CN107386120A - A kind of method for filling arcading slab bridge air bubble mix light-textured soil - Google Patents

A kind of method for filling arcading slab bridge air bubble mix light-textured soil Download PDF

Info

Publication number
CN107386120A
CN107386120A CN201710627641.3A CN201710627641A CN107386120A CN 107386120 A CN107386120 A CN 107386120A CN 201710627641 A CN201710627641 A CN 201710627641A CN 107386120 A CN107386120 A CN 107386120A
Authority
CN
China
Prior art keywords
arcading
slab bridge
air bubble
mix light
textured soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710627641.3A
Other languages
Chinese (zh)
Inventor
宋佩超
付发壮
吴刚刚
刘焕
杨茗钦
莫昀锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
Guangxi Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road and Bridge Engineering Group Co Ltd filed Critical Guangxi Road and Bridge Engineering Group Co Ltd
Priority to CN201710627641.3A priority Critical patent/CN107386120A/en
Publication of CN107386120A publication Critical patent/CN107386120A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:(1) foaming is handled:Prepare bubble population;(2) mix:Bubble population is passed through into mud, stirs, obtains air bubble mix light-textured soil;(3) pour:Built-in fitting is set in arcading slab bridge template, air bubble mix light-textured soil is poured into the mold using pumping line using the symmetrical mode in layering point hole, it is poured into simultaneously in mould at the both ends in the symmetrical hole of arcading slab bridge or so, and when construction area is constructed each time, each layer of construction thickness is 30~80cm, the operation that pours next time is just carried out after final set is poured, pumping line outlet is with pouring face keep level in casting process;(4) conserve.The method applied in the present invention can reduce arch ring pressure, reduce the dead load thrust of adjacent holes, that is, mitigate arch ring for arch ring pressure and whole bridge weight, and reduce the requirement for bearing capacity to basis.

