CN107363984B - Device for fixing precast beam bridge deck drain pipe - Google Patents

Device for fixing precast beam bridge deck drain pipe Download PDF

Info

Publication number
CN107363984B
CN107363984B CN201710677032.9A CN201710677032A CN107363984B CN 107363984 B CN107363984 B CN 107363984B CN 201710677032 A CN201710677032 A CN 201710677032A CN 107363984 B CN107363984 B CN 107363984B
Authority
CN
China
Prior art keywords
steel plate
drain pipe
fixing device
round
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710677032.9A
Other languages
Chinese (zh)
Other versions
CN107363984A (en
Inventor
姜同贵
倪坤林
阮小勇
王焕强
王文成
殷本林
刘志旭
段岗
柯贤孝
王凡
李成伟
杨旭
赵笑
胡瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201710677032.9A priority Critical patent/CN107363984B/en
Publication of CN107363984A publication Critical patent/CN107363984A/en
Application granted granted Critical
Publication of CN107363984B publication Critical patent/CN107363984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

A device for fixing a precast beam bridge face water drain pipe belongs to a fixing device used in the construction of precast beams in railway engineering, in particular to a mounting and fixing device for the precast beam bridge face water drain pipe. The device comprises a handle device, an upper fixing device and a bottom fixing device, wherein the upper fixing device is formed by sleeving a protection tube on a connecting pull rod, and a spring is sleeved between a first round steel plate and a second round steel plate in the protection tube; the bottom fixing device is characterized in that two crescent steel plates are arranged at the upper opening of the wedge-shaped steel ring, a bottom steel plate is arranged at the lower opening of the wedge-shaped steel ring, and a connecting hole is formed in the bottom steel plate. The invention has the beneficial effects that: the concrete pouring and vibrating device can effectively prevent the bottom of the water drain pipe from moving when vibrating concrete or reinforcing steel bars move, ensure that the concrete pouring and vibrating device has no disturbance influence on the installation position of the water drain pipe, and can effectively control the installation quality of the water drain pipe.

