CN107364739A - 一种翻车机系统推车机的改造工艺 - Google Patents
一种翻车机系统推车机的改造工艺 Download PDFInfo
- Publication number
- CN107364739A CN107364739A CN201710495455.9A CN201710495455A CN107364739A CN 107364739 A CN107364739 A CN 107364739A CN 201710495455 A CN201710495455 A CN 201710495455A CN 107364739 A CN107364739 A CN 107364739A
- Authority
- CN
- China
- Prior art keywords
- car
- car puller
- puller
- reforming technology
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/02—Loading or unloading land vehicles
- B65G67/24—Unloading land vehicles
- B65G67/32—Unloading land vehicles using fixed tipping installations
- B65G67/48—Vehicle tipplers
Abstract
本发明是一种翻车机系统推车机的改造工艺,其改造步骤为:施工前准备,清理施工现场,并做好安全防护措施;吊装旧的推车机整体,保护性拆除零部件;待推车机上所有待更换的装置拆卸完毕后;推车机的调整,行走导向装置中通过弹性行走轮来补偿轨道的不平,以保持车体平稳运行;安装电气管线与电气元件,送电前按照电气互联表校对电缆,检查线路是否接地、短路;安装推车机液压管路和安全防护装置;清理现场并空载试车。本发明提供的一种翻车机系统推车机的改造工艺降低了吊装的难度,进而降低了对吊车的选型和吊装场地的要求,满足了牵引不摘钩卸车作业,安全可靠。
Description
技术领域
本发明涉及翻车机系统的改造工艺技术领域,尤其涉及一种翻车机系统推车机的改造工艺。
背景技术
随着大宗货物运输和装修工作量的增多,以及对于卸载货物效率要求的不断提高,翻车机系统越来越多地替代人工作业,推车机也称为调车机,作为翻车机系统的关键设备,是将车台上的车辆推出送到指定位置的设备,然而,传统的翻车机系统推车机改造施工中吊装难度大,对吊车选型和吊装场地的要求较高,无法满足牵引不摘钩卸车作业。
发明内容
本发明旨在解决现有技术的不足,而提供一种翻车机系统推车机的改造工艺。
本发明为实现上述目的,采用以下技术方案:一种翻车机系统推车机的改造工艺,其特征在于,其改造步骤如下:
(1)施工前准备,提前熟悉图纸,组织人员、氧气、乙炔、电焊机及改造材料进场,协调停机时间,将推车机运行至安装施工位置后断电,清理施工现场,对系统进行降压,并拆掉所有压力管,并做好安全防护措施;
(2)吊装旧的推车机整体,保护性拆除零部件,首先拆除电缆和接线箱中的电气管线与电气元件,再拆除推车机液压管路、牵引臂装置、驱动装置、行走导向装置、位置检测装置及安全防护装置;
(3)待推车机上所有待更换的装置拆卸完毕后,将新的零部件小心放置在起重滑车上并固定,采用提升机构或悬挂系统按照图纸要求安装推车机牵引臂装置、驱动装置、行走导向装置及位置检测装置;
(4)推车机的调整,行走导向装置中通过弹性行走轮来补偿轨道的不平,以保持车体平稳运行,牵引力的反作用力矩由导向轮承担,力矩为85~110N·m,调节导向轮,保证推车机在任何位置时齿轮齿条副侧隙为1~3mm,然后拧紧压紧螺栓;
(5)安装电气管线与电气元件,先按图纸尺寸将限位开关安装到位,并按照电气配线图铺设电缆、电线,电缆和接线箱的衔接处进行密封处理,送电前按照电气互联表校对电缆,检查线路是否接地、短路;
(6)安装推车机液压管路和安全防护装置;
(7)清理现场并空载试车。
特别的,所述步骤(2)和所述步骤(3)中的驱动装置采用液力、电磁力或多层盘式制动器。
特别的,所述步骤(4)中的行走轮和导向轮均设有滚动轴承密封装置。
本发明的有益效果是:本发明提供的一种翻车机系统推车机的改造工艺降低了吊装的难度,进而降低了对吊车的选型和吊装场地的要求,满足了牵引不摘钩卸车作业,安全可靠。
具体实施方式
下面结合实施例对本发明作进一步说明:
实施例1
一种翻车机系统推车机的改造工艺,其改造步骤如下:
(1)施工前准备,提前熟悉图纸,组织人员、氧气、乙炔、电焊机及改造材料进场,协调停机时间,将推车机运行至安装施工位置后断电,清理施工现场,对系统进行降压,并拆掉所有压力管,并做好安全防护措施;
(2)吊装旧的推车机整体,保护性拆除零部件,首先拆除电缆和接线箱中的电气管线与电气元件,再拆除推车机液压管路、牵引臂装置、驱动装置、行走导向装置、位置检测装置及安全防护装置,所述驱动装置采用多层盘式制动器;
(3)待推车机上所有待更换的装置拆卸完毕后,将新的零部件小心放置在起重滑车上并固定,采用提升机构或悬挂系统按照图纸要求安装推车机牵引臂装置、驱动装置、行走导向装置及位置检测装置,所述驱动装置采用多层盘式制动器;
(4)推车机的调整,行走导向装置中通过弹性行走轮来补偿轨道的不平,以保持车体平稳运行,牵引力的反作用力矩由导向轮承担,力矩为85N·m,调节导向轮,保证推车机在任何位置时齿轮齿条副侧隙为1mm,然后拧紧压紧螺栓,行走轮和导向轮均设有滚动轴承密封装置;
(5)安装电气管线与电气元件,先按图纸尺寸将限位开关安装到位,并按照电气配线图铺设电缆、电线,电缆和接线箱的衔接处进行密封处理,送电前按照电气互联表校对电缆,检查线路是否接地、短路;
(6)安装推车机液压管路和安全防护装置;
(7)清理现场并空载试车。
实施例2
一种翻车机系统推车机的改造工艺,其改造步骤如下:
(1)施工前准备,提前熟悉图纸,组织人员、氧气、乙炔、电焊机及改造材料进场,协调停机时间,将推车机运行至安装施工位置后断电,清理施工现场,对系统进行降压,并拆掉所有压力管,并做好安全防护措施;
(2)吊装旧的推车机整体,保护性拆除零部件,首先拆除电缆和接线箱中的电气管线与电气元件,再拆除推车机液压管路、牵引臂装置、驱动装置、行走导向装置、位置检测装置及安全防护装置,所述驱动装置采用液力制动器;
(3)待推车机上所有待更换的装置拆卸完毕后,将新的零部件小心放置在起重滑车上并固定,采用提升机构或悬挂系统按照图纸要求安装推车机牵引臂装置、驱动装置、行走导向装置及位置检测装置,所述驱动装置采用液力制动器;
(4)推车机的调整,行走导向装置中通过弹性行走轮来补偿轨道的不平,以保持车体平稳运行,牵引力的反作用力矩由导向轮承担,力矩为110N·m,调节导向轮,保证推车机在任何位置时齿轮齿条副侧隙为3mm,然后拧紧压紧螺栓,行走轮和导向轮均设有滚动轴承密封装置;
(5)安装电气管线与电气元件,先按图纸尺寸将限位开关安装到位,并按照电气配线图铺设电缆、电线,电缆和接线箱的衔接处进行密封处理,送电前按照电气互联表校对电缆,检查线路是否接地、短路;
(6)安装推车机液压管路和安全防护装置;
(7)清理现场并空载试车。
上面对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。
Claims (3)
1.一种翻车机系统推车机的改造工艺,其特征在于,其改造步骤如下:
(1)施工前准备,提前熟悉图纸,组织人员、氧气、乙炔、电焊机及改造材料进场,协调停机时间,将推车机运行至安装施工位置后断电,清理施工现场,对系统进行降压,并拆掉所有压力管,并做好安全防护措施;
(2)吊装旧的推车机整体,保护性拆除零部件,首先拆除电缆和接线箱中的电气管线与电气元件,再拆除推车机液压管路、牵引臂装置、驱动装置、行走导向装置、位置检测装置及安全防护装置;
(3)待推车机上所有待更换的装置拆卸完毕后,将新的零部件小心放置在起重滑车上并固定,采用提升机构或悬挂系统按照图纸要求安装推车机牵引臂装置、驱动装置、行走导向装置及位置检测装置;
(4)推车机的调整,行走导向装置中通过弹性行走轮来补偿轨道的不平,以保持车体平稳运行,牵引力的反作用力矩由导向轮承担,力矩为85~110N·m,调节导向轮,保证推车机在任何位置时齿轮齿条副侧隙为1~3mm,然后拧紧压紧螺栓;
(5)安装电气管线与电气元件,先按图纸尺寸将限位开关安装到位,并按照电气配线图铺设电缆、电线,电缆和接线箱的衔接处进行密封处理,送电前按照电气互联表校对电缆,检查线路是否接地、短路;
(6)安装推车机液压管路和安全防护装置;
(7)清理现场并空载试车。
2.根据权利要求1所述的一种翻车机系统推车机的改造工艺,其特征在于,所述步骤(2)和所述步骤(3)中的驱动装置采用液力、电磁力或多层盘式制动器。
3.根据权利要求1所述的一种翻车机系统推车机的改造工艺,其特征在于,所述步骤(4)中的行走轮和导向轮均设有滚动轴承密封装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710495455.9A CN107364739B (zh) | 2017-06-26 | 2017-06-26 | 一种翻车机系统推车机的改造工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710495455.9A CN107364739B (zh) | 2017-06-26 | 2017-06-26 | 一种翻车机系统推车机的改造工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107364739A true CN107364739A (zh) | 2017-11-21 |
CN107364739B CN107364739B (zh) | 2020-06-30 |
Family
ID=60305801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710495455.9A Active CN107364739B (zh) | 2017-06-26 | 2017-06-26 | 一种翻车机系统推车机的改造工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107364739B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201458384U (zh) * | 2009-08-20 | 2010-05-12 | 秦皇岛港股份有限公司 | 新型翻车机系统 |