Description

A kind of method for filling arcading slab bridge air bubble mix light-textured soil
【Technical field】
It is more particularly to a kind of to be used to fill arcading slab bridge bubble mixing light the invention belongs to air bubble mix light-textured soil field The method of soil.
【Background technology】
Air bubble mix light-textured soil is the novel light fill material that last decade grows up, because the material has lightweight The excellent spies such as independence, good application property, durability and thermal insulation after property, intensity controllability, high fluidity and solidification Property, general more application is banketed antifreeze in Soft Ground, the cold frozen earth roadbed heat-insulation and heat-preservation in area and the platform back of the body in Geotechnical Engineering Swollen and widening of subgrade etc., it is less in the Project case of arcading slab bridge hogback filling.Air bubble mix light-textured soil is bright by laboratory test The really physical mechanics of air bubble mix light-textured soil and road characteristic, it is mainly reflected in quick construction, automatic closely knit, short time limit With to the advantage such as traffic impact is small, it is domestic at present carry out is directed to air bubble mix light-textured soil performance study, be to change in road mostly Carry out what is completed in extension project, highway.And air bubble mix light-textured soil is applied less on arcading slab bridge, bubble mixing is light Matter soil will be undoubtedly the construction Difficulties for needing primary study in the construction of arcading slab bridge as arch fill, and achievement in research is to even The detail design of arch bar bridge has good reference function, to promoting bridge construction technology to have positive meaning, economic benefit Also it is very notable.Therefore, upper application prospect of the air bubble mix light-textured soil in bridge structure is studied, for air bubble mix light-textured soil Application there is vast promotional value.
【The content of the invention】
It is an object of the invention to provide a kind of method for filling arcading slab bridge air bubble mix light-textured soil, including foaming The step such as handle, mix, pour and conserve, the method applied in the present invention can reduce arch ring pressure, reduce adjacent holes Dead load thrust, that is, mitigate arch ring for arch ring pressure and whole bridge weight, and reduce the requirement for bearing capacity to basis.
The present invention is for problem present in existing neutralization technique, there is provided one kind is light for filling the mixing of arcading slab bridge bubble The method of matter soil, comprises the following steps:
(1) foaming is handled:To be 1 by weight:After 39 foaming agent and water is well mixed, it is put into foam device, presses Compressed air is passed through according to 30L/min condition, it is 50 ± 2g/m to obtain foam density3Bubble population;
(2) mix:Count in parts by weight, be passed through 500~700 parts of bubbles into 100 parts of mud at 10~15 DEG C Group, while 10~30min is stirred with 100~300r/min speed, obtain wet density≤6.5kN/m3With fluidity be 180 ± 20mm air bubble mix light-textured soil;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and is poured into simultaneously in mould at the both ends in the symmetrical hole of arcading slab bridge or so, and When construction area is constructed each time, each layer of construction thickness is 30~80cm, is just carried out down after final set is poured Once pour operation, pumping line outlet is with pouring face keep level in casting process;
(4) conserve:After the template dismounting in mould, face sealed plastic bag is being poured, is being 20 ± 2 DEG C, humidity in temperature To conserve 28d under conditions of 85~90 degree, you can obtain the foamed concrete material conserved.
In the present invention, as further explanation, the hole described in step (3) is by arch springing, some hogbacks and arcading slab bridge The sealing area that plane is formed;Described hogback is located at the opposite end of described arch springing respectively.
In the present invention, as further explanation, the aperture of foam is in the bubble population described in step (1) or step (2) 0.5~1mm.
In the present invention, as further explanation, the pressure when foam device described in step (1) works is 0.5MPa.
In the present invention, as further explanation, the frothing percentage of the foaming agent described in step (1) is 20 times.
In the present invention, as further explanation, volume≤400m of the mould described in step (3)3
In the present invention, do not poured as further explanation, step (3) during pouring by the way of injection.
The invention has the advantages that:
1. the present invention is mixed bubble using pumping line using the symmetrical mode in layering point hole when filling arcading slab bridge template Close the technological means that pours into the mold of light soil, transmitting portions load action power can be disperseed, mitigate arch ring for arch ring pressure and The pressure of whole bridge weight, add the security of arcading slab bridge.The technological means that the present invention is symmetrically filled using point hole, can make The stress equalization of arcading slab bridge, avoid the generation for the phenomenon that arcading slab bridge is uneven, abutment is unstable.The present invention additionally uses point The technological means of layer construction, makes the height of foamed concrete material adjusted, and then makes the arch ring pressure controllable of arcading slab bridge, Mitigate the pressure to arch ring.
2. air bubble mix light-textured soil of the present invention have pipe arrangement pumping, pouring construction point take up space it is minimum, pour There is high fluidity when building and can solidify at once, be not required to cal rolling or vibrate etc. advantage after having poured, reach easy construction and Closely knit effect can be backfilled.In civil engineering, to lead to not backfill closely knit, formation underground because working space is excessively narrow and small Cavity and the periphery of Extra-Deep Foundation Pit seepage under cavity, pipeline pack, useless hole cavity, lava cavity, building cavity, transition slab at bridge head The solution of the problems such as space provides a kind of new technological means.
3. air bubble mix light-textured soil of the present invention have effect play it is Lightness, solidification after independence, intensity can Modulability and construction convenience, the technical economic benefit that can be brought, and the social benefit that the superior feature of environmental protection is brought.
【Brief description of the drawings】
Fig. 1 is a kind of flow chart for being used to fill the method for arcading slab bridge air bubble mix light-textured soil of the present invention.
【Embodiment】
Embodiment 1:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 50g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.55 portland cement and water stir into mud, so It is passed through 500 parts of bubble populations into 100 parts of mud at 10 DEG C afterwards, while 10min is stirred with 100r/min speed, obtains wet appearance Weight is 6.5kN/m3With the air bubble mix light-textured soil that fluidity is 180mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 400m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 30cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 20 DEG C, humidity 85 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.63Mpa.
Embodiment 2:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 48g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.58 portland cement and water stir into mud, so It is passed through 550 parts of bubble populations into 100 parts of mud at 11 DEG C afterwards, while 18min is stirred with 150r/min speed, obtains wet appearance Weight is 6.2kN/m3With the air bubble mix light-textured soil that fluidity is 160mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 380m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 30cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 18 DEG C, humidity 86 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.69Mpa.
Embodiment 3:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 49g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.61 portland cement and water stir into mud, so It is passed through 600 parts of bubble populations into 100 parts of mud at 14 DEG C afterwards, while 25min is stirred with 200r/min speed, obtains wet appearance Weight is 6.1kN/m3With the air bubble mix light-textured soil that fluidity is 170mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 400m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 40cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 19 DEG C, humidity 87 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.70Mpa.
Embodiment 4:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 51g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.61 portland cement and water stir into mud, so It is passed through 630 parts of bubble populations into 100 parts of mud at 12 DEG C afterwards, while 20min is stirred with 230r/min speed, obtains wet appearance Weight is 6.4kN/m3With the air bubble mix light-textured soil that fluidity is 195mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 390m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 60cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 21 DEG C, humidity 88 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.68Mpa.
Embodiment 5:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 51g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.63 portland cement and water stir into mud, so It is passed through 630 parts of bubble populations into 100 parts of mud at 14 DEG C afterwards, while 22min is stirred with 200r/min speed, obtains wet appearance Weight is 6.5kN/m3With the air bubble mix light-textured soil that fluidity is 185mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 400m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 70cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 21 DEG C, humidity 87 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.68Mpa.
Embodiment 6:
A kind of method for filling arcading slab bridge air bubble mix light-textured soil, comprise the following steps:
(1) foaming is handled:To be 1 by weight:After the foaming agent and water that 39 frothing percentage is 20 times are well mixed, it is put into In foam device, pressure when setting foam device work is 0.5MPa, is passed through compressed air according to 30L/min condition, obtains Aperture to foam is 0.5~1mm and foam density is 52g/m3Bubble population;
(2) mix:Count in parts by weight, water intaking gray scale is that 0.65 portland cement and water stir into mud, so It is passed through 700 parts of bubble populations into 100 parts of mud at 15 DEG C afterwards, while 30min is stirred with 300r/min speed, obtains wet appearance Weight is 6.3kN/m3With the air bubble mix light-textured soil that fluidity is 200mm;
(3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole will using pumping line using layering Air bubble mix light-textured soil pours into the mold, and it is 390m to be poured into volume simultaneously at the both ends in the symmetrical hole of arcading slab bridge or so3 Mould in, and when construction area is constructed each time, each layer of construction thickness is 80cm, after final set is poured The operation that pours next time is just carried out, pumping line outlet is with pouring face keep level in casting process;Described hole be by arch springing, The sealing area that some hogbacks and arcading slab bridge plane are formed;Described hogback is respectively positioned at relative the two of described arch springing End;
(4) conserve:By in mould template dismounting after, pouring face sealed plastic bag, temperature be 22 DEG C, humidity 90 28d is conserved under conditions of degree, you can obtain the foamed concrete material conserved.
Through examining, the compression strength of the obtained foamed concrete material conserved is 1.69Mpa.
Described above is the detailed description for the present invention preferably possible embodiments, but embodiment is not limited to this hair Bright patent claim, the equal change completed or modification change under the technical spirit suggested by all present invention, all should belong to Cover the scope of the claims in the present invention.

Claims (6)

  1. A kind of 1. method for filling arcading slab bridge air bubble mix light-textured soil, it is characterised in that:Comprise the following steps:
    (1) foaming is handled:To be 1 by weight:After 39 foaming agent and water is well mixed, it is put into foam device, according to 30L/min condition is passed through compressed air, and it is 50 ± 2g/m to obtain foam density3Bubble population;
    (2) mix:Count in parts by weight, be passed through 500~700 parts of bubble populations into 100 parts of mud at 10~15 DEG C, together When 10~30min stirred with 100~300r/min speed, obtain wet density≤6.5kN/m3It is 180 ± 20mm with fluidity Air bubble mix light-textured soil;
    (3) pour:Built-in fitting is set in arcading slab bridge template, divides the symmetrical mode in hole to use pumping line by bubble using layering Mix light-textured soil pours into the mold, and is poured into simultaneously in mould at the both ends in the symmetrical hole of arcading slab bridge or so, and each When secondary construction area is constructed, each layer of construction thickness is 30~80cm, is just carried out next time after final set is poured Pour operation, pumping line outlet is with pouring face keep level in casting process;
    (4) conserve:After the template dismounting in mould, face sealed plastic bag is being poured, is being 20 ± 2 DEG C, humidity 85 in temperature 28d is conserved under conditions of~90 degree, you can obtains the foamed concrete material conserved.
  2. A kind of 2. method for filling arcading slab bridge air bubble mix light-textured soil according to claim 1, it is characterised in that: Hole described in step (3) is the sealing area that is made up of arch springing, some hogbacks and arcading slab bridge plane;Described hogback difference Positioned at the opposite end of described arch springing.
  3. A kind of 3. method for filling arcading slab bridge air bubble mix light-textured soil according to claim 1, it is characterised in that: The aperture of foam is 0.5~1mm in bubble population described in step (1) or step (2).
  4. A kind of 4. method for filling arcading slab bridge air bubble mix light-textured soil according to claim 1, it is characterised in that: Pressure when foam device described in step (1) works is 0.5MPa.
  5. A kind of 5. method for filling arcading slab bridge air bubble mix light-textured soil according to claim 1, it is characterised in that: The frothing percentage of foaming agent described in step (1) is 20 times.
  6. A kind of 6. method for filling arcading slab bridge air bubble mix light-textured soil according to claim 1, it is characterised in that: Volume≤400m of mould described in step (3)3
CN201710627641.3A 2017-07-28 2017-07-28 A kind of method for filling arcading slab bridge air bubble mix light-textured soil Pending CN107386120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710627641.3A CN107386120A (en) 2017-07-28 2017-07-28 A kind of method for filling arcading slab bridge air bubble mix light-textured soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710627641.3A CN107386120A (en) 2017-07-28 2017-07-28 A kind of method for filling arcading slab bridge air bubble mix light-textured soil

Publications (1)

Publication Number Publication Date
CN107386120A true CN107386120A (en) 2017-11-24

Family

ID=60342075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710627641.3A Pending CN107386120A (en) 2017-07-28 2017-07-28 A kind of method for filling arcading slab bridge air bubble mix light-textured soil

Country Status (1)

Country Link
CN (1) CN107386120A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111696098A (en) * 2020-06-16 2020-09-22 王昕阳 Concrete member detection system and method based on big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110047500A (en) * 2009-10-30 2011-05-09 고려대학교 산학협력단 Orthotropic steel bridge deck with improved fatigue strength having UHPC pavement and polyurethane foam tamping and constructing method of the same
CN102359058A (en) * 2011-07-15 2012-02-22 广东冠生土木工程技术有限公司 Combination bridge and manufacturing method thereof
CN102562091A (en) * 2012-01-30 2012-07-11 中铁七局集团有限公司 Foam concrete shock absorbing structure of tunnel and construction method of foam concrete shock absorbing structure
CN105648892A (en) * 2015-12-31 2016-06-08 长安大学 Arch bridge structure adopting foam concrete and corrugated steel sheets and construction method of arch bridge structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110047500A (en) * 2009-10-30 2011-05-09 고려대학교 산학협력단 Orthotropic steel bridge deck with improved fatigue strength having UHPC pavement and polyurethane foam tamping and constructing method of the same
CN102359058A (en) * 2011-07-15 2012-02-22 广东冠生土木工程技术有限公司 Combination bridge and manufacturing method thereof
CN102562091A (en) * 2012-01-30 2012-07-11 中铁七局集团有限公司 Foam concrete shock absorbing structure of tunnel and construction method of foam concrete shock absorbing structure
CN105648892A (en) * 2015-12-31 2016-06-08 长安大学 Arch bridge structure adopting foam concrete and corrugated steel sheets and construction method of arch bridge structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
廖纪明: "现浇气泡混合轻质土在桥梁减跨施工中的应用", 《建筑施工》 *
张建梅等: "浅谈气泡混合轻质土在登州路桥桥拱上的应用", 《科技致富向导》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111696098A (en) * 2020-06-16 2020-09-22 王昕阳 Concrete member detection system and method based on big data

Similar Documents

Publication Publication Date Title
CN107084868B (en) A kind of solution cavity preparation method and device based on 3D printing technique
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN101935995B (en) Rock-fill concrete (RFC) and cemented sand and gravel (CSG) composite material dam as well as design and construction method thereof
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN105801165B (en) The permeable composition of mixed foaming mud lightweight and preparation method for roadbed filling
CN105236872A (en) Lightweight foam soil applied to roadbed filling of mountainous-area steep road section
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN107859062B (en) The earth-filling method of underground pipe gallery
CN108678041A (en) A kind of existing Bearing Capacity of Pile Foundation slip casting method for improving
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN107905249A (en) A kind of novel earthquake-proof supporting and retaining system backfills composite construction
CN105985138A (en) Foam light soil synthetic material for filling highway subgrade, method for preparing foam light soil synthetic material, and highway subgrade filling method
CN107816056A (en) Filled type concrete gravity retaining wall and its construction technology
CN110230314B (en) Pile foundation structure and construction method thereof
CN105155383A (en) Construction process of bubble light soil
CN204825520U (en) Railway subtracts vibration isolation and fills ditch structure
CN107386120A (en) A kind of method for filling arcading slab bridge air bubble mix light-textured soil
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN204385724U (en) A kind of polyurethane gravel pile
CN110172979B (en) Roller compacted concrete damming method
CN107142805A (en) The technique that a kind of utilization light soil handles soft base
CN111501837A (en) Foam concrete based plastic inspection well peripheral backfill method
CN103437353A (en) Cast-in-situ light foam concrete reinforcing method based on anchor bolt support
CN110409255A (en) Town road and constructing operation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124