CN107371430A - Change the physico-chemical process of desert soil structure and ecological environment - Google Patents
Change the physico-chemical process of desert soil structure and ecological environment Download PDFInfo
- Publication number
- CN107371430A CN107371430A CN201710554789.9A CN201710554789A CN107371430A CN 107371430 A CN107371430 A CN 107371430A CN 201710554789 A CN201710554789 A CN 201710554789A CN 107371430 A CN107371430 A CN 107371430A
- Authority
- CN
- China
- Prior art keywords
- soil
- desert
- physico
- improvement
- ecological environment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B79/00—Methods for working soil
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P60/00—Technologies relating to agriculture, livestock or agroalimentary industries
- Y02P60/20—Reduction of greenhouse gas [GHG] emissions in agriculture, e.g. CO2
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses a kind of physico-chemical process for changing desert soil structure and ecological environment, 1. the soil that needs are improved is carried out smooth;2. compactness, infiltration coefficient and the water content in the soil before measure improvement;3. the soil improved using dynamic compaction machinery to needs carries out full rammer, change the microstructure of desert soil using strong rammer impact energy, form it into structure necessary to soil, desert soil can produce certain consolidation after strong rammer, improve compactness, form crumb structure;4. grouting material of being sprayed on the soil after strong rammer, pipeline of the grouting material along desert, which flows down, to be oozed, at precalculated position under penetrating into earth's surface, the rapid expansion curing of the grouting material, thus block the pipeline flow structure in desert;5. compactness, infiltration coefficient and the water content of the soil after detection improvement, it is determined that the plant that can be planted.The invention has the advantages that can on the barren soil of desert area planting plants, change the microstructure in desert, be effectively prevented soil erosion.
Description
Technical field
The present invention relates to a kind of method of Desert Control, more particularly to a kind of desert soil structure and ecological environment of changing
Physico-chemical process.
Background technology
Control of desert is a world-famous puzzle, and China is that desert more than one is national, and the deep country by desert harm
One, at present, the desert area and desertification area in China are increasing, have reached 168.9 ten thousand square kilometres, have accounted for area
17.6%, interior basin between 35 degree to 56 degree of north latitude, plateau are mainly distributed on, forms one west from Tarim Basin,
West of Songnen Plain arrive in east, 4500 kilometers of thing length, the desert belt that wide about 600 kilometers of north and south, and with annual 2460 square kilometres
Speed expanded.
China increases the dynamics to control of desert in recent years, but the extension of desert and desertification still becomes in expansion
Gesture.
Plant or crops are difficult to have three the main reason for desert grows:When the missing of moisture, second, desert soil
Loose structure, necessary crumb structure in soil is lacked, third, movement and the mobility of desert soil subparticle, cause plant
Root system is difficult to take root.
The content of the invention
Technical problem solved by the invention is to be directed to existing desert and desertification ecological environment problem, proposes a kind of change
Existing desert and the physical method of desertification soil texture and ecological environment, this method have that speed is fast, the spy of construction is simple
Point, existing desert area Current Situation of Eco-environment can be improved rapidly.
The technical solution adopted by the present invention is:Change the physico-chemical process of desert soil structure and ecological environment, step
It is as follows:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, change the microcosmic knot of desert soil using strong rammer impact energy
Structure, desert soil can produce certain consolidation after strong rammer, improve compactness, form crumb structure, reduce vertically moving for moisture, make
Hydrone can be conserved in soil, add the humidity and water content of soil, and primary condition is created for the growth of plant;
4. grouting material of being sprayed on the soil after strong rammer, pipeline of the grouting material along desert, which flows down, to be oozed, and is being penetrated into
Under earth's surface during precalculated position, the rapid expansion curing of the grouting material, thus block the pipeline flow structure in desert;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, it is determined that the plant that can be planted.
The plant of described step 5. can be crops, or herbaceous plant or xylophyta.
The strong rammer step of described step 3. is:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert
The structure of soil is changed.
The method of the water content of soil after the detection improvement of described step 5. is that the soil after improvement is seeped water
Experiment, measure water content simultaneously draw the relation curve of water content and time, before contrast improvement with improve after soil it is stable aqueous
The difference of amount, the plant or crop of suitable growth are selected according to the stable aqueous amount of soil after improvement.
4. described grouting material is high polymer material to step.
Described step 4. after soil surface spray fixative.
Described grouting material includes cement mortar.
According to the ratio of mud that described cement mortar is determined the time required to precalculated position is seeped under grouting material.
The ratio of mud of described cement mortar is 2-5.
The invention has the advantages that desert water and soil flowing water can be prevented effectively, Soil Microstructure is changed, is allowed the water to
Self-restraint is in the structure of soil.And under follow-up natural environment, the soil after natural precipitation can also be modified conserves, and is
Plant growth provides enough moisture, is effectively prevented soil erosion.
Brief description of the drawings
Fig. 1 is the enlarged diagram of desert soil structure before improvement.
Fig. 2 is desert soil structural representation after strong rammer
Fig. 3 is the enlarged diagram of desert soil structure after improvement.
Fig. 4 is the operational flowchart of the present invention.
Reference is as follows:1- pipeline streams, 2- grouting materials, 3- crumb structure.
Embodiment
The physico-chemical process for changing desert soil structure and ecological environment is further described below in conjunction with the accompanying drawings.
This physico-chemical process for changing desert soil structure and ecological environment, according to the following steps:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, change the microcosmic knot of desert soil using strong rammer impact energy
Structure, structure necessary to soil is formed it into, desert soil can produce certain consolidation after strong rammer, improve compactness, form granule
Structure 3, vertically moving for moisture is reduced, hydrone is conserved in soil, added the humidity and water content of soil, be
The growth of plant creates primary condition;
4. grouting material 2 of being sprayed on the soil after strong rammer, the grouting material 2 ooze under the pipeline stream 1 along desert, penetrated into
Under to earth's surface during precalculated position, the 2 rapid expansion curing of grouting material, thus block the structure of pipeline stream 1 in desert;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, it is determined that the plant that can be planted.
The plant of described step 5. can be crops, or herbaceous plant or xylophyta.
The strong rammer step of described step 3. is:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert
The structure of soil is changed.
The method of the water content of soil after the detection improvement of described step 5. is that the soil after improvement is seeped water
Experiment, measure water content simultaneously draw the relation curve of water content and time, before contrast improvement with improve after soil it is stable aqueous
The difference of amount, the plant or crop of suitable growth are selected according to the stable aqueous amount of soil after improvement.
4. described grouting material 2 is high polymer material to step.
Described step 4. after soil surface spray fixative.
Described grouting material 2 includes cement mortar.
According to the ratio of mud that described cement mortar is determined the time required to precalculated position is seeped under grouting material 2.
The ratio of mud of described cement mortar is 2-5.
Embodiment one:Change the physico-chemical process of desert soil structure and ecological environment, method operating procedure is such as successively
Under:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, step is as follows:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert
The structure of soil is changed.
Change the microstructure of desert soil using strong rammer impact energy, form it into structure necessary to soil, it is husky after strong rammer
Desert soil can produce certain consolidation, improve compactness, form crumb structure 3, reduce vertically moving for moisture, enable hydrone
Self-restraint adds the humidity and water content of soil in soil, and primary condition is created for the growth of plant;
4. there are the Polymeric Grouting Materials 2 of water preventing ability, according to filling after the solidification for liquid of being sprayed on the soil after strong rammer
Precalculated position is seeped under pulp material 2 needs 2min, and grouting material 2 selects cement mortar, and the ratio of mud for determining cement mortar is 2, cement
Slurry oozes along under the pipeline stream 1 in desert, at precalculated position under penetrating into earth's surface, the rapid expansion curing of cement mortar, thus block husky
The unconcerned structure of pipeline stream 1, plays a part of water barrier;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, the water content of the soil after detection improvement
Method to carry out infiltration experiment to the soil after improvement, measure water content simultaneously draws the relation curve of water content and time, right
Than the difference before improveing with the stable aqueous amount of soil after improvement, after the determination improvement of the stable aqueous amount of the soil after improvement
The depth of soil be 5m, oxygen content 10%-15% in soil air, general porosity 55%, capillary porosity 40%, point
Corn growth characteristic, depth of soil 5m, oxygen content 10%-15% in soil air are analysed, general porosity is 55% or so, hollow billet
Porosity is 35%-40%, the soil suitable planting corn after improvement, on the soil after improvement, when temperature conditionss are suitable, and kind
Plant corn.
The method can effectively prevent desert area water and soil flowing water, change Soil Microstructure, allow the water to self-restraint in soil
In the structure of earth, the fragile ecological environment of desert area is effectively improved.And under follow-up natural environment, natural precipitation
Soil after can also being modified is conserved, and enough moisture is provided for plant growth, is effectively prevented soil erosion.Together
When, the yield of corn is also improved, the raising of corn yield has driven aquaculture and industrial expansion.
Embodiment two:Change the physico-chemical process of desert soil structure and ecological environment, method operating procedure is such as successively
Under:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, step is as follows:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert
The structure of soil is changed.
Change the microstructure of desert soil using strong rammer impact energy, form it into structure necessary to soil, it is husky after strong rammer
Desert soil can produce certain consolidation, improve compactness, form crumb structure 3, reduce vertically moving for moisture, enable hydrone
Self-restraint adds the humidity and water content of soil in soil, and primary condition is created for the growth of plant;
4. there are the Polymeric Grouting Materials 2 of water preventing ability, according to filling after the solidification for liquid of being sprayed on the soil after strong rammer
Precalculated position is seeped under pulp material 2 needs 1min, and grouting material 2 selects cement mortar, and the ratio of mud for determining cement mortar is 4, cement
Slurry oozes along under the pipeline stream 1 in desert, at precalculated position under penetrating into earth's surface, the rapid expansion curing of cement mortar, thus block husky
The unconcerned structure of pipeline stream 1, plays a part of water barrier;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, the water content of the soil after detection improvement
Method to carry out infiltration experiment to the soil after improvement, measure water content simultaneously draws the relation curve of water content and time, right
Than the difference before improveing with the stable aqueous amount of soil after improvement, after the determination improvement of the stable aqueous amount of the soil after improvement
The depth of soil be 5m, oxygen content 10%-15% in soil air, general porosity is 30% or so, soil permeability 10%
Left and right, the growth characteristics of matrimony vine are analyzed, learn that matrimony vine is less demanding to soil property, the suitable matrimony vine growth of the soil after improvement, changed
On soil after good, under the conditions of proper temperature, matrimony vine is planted.
Matrimony vine is mentioned, presumably everybody should be unable to be strange, and modern pharmacology research confirms that the fruit of Chinese wolfberry can adjust immunity of organism
Function, it can effectively suppress tumour growth and cell mutation, there is anti-aging, anti-fatty liver, regulation blood fat and blood glucose, promotion to make
The effect of blood function etc., and applied to clinic.The fruit of Chinese wolfberry is convenient to take, can be used as medicine, chew clothes, steeps in wine.In mountain area, plant can
To conserve water and soil, improved soil, to regulate the climate, it can check winds and fix drifting sand, keep soil from packing together in plain dune plant, reduce disaster
The harm of property weather.Matrimony vine is planted in Canal in Loess Area, the yield of matrimony vine can be greatly improved, promotes the hair of China's medical industry
Exhibition.
Embodiment three:Change the physico-chemical process of desert soil structure and ecological environment, method operating procedure is such as successively
Under:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, step is as follows:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert
The structure of soil is changed.
Change the microstructure of desert soil using strong rammer impact energy, form it into structure necessary to soil, it is husky after strong rammer
Desert soil can produce certain consolidation, improve compactness, form crumb structure 3, reduce vertically moving for moisture, enable hydrone
Self-restraint adds the humidity and water content of soil in soil, and primary condition is created for the growth of plant;
4. there are the Polymeric Grouting Materials 2 of water preventing ability, according to filling after the solidification for liquid of being sprayed on the soil after strong rammer
Precalculated position is seeped under pulp material needs 30s, and grouting material selection cement mortar, the ratio of mud for determining cement mortar is 5, cement mortar edge
Oozed under the pipeline stream 1 in desert, at precalculated position under penetrating into earth's surface, the rapid expansion curing of cement mortar, thus block desert
The structure of pipeline stream 1, plays a part of water barrier;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, the water content of the soil after detection improvement
Method to carry out infiltration experiment to the soil after improvement, measure water content simultaneously draws the relation curve of water content and time, right
Than the difference before improveing with the stable aqueous amount of soil after improvement, after the determination improvement of the stable aqueous amount of the soil after improvement
The depth of soil be 10m, oxygen content 10%-15% in soil air, general porosity 20%, the growth for analyzing pine and cypress is special
Property, pine and cypress is less demanding to soil, and the soil after improvement can plant pine and cypress, the grown on soil pine and cypress after improvement.
