have certain rigidity, can bear the sliding force of bulk solid physical model, and not deform, such as From galvanized wire.Moving trolley is driven by adjusting screw so that shot block stone physical model installing system is horizontal.By shot The uniform spreading of block stone physical model is into the rectangle frame of shot block stone physical model installing system.What deserves to be explained is it can not touch Curved plant stake physical model, if plant stake physical model touched it is curved, can be before shot block stone physical model be leveled by plant stake Physical model straightening.The spreading upper surface of shot block stone physical model need basic horizontal and with limiting plate along concordant.Work as plant , can multiple spreading, and it is flat to coordinate geotechnological knife to apply shot block stone physical model upper surface on a small quantity when stake physical model is overstocked.
2) functional reliability for sliding unstability analyzer is examined:It is reliable to its after the power on for sliding unstability analyzer Property test, make manually conductive contact contact after, if indicator lamp lights, slide unstability analyzer it is effective, can be connect The experiment got off.If it is indicated that lamp is reactionless, then whether need has electricity, wire whether to connect complete and conductive contact to power supply is It is no to be checked with beam conduction.In addition, also need to check the rotation on slip unstability analyzer, slide unit, really Protecting it can be with normal work, coating lubricating oil if necessary.
Slide the installation of unstability analyzer:After the completion of shot block stone physical model arrangement, unstability will be slided using fixed mount Analyzer is fixed on shot block stone physical model installing structure, after switching on power, will slide unstability gauge head insertion bulk solid thing Manage in model, and keep the lower edge for sliding lower edge and the bulk solid physical model of unstability gauge head to have to ensure to slide unstability gauge head The distance normally swung.The center line that unstability gauge head need to be aligned between two avenue system thing stake physical models is slided, not may occur in which deflection.
3) screw mandrel driving moving trolley 142 moves so that shot block stone physical model installing system tilts.In embodiment, need Will slowly, at the uniform velocity, be rotated intermittently screw mandrel, the change of immediate observation protection body physical model and indicator lamp while rotary screw Whether light.For guarantee test precision, screw mandrel often rotates a circle, intermittently once, time 30s or so, such as bank slope protection body thing Changing does not occur in reason model, and continues rotary screw, until bank slope protection body physical model changes.
When shot block stone physical model installing system tilts to certain angle, bulk solid physical model occur it is overall or Local downslide unstability or particle tumble phenomenon, now, in the presence of bulk solid physical model sliding force, above-mentioned slip unstability Unstability gauge head is slided in analyzer to be promoted, and then two conductive contacts is touched together, and power supply forms path, indicator lamp Light, can now be used cooperatively the domatic slip angle that horizon rule and protractor measure bulk solid physical model, and shot block Tumbling for stone physical model individual particle judges by range estimation.

Claims (2)

