CN107358423A - A kind of message accounting and charging method of the shared bicycle based on slope change amount - Google Patents
A kind of message accounting and charging method of the shared bicycle based on slope change amount Download PDFInfo
- Publication number
- CN107358423A CN107358423A CN201710572916.8A CN201710572916A CN107358423A CN 107358423 A CN107358423 A CN 107358423A CN 201710572916 A CN201710572916 A CN 201710572916A CN 107358423 A CN107358423 A CN 107358423A
- Authority
- CN
- China
- Prior art keywords
- shared bicycle
- expense
- bicycle
- riding
- sea level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/085—Payment architectures involving remote charge determination or related payment systems
- G06Q20/0855—Payment architectures involving remote charge determination or related payment systems involving a third party
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/14—Payment architectures specially adapted for billing systems
- G06Q20/145—Payments according to the detected use or quantity
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0645—Rental transactions; Leasing transactions
Landscapes
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Pass through the message accounting and charging method of shared bicycle proposed by the present invention, expense of riding is determined according to the slope change amount of ride original position and final position, solves the problems, such as shared bicycle area distribution inequality, so that bicycle resource distribution is more reasonable, reduce the cost of transportation that bicycle operation platform is used to balance bicycle area distribution, operating income is added, is advantageous to shared bicycle and is promoted to the larger city of relief.
Description
Technical field
The invention belongs to shared bicycle technical field, the more particularly to a kind of message accounting and charging method of shared bicycle.
Background technology
At present, shared bicycle is the choice for traveling being generally accepted, and the charging of shared bicycle is ridden by user at present
Capable duration and the distance ridden carry out charging, also pass through the APP of the mobile phone terminal of user in special date operator
Carry out reward and preferential activity is reduced or remitted the expense of riding, but such charging mode Shortcomings.East at home
Area major part city is located at plains region, and city altitude change is smaller, but the city in other areas or eastern part city
There is hill in hilly country or mountain area edge zone, some urban districts, the height above sea level of diverse location differs larger.At this
In the case of kind, shared riding for bicycle will be gone wrong, it is well known that bicycle is ridden more laborious, and the descending of riding that goes up a slope
Then more laborsaving, therefore, when the height above sea level difference in city is larger, the user of shared bicycle can usually select to ride from height above sea level
Lower ground put and ride to height above sea level from height above sea level without selection to height above sea level lower ground point in the higher place of height
The higher place of degree.In actual observation, the height above sea level between departure place and destination differs 20 meters and is just enough to have influence on
The choice for traveling of user, such result are exactly that the shared bicycle in these cities often focuses on height above sea level lower ground point, user
It is typically reluctant to cycle and is lower ground put to the higher place of height above sea level from height above sea level, and the replacement trip such as selection is called a taxi, public transport
Mode, in terms of the aspect in whole city, so caused by share bicycle distribution very big inhomogeneities, in height above sea level point higher
User almost can not find available bicycle, and the capacity of height above sea level lower ground area's bicycle substantially exceeds demand, causes trip to provide
The waste in source, such in order to solve the problems, such as, the operator of shared bicycle usually requires to employ special haulage vehicle by height above sea level
The bicycle for lower ground putting surplus transports the higher place of height above sea level, and this significantly increases the cost of operation, and it is launched
Place also has limitation, it is impossible to the actual demand of reaction bicycle conscientiously.Chinese patent application CN1818557A discloses one kind
Bicycle information managing device and bicycle computer, its computer determine oneself position using multiple satellite-signals,
Travel distance, travel time and altitude data can be read automatically, but are used only for calculating the energy expenditure of user,
User is not related to ride the calculating of expense.
The content of the invention
In order to solve such technical problem, the present invention proposes a kind of new shared bicycle message accounting and charging method.
The shared bicycle message accounting includes:Locating module, the locating module are arranged on shared bicycle, shared single for determining
Geographical position where car;Communication module, the communication module is arranged on shared bicycle, for sending the geography of shared bicycle
Position is to remote platform;Remote platform, the shared bicycle geographic location that the communication module is sent is received, and determined shared
The height above sea level of bicycle geographic location, and calculated and ridden according to slope change amount of the original position with final position of riding of riding
Row expense, and the cost information is sent to user terminal;User terminal, for confirming and payment is ridden expense.Wherein, first
The height above sea level of position is less than the second place, then the expense ridden from first position to the second place, which is less than from the second place, rides
To the expense of first position;Or the height above sea level of first position is less than the second place, also, first position and the second place
Between slope change amount be more than given threshold, then the expense ridden from first position to the second place, which is less than, rides from the second place
To the expense of first position.
Further, the remote platform has processing unit and database, and the database is used to store shared bicycle
Geographic location and the elevation data of shared bicycle operational area.The processing unit is according to the shared bicycle location
The height above sea level of the shared bicycle geographic location of the elevation data of reason position and shared bicycle operational area determination, and according to
Original position of riding and the slope change amount for final position of riding calculate expense of riding.The slope change amount
Further, under the first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, its ride duration or path length of riding determination according to user, the k is that ratio is joined
Number, k is poor for the height above sea level of the original position and final position more than or equal to 0, H, and L is the original position and stop bit
The air line distance put.
Under the second charge mode, the expense f that rides for the user that processing unit calculates is:
Wherein | H | for H absolute value, G0For the gradient threshold value of setting, the G0≥0。
Under the 3rd charge mode, the expense f that rides for the user that processing unit calculates is calculated using piecewise function, wherein
At least two sections of functions are:
Wherein G1For the first grading pitch, F1For the first sectional charge.
Under the 4th charge mode, in first three charge mode, as H > 0, f=F.
The present invention also proposes a kind of charging method of shared bicycle, and this method comprises the following steps:
Step 1, the locating module for sharing bicycle is determined to share the geographical position where bicycle, and the geographical position is sent
To remote platform;
Step 2, the remote platform determines the height above sea level of shared bicycle geographic location;
Step 3, the remote platform is calculated according to slope change amount of the original position with final position of riding of riding and ridden
Expense, and the cost information is sent to user terminal;Wherein, the height above sea level of first position is less than the second place, then from
The expense that one position is ridden to the second place, which is less than from the second place, rides to the expense of first position;Or first position
Height above sea level is less than the second place, also, slope change amount is more than given threshold between first position and the second place, then from
The expense that one position is ridden to the second place, which is less than from the second place, rides to the expense of first position.
Step 4, user terminal confirms and payment is ridden expense.
Wherein in step 3, the calculating for expense of riding uses following charge mode.
Under first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, its ride duration or path length of riding determination according to user, the k is that ratio is joined
Number, H is poor for the height above sea level of the original position and final position, and L is the original position and the air line distance of final position.
Under the second charge mode, the expense f that rides for the user that processing unit calculates is:
Wherein | H | for H absolute value, G0For the gradient threshold value of setting, the G0≥0。
Under the 3rd charge mode, the expense f that rides for the user that processing unit calculates is calculated using piecewise function, wherein
At least two sections of functions are:
Wherein G1For the first segmentation height above sea level, F1For the first sectional charge.
Under the 4th charge mode, in first three charge mode, as H > 0, f=F.
By the message accounting and charging method of shared bicycle proposed by the present invention, according to original position and the stop bit of riding
The slope change amount put determines expense of riding, and solves the problems, such as shared bicycle area distribution inequality so that bicycle resource distribution
More rationally, reduce the cost of transportation that bicycle operation platform is used to balance bicycle area distribution, add operating income, favorably
Promoted in shared bicycle to the larger city of relief.
Brief description of the drawings
Fig. 1 is the shared bicycle message accounting schematic diagram of the present invention;
Fig. 2 is the shared bicycle charging method flow chart of the present invention;
Embodiment
The present invention is further described in particular embodiments below.
In one embodiment, the shared bicycle message accounting of the invention includes locating module, communication module, long-range
Platform, user terminal.Specifically, the locating module is arranged on shared bicycle, for obtaining the geographical position of shared bicycle,
Based on currently used mobile positioning technique, mobile positioning technique is including the location technology based on mobile network and based on mobile whole
The location technology at end.For the location technology based on mobile terminal, its principle is the Base Transmitter letter based on multiple known locations
Number, institute's transmission signal carries the characteristic information relevant with base station location, after mobile terminal receives these signals, determines it
With the geometry site between each base station, and according to related algorithm to its own position carry out positioning estimation, so as to obtain from
The positional information of body, such as including conventional architecture, GPS location and WIFI positioning.
The communication module is arranged on the shared bicycle, for the geographical position of bicycle to be sent into remote platform.
Its communication mode can pass through communication pattern known to mobile Internet, WiFi etc..The remote platform have processing unit and
Database, the database are used to store the geographic position data that shared bicycle communication module uploads, and the shared bicycle of storage
The elevation data of operational area, the remote platform can be the cloud platform of shared bicycle operator or shared bicycle
The cloud platform of operator and the combination of third-party platform, therefore database can be the data of the cloud platform of shared bicycle operator
The combination of the database of the cloud platform of storehouse or shared bicycle operator and the database of third-party platform, the described 3rd
Fang Pingtai database is used for the elevation data for storing shared bicycle operational area.The processing unit is shared bicycle operator
Server of cloud platform, for the geographical location information that uploads shared bicycle communication module and shared bicycle operational area
Elevation data is matched, to obtain the height above sea level in the geographical position that shared bicycle communication module uploads.In actual implementation process,
Database preferably uses the database of third-party platform, in the commercial database of current third party, is stored with all parts of the country
Altitude info ination under different latitude coordinates, if it is determined that the latitude coordinates in certain place, you can obtain the relative of the place
Answer height above sea level, its precision can reach 0.1 meter, in actual implementation process, the precision of its elevation data can select 1 meter,
0.5 meter, 0.2 meter, 0.1 meter etc..The remote platform also has remote communication module, and the remote communication module is used for sharing
The communication module and user terminal transmitting data information of bicycle, include without being only limitted to receive the shared bicycle communication module
The geographical location information of upload, and send cost information of riding, user terminal, remote platform and shared bicycle to user terminal
Data interaction and communication pattern between communication module can refer to prior art, then this is repeated no more.
Further, the processing unit is according to receiving the communication module uploads on shared bicycle route of riding
Original position and final position, the height above sea level HI of the original position and the height above sea level HE of final position are respectively obtained, and
The height above sea level difference H of the original position and final position is calculated, and further obtains the original position and stop bit
The slope change amount put, the slope change amountExpense of riding is determined further according to the slope change amount.
The height above sea level HE of height above sea level difference H=original position height above sea level HI- final positions.
When H be on the occasion of when, illustrate user in ride original position height above sea level more than final position height above sea level
Degree, user is more laborsaving in ride, and when H is negative value, illustrate user's original position height above sea level in ride
It is more painstaking in ride less than the height above sea level of final position, user.And if the distance ridden is longer, even if user
Original position height above sea level is less than the height above sea level of final position in ride, and user, which rides, laboriously to be felt also to fail to understand
It is aobvious, therefore the application determines expense of riding with the slope change amount of ride original position and final position.
Under the first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, the calculating side of the computational methods of the basic expense with reference to existing shared bicycle expense
Method, it is determined according to ride duration or the path length of riding of user, L be the original position and final position straight line away from
From.The seat for obtaining the original position that can be uploaded by remote platform according to shared bicycle communication module and final position of the L
Mark calculation of longitude & latitude obtains.
The k is scale parameter, and it is more than or equal to 0, can voluntarily be determined by bicycle operation platform.Such as k=is set
50, basic expense F are 1 yuan, and H is -10 meters, i.e., in the ride of user, 10 meters of altitude increase, distance of riding L is 1 kilometer
(1000 meters), expense of riding f result of calculations are 0.5 yuan.
Under the second charge mode, whenLess than or equal to threshold value G0When, processing unit does not consider just in charging process
Beginning position and final position slope change.I.e. if when initial position changes little with final position elevation grade, Yong Hu
Impression unobvious in ride, therefore also will not abandon riding because of the rise for route intermediate altitude height of riding.G0's
Setting can obtain according to platform big data computing, can also be set by operation platform according to the actual conditions of operational area, can be with
Understand, the G0>=0, as setting G0When being zero, the second charge mode is identical with the first charge mode.
Specifically, such as G is set0=0.01, i.e., if user is in ride, initial position and the final position gradient
Within 10 meters/kilometer, expense of riding f is equal to basic expense F for change, and initial position and final position slope in ride
Degree change is more than or equal to 10 meters/kilometer, then carries out charging by the first charge mode.
Under the 3rd charge mode, processing unit can use the charging mode of piecewise function, such to be advantageous in that meter
Expense is not in coin.