Description

Device for fixing precast beam bridge deck drain pipe
Technical Field
The invention belongs to a fixing device used in the construction of a precast beam in railway engineering, in particular to a mounting and fixing device for a precast beam bridge face drain pipe.
Background
PVC (polyvinyl chloride) pipes are adopted for the bridge surface water drain pipes of the precast beams of the high-speed railway, the pipes are light in weight and difficult to fix with the outer mold, and the accuracy of the installation position of the water drain pipes can be affected in the concrete pouring and vibrating process. The drain pipe is improperly installed, so that the accumulated water on the bridge deck is difficult to discharge, and the appearance quality of the beam body is affected. Under the influence of the current construction conditions, construction process and other factors, the drain pipe is installed to form a difficult problem of box girder construction.
Disclosure of Invention
The invention aims to solve the problems of providing the drain pipe fixing device which is simple in structure, convenient to operate and high in practicability. The technical scheme is as follows:
the handle device is characterized in that the lower end of the handle device is also provided with a clamping steel plate, and one end, close to the handle, of the connecting pull rod is provided with a first round steel plate; the handle device is also connected with an upper fixing device and a bottom fixing device, the upper fixing device is formed by sleeving a protection tube on the connecting pull rod, a first round steel plate is positioned in the protection tube, a second round steel plate is fixed at the lower end of the protection tube, a third round steel plate is fixed by the second round steel plate through the connecting steel plate, and a spring is sleeved between the first round steel plate and the second round steel plate in the protection tube; the bottom fixing device is characterized in that two crescent steel plates are arranged at the upper opening of the wedge-shaped steel ring, a bottom steel plate is arranged at the lower opening of the wedge-shaped steel ring, and a connecting hole is formed in the bottom steel plate.
Compared with the prior art, the invention has the following beneficial effects:
1. the device comprises a handle device, an upper fixing device and a bottom fixing device, wherein the handle device is connected with the upper fixing device and the bottom fixing device; the upper fixing device ensures that the upper part of the drain pipe is consistent with the lower interface, so that the drain pipe is not inclined and does not float upwards; the bottom fixing device can be fixed on the outer die of the box girder through bolts to fix the lower joint of the drain pipe. Through the synergistic effect of the three parts of devices, the bottom of the water drain hole is fixed, the bottom of the water drain pipe can be effectively prevented from moving when concrete or steel bars are vibrated, the situation that the installation position of the water drain pipe is not disturbed when concrete pouring and vibrating of the box girder are guaranteed, and the installation quality of the water drain pipe can be effectively controlled.
2. Before construction, the lower fixing device can be firstly arranged at the fixed position of the template, and only one person is required to press the handle to fix the drain pipe through the compression spring during installation, so that the fixing bolt is not required to be additionally arranged at the bottom of the template by the person; if the construction is finished and the subsequent construction is carried out, the lower fixing device can be not disassembled, so that the installation time is saved, and the labor cost is saved.
3. The arc edge of the crescent steel plate is welded at the top of the wedge steel ring, and the straight edges of the two crescent steel plates form a rectangular space, so that the clamping steel plate can work.
4. The device can be suitable for fixing all drain pipes under general conditions by adjusting the length of the connecting pull rod and forming a slope by the inclined surface at the bottom of the wedge-shaped steel ring.
5. The stress is applied to two positions of the two layers of steel plates of the second round steel plate and the third round steel plate, so that the gravity center is reduced, and the stability of the device is improved.
6. The end of the handle device is processed into a T-shaped structure, so that the operation is convenient.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the handle assembly of the present invention;
FIG. 3 is a schematic view of the upper fixture of the present invention;
FIG. 4 is a schematic view of the bottom fixture of the present invention;
FIG. 5 is a schematic view of the crescent steel plate structure of the invention;
FIG. 6 is a schematic diagram showing the change of the working state of the clamping steel plate.
Detailed Description
Referring to the drawings, the invention comprises a handle device, wherein the handle device is provided with a handle 1 at the upper end of a connecting pull rod 2, and the key technology is that the lower end of the handle device is also provided with a clamping steel plate 9, and a first round steel plate 4 is arranged at one end of the connecting pull rod 2 close to the handle; the handle device is also connected with an upper fixing device and a bottom fixing device, the upper fixing device is formed by sleeving a protection tube 3 on a connecting pull rod 2, a first round steel plate 4 is positioned in the protection tube 3, a second round steel plate 6 is fixed at the lower end of the protection tube 3, a third round steel plate 8 is fixed on the second round steel plate 6 through a connecting steel plate 7, and a spring 5 is sleeved between the first round steel plate 4 and the second round steel plate 6 in the protection tube 3; the bottom fixing device is characterized in that two crescent steel plates 10 are arranged at the upper opening of a wedge steel ring 11, a bottom steel plate 12 is arranged at the lower opening of the wedge steel ring 11, and a connecting hole 13 is formed in the bottom steel plate 12.
The lower end of the connecting pull rod 2 is provided with a thread 17, the clamping steel plate 9 is provided with a round hole, the upper part of the round hole is provided with a second nut 16, and the connecting pull rod 2 can be screwed into the second nut 16.
Circular holes are formed in the circle center positions of the second circular steel plate 6 and the third circular steel plate 8, and are welded into a whole through the connecting steel plates 7.
The bottom of the wedge-shaped steel ring 11 is inclined.
One side of the cross section of the crescent steel plate 10 is a straight line side, and the other side is an arc side.
The shape of the detent steel plate 9 is rectangular.
The thickness of the steel plates is 2-3mm, and the dimensions of the steel plates are matched with the internal dimensions of the drain pipe;
the connecting pull rod 2 is made of a common steel pipe with the diameter of 18-20 mm;
the outer diameter of the wedge-shaped steel ring 11 is equal to the outer diameter of the drain pipe, the bottom is processed into an inclined plane, and the angle of the inclined plane is equal to the design angle of the bottom surface of the drain pipe.
The device of the invention is assembled as follows:
(1) assembling a handle device: firstly, welding a handle 1 on the top of a connecting pull rod 2, and then welding a first round steel plate 4 on the upper half part of the connecting pull rod 2; finally, welding the first nut 16 and the clamping steel plate 9 together, and keeping the centers of the holes of the first nut 16 and the clamping steel plate 9 aligned during welding;
(2) upper fixture assembly: after the processing of the protection steel pipe 3 is completed, the handle device penetrates through the protection steel pipe 3, the spring 5 penetrates into the protection steel pipe 3 from the bottom of the connecting pull rod, the second round steel plate 6 is welded at the lower part of the protection steel pipe 3, and finally the third round steel plate 8 is welded together through the connecting steel plate 7, so that the centers of holes in the protection steel pipe 3, the second round steel plate 6 and the third round steel plate 8 are kept consistent during welding;
(3) and (3) assembling a lower fixing device: firstly, welding a bottom steel plate 12 on the lower inclined surface of a wedge-shaped steel ring 11; and two crescent steel plates 10 are symmetrically welded on the top plane of the wedge-shaped steel ring 11, and the arc-shaped edges of the crescent steel plates are welded on the top of the wedge-shaped steel ring 11.
During construction, the bottom fixing device is fixed at the corresponding position of the structural formwork, 4 second nuts 14 are used for fixing the bottom steel plate 12 on the formwork surface, then the drain pipe 15 is arranged on the bottom fixing device, and the clamping steel plate 9 is adjusted to a proper position according to the length of the drain pipe 15; then the whole welded by the handle device and the upper fixing device is put into the drain pipe 15, the handle 1 is pressed down, the spring 5 is extruded by the first round steel plate 4, the upper fixing device is subjected to downward acting force by acting counterforce, and the acting force fixes the drain pipe 15 on the bottom fixing device through the second round steel plate 6 and the third round steel plate 8; referring to fig. 6, the handle 1 is pressed down, the connecting pull rod 2 moves down to drive the clamping steel plate 9 to move down, the clamping steel plate 9 is rotated to be parallel to the rectangle formed between the two crescent steel plates 10, then the clamping steel plate 9 enters the bottom fixing device, after the clamping steel plate 9 enters, the clamping steel plate 9 is rotated again to enable the rectangle formed between the clamping steel plate 9 and the two crescent steel plates 10 to be vertical, and accordingly the fixing work of the drain pipe 15 is completed.
After the construction is completed, the rotary handle 1 is pressed down to drive the clamping steel plate 9 to rotate, the clamping steel plate 9 is taken out in the same way, the whole welded by the handle device and the upper fixing device is taken down, the lower fixing device is still placed in place, and after the drain pipe 15 is separated from the template along with the structure, the second nut 14 is loosened to take down the lower fixing device. If construction is to be continued, the lower fixing device may not be removed.

Claims (4)

1. The device for fixing the precast beam bridge deck drain pipe comprises a handle device, wherein the handle device is provided with a handle (1) at the upper end of a connecting pull rod (2), and is characterized in that the lower end of the handle device is also provided with a clamping steel plate (9), and one end, close to the handle, of the connecting pull rod (2) is provided with a first round steel plate (4); the handle device is also connected with an upper fixing device and a bottom fixing device, the upper fixing device is formed by sleeving a protection tube (3) on a connecting pull rod (2), a first round steel plate (4) is positioned in the protection tube (3), a second round steel plate (6) is fixed at the lower end of the protection tube (3), a third round steel plate (8) is fixed on the second round steel plate (6) through a connecting steel plate (7), and a spring (5) is sleeved between the first round steel plate (4) and the second round steel plate (6) in the protection tube (3); the bottom fixing device is characterized in that two crescent steel plates (10) are arranged at the upper opening of a wedge steel ring (11), a bottom steel plate (12) is arranged at the lower opening of the wedge steel ring (11), a connecting hole (13) is formed in the bottom steel plate (12), the bottom of the wedge steel ring (11) is an inclined plane, one side of the cross section of the crescent steel plate (10) is a straight line side, and the other side of the cross section of the crescent steel plate is an arc side.
2. The device for fixing a precast beam bridge deck drain pipe according to claim 1, characterized in that the lower end of the connecting pull rod (2) is provided with a screw thread (17), the clamping steel plate (9) is provided with a round hole, and the upper part of the round hole is provided with a second nut (16).
3. The device for fixing the precast beam bridge deck drain pipe according to claim 1, characterized in that the center positions of the second round steel plate (6) and the third round steel plate (8) are provided with round holes, and are welded into a whole through the connecting steel plates (7).
4. Device for fixing a precast bridge deck drain according to claim 1, characterized in that the shape of the detent steel plate (9) is rectangular.
CN201710677032.9A 2017-08-09 2017-08-09 Device for fixing precast beam bridge deck drain pipe Active CN107363984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710677032.9A CN107363984B (en) 2017-08-09 2017-08-09 Device for fixing precast beam bridge deck drain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710677032.9A CN107363984B (en) 2017-08-09 2017-08-09 Device for fixing precast beam bridge deck drain pipe

Publications (2)

Publication Number Publication Date
CN107363984A CN107363984A (en) 2017-11-21
CN107363984B true CN107363984B (en) 2023-05-05

Family

ID=60309357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710677032.9A Active CN107363984B (en) 2017-08-09 2017-08-09 Device for fixing precast beam bridge deck drain pipe

Country Status (1)

Country Link
CN (1) CN107363984B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10115092A (en) * 1996-08-21 1998-05-06 Nippon Hume Pipe Co Ltd Forming method for sheath hole
CN202047597U (en) * 2011-04-13 2011-11-23 中建七局第二建筑有限公司 Sleeve fixator

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3942735B2 (en) * 1998-06-02 2007-07-11 カネソウ株式会社 Drain body fixing device
CN102364004A (en) * 2011-11-02 2012-02-29 中建三局第二建设工程有限责任公司 Concrete floor hole reserving device capable of being quickly assembled and disassembled
CN202937007U (en) * 2012-11-29 2013-05-15 傅国勤 Air conditioner through pipe embedded part
CN103291072A (en) * 2013-05-31 2013-09-11 上海宝冶集团有限公司 Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves
CN206233577U (en) * 2016-11-29 2017-06-09 中建五局华东建设有限公司 The positioner of sleeve pipe on a kind of aluminum dipping form
CN206376567U (en) * 2017-01-09 2017-08-04 山东华邦建设集团有限公司 Drainage pipeline hole to be provided protector
CN207044386U (en) * 2017-08-09 2018-02-27 中国水利水电第七工程局有限公司 A kind of device for being used to fix prefabricated beam bridge floor tapping pipe

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10115092A (en) * 1996-08-21 1998-05-06 Nippon Hume Pipe Co Ltd Forming method for sheath hole
CN202047597U (en) * 2011-04-13 2011-11-23 中建七局第二建筑有限公司 Sleeve fixator

Also Published As

Publication number Publication date
CN107363984A (en) 2017-11-21

Similar Documents

Publication Publication Date Title
CN204546759U (en) Prestressed concrete mortar leakage prevention device
CN106150055B (en) The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting
CN109629424B (en) Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support
CN211114418U (en) Main material damage-free detachable steel-concrete combined beam
CN110593485A (en) Main material damage-free detachable steel-concrete combined beam
CN104070603A (en) Tensioning assembly for producing prestressed concrete pile without end plate
CN107363984B (en) Device for fixing precast beam bridge deck drain pipe
CN105173379B (en) The band special Auxiliary support bar assembly of door opening prefabricated panel
CN111906902A (en) General mould of prefabricated bottom plate processing of assembled superimposed sheet
CN207643373U (en) A kind of prefabricated anchor block adjustable composite steel form
CN215671022U (en) Pre-embedded type mounting device for aluminum alloy template
CN210164054U (en) Quick butt joint and temporary fixing device for upper and lower layers of steel concrete composite pipe
CN207044386U (en) A kind of device for being used to fix prefabricated beam bridge floor tapping pipe
CN211850805U (en) Novel concrete embedded bolt mechanism
CN210164055U (en) Quick butt joint fine adjustment device for upper layer and lower layer of steel concrete composite pipe
CN209800450U (en) Portable steel support convenient to concatenation is built
KR101372899B1 (en) Deck plate spacer
CN112627514A (en) Construction method of steel structure cylindrical beam column joint aluminum frame wood formwork
CN205907615U (en) Underwater foundation is template mounting structure for reinforcing construction
CN111021713A (en) Novel concrete embedded bolt mechanism and use method thereof
CN214615528U (en) Auxiliary installation workpiece for prefabricated column
CN113482343B (en) Detachable waterproof split bolt
CN217840881U (en) Construction device for penetrating roof pipeline sleeve and reinforced concrete member
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
CN109162371A (en) A kind of fixed structure and its construction method of outer patch rubber fastening band

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant