CN107370088A - 输电线路预绞丝施工平台 - Google Patents

输电线路预绞丝施工平台 Download PDF

Info

Publication number
CN107370088A
CN107370088A CN201710733164.9A CN201710733164A CN107370088A CN 107370088 A CN107370088 A CN 107370088A CN 201710733164 A CN201710733164 A CN 201710733164A CN 107370088 A CN107370088 A CN 107370088A
Authority
CN
China
Prior art keywords
flat ladder
preformed armor
armor rods
electricity
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710733164.9A
Other languages
English (en)
Inventor
王凯
刘宏光
金增航
盛德琦
孙庆国
蒋磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710733164.9A priority Critical patent/CN107370088A/zh
Publication of CN107370088A publication Critical patent/CN107370088A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables

Landscapes

  • Ladders (AREA)

Abstract

本发明属于电力施工工具设备领域,涉及一种输电线路预绞丝施工平台,包括平梯和挂钩机构,平梯的两端各设置有一个挂钩机构;平梯包括两根支杆和垂直设置于两根支杆之间的横担;挂钩机构包括U型件和滑轮,滑轮通过挂钩设于U型件的中间位置,U型件的开口端与平梯两端的横担铰链接。本发明结构设计合理,可以悬挂在导线上进行高空作业,一方面可以极大的节省作业人员的体力,提高施工效率,加快消除因爆压管老化带来的线路缺陷。

Description

输电线路预绞丝施工平台
技术领域
本发明涉及一种输电线路预绞丝施工平台,属于电力施工工具设备领域。
背景技术
在目前的电力线路工程建设中,为方便施工,大量采用爆压接续技术。但该技术压接质量很难控制,造成压接强度和电气连接的不稳定。这也是目前很多运行线路存在的严重安全隐患。最近几年由于线路逐渐老化,由于爆压管压接质量问题导致的接头发热,导线断线等事故逐步增多,危害线路安全运行,而且爆压管接头数量众多,如果重新进行爆压处理也存在无法控制爆压质量等问题。
为使爆压接续线路安全运行,一般采取将补强式预绞丝对爆压管接头进行补强和分流,这种方法能够对导线提供稳定和持久的握力,很好对导线的蠕变、塑性变形进行补偿,提高导线的耐疲劳性能。
目前补强式预绞丝施工方法主要是将有接头导线档的两侧杆塔悬垂线夹解开,放下导线,在地面作业,都有效率低,施工工艺比较繁琐、劳动力要求较高,因此施工时间比较长的缺点。而且随着线路老化,全国每年因接续管老化、安装质量差引起的金具发热、导线掉线的事故在上百起,严重影响线路的安全运行。现有的安装工器具和安装方法效率低下,无法在原有的停电计划时间内消除线路缺陷。给线路安全稳定运行留下了很大的隐患。现在急需一种新工具来提高补强式预绞丝施工效率。
发明内容
本发明的目的在于提出一种输电线路预绞丝施工平台,该输电线路预绞丝施工平台结构简单,应用方便,极大的节省作业人员的体力,提高施工效率。
本发明所述的输电线路预绞丝施工平台,包括平梯和挂钩机构,平梯的两端各设置有一个挂钩机构;平梯包括两根支杆和垂直设置于两根支杆之间的横担;挂钩机构包括U型件和滑轮,滑轮通过挂钩设于U型件的中间位置,U型件的开口端与平梯两端的横担铰链接。
使用时,将平梯两端的滑轮横跨待补强位置的爆压管挂到导线上,施工人员坐到平梯上,进行具体操作施工,并且可以利用滑轮沿导线轻松移动进行多位置操作施工。施工过程简单方便,节省作业人员体力,提高了施工效率。
优选的,所述的平梯两端各设有一根安全绳,安全绳的两端分别通过安全扣固定于平梯的两根支杆。能够增强安全保护,有效防止平梯滑落,保证输电作业人员的安全。
优选的,所述的平梯的两根支杆侧面设有预绞丝固定带,能够方便装载待用的预绞丝,施工操作时,取用更加方便,提高工作效率。
优选的,所述的连接U型件的横担为与平梯装配连接的金属螺杆。
优选的,所述的挂钩和U型件为金属材质。
优选的,所述的平梯的两根支杆和除连接U型件的横担均为绝缘材质。
优选的,所述的预绞丝固定带为尼龙搭扣。
本发明与现有技术相比所具有的有益效果是:
本发明结构设计合理,可以悬挂在导线上进行高空作业,一方面可以极大的节省作业人员的体力,提高施工效率,加快消除因爆压管老化带来的线路缺陷;另一方面加强了安全保护,能够有效防止梯体滑落,保证作业人员的安全。
附图说明
图1、输电线路预绞丝施工平台主视图;
图2、输电线路预绞丝施工平台俯视图;
图3、输电线路预绞丝施工平台左视图。
图中:1、平梯;2、U型件;3、挂钩;4、滑轮;5、安全绳;6、安全扣;7、支杆;8、横担;9、尼龙搭扣。
具体实施方式
下面结合附图对本发明做进一步描述:
如图1-图3,本发明所述的输电线路预绞丝施工平台,包括平梯1和挂钩机构,平梯1的两端各设置有一个挂钩机构;平梯1包括两根支杆7和垂直设置于两根支杆7之间的横担8;挂钩机构包括U型件2和滑轮4,滑轮4通过挂钩3设于U型件2的中间位置,U型件2的开口端与平梯1两端的横担8铰链接。
本实施例中:平梯1两端各设有一根安全绳5,安全绳5的两端分别通过安全扣6固定于平梯1的两根支杆7,能够增强安全保护,有效防止平梯1滑落,保证输电作业人员的安全;平梯1的两根支杆7侧面设有预绞丝固定带,能够方便装载待用的预绞丝,施工操作时,取用更加方便,提高工作效率,并且预绞丝固定带为尼龙搭扣9;连接U型件2的横担8为与平梯1装配连接的金属螺杆,挂钩3和U型件2为金属材质,平梯1的两根支杆7和除连接U型件2的横担8均为绝缘材质。
工作时,提前将施工用的补强式预绞丝通过尼龙搭扣9固定到平梯1上,然后将平梯1两端的滑轮4横跨待补强位置的爆压管挂到导线上,并且将安全绳5的一端绕过导线后固定在平梯1上,然后施工人员坐到平梯1上,从尼龙搭扣9位置取用预绞丝进行具体操作施工,并且可以利用滑轮4沿导线轻松移动进行多位置操作施工。施工过程简单方便,节省作业人员体力,提高了施工效率,并且加强了安全保护,能够有效防止平梯1滑落,保证作业人员的安全。

Claims (7)

1.一种输电线路预绞丝施工平台,其特征在于:包括平梯(1)和挂钩机构,平梯(1)的两端各设置有一个挂钩机构;平梯(1)包括两根支杆(7)和垂直设置于两根支杆(7)之间的横担(8);挂钩机构包括U型件(2)和滑轮(4),滑轮(4)通过挂钩(3)设于U型件(2)的中间位置,U型件(2)的开口端与平梯(1)两端的横担(8)铰链接。
2.根据权利要求1所述的输电线路预绞丝施工平台,其特征在于:平梯(1)两端各设有一根安全绳(5),安全绳(5)的两端分别通过安全扣(6)固定于平梯(1)的两根支杆(7)。
3.根据权利要求1所述的输电线路预绞丝施工平台,其特征在于:平梯(1)的两根支杆(7)侧面设有预绞丝固定带。
4.根据权利要求1所述的输电线路预绞丝施工平台,其特征在于:连接U型件(2)的横担(8)为与平梯(1)装配连接的金属螺杆。
5.根据权利要求1所述的输电线路预绞丝施工平台,其特征在于:挂钩(3)和U型件(2)为金属材质。
6.根据权利要求1所述的输电线路预绞丝施工平台,其特征在于:平梯(1)的两根支杆(7)和除连接U型件(2)的横担(8)均为绝缘材质。
7.根据权利要求3所述的输电线路预绞丝施工平台,其特征在于:预绞丝固定带为尼龙搭扣(9)。
CN201710733164.9A 2017-08-24 2017-08-24 输电线路预绞丝施工平台 Pending CN107370088A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710733164.9A CN107370088A (zh) 2017-08-24 2017-08-24 输电线路预绞丝施工平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710733164.9A CN107370088A (zh) 2017-08-24 2017-08-24 输电线路预绞丝施工平台

Publications (1)

Publication Number Publication Date
CN107370088A true CN107370088A (zh) 2017-11-21

Family

ID=60311901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710733164.9A Pending CN107370088A (zh) 2017-08-24 2017-08-24 输电线路预绞丝施工平台

Country Status (1)