In above-mentioned formula (3), G1For grading pitch variable quantity, F1For sectional charge, it will be understood by those skilled in the art that
G0Can be zero, and the piecewise function can be divided at least two sections, can also be set in different piecewise functions different
Grading pitch variable quantity and sectional charge, and costs on the higher scale Fmax and least cost Fmin can be set.For example, for example set F
=1, G0=0.01, G1=0.02 meter, F1=1.5, for user in ride, H is -10 meters, i.e., in the ride of user,
10 meters of altitude increase, starting point are 1000 meters with terminating point distance, and expense of finally riding is f=F.If user was riding
Cheng Zhong, H are -15 meters, i.e., in the ride of user, 15 meters of altitude increase, starting point is 1000 meters with terminating point distance, most
Expense of riding eventually f=-0.5, that is to say, that user need not pay any expense, and operation platform needs to distribute 0.5 to user
Member subsidy, the subsidy can be distributed in the form of cash red packet, coupons etc., because user is lower ground square from physical features by bicycle
Ride to the higher place of physical features, optimize bicycle region distribution, saved bicycle operation platform be used for by bicycle from physical features compared with
Low place is transported to the freight in the higher place of physical features, and this expense can ride bicycle from the higher place of physical features
Costs reimbursement is obtained to the user there that physical features is lower ground put, therefore the operation for sharing bicycle is favourable.
Under the 4th charge mode, as H > 0 under above-mentioned three kinds of charge mode, i.e., user is initial during riding
The height above sea level of position is higher than the height above sea level of final position, rides more easily, charge system can't additionally collect user except basis
Expense outside expense F, and only the height above sea level of user in sight initial position during riding is less than the height above sea level of final position
In the case of the expense of riding is reduced or remitted, with encourage ride, i.e. H > 0, f=F.
The processing unit of remote platform calculates user and ridden after expense, re-sends to user terminal, user is at APP interfaces
The expense of riding is confirmed and paid, this belongs to prior art, then this is repeated no more.
The preferred embodiments of the disclosure is these are only, but protection scope of the present invention is not limited thereto, it is any
Those familiar with the art the invention discloses technical scope in, it is contemplated that change or replacement should all cover this
Within the protection domain of invention.
Claims (3)
- A kind of 1. shared bicycle message accounting based on slope change amount, it is characterised in that the shared bicycle message accounting bag Include:Locating module, the locating module are arranged on shared bicycle, for determining the geographical position where shared bicycle;Communication module, the communication module are arranged on shared bicycle, for sending the geographical position of shared bicycle to long-range flat Platform;Remote platform, the shared bicycle geographic location that the communication module is sent is received, and determine shared bicycle location The height above sea level of position is managed, and expense of riding is calculated according to the slope change amount of ride original position and final position of riding, and The cost information is sent to user terminal;User terminal, for confirming and payment is ridden expense.
- 2. shared bicycle message accounting as claimed in claim 1, it is characterised in that the remote platform have processing unit and Database, the database are used for the elevation data for storing shared bicycle geographic location and shared bicycle operational area, The processing unit determines altogether according to the elevation data of the shared bicycle geographic location and shared bicycle operational area The height above sea level of bicycle geographic location is enjoyed, and is calculated according to the slope change amount of ride original position and final position of riding Ride expense.
- 3. a kind of charging method of bicycle message accounting shared as claimed in claim 1, it is characterised in that comprise the following steps:Step 1, the locating module for sharing bicycle is determined to share the geographical position where bicycle, and the geographical position is sent to far Cheng Pingtai;Step 2, the remote platform determines the height above sea level of shared bicycle geographic location;Step 3, the remote platform calculates expense of riding according to the slope change amount of ride original position and final position of riding, And the cost information is sent to user terminal;Wherein, the height above sea level of first position is less than the second place, then from first position The expense ridden to the second place, which is less than from the second place, rides to the expense of first position;Or the height above sea level of first position Degree is less than the second place, also, slope change amount is more than given threshold between first position and the second place, then from first position The expense ridden to the second place, which is less than from the second place, rides to the expense of first position.Step 4, user terminal confirms and payment is ridden expense.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710572916.8A CN107358423A (en) | 2017-07-14 | 2017-07-14 | A kind of message accounting and charging method of the shared bicycle based on slope change amount |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710572916.8A CN107358423A (en) | 2017-07-14 | 2017-07-14 | A kind of message accounting and charging method of the shared bicycle based on slope change amount |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107358423A true CN107358423A (en) | 2017-11-17 |