The invention has the advantages that can on the barren soil of desert area planting plants, can effectively prevent
Water and soil flowing water, changes the microstructure in desert, effectively improves the fragile ecological environment of desert area.And follow-up
Under natural environment, the soil after natural precipitation can also be modified conserves, and enough moisture is provided for plant growth, effectively
Prevent soil erosion.
Claims (9)
1. change the physico-chemical process of desert soil structure and ecological environment, it is characterised in that:Step is as follows:
1. the soil that needs are improved is carried out smooth;
2. compactness, infiltration coefficient and the water content in the soil before measure improvement;
3. the soil improved using dynamic compaction machinery to needs carries out full rammer, change the microstructure of desert soil using strong rammer impact energy,
Desert soil can produce certain consolidation after strong rammer, improve compactness, form crumb structure, reduce vertically moving for moisture, make water
Molecule can be conserved in soil, add the humidity and water content of soil, and primary condition is created for the growth of plant;
4. grouting material of being sprayed on the soil after strong rammer, pipeline of the grouting material along desert, which flows down, to be oozed, and is penetrating into earth's surface
During lower precalculated position, the rapid expansion curing of the grouting material, thus block the pipeline flow structure in desert;
5. compactness, infiltration coefficient and the water content of the soil after detection improvement, it is determined that the plant that can be planted.
2. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
The plant of described step 5. can be crops, or herbaceous plant or xylophyta.
3. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
The strong rammer step of described step 3. is:
A. dynamic compaction machinery is in place, and full rammer is carried out to whole place;
B. dynamic compaction machinery control system is adjusted, makes the hammer ram movement of falling object;
C. the potential energy of hammer ram is changed into kinetic energy, and its kinetic energy produces destruction to the soil texture in desert, so that desert soil
Structure is changed.
4. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
The method of the water content of soil after the detection improvement of described step 5. determines to carry out infiltration experiment to the soil after improvement
Water content and the relation curve for drawing water content and time, the preceding difference with the stable aqueous amount of soil after improvement of contrast improvement,
According to the plant or crop of the stable aqueous amount selection suitable growth of soil after improvement.
5. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
4. described grouting material is high polymer material to step.
6. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
Described step 4. after soil surface spray fixative.
7. the physico-chemical process according to claim 1 for changing desert soil structure and ecological environment, it is characterised in that:
Described grouting material includes cement mortar.
8. the physico-chemical process according to claim 7 for changing desert soil structure and ecological environment, it is characterised in that:
According to the ratio of mud that described cement mortar is determined the time required to precalculated position is seeped under grouting material.
9. the physico-chemical process according to claim 8 for changing desert soil structure and ecological environment, it is characterised in that:
The ratio of mud of described cement mortar is 2-5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710554789.9A CN107371430A (en) | 2017-07-10 | 2017-07-10 | Change the physico-chemical process of desert soil structure and ecological environment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710554789.9A CN107371430A (en) | 2017-07-10 | 2017-07-10 | Change the physico-chemical process of desert soil structure and ecological environment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107371430A true CN107371430A (en) | 2017-11-24 |
Family
ID=60335528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710554789.9A Withdrawn CN107371430A (en) | 2017-07-10 | 2017-07-10 | Change the physico-chemical process of desert soil structure and ecological environment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107371430A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670435A (en) * | 2019-09-19 | 2020-01-10 | 东南大学 | Method for treating collapsible loess subgrade through dynamic compaction and curing |
CN114397237A (en) * | 2022-01-19 | 2022-04-26 | 成都理工大学 | Water bath type temperature control variable water head seepage instrument and method for testing permeability by using same |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1341343A (en) * | 2000-09-05 | 2002-03-27 | 蓝派冲击压实技术开发(北京)有限公司 | Rice field irrigation water saving method by impact-compacting soil of rice field |
CN103609220A (en) * | 2013-11-26 | 2014-03-05 | 南京市水利规划设计院有限责任公司 | Farmland operation method for reducing quantity of leakage water of soil |
CN106105458A (en) * | 2016-06-23 | 2016-11-16 | 四川华电杂谷脑水电开发有限责任公司 | Intercept water method for the plantation solid water saving of desert habitat scale and ground |
-
2017
- 2017-07-10 CN CN201710554789.9A patent/CN107371430A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1341343A (en) * | 2000-09-05 | 2002-03-27 | 蓝派冲击压实技术开发(北京)有限公司 | Rice field irrigation water saving method by impact-compacting soil of rice field |
CN103609220A (en) * | 2013-11-26 | 2014-03-05 | 南京市水利规划设计院有限责任公司 | Farmland operation method for reducing quantity of leakage water of soil |
CN106105458A (en) * | 2016-06-23 | 2016-11-16 | 四川华电杂谷脑水电开发有限责任公司 | Intercept water method for the plantation solid water saving of desert habitat scale and ground |
Non-Patent Citations (1)
Title |
---|
生死扣1223: ""强夯施工质量控制"", 《百度文库》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670435A (en) * | 2019-09-19 | 2020-01-10 | 东南大学 | Method for treating collapsible loess subgrade through dynamic compaction and curing |
CN114397237A (en) * | 2022-01-19 | 2022-04-26 | 成都理工大学 | Water bath type temperature control variable water head seepage instrument and method for testing permeability by using same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106961864B (en) | A kind of the alkaline land improving system and its modification method of wells connecting with canals | |
CN104878760B (en) | A kind of side slope is from draining electric osmose anchor pole and construction method | |
Lili et al. | Methods for measuring soil infiltration: State of the art | |
CN107371430A (en) | Change the physico-chemical process of desert soil structure and ecological environment | |
CN102704497B (en) | RPW (ranked position weight) process for treating high fill slope | |
CN106120822B (en) | A kind of method for protecting support and device that prevent mud stone from coming down | |
CN104458530A (en) | Indoor determination method and device for permeability coefficient of degraded layer of cement soil | |
CN204715341U (en) | A kind of Grouting Pipe for miscellaneous fill stratum | |
CN108842724B (en) | A kind of fine tailings and high concentration do not sort the quick damming method of tailing | |
CN104499467B (en) | A kind of field drainage aerating system and embedded device | |
CN104328781B (en) | A kind of unfavorable geologic body controlling oozes profit chemical grouting method | |
CN107237314A (en) | Change desert soil structure and the chemical method of ecological environment | |
CN106818362B (en) | Barren green desert pattern of farming and in desert planting plants method | |
CN107278405A (en) | Change the physical method of desert soil structure and ecological environment | |
CN103233455B (en) | Horizontal drainage plate net with grid | |
CN206173893U (en) | High efficiency's solid sloping structure | |
CN108739258A (en) | A kind of Arid desert region shrubbery sand drift collection rain method for recovering vegetation | |
CN107278404A (en) | Change Canal in Loess Area fragile ecological environment and increase the physico-chemical process in arable land | |
Lee | Effect of rainfall on tree stability | |
CN106836110A (en) | A kind of phreatic high irrigated area feed ditch Mono direct percolation model test apparatus | |
CN203446252U (en) | Plant planting system for saline-alkaline land | |
CN107524137B (en) | A kind of construction technology of deep soft soil treatment | |
CN209443485U (en) | Seepage well system is led suitable for deep layer aproll ground | |
CN102612884B (en) | Land consolidation method capable of increasing effective cultivated land area | |
CN107360748A (en) | Change Canal in Loess Area fragile ecological environment and increase the physical method in arable land |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180205 Address after: Dalian high tech Industrial Park in Liaoning province 116023 D1 building third Guang Xian Lu Chi square No. 133 room 329 Applicant after: DALIAN JIUDING ECOLOGICAL WATERSHED MANAGEMENT DEVELOPMENT CO.,LTD. Address before: 116023 56A3 layer 305B of Torch Road of Dalian hi tech park in Liaoning Applicant before: DALIAN JIUDING XIANGRUI SPECIAL ENGINEERING TECHNOLOGY RESEARCH INSTITUTE Co.,Ltd. |
|
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171124 |