1. a kind of river storehouse bank slope ecological safeguard structure service behaviour analogue means and method, it is characterised in that:It is main to include sliding Unstability analyzer (110), fixed mount (120), shot block stone physical model installing system (130), supporting structure (140), base And plant stake physical model installing system (160) (150);
The shot block stone physical model installing system (130) includes limiting side plate (131), rubber blanket with holes (132), bottom plate (133) and spigot-and-socket limits side plate (134);
In the plate face of the bottom plate (133), several strip through-holes (1334) are provided with;Pacify respectively at the both ends of the bottom plate (133) Equipped with hinged pipe I (1331) and hinged pipe II (1332);Hinged pipe III (1333) is fixed with below the bottom plate (133);Three Side plate (131) is limited described in block and one piece of spigot-and-socket limits side plate (134) and surrounds rectangle frame;Three pieces of restriction side plates (131) It is fixed in the plate face of bottom plate (133);The both ends that spigot-and-socket limits side plate (134) are plugged on the inwall for limiting side plate (131);Hold The formula of inserting limits side plate (134) relative to hinged pipe II (1332), closer to hinged pipe I (1331);The rubber blanket with holes (132) It is covered in the plate face of the bottom plate (133);The rubber blanket with holes (132) is provided with corresponding with several strip through-holes (1334) Through hole (1321);
The base (150) has a horizontal upper surface;The base (150) has two walking tracks being parallel to each other (153);On adjacent two angle of base (150), vertical be hinged thick stick (152) is respectively provided with;The two be hinged thick sticks (152) are in The end of walking track (153);
The supporting structure (140) includes moving trolley (142) and two support rods (141);The moving trolley (142) is located at track (153) on;Moving trolley (142) is driven to be slided along walking track (153) by leading screw (151);One end of the support rod (141) It is hinged on moving trolley (142), the other end is hinged on two of hinged pipe III (1333);
Plant stake physical model installing system (160) includes some upper framed bent fix bars (161), lower framed bent fix bar (162), planted Thing stake physical model fixing pipe (163), upper framed bent latch (164) and lower framed bent latch (165)
On the body of rod of the upper framed bent fix bar (161) and lower framed bent fix bar (162), some hinge holes are respectively provided with;On described The both ends of framed bent fix bar (161) and the both ends of lower framed bent fix bar (162), are welded with hollow hinged pipe (166);
The lower end of the plant stake physical model fixing pipe (163), there is neck (1631);The plant stake physical model is fixed The upper end of (163) is managed, there is jack (1633);The side of the plant stake physical model fixing pipe (163), there are upper and lower two Through hole (1632);The two through holes (1632) both pass through neck (1631);
Some necks (1631) for taking root in thing stake physical model fixing pipe (163) clamp a upper framed bent fix bar (161) and one Framed bent fix bar (162) under root;The hinge hole inserted using latch (164) on through hole (1632) and upper and lower framed bent fix bar, So that upper framed bent fix bar (161), a lower framed bent fix bar (162) and some plant stake physical model fixing pipes (163) it is hinged;
The be hinged thick stick (152) has three pin joints from top to bottom;Hinged pipe I (1331) both ends are hinged on the friendship of the top Contact;The hollow hinged pipe (166) of some upper framed bent fix bar (161) one end is hinged on the pin joint of centre side by side;Under some The hollow hinged pipe (166) of framed bent fix bar (162) one end is hinged on the pin joint of bottom side by side;
The both ends of the hinged pipe II (1332) are respectively hinged on a hinge strip (165);Some upper framed bent fix bars (161) Other end of hollow hinged pipe (166) is hinged in hinge strip (165) side by side;Some lower framed bent fix bars (162) other one The hollow hinged pipe (166) at end is hinged in hinge strip (165) side by side;
The fixed mount (120) includes cantilever (121), fixed column (122) and power supply (123);
Fixed column (122) lower end is fixed on the side of shot block stone physical model installing system (130);The fixed column (122) relative to hinged pipe I (1331), closer to hinged pipe II (1332);One end of the cantilever (121) is fixed on fixed column (122) on, and height adjustable;The other end of the cantilever (121) is located at the top of bottom plate (133);
The slip unstability analyzer (110), conductive contact (111), slide unstability gauge head (112), indicator lamp (113), fastening Bayonet socket (114), wire (115) and clamp (116);
In its natural state, branch A and branch B are separated the clamp (116);The inner side of the branch A and branch B have conduction Contact;In a compressed state, when bulk solid physical model glides, branch A and branch B are close, until the conduction of the two Contact combines;The indicator lamp (113) is powered by power supply (123);A piece wire (115) of indicator lamp (113) disconnects, disconnection Both ends connect the conductive contact on branch A and branch B respectively;
Treat branch A and be fixed on by fastening bayonet socket (114) on the cantilever (121);The branch B lower ends are installed by fix bar (117);Fix bar (117) lower end, which is fixed with, slides unstability gauge head (112);The slip unstability gauge head (112) is sheet; During experiment, slide in the shot block stone that unstability gauge head (112) is embedded to above the bottom plate (133).
2. a kind of experimental method based on claim 1 described device, it is characterised in that comprise the following steps:
1) assembled device, the plant stake physical model for needing quantity, plant stake are plugged in plant stake physical model fixing pipe The bar that the selection of physical model need to have rigidity drives moving trolley by adjusting screw so that shot block stone physical model Installing system is horizontal.By in the rectangle frame of the shot uniform spreading of block stone physical model to shot block stone physical model installing system.
2) functional reliability for sliding unstability analyzer is examined.
3) screw mandrel driving moving trolley (142) is mobile so that shot block stone physical model installing system tilts;When it is tilted to necessarily During angle, bulk solid physical model occurs that overall or local downslide unstability or particle tumble phenomenon, now, in bulk solid thing Unstability gauge head is slided in the presence of managing model sliding force, in above-mentioned slip unstability analyzer to be promoted, and then makes two conductions Contact touches together, and power supply forms path, and indicator lamp lights, and can now be used cooperatively horizon rule and protractor measures shot The domatic slip angle of body physical model.
CN201710593802.1A 2017-07-20 2017-07-20 River library bank slope ecological safeguard structure working performance simulator and method Active CN107386193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710593802.1A CN107386193B (en) 2017-07-20 2017-07-20 River library bank slope ecological safeguard structure working performance simulator and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710593802.1A CN107386193B (en) 2017-07-20 2017-07-20 River library bank slope ecological safeguard structure working performance simulator and method