Family
ID=60292470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710572916.8A Withdrawn CN107358423A (en) | 2017-07-14 | 2017-07-14 | A kind of message accounting and charging method of the shared bicycle based on slope change amount |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107358423A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108921371A (en) * | 2018-05-15 | 2018-11-30 | 平安科技(深圳)有限公司 | Method, device and equipment for releasing shared bicycle and computer readable storage medium |
CN109285054A (en) * | 2018-09-19 | 2019-01-29 | 山东建筑大学 | A kind of shared bicycle charging method for encouraging user's scheduling |
CN109754603A (en) * | 2019-01-21 | 2019-05-14 | 石家庄铁道大学 | Travel time computation method, device and terminal device |
CN112330205A (en) * | 2020-11-25 | 2021-02-05 | 詹桂亭 | Shared bicycle release position analysis system based on big data |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251495A (en) * | 2016-08-08 | 2016-12-21 | 滁州学院 | The management system of a kind of portable city public bicycle and dispatching method |
CN106600348A (en) * | 2017-01-22 | 2017-04-26 | 上海量明科技发展有限公司 | Method, device and system for charging path-triggered shared transportation tools |
CN106600349A (en) * | 2017-01-22 | 2017-04-26 | 上海量明科技发展有限公司 | Road-condition-triggered shared transportation tool charging method, device and system |
-
2017
- 2017-07-14 CN CN201710572916.8A patent/CN107358423A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251495A (en) * | 2016-08-08 | 2016-12-21 | 滁州学院 | The management system of a kind of portable city public bicycle and dispatching method |
CN106600348A (en) * | 2017-01-22 | 2017-04-26 | 上海量明科技发展有限公司 | Method, device and system for charging path-triggered shared transportation tools |
CN106600349A (en) * | 2017-01-22 | 2017-04-26 | 上海量明科技发展有限公司 | Road-condition-triggered shared transportation tool charging method, device and system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108921371A (en) * | 2018-05-15 | 2018-11-30 | 平安科技(深圳)有限公司 | Method, device and equipment for releasing shared bicycle and computer readable storage medium |
CN109285054A (en) * | 2018-09-19 | 2019-01-29 | 山东建筑大学 | A kind of shared bicycle charging method for encouraging user's scheduling |
CN109754603A (en) * | 2019-01-21 | 2019-05-14 | 石家庄铁道大学 | Travel time computation method, device and terminal device |
CN112330205A (en) * | 2020-11-25 | 2021-02-05 | 詹桂亭 | Shared bicycle release position analysis system based on big data |
CN112330205B (en) * | 2020-11-25 | 2021-09-21 | 乐清市辰卓电气有限公司 | Shared bicycle release position analysis system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107358423A (en) | A kind of message accounting and charging method of the shared bicycle based on slope change amount | |
US10274337B2 (en) | Method and system for dynamic estimation and predictive route generation | |
US5694322A (en) | Method and apparatus for determining tax of a vehicle | |
CN103971507A (en) | Taxi calling method, platform and system | |
CN105701634A (en) | Logistics monitoring and dispatching system based on mobile terminal | |
CN101673460B (en) | Traffic information quality evaluation method, device and system therefor | |
WO2015096379A1 (en) | Bus station optimization evaluation method and system | |
CN101458088A (en) | Portable electronic device and traffic information enquiry method thereof | |
JP2010176500A (en) | Parking lot information providing system, server and navigation apparatus | |
US9749930B2 (en) | Method for delivering optimum path including plurality of passage places and apparatus therefor | |
CN102027523A (en) | Virtual traffic sensors | |
CN207367382U (en) | A kind of bus stop board with route planning | |
CN106960406A (en) | A kind of bus service coverage rate computational methods for considering resident trip OD | |
CN104270721B (en) | The method for improving AIS location information precision by intelligent mobile terminal | |
CN104751312A (en) | System and method for actively acquiring logistic freight source information based on LBS | |
CN101989382A (en) | Real-time road condition acquisition method based on positioning devices and data network | |
CN109863765A (en) | Information is provided by the vehicle group of more motor vehicles | |
CN106023582A (en) | BRT passenger traveling information acquisition and guiding scheme publishing system and method | |
CN111931079A (en) | Method and system for recommending online booking getting-on points | |
CN115728802A (en) | Spatial layout method for regional CORS reference station | |
CN107392657A (en) | A kind of message accounting and charging method of the shared motor bicycle distributed rationally | |
CN101813482A (en) | Vehicle-mounted navigation device and navigation method thereof | |
CN107369213A (en) | A kind of message accounting and charging method of the shared bicycle based on height above sea level difference | |
TWI471582B (en) | Road side data exchange net and method thereof | |
CN116307580A (en) | Method and device for scheduling capacity, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171117 |
|
WW01 | Invention patent application withdrawn after publication |