CN103043461A (zh) * | 2012-12-28 | 2013-04-17 | 中国神华能源股份有限公司 | 翻车机系统的平台和翻车机系统 |
CN105404962A (zh) * | 2015-10-30 | 2016-03-16 | 广东电网有限责任公司电网规划研究中心 | 电力系统继电保护装置的改造策略及其生成系统 |
CN105502024A (zh) * | 2015-12-03 | 2016-04-20 | 中国神华能源股份有限公司 | 用于改造翻车机系统的平台的方法 |
CN106395432A (zh) * | 2016-10-06 | 2017-02-15 | 大连奇重机电成套设备有限公司 | 翻车机提效改造方法 |
-
2017
- 2017-06-26 CN CN201710495455.9A patent/CN107364739B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201458384U (zh) * | 2009-08-20 | 2010-05-12 | 秦皇岛港股份有限公司 | 新型翻车机系统 |
CN103043461A (zh) * | 2012-12-28 | 2013-04-17 | 中国神华能源股份有限公司 | 翻车机系统的平台和翻车机系统 |
CN105404962A (zh) * | 2015-10-30 | 2016-03-16 | 广东电网有限责任公司电网规划研究中心 | 电力系统继电保护装置的改造策略及其生成系统 |
CN105502024A (zh) * | 2015-12-03 | 2016-04-20 | 中国神华能源股份有限公司 | 用于改造翻车机系统的平台的方法 |
CN106395432A (zh) * | 2016-10-06 | 2017-02-15 | 大连奇重机电成套设备有限公司 | 翻车机提效改造方法 |
Non-Patent Citations (1)
Title |
---|
YOUMUYOU7: ""地面单罐弯道推车机改造措施"", 《道客巴巴》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107364739B (zh) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203979647U (zh) | 一种可拆卸重复利用导轨穿管器 | |
CN102601086B (zh) | 一种双卷筒式管道机器人投放回收装置 | |
CN109572928A (zh) | 一种船舶管弄舱作业小车 | |
CN103358115A (zh) | 石墨电极自动接长装置 | |
CN107364739A (zh) | 一种翻车机系统推车机的改造工艺 | |
CN103523667A (zh) | 矿用钢丝绳牵引单轨吊车运输系统及其运输方法 | |
CN105818833A (zh) | 一种用于地铁盾构运输电机车的紧急防溜车装置 | |
CN106315407A (zh) | 狭小空间内超大型吊车梁滑移拆除方法 | |
CN106276595A (zh) | 煤矿巷道专用的单轨吊机车 | |
CN107858881B (zh) | 一种地铁运营线百米长轨更换施工装置及方法 | |
CN101723252B (zh) | 400吨桥式起重机更换设备高空移动安装方法 | |
CN103602769A (zh) | 一种平移更换高炉炉顶气密箱设备的施工方法 | |
CN103241683B (zh) | 一种海洋管道配重生产线下管的轨道式抬管装置 | |
CN210418998U (zh) | 循环水系统大口径管道的运输装置 | |
CN101537982B (zh) | 井下变轨液压起重车 | |
CN205971291U (zh) | 电液动单轨吊机车 | |
CN103938536A (zh) | 露天矿用跨越工作面障碍物的运输方法及桥涵 | |
CN103434992A (zh) | 桥吊用液压推进式台车搬运系统 | |
CN103084409B (zh) | 压力定宽机夹送辊更换系统 | |
CN207173622U (zh) | 铁路调车辅助设备 | |
CN107187903B (zh) | 一种翻车机系统定位车的改造工艺 | |
CN206338037U (zh) | 一种修井自平衡井架 | |
CN101713613A (zh) | 特大型烧结工程主抽风管道施工工艺 | |
CN205745645U (zh) | 管道对接运输车 | |
CN215826867U (zh) | 一种用于管道非开挖修复的管道运输设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |