- CN107381286A CN107381286A CN201610331048.XA CN201610331048A CN107381286A CN 107381286 A CN107381286 A CN 107381286A CN 201610331048 A CN201610331048 A CN 201610331048A CN 107381286 A CN107381286 A CN 107381286A
- Authority
- CN
- China
- Prior art keywords
- building
- door
- elevator
- bridge
- high level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Automation & Control Theory (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The present invention provides a kind of for elevator viaduct device outside more building or multiunit building.It is that the high level elements door opened to outside building is set on building high level and roof, and lift appliance and building outside corridor bridge are set outside building.Personnel take lift appliance, are lifted into the high level being mated with and walk shelter bridge or roof, enter back into unit high level elements door and corresponding apartment corridor and room.Vice versa, and the present invention is simple in construction, is easy to make and promotes, and because elevator realizes, more building are multiunit to be shared, therefore improves service efficiency, reduces elevator investment and space, and the trip of resident is ascended a height the very convenient of change with roof activity.
Description
Technical field
The present invention relates to one kind during with (resident in) elevator viaduct device outside the building of high-rise building.
Background technology
It is being that resident ascends a height and offered convenience with the elevator of building, but the building having not are set so that disengaging is high-rise and arrives
The movable personnel of roof are inconvenient, and some need install plug-in elevator additional, but problems be present:On the one hand it is that the elevator can only
For this unit, each layer resident uses, and counter investment is big, and utilization rate is low, and space-consuming is more, and the most of the time is in idle state;Separately
On the one hand be related in installation process each layer and around between occupation of land, daylighting, the personal field such as attractive in appearance, be not easy to coordinate system
One, therefore be difficult to promote.
The content of the invention
The invention aims to provide one kind to overcome background defect, be advantageous to building resident ascend a height and roof activity and easily
In elevator viaduct device outside the building of popularization.
The present invention completes as follows:
For it is existing with during (resident's garrison) mainly by multilayer parallel room and vertical apartment corridor (including platform
Rank, turning platform, handrail and its bottom floor units door) composition common multiple-unit building, we need elevator in its unit
The high level elements corridor position for lifting the floor (on general 4 layers to roof) reached is set to high level elements open outside floor
Door;At the same time, nearby suitably putting for ground sets elevator outside the building for the vertical-lift of personnel's seating according to a conventional method
Device (including elevator well frame, lifting forechoir and its forechoir door, elevator frame door, elevator cage guide, elevator car canopy etc., elevator well frame door
It is arranged on elevator frame, forechoir door need to typically be opened with special door card key), to cause the hoisting depth for lifting forechoir door
Concordant with the height of foregoing high level elements door to adapt to, its maximum lifting height will reach on the top of corresponding building;So
We set building outside corridor bridge between each high level elements door and elevator well frame door afterwards, and the bridge will ensure personnel between
Safely and conveniently walking (may include to have safe bridge railing of the body of skew bridge in length and breadth for the convenient walking of personnel, bridge support and both sides etc.
Protective equipment), its one end conducting parallel with elevator well frame door, and being supported by elevator well frame, the other end with floor parallel transverse
Or multiple high level elements doors of longitudinal direction are conducted, can typically be supported by the overhanging cantilever beam being connected in each high level elements door,
Also it can be directly supported by roof, that is, complete the construction of the invention of the building;Other building nearby are constructed with the building with method again
Or " grade separation Biodge device outside building " is set gradually between building, that is, complete the making of the housing-group present invention.
In use, ground staff enters elevator car door, a certain high level elements door or roof height is promoted to, then, is led to
Cross elevator well frame door enter corresponding to building outside corridor bridge, you can enter corresponding high level elements door or roof, then, into corresponding
Apartment corridor and room.So as to realize that an elevator can provide ascend a height walking, roof for the resident of the multiple building of multiple units
Facility in terms of movable and mutual contact.
