CN107358787A - A kind of source of early warning of Geological Hazards of debris - Google Patents

A kind of source of early warning of Geological Hazards of debris Download PDF

Info

Publication number
CN107358787A
CN107358787A CN201710844301.6A CN201710844301A CN107358787A CN 107358787 A CN107358787 A CN 107358787A CN 201710844301 A CN201710844301 A CN 201710844301A CN 107358787 A CN107358787 A CN 107358787A
Authority
CN
China
Prior art keywords
mobile jib
broach
mudstone
vertical mobile
displacement detector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710844301.6A
Other languages
Chinese (zh)
Inventor
孟微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU MICROCENTAL TECHNOLOGY Co Ltd
Original Assignee
CHENGDU MICROCENTAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU MICROCENTAL TECHNOLOGY Co Ltd filed Critical CHENGDU MICROCENTAL TECHNOLOGY Co Ltd
Priority to CN201710844301.6A priority Critical patent/CN107358787A/en
Publication of CN107358787A publication Critical patent/CN107358787A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes

Abstract

The invention discloses a kind of source of early warning of Geological Hazards of debris, including vertical mobile jib, horizontal mobile jib, broach, mudstone displacement detector, support bar, the vertical mobile jib top is provided with horizontal mobile jib, hole of the horizontal mobile jib through the upper setting of vertical mobile jib, the a plurality of broach being parallel to each other is provided with horizontal mobile jib in vertical mobile jib both sides, the broach is platy structure, and the plane residing for multiple broach passes through vertical mobile jib;Each broach is provided with mudstone displacement detector, the mudstone displacement detector is arranged on the upper surface of broach;Multiple support bars are provided with the lower end of vertical mobile jib, distance is equal between multiple support bars.The present invention can carry out barrier effect to mudstone by support bar and broach, and trend early stage of mudstone can also be detected by the mudstone displacement detector of setting, carry out prevention work in advance.

Description

A kind of source of early warning of Geological Hazards of debris
Technical field
The present invention relates to Geological Hazards Monitoring equipment, and in particular to a kind of source of early warning of Geological Hazards of debris.
Background technology
Mud-rock flow refers in mountain area or other cheuch deep gullies, the dangerously steep area of landform because heavy rain, severe snow or other from The landslide of right disaster initiation simultaneously carries the special mighty torrent of a large amount of silts and stone.Mud-rock flow has sudden and stream The features such as fast fast, flow is big, and matter content is big and destructive power is strong.Generation mud-rock flow can usually destroy by rush of water the means of transportation such as road and rail Even villages and small towns etc., bring about great losses.
Mud-rock flow is the mighty torrent that heavy rain, flood will be formed containing sandstone and soft soil property massif after saturation dilutes, it Area, volume and flow it is all larger, and come down be through dilute soil property massif small area region, typical mud-rock flow is by suspending Thick solid debris thing and the sticky mud composition rich in flour sand and clay.Under appropriate orographic condition, substantial amounts of water body The solids bulk material being impregnated with flowing water hillside or ditch bed, stabilizing it property reduce, and the solids bulk material of saturated with water is certainly Moved under body Action of Gravity Field, be formed mud-rock flow.Mud-rock flow is a kind of disastrous geological phenomenon.Usual mud-rock flow is quick-fried Hair is unexpected, breaks with tremendous force, and can carry huge stone.Because it advances at utmost speed, there is powerful energy, thus it is destructive very big.
The overall process of mud-rock flow flowing typically only has several hours, and short only a few minutes, are that one kind is distributed widely in generation Various countries of boundary some have extreme terrain, landforms situation area natural calamity.This be mountain area cheuch or mountain region it is domatic on, by sudden and violent Soil between sediment laden flow and landslide, water, gas that the water sources such as rain, ice dissolution excite, containing a large amount of silt stones mix Interflow.Mud-rock flow occurs with flood of a mountain area mostly.Its difference with general flood is to contain sufficient amount of mud in mighty torrent The solid debris thing such as sandstone, its volume content are at least 15%, reach as high as 80% or so, therefore than flood with more destruction Power.
The detection to mud-rock flow is only limited to detect in the prior art, it is impossible to carries out certain barrier effect to mud-rock flow.
The content of the invention
The technical problems to be solved by the invention are that the detection in the prior art to mud-rock flow is only limited to detect, it is impossible to right Mud-rock flow carries out certain barrier effect, and it is an object of the present invention to provide a kind of source of early warning of Geological Hazards of debris, can not only be to mud Rock glacier disaster is monitored, additionally it is possible to a certain degree of barrier effect is realized to mud-rock flow.
The present invention is achieved through the following technical solutions:
A kind of source of early warning of Geological Hazards of debris, including vertical mobile jib, horizontal mobile jib, broach, mudstone displacement detecting Device, support bar, the vertical mobile jib top are provided with horizontal mobile jib, and the horizontal mobile jib passes through the upper setting of vertical mobile jib Hole, a plurality of broach being parallel to each other is provided with the horizontal mobile jib in vertical mobile jib both sides, the broach is platy structure, And the plane residing for multiple broach passes through vertical mobile jib;Each broach is provided with mudstone displacement detector, the mudstone Displacement detector is arranged on the upper surface of broach;Be provided with multiple support bars in the lower end of vertical mobile jib, multiple support bars it Between distance it is equal.
The present invention by support bar it is buried enter easily occur mud-stone flow disaster gully in, by the upper of the broach on vertical mobile jib End is just embedded in mudstone just at earth's surface, broach, and vertical mobile jib is preferably vertical with earth's surface when setting;When mudstone moves When dynamic, mudstone displacement detector detects to caused vibration in mudstone moving process, and mudstone displacement detector has One deterministic process, when vibration caused by mudstone moves is more than a certain numerical value, the letter in mudstone displacement detector can be started Number emitter, sender unit send the signal to relevant departments, and counter-measure is made by relevant departments;Moved in mudstone When dynamic, vertical mobile jib of the invention, horizontal mobile jib and broach are using deep buried support bar as support, the face formed with broach As stop, slow down the speed of mudstone flowing, so as to arrive to provide the partial buffer time for disaster.If mud is easily occurring The position of rock glacier disaster sets multiple present invention, can be with the more obvious flow velocity for slowing down mud-rock flow.
Further, the lower end of each support bar is provided with fixed cone, and the fixed cone, which is adopted, to be made of a steel.
Further, support bar is provided with three.Support bar sets three, can be reduced in the case where ensureing stability Spillage of material.
Further, the support bar uses tungsten alloy.Support bar and fixed cone can be ensured using the material of high intensity Stability of the present invention when meeting with mud-rock flow.
The present invention compared with prior art, has the following advantages and advantages:The present invention passes through support bar and comb Tooth can carry out barrier effect to mudstone, and trend early stage of mudstone can also be detected by the mudstone displacement detector of setting, Prevention work is carried out in advance.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is support bar schematic diagram of the present invention.
Mark and corresponding parts title in accompanying drawing:
The vertical mobile jibs of 1-, 2- transverse direction mobile jibs, 3- broach, 4- mudstone displacement detectors, 5- support bars, 6- fixed cones.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment
As depicted in figs. 1 and 2, a kind of source of early warning of Geological Hazards of debris, including vertical mobile jib 1, horizontal mobile jib 2, Broach 3, mudstone displacement detector 4, support bar 5, the vertical top of mobile jib 1 are provided with horizontal mobile jib 2, the horizontal mobile jib 2 through the upper setting of vertical mobile jib 1 hole, be provided with the horizontal mobile jib 2 in the vertical both sides of mobile jib 1 be parallel to each other it is more Bar broach 3, the broach 3 is platy structure, and the plane residing for multiple broach 3 passes through vertical mobile jib 1;In each broach 3 Mudstone displacement detector 4 is provided with, the mudstone displacement detector 4 is arranged on the upper surface of broach 3;In vertical mobile jib 1 Lower end be provided with multiple support bars 5, distance is equal between multiple support bars 5.Support bar 5 is provided with three.Each support bar 5 Lower end be provided with fixed cone 6, the fixed cone 6, which is adopted, to be made of a steel.Support bar 5 uses tungsten alloy.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include Within protection scope of the present invention.

Claims (4)

1. a kind of source of early warning of Geological Hazards of debris, it is characterised in that including vertical mobile jib (1), horizontal mobile jib (2), comb Tooth (3), mudstone displacement detector (4), support bar (5), described vertical mobile jib (1) top is provided with horizontal mobile jib (2), described Horizontal mobile jib (2) passes through the hole of the upper setting of vertical mobile jib (1), is set on the horizontal mobile jib (2) in vertical mobile jib (1) both sides The a plurality of broach (3) being parallel to each other is equipped with, the broach (3) is platy structure, and the plane residing for multiple broach (3) passes through Vertical mobile jib (1);Each broach (3) is provided with mudstone displacement detector (4), the mudstone displacement detector (4) sets Put in the upper surface of broach (3);Multiple support bars (5) are provided with the lower end of vertical mobile jib (1), between multiple support bars (5) Apart from equal.
A kind of 2. source of early warning of Geological Hazards of debris according to claim 1, it is characterised in that each support bar (5) lower end is provided with fixed cone (6), and the fixed cone (6), which is adopted, to be made of a steel.
3. the source of early warning of a kind of Geological Hazards of debris according to claim 1, it is characterised in that support bar (5) is set It is equipped with three.
A kind of 4. source of early warning of Geological Hazards of debris according to claim 1, it is characterised in that the support bar (5) tungsten alloy is used.
CN201710844301.6A 2017-09-19 2017-09-19 A kind of source of early warning of Geological Hazards of debris Pending CN107358787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710844301.6A CN107358787A (en) 2017-09-19 2017-09-19 A kind of source of early warning of Geological Hazards of debris

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710844301.6A CN107358787A (en) 2017-09-19 2017-09-19 A kind of source of early warning of Geological Hazards of debris

Publications (1)

Publication Number Publication Date
CN107358787A true CN107358787A (en) 2017-11-17

Family

ID=60291577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710844301.6A Pending CN107358787A (en) 2017-09-19 2017-09-19 A kind of source of early warning of Geological Hazards of debris

Country Status (1)

Country Link
CN (1) CN107358787A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110047250A (en) * 2019-05-24 2019-07-23 安徽工程大学 A kind of landslide monitoring and early warning shearing lever apparatus and landslide monitoring method for early warning
CN112731418A (en) * 2020-12-22 2021-04-30 湖北省楚鹏基础工程有限责任公司 Geological disaster detection device, equipment and method
CN113089591A (en) * 2021-04-23 2021-07-09 青海省环境地质勘查局 Interception dam for preventing debris flow

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0294740A1 (en) * 1987-06-08 1988-12-14 Pioneer Sangyo Kabushiki Kaisha Drainpipe and method of inserting it
CN204875819U (en) * 2015-09-05 2015-12-16 马斓 Highway subgrade side slope antiskid
CN205617395U (en) * 2016-04-15 2016-10-05 麦永光 Take precautions against structural engineering of mountain landslide and mud -rock flow harm
CN205676907U (en) * 2016-06-14 2016-11-09 杨冰 A kind of highway subgrade landslide-proofing device
CN206488815U (en) * 2017-01-23 2017-09-12 中交二公局东萌工程有限公司 A kind of device for high gradient slope Geological Hazards Monitoring early warning

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0294740A1 (en) * 1987-06-08 1988-12-14 Pioneer Sangyo Kabushiki Kaisha Drainpipe and method of inserting it
CN204875819U (en) * 2015-09-05 2015-12-16 马斓 Highway subgrade side slope antiskid
CN205617395U (en) * 2016-04-15 2016-10-05 麦永光 Take precautions against structural engineering of mountain landslide and mud -rock flow harm
CN205676907U (en) * 2016-06-14 2016-11-09 杨冰 A kind of highway subgrade landslide-proofing device
CN206488815U (en) * 2017-01-23 2017-09-12 中交二公局东萌工程有限公司 A kind of device for high gradient slope Geological Hazards Monitoring early warning

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110047250A (en) * 2019-05-24 2019-07-23 安徽工程大学 A kind of landslide monitoring and early warning shearing lever apparatus and landslide monitoring method for early warning
CN110047250B (en) * 2019-05-24 2024-04-26 安徽工程大学 Landslide monitoring and early warning shear bar device and landslide monitoring and early warning method
CN112731418A (en) * 2020-12-22 2021-04-30 湖北省楚鹏基础工程有限责任公司 Geological disaster detection device, equipment and method
CN112731418B (en) * 2020-12-22 2022-06-28 湖北省楚鹏基础工程有限责任公司 Geological disaster detection device, equipment and method
CN113089591A (en) * 2021-04-23 2021-07-09 青海省环境地质勘查局 Interception dam for preventing debris flow

Similar Documents

Publication Publication Date Title
Ma et al. Failure mechanisms and development of catastrophic rockslides triggered by precipitation and open-pit mining in Emei, Sichuan, China
Zaruba et al. Landslides and their control
Chiaro et al. Reconnaissance report on geotechnical and structural damage caused by the 2015 Gorkha Earthquake, Nepal
RU2606790C1 (en) Coal mine underground reservoir artificial retaining dam and safety coal pillar, surrounding rock and retaining dam connection method
CN107358787A (en) A kind of source of early warning of Geological Hazards of debris
CN105672188A (en) Debris flow ecological protection device capable of dissipating energy and conducting filtration
Adhikari et al. Debris flow disaster at Larcha, upper Bhotekoshi Valley, central Nepal
Mrvík et al. Experience with treatment of road structure landslides by innovative methods of deep drainage
Apostu et al. Identification and analysis of geotechnical risks in the conditions of flooding of the remaining gaps
Singh et al. Road cut slope stability analysis at Kotropi landslide zone along NH-154 in Himachal Pradesh, India
CN104992532B (en) Mud-stone flow disaster monitoring device
Broms et al. Landslides
CN109162297A (en) A kind of the solid-liquid separating shed hole structure and its construction method of anti-mud-rock flow
Barrocu et al. Geomorphology and Flooding
Ge et al. Characteristics, causes and mitigation of catastrophic debris flow hazard on 21 July 2011 at the Longda Watershed of Songpan County, China
Chandrasekaran et al. Damages to transport facilities by rainfall induced landslides during November 2009 in Nilgiris, India
Ishihara Performances of rockfill dams during recent large earthquakes
CN103233440A (en) Slag type debris flow formation mechanism based prevention method
Scholz et al. Synsedimentary deformational structures caused by tectonics and seismic events–examples from the Cambrian of Sweden, Permian and Cenozoic of Germany
Lin et al. Analysis of stability of mud inrush induced by fillings sliding failure in karst cave based on the simplified Bishop method and its application
Thaljaoui et al. Limit equilibrium based landslide prediction system using WSN
Sakurai Case studies on the dynamic behavior of tunnels caused by Hyogoken-Nanbu earthquake whose epicenter was very close to the tunnels
Tiwari et al. Slope stability issues after Mw 9.0 Tohoku earthquake
Tian et al. Research on safety impact analysis and Countermeasures of geological Disaster for China-Pakistan Karakorum Highway
Chaulagai Stabilization measure adopted for controlling landslide: a case study of upper mai hydroelectric project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171117

RJ01 Rejection of invention patent application after publication