Country Link
CN (1) CN107370088A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254848A (zh) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 一种输电线路架空光缆提线装置
CN112451870A (zh) * 2020-11-26 2021-03-09 国网山东省电力公司建设公司 一种变电站构支架安全作业平台
CN113788443A (zh) * 2021-09-14 2021-12-14 广东电网有限责任公司 一种高空线路作业车

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010092562A1 (en) * 2009-02-09 2010-08-19 Bahat Ben Ibrahim S Erection method by simple tower instrument devices of building upper bridge construction
CN202153620U (zh) * 2011-08-16 2012-02-29 山东电力集团公司潍坊供电公司 一种等电位作业绝缘平台
CN203398638U (zh) * 2013-07-16 2014-01-15 国家电网公司 输电线路中用于涂刷绝缘子串的作业梯
CN203398640U (zh) * 2013-07-16 2014-01-15 国家电网公司 输电线路中用于涂刷绝缘子串的专用支架
CN205212340U (zh) * 2015-12-25 2016-05-04 国网浙江省电力公司台州供电公司 一种便携式瓷瓶出线梯
CN205282997U (zh) * 2016-01-06 2016-06-01 国网山东郓城县供电公司 用于供电输电线路的检修装置
CN205753176U (zh) * 2016-05-10 2016-11-30 国网湖南省电力公司带电作业中心 一种全方位旋转伸缩绝缘梯

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010092562A1 (en) * 2009-02-09 2010-08-19 Bahat Ben Ibrahim S Erection method by simple tower instrument devices of building upper bridge construction
CN202153620U (zh) * 2011-08-16 2012-02-29 山东电力集团公司潍坊供电公司 一种等电位作业绝缘平台
CN203398638U (zh) * 2013-07-16 2014-01-15 国家电网公司 输电线路中用于涂刷绝缘子串的作业梯
CN203398640U (zh) * 2013-07-16 2014-01-15 国家电网公司 输电线路中用于涂刷绝缘子串的专用支架
CN205212340U (zh) * 2015-12-25 2016-05-04 国网浙江省电力公司台州供电公司 一种便携式瓷瓶出线梯
CN205282997U (zh) * 2016-01-06 2016-06-01 国网山东郓城县供电公司 用于供电输电线路的检修装置
CN205753176U (zh) * 2016-05-10 2016-11-30 国网湖南省电力公司带电作业中心 一种全方位旋转伸缩绝缘梯

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254848A (zh) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 一种输电线路架空光缆提线装置
CN112451870A (zh) * 2020-11-26 2021-03-09 国网山东省电力公司建设公司 一种变电站构支架安全作业平台
CN113788443A (zh) * 2021-09-14 2021-12-14 广东电网有限责任公司 一种高空线路作业车

Similar Documents

Publication Publication Date Title
CN107370088A (zh) 输电线路预绞丝施工平台
CN201638948U (zh) 一种输电线路抛拉式接地线
CN106356763A (zh) 一种进入紧凑型输电线路等电位的方法及所用折叠梯
CN209488052U (zh) 一种输电线路跨越点封网装置
CN112736768A (zh) 一种进入紧凑型线路中相电场的方法
CN203312696U (zh) 10kV线路带电搭头挂扣式绝缘挡板
CN205264881U (zh) 一种可调角度的接地线端头
CN104682037A (zh) 一种携带型高压接地线
CN207813473U (zh) 一种应用于高压输电线路检修的硬梯
CN206976942U (zh) 一种电力施工用送线装置
CN203288999U (zh) 一种电力接地线接地针操作专用装置
CN106099412B (zh) 一种便携式电力施工接地装置及其使用方法
CN206148640U (zh) 一种具有双挂线模式的导线接地线夹
CN214590202U (zh) 一种进入紧凑型线路中相电场的工器具
CN202333156U (zh) 端子保护接地针
CN206117005U (zh) 一种进入紧凑型输电线路等电位过程中所用的折叠梯
CN105762702B (zh) 更换±800kV直流输电线路L串绝缘子的方法
CN209545019U (zh) 输电线路补强式预绞丝施工平台
CN208603665U (zh) 绝缘升降装置
CN204720888U (zh) 便携式配电辅助作业平台
CN204402335U (zh) 一种耐张专用检修工具
CN107558793A (zh) 一种架空线路电杆上多层横担提升安装方法及其专用工具
CN103259153B (zh) 一种电力接地线接地针拆装工具
CN106877262A (zh) 一种带有重锤悬挂点的悬垂线夹
CN202059099U (zh) 双串耐张绝缘子紧线钩

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171121

RJ01 Rejection of invention patent application after publication