The present invention is simple in construction, easily makes and constructs, because the elevator is available for the resident of the multiple building of multiple units to carry
For ascending a height and roof activity etc. services, therefore utilization rate is higher, and it is suitable between building to select to be arranged at due to lift appliance
Place, therefore construction reformation interference is few, it is easy to spread.With the facility of high-rise traffic and making full use of for roof area, community occupies
The scope of activities and quality of life of the people will also have a distinct increment for it.This embodiment provides as follows:
Accompanying drawing is general structure schematic diagram of the invention
In above-mentioned figure:1--- is with (resident is in period) building 2--- lift appliances
3--- buildings outside corridor bridge 4--- high level elements door 5--- elevator well frames
6--- elevator cars door (including forechoir) 7--- elevator well frame door 8--- elevator cage guides
9--- elevator car canopy 10--- pontic 11---- bridges support 12--- bridge railings
The private key keycard of 13--- elevator car doors
With reference to the accompanying drawings, the present invention is described in further detail:
For existing resident in common multiple-unit building (1) first, we are in its 5th high-rise apartment corridor
Set respectively with roof to high level elements door (4) open outside building, while nearby the suitably point on ground is set according to a conventional method
The lift appliance (2) for putting vertical-lift (includes elevator well frame (5), lifting forechoir door (6), elevator well frame door (7), elevator tank
Road (8), elevator car canopy (9) etc.), elevator well frame door (7) is arranged on elevator frame (5), is allowed to the height respectively with the 5th and roof
The position of layer unit door (4) flush;Then frame is distinguished between two high level elements doors (4) and two elevator well frame doors (7)
Two building outside corridor bridges (3) are set:5th high-rise pontic (10) can be fabricated to girder steel the suitable shape such as longitudinal and transverse, oblique and
Structure, its one end is supported by elevator well frame (5) and UNICOM parallel with elevator well frame door (7), the other end and this layer of position and neighbouring
Each high level elements door (4) concordant docking of layer position and conducting, and the stiff cantilevers beam by being connected in the 5th high level elements door (4)
(also can be by the common steel frame columns for standing on ground or other supporters) supports;For roof position building outside corridor bridge (3), its bridge
Body (10) also makes of girder steel, and its one end is supported by elevator well frame (5) and UNICOM parallel with elevator well frame door (7), the other end
Directly supported by roof or be integrated with roof, holding is docked with each high level elements door (4) of roof to be turned on and cause
Personnel can safely, smoothly walk on bridge, so as to realize the 5th high level elements door (4) and roof high level elements door (4) and
The elevator traffic of the interior corridor personnel of neighbouring high level elements door (4), it is ensured that the safety walking when personnel on bridge are most, i.e., it is complete
Into the construction of the invention of building (1) first;Again by other building (1) second and building (1) first with method construction or between
Grade separation Biodge device (3) outside building is set, that is, completes the making of this two buildings present invention, realizes the housing-group and the region present invention's successively
Make.
In use, ground staff enters in elevator car door (6), the respective heights of the 5th or roof, elevator block are promoted to
Railway carriage or compartment door (6) and elevator well frame door (7) while synchronous unlatching, personnel can enter corresponding building outside corridor bridge (3), subsequently into phase
High level elements door (4) answer or neighbouring, then sequentially enter apartment corridor and room.So as to realize that an elevator can be multiple lists
The resident of the multiple building of member provides walking of ascending a height, roof activity and the facility mutually in terms of contact.
Claims (10)
- A kind of 1. elevator viaduct device outside building, mainly by the multiple-unit high-rise building (1) with (resident has moved into), building dispatch from foreign news agency Ladder device (2) and the high level elements door (4) opened to outside building are formed;At the high-rise position of building (1) each unit, (general 4 layers extremely On roof), it is provided with to high level elements door (4) open outside floor, conventional method is being used on ground near building outside The lift appliance (2) that lifting is taken for personnel is provided with, (including elevator well frame (5), lifting forechoir door (6), elevator well frame door (7), safety devices etc. necessary to elevator cage guide (8) elevator lid (9) and other transport people), it lifts forechoir door (6) can will Personnel are promoted to specified high-rise position on roof and concordant with other high level elements doors (4) by ground outside building.Its feature It is that it also includes building outside corridor bridge (3) (typically by the bridge support (11) and two of the pontic (10) for personal security walking, support pontic The safety protection facilities such as the bridge railing (12) of side are formed), the bridge one end and elevator well frame door (7) parallel docking UNICOM, the other end Relative with the high level elements door (4) of unit, each layer of position and other building (1) on demand it can connect conducting.In use, entering building personnel can be entered in elevator car door (6) by ground, the parallel position with building outside corridor bridge (3) is promoted to Postponing, elevator car door (6) and elevator well frame door (7) are opened simultaneously, and personnel enter the building outside corridor bridge (3) being mated with, then Enter along building outside corridor bridge (3) in the high level elements door (4) being mated with, then enter back into apartment corridor and room, otherwise also So, ascended a height and the facility of roof activity aspect so as to realize to provide the high-rise personnel that live.
- 2. lift appliance (2) according to claim 1, it is characterized in that the maximum lifting height of the forechoir door (6) is located at The top of building (1).
- 3. building outside corridor bridge (3) according to claim 1, it is characterized in that the supporter of the building outside corridor bridge pontic (10) (11) it is the cantilever beam that is installed in high level elements door (4).
- 4. building outside corridor bridge (3) according to claim 1, it is characterized in that the building outside corridor bridge (3) is to establish simultaneously The tops of building (1) and sideway stance.
- 5. building outside corridor bridge (3) according to claim 1, it is characterized in that the building outside corridor bridge (3), be connected across it is multiple Between building (1).