Publications (2)

Publication Number Publication Date
CN107386193A true CN107386193A (en) 2017-11-24
CN107386193B CN107386193B (en) 2019-09-17

Family

ID=60336293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710593802.1A Active CN107386193B (en) 2017-07-20 2017-07-20 River library bank slope ecological safeguard structure working performance simulator and method

Country Status (1)

Country Link
CN (1) CN107386193B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385596A (en) * 2018-02-01 2018-08-10 中铁建港航局集团勘察设计院有限公司 A kind of device and method of simulation test bank slope protection structural stability

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584542A (en) * 2004-05-28 2005-02-23 中国科学院力学研究所 Analogic testing device for water induced landslide and method for monitoring shift of land top surface
CN204435306U (en) * 2015-01-09 2015-07-01 辽宁工程技术大学 A kind of simulation tailing dam ecological revetment system
CN106940366A (en) * 2017-03-31 2017-07-11 中国安全生产科学研究院 A kind of slope instability experimental rig

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584542A (en) * 2004-05-28 2005-02-23 中国科学院力学研究所 Analogic testing device for water induced landslide and method for monitoring shift of land top surface
CN204435306U (en) * 2015-01-09 2015-07-01 辽宁工程技术大学 A kind of simulation tailing dam ecological revetment system
CN106940366A (en) * 2017-03-31 2017-07-11 中国安全生产科学研究院 A kind of slope instability experimental rig

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385596A (en) * 2018-02-01 2018-08-10 中铁建港航局集团勘察设计院有限公司 A kind of device and method of simulation test bank slope protection structural stability

Also Published As

Publication number Publication date
CN107386193B (en) 2019-09-17

Similar Documents

Publication Publication Date Title
KR101354452B1 (en) Small-multiset rainfall-runoff simulator for lid technology experiment
Johnson Large-scale experimental and analytical seismic studies of a two-span reinforced concrete bridge system
CN203941160U (en) Multi-functional indoor soil test device
KR20160106976A (en) Movable Type Field Rainfall Simulator For LID Verification
CN107386193A (en) River storehouse bank slope ecological safeguard structure service behaviour analogue means and method
CN206709830U (en) A kind of self-balancing type cable-stayed bridge pylon deviation measurement device
CN210427564U (en) Geotechnical engineering landslide model test box
CN209388578U (en) A kind of civil engineering class colleges and universities sponge city teaching mode and architectural teaching model
CN216747138U (en) Reinforcing bar intensity measuring equipment is used in civil engineering construction
CN215930909U (en) Novel measuring apparatu for civil engineering
CN209493274U (en) A kind of jacking apparatus of civil engineering
KR101592927B1 (en) Movable and Assemble Type Field Rainfall Simulator For LID Verification
CN211576183U (en) Hydroelectric engineering earthwork is filled out and is dug observation device
CN210204031U (en) Garden chair
CN204258064U (en) A kind of power distribution cabinet assembly based on triangle splice plate
CN214365159U (en) Civil engineering construction is with die carrier of convenient dismouting
CN205642869U (en) Modular adjustable undulation road surface testing arrangement
CN205035746U (en) Warning frame is used in gardens construction
CN110453647A (en) A kind of ecological slope protection structure of ecological slope protection unit and its composition
Kresin Long-term stormwater infiltration through concrete pavers.
CN211621587U (en) Civil engineering stock construction equipment
CN216071443U (en) Civil engineering pipeline placing frame
CN111305351A (en) Municipal works drainage pipe road junction device
CN214048329U (en) Drawing rack for civil engineering
CN215565017U (en) Recycled concrete assembled enclosure wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200414

Address after: No. 107, Dahuang Road, Daping, Yuzhong District, Chongqing 400000

Patentee after: Chongqing Seekon Consulting Center

Address before: 400074 No. 66, Xuefu Avenue, Nan'an District, Chongqing

Patentee before: CHONGQING JIAOTONG University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230707

Address after: No.66, Xuefu Avenue, Nan'an District, Chongqing, 400000

Patentee after: CHONGQING JIAOTONG University

Address before: No.107, Dahuang Road, Daping, Yuzhong District, Chongqing

Patentee before: Chongqing Seekon Consulting Center

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240126

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Country or region after: China

Address before: No.66, Xuefu Avenue, Nan'an District, Chongqing, 400000

Patentee before: CHONGQING JIAOTONG University

Country or region before: China