- 6. building outside corridor bridge (3) according to claim 1, it is characterized in that the supporter of the building outside corridor bridge pontic (10) (11) it is the hanging body that is installed on roof.
- 7. building outside corridor bridge (3) according to claim 1, it is characterized in that the building outside corridor bridge (3), is parallel with floor It is spaced apart.
- 8. building outside corridor bridge (3) according to claim 1, it is characterized in that the building outside corridor bridge (3), is with floor direction What parallel and inclination was provided simultaneously with.
- 9. lift appliance (2) according to claim 1, it is characterized in that the forechoir door (5) is with special key card (13) open.
- 10. building outside corridor bridge (3) according to claim 1, it is characterized in that described pontic (10) with being at the top of building (1) And it is connected in integral.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610331048.XA CN107381286A (en) | 2016-05-16 | 2016-05-16 | Elevator viaduct device outside building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610331048.XA CN107381286A (en) | 2016-05-16 | 2016-05-16 | Elevator viaduct device outside building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107381286A true CN107381286A (en) | 2017-11-24 |
Family
ID=60338207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610331048.XA Pending CN107381286A (en) | 2016-05-16 | 2016-05-16 | Elevator viaduct device outside building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107381286A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005307612A (en) * | 2004-04-22 | 2005-11-04 | Sumitomo Mitsui Construction Co Ltd | Multi-storied building |
CN1884775A (en) * | 2006-07-10 | 2006-12-27 | 郭建军 | Multistory building |
JP2007177394A (en) * | 2005-12-26 | 2007-07-12 | Miracle Three Corporation | Reconstruction method of apartment house of direct access of plurality of buildings and building reconstructed by this method |
JP2007211491A (en) * | 2006-02-09 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | Intermediate floor base-isolated building |
CN102359305A (en) * | 2011-09-11 | 2012-02-22 | 冯静 | Building facility for elevator shared by multi-storey residential building and three-dimensional garage and use method thereof |
CN206142608U (en) * | 2016-05-16 | 2017-05-03 | 张爱华 | Outer elevator overpass device of building |
-
2016
- 2016-05-16 CN CN201610331048.XA patent/CN107381286A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005307612A (en) * | 2004-04-22 | 2005-11-04 | Sumitomo Mitsui Construction Co Ltd | Multi-storied building |
JP2007177394A (en) * | 2005-12-26 | 2007-07-12 | Miracle Three Corporation | Reconstruction method of apartment house of direct access of plurality of buildings and building reconstructed by this method |
JP2007211491A (en) * | 2006-02-09 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | Intermediate floor base-isolated building |
CN1884775A (en) * | 2006-07-10 | 2006-12-27 | 郭建军 | Multistory building |
CN102359305A (en) * | 2011-09-11 | 2012-02-22 | 冯静 | Building facility for elevator shared by multi-storey residential building and three-dimensional garage and use method thereof |
CN206142608U (en) * | 2016-05-16 | 2017-05-03 | 张爱华 | Outer elevator overpass device of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207526020U (en) | A kind of new-type stair | |
CN206142608U (en) | Outer elevator overpass device of building | |
KR100936020B1 (en) | Low floor wheel chair lift | |
CN109505386A (en) | A kind of new-type stair and its implementation | |
KR101884830B1 (en) | multi-story parking device | |
CN113186975A (en) | Underground three-layer subway station | |
CN204400413U (en) | A kind of emergency staircase | |
CN107381286A (en) | Elevator viaduct device outside building | |
JP6502055B2 (en) | building | |
CN214246722U (en) | Crossing stair add elevator and realize flat-bed corridor transformation structure of registering one's residence | |
CN203513035U (en) | Outdoor elevator for residential building | |
CN211691288U (en) | Flat floor-in and outdoor-hanging elevator with rescue channel | |
CN204454160U (en) | Pedestrian stairway installs suspension type elevator additional | |
CN211769627U (en) | Elevator for car chair capable of getting in and out from window | |
CN204342209U (en) | A kind of self saving lift | |
CN112681792A (en) | Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway | |
CN102464247B (en) | Multi-building common elevator for multi-storey residential buildings and building structure thereof | |
CN206590722U (en) | It is secondary to install elevator structure additional | |
CN109267710A (en) | The accessible plug-in installation elevator of registering one's residence of big half storey platform multi-section | |
CN205328417U (en) | Accessible elevator | |
CN104163377A (en) | Home lift | |
CN111086939A (en) | Elevator for car chair capable of getting in and out from window | |
CN210313041U (en) | Elevator for old building reconstruction | |
JP2003232136A (en) | Method of installing more elevators for dwelling unit access and its construction procedure | |
JP2005350178A (en) | Elevator device for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |