CN107358423A - A kind of message accounting and charging method of the shared bicycle based on slope change amount - Google Patents

A kind of message accounting and charging method of the shared bicycle based on slope change amount Download PDF

Info

Publication number
CN107358423A
CN107358423A CN201710572916.8A CN201710572916A CN107358423A CN 107358423 A CN107358423 A CN 107358423A CN 201710572916 A CN201710572916 A CN 201710572916A CN 107358423 A CN107358423 A CN 107358423A
Authority
CN
China
Prior art keywords
shared bicycle
expense
bicycle
riding
sea level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710572916.8A
Other languages
Chinese (zh)
Inventor
吴联凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710572916.8A priority Critical patent/CN107358423A/en
Publication of CN107358423A publication Critical patent/CN107358423A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/085Payment architectures involving remote charge determination or related payment systems
    • G06Q20/0855Payment architectures involving remote charge determination or related payment systems involving a third party
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • G06Q20/145Payments according to the detected use or quantity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Pass through the message accounting and charging method of shared bicycle proposed by the present invention, expense of riding is determined according to the slope change amount of ride original position and final position, solves the problems, such as shared bicycle area distribution inequality, so that bicycle resource distribution is more reasonable, reduce the cost of transportation that bicycle operation platform is used to balance bicycle area distribution, operating income is added, is advantageous to shared bicycle and is promoted to the larger city of relief.

Description

A kind of message accounting and charging method of the shared bicycle based on slope change amount
Technical field
The invention belongs to shared bicycle technical field, the more particularly to a kind of message accounting and charging method of shared bicycle.
Background technology
At present, shared bicycle is the choice for traveling being generally accepted, and the charging of shared bicycle is ridden by user at present Capable duration and the distance ridden carry out charging, also pass through the APP of the mobile phone terminal of user in special date operator Carry out reward and preferential activity is reduced or remitted the expense of riding, but such charging mode Shortcomings.East at home Area major part city is located at plains region, and city altitude change is smaller, but the city in other areas or eastern part city There is hill in hilly country or mountain area edge zone, some urban districts, the height above sea level of diverse location differs larger.At this In the case of kind, shared riding for bicycle will be gone wrong, it is well known that bicycle is ridden more laborious, and the descending of riding that goes up a slope Then more laborsaving, therefore, when the height above sea level difference in city is larger, the user of shared bicycle can usually select to ride from height above sea level Lower ground put and ride to height above sea level from height above sea level without selection to height above sea level lower ground point in the higher place of height The higher place of degree.In actual observation, the height above sea level between departure place and destination differs 20 meters and is just enough to have influence on The choice for traveling of user, such result are exactly that the shared bicycle in these cities often focuses on height above sea level lower ground point, user It is typically reluctant to cycle and is lower ground put to the higher place of height above sea level from height above sea level, and the replacement trip such as selection is called a taxi, public transport Mode, in terms of the aspect in whole city, so caused by share bicycle distribution very big inhomogeneities, in height above sea level point higher User almost can not find available bicycle, and the capacity of height above sea level lower ground area's bicycle substantially exceeds demand, causes trip to provide The waste in source, such in order to solve the problems, such as, the operator of shared bicycle usually requires to employ special haulage vehicle by height above sea level The bicycle for lower ground putting surplus transports the higher place of height above sea level, and this significantly increases the cost of operation, and it is launched Place also has limitation, it is impossible to the actual demand of reaction bicycle conscientiously.Chinese patent application CN1818557A discloses one kind Bicycle information managing device and bicycle computer, its computer determine oneself position using multiple satellite-signals, Travel distance, travel time and altitude data can be read automatically, but are used only for calculating the energy expenditure of user, User is not related to ride the calculating of expense.
The content of the invention
In order to solve such technical problem, the present invention proposes a kind of new shared bicycle message accounting and charging method. The shared bicycle message accounting includes:Locating module, the locating module are arranged on shared bicycle, shared single for determining Geographical position where car;Communication module, the communication module is arranged on shared bicycle, for sending the geography of shared bicycle Position is to remote platform;Remote platform, the shared bicycle geographic location that the communication module is sent is received, and determined shared The height above sea level of bicycle geographic location, and calculated and ridden according to slope change amount of the original position with final position of riding of riding Row expense, and the cost information is sent to user terminal;User terminal, for confirming and payment is ridden expense.Wherein, first The height above sea level of position is less than the second place, then the expense ridden from first position to the second place, which is less than from the second place, rides To the expense of first position;Or the height above sea level of first position is less than the second place, also, first position and the second place Between slope change amount be more than given threshold, then the expense ridden from first position to the second place, which is less than, rides from the second place To the expense of first position.
Further, the remote platform has processing unit and database, and the database is used to store shared bicycle Geographic location and the elevation data of shared bicycle operational area.The processing unit is according to the shared bicycle location The height above sea level of the shared bicycle geographic location of the elevation data of reason position and shared bicycle operational area determination, and according to Original position of riding and the slope change amount for final position of riding calculate expense of riding.The slope change amount
Further, under the first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, its ride duration or path length of riding determination according to user, the k is that ratio is joined Number, k is poor for the height above sea level of the original position and final position more than or equal to 0, H, and L is the original position and stop bit The air line distance put.
Under the second charge mode, the expense f that rides for the user that processing unit calculates is:
Wherein | H | for H absolute value, G0For the gradient threshold value of setting, the G0≥0。
Under the 3rd charge mode, the expense f that rides for the user that processing unit calculates is calculated using piecewise function, wherein At least two sections of functions are:
Wherein G1For the first grading pitch, F1For the first sectional charge.
Under the 4th charge mode, in first three charge mode, as H > 0, f=F.
The present invention also proposes a kind of charging method of shared bicycle, and this method comprises the following steps:
Step 1, the locating module for sharing bicycle is determined to share the geographical position where bicycle, and the geographical position is sent To remote platform;
Step 2, the remote platform determines the height above sea level of shared bicycle geographic location;
Step 3, the remote platform is calculated according to slope change amount of the original position with final position of riding of riding and ridden Expense, and the cost information is sent to user terminal;Wherein, the height above sea level of first position is less than the second place, then from The expense that one position is ridden to the second place, which is less than from the second place, rides to the expense of first position;Or first position Height above sea level is less than the second place, also, slope change amount is more than given threshold between first position and the second place, then from The expense that one position is ridden to the second place, which is less than from the second place, rides to the expense of first position.
Step 4, user terminal confirms and payment is ridden expense.
Wherein in step 3, the calculating for expense of riding uses following charge mode.
Under first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, its ride duration or path length of riding determination according to user, the k is that ratio is joined Number, H is poor for the height above sea level of the original position and final position, and L is the original position and the air line distance of final position.
Under the second charge mode, the expense f that rides for the user that processing unit calculates is:
Wherein | H | for H absolute value, G0For the gradient threshold value of setting, the G0≥0。
Under the 3rd charge mode, the expense f that rides for the user that processing unit calculates is calculated using piecewise function, wherein At least two sections of functions are:
Wherein G1For the first segmentation height above sea level, F1For the first sectional charge.
Under the 4th charge mode, in first three charge mode, as H > 0, f=F.
By the message accounting and charging method of shared bicycle proposed by the present invention, according to original position and the stop bit of riding The slope change amount put determines expense of riding, and solves the problems, such as shared bicycle area distribution inequality so that bicycle resource distribution More rationally, reduce the cost of transportation that bicycle operation platform is used to balance bicycle area distribution, add operating income, favorably Promoted in shared bicycle to the larger city of relief.
Brief description of the drawings
Fig. 1 is the shared bicycle message accounting schematic diagram of the present invention;
Fig. 2 is the shared bicycle charging method flow chart of the present invention;
Embodiment
The present invention is further described in particular embodiments below.
In one embodiment, the shared bicycle message accounting of the invention includes locating module, communication module, long-range Platform, user terminal.Specifically, the locating module is arranged on shared bicycle, for obtaining the geographical position of shared bicycle, Based on currently used mobile positioning technique, mobile positioning technique is including the location technology based on mobile network and based on mobile whole The location technology at end.For the location technology based on mobile terminal, its principle is the Base Transmitter letter based on multiple known locations Number, institute's transmission signal carries the characteristic information relevant with base station location, after mobile terminal receives these signals, determines it With the geometry site between each base station, and according to related algorithm to its own position carry out positioning estimation, so as to obtain from The positional information of body, such as including conventional architecture, GPS location and WIFI positioning.
The communication module is arranged on the shared bicycle, for the geographical position of bicycle to be sent into remote platform. Its communication mode can pass through communication pattern known to mobile Internet, WiFi etc..The remote platform have processing unit and Database, the database are used to store the geographic position data that shared bicycle communication module uploads, and the shared bicycle of storage The elevation data of operational area, the remote platform can be the cloud platform of shared bicycle operator or shared bicycle The cloud platform of operator and the combination of third-party platform, therefore database can be the data of the cloud platform of shared bicycle operator The combination of the database of the cloud platform of storehouse or shared bicycle operator and the database of third-party platform, the described 3rd Fang Pingtai database is used for the elevation data for storing shared bicycle operational area.The processing unit is shared bicycle operator Server of cloud platform, for the geographical location information that uploads shared bicycle communication module and shared bicycle operational area Elevation data is matched, to obtain the height above sea level in the geographical position that shared bicycle communication module uploads.In actual implementation process, Database preferably uses the database of third-party platform, in the commercial database of current third party, is stored with all parts of the country Altitude info ination under different latitude coordinates, if it is determined that the latitude coordinates in certain place, you can obtain the relative of the place Answer height above sea level, its precision can reach 0.1 meter, in actual implementation process, the precision of its elevation data can select 1 meter, 0.5 meter, 0.2 meter, 0.1 meter etc..The remote platform also has remote communication module, and the remote communication module is used for sharing The communication module and user terminal transmitting data information of bicycle, include without being only limitted to receive the shared bicycle communication module The geographical location information of upload, and send cost information of riding, user terminal, remote platform and shared bicycle to user terminal Data interaction and communication pattern between communication module can refer to prior art, then this is repeated no more.
Further, the processing unit is according to receiving the communication module uploads on shared bicycle route of riding Original position and final position, the height above sea level HI of the original position and the height above sea level HE of final position are respectively obtained, and The height above sea level difference H of the original position and final position is calculated, and further obtains the original position and stop bit The slope change amount put, the slope change amountExpense of riding is determined further according to the slope change amount.
The height above sea level HE of height above sea level difference H=original position height above sea level HI- final positions.
When H be on the occasion of when, illustrate user in ride original position height above sea level more than final position height above sea level Degree, user is more laborsaving in ride, and when H is negative value, illustrate user's original position height above sea level in ride It is more painstaking in ride less than the height above sea level of final position, user.And if the distance ridden is longer, even if user Original position height above sea level is less than the height above sea level of final position in ride, and user, which rides, laboriously to be felt also to fail to understand It is aobvious, therefore the application determines expense of riding with the slope change amount of ride original position and final position.
Under the first charge mode, the expense f that rides for the user that processing unit calculates is:
Expense based on the F, the calculating side of the computational methods of the basic expense with reference to existing shared bicycle expense Method, it is determined according to ride duration or the path length of riding of user, L be the original position and final position straight line away from From.The seat for obtaining the original position that can be uploaded by remote platform according to shared bicycle communication module and final position of the L Mark calculation of longitude & latitude obtains.
The k is scale parameter, and it is more than or equal to 0, can voluntarily be determined by bicycle operation platform.Such as k=is set 50, basic expense F are 1 yuan, and H is -10 meters, i.e., in the ride of user, 10 meters of altitude increase, distance of riding L is 1 kilometer (1000 meters), expense of riding f result of calculations are 0.5 yuan.
Under the second charge mode, whenLess than or equal to threshold value G0When, processing unit does not consider just in charging process Beginning position and final position slope change.I.e. if when initial position changes little with final position elevation grade, Yong Hu Impression unobvious in ride, therefore also will not abandon riding because of the rise for route intermediate altitude height of riding.G0's Setting can obtain according to platform big data computing, can also be set by operation platform according to the actual conditions of operational area, can be with Understand, the G0>=0, as setting G0When being zero, the second charge mode is identical with the first charge mode.
Specifically, such as G is set0=0.01, i.e., if user is in ride, initial position and the final position gradient Within 10 meters/kilometer, expense of riding f is equal to basic expense F for change, and initial position and final position slope in ride Degree change is more than or equal to 10 meters/kilometer, then carries out charging by the first charge mode.
Under the 3rd charge mode, processing unit can use the charging mode of piecewise function, such to be advantageous in that meter Expense is not in coin.
In above-mentioned formula (3), G1For grading pitch variable quantity, F1For sectional charge, it will be understood by those skilled in the art that G0Can be zero, and the piecewise function can be divided at least two sections, can also be set in different piecewise functions different Grading pitch variable quantity and sectional charge, and costs on the higher scale Fmax and least cost Fmin can be set.For example, for example set F =1, G0=0.01, G1=0.02 meter, F1=1.5, for user in ride, H is -10 meters, i.e., in the ride of user, 10 meters of altitude increase, starting point are 1000 meters with terminating point distance, and expense of finally riding is f=F.If user was riding Cheng Zhong, H are -15 meters, i.e., in the ride of user, 15 meters of altitude increase, starting point is 1000 meters with terminating point distance, most Expense of riding eventually f=-0.5, that is to say, that user need not pay any expense, and operation platform needs to distribute 0.5 to user Member subsidy, the subsidy can be distributed in the form of cash red packet, coupons etc., because user is lower ground square from physical features by bicycle Ride to the higher place of physical features, optimize bicycle region distribution, saved bicycle operation platform be used for by bicycle from physical features compared with Low place is transported to the freight in the higher place of physical features, and this expense can ride bicycle from the higher place of physical features Costs reimbursement is obtained to the user there that physical features is lower ground put, therefore the operation for sharing bicycle is favourable.
Under the 4th charge mode, as H > 0 under above-mentioned three kinds of charge mode, i.e., user is initial during riding The height above sea level of position is higher than the height above sea level of final position, rides more easily, charge system can't additionally collect user except basis Expense outside expense F, and only the height above sea level of user in sight initial position during riding is less than the height above sea level of final position In the case of the expense of riding is reduced or remitted, with encourage ride, i.e. H > 0, f=F.
The processing unit of remote platform calculates user and ridden after expense, re-sends to user terminal, user is at APP interfaces The expense of riding is confirmed and paid, this belongs to prior art, then this is repeated no more.
The preferred embodiments of the disclosure is these are only, but protection scope of the present invention is not limited thereto, it is any Those familiar with the art the invention discloses technical scope in, it is contemplated that change or replacement should all cover this Within the protection domain of invention.

Claims (3)

  1. A kind of 1. shared bicycle message accounting based on slope change amount, it is characterised in that the shared bicycle message accounting bag Include:
    Locating module, the locating module are arranged on shared bicycle, for determining the geographical position where shared bicycle;
    Communication module, the communication module are arranged on shared bicycle, for sending the geographical position of shared bicycle to long-range flat Platform;
    Remote platform, the shared bicycle geographic location that the communication module is sent is received, and determine shared bicycle location The height above sea level of position is managed, and expense of riding is calculated according to the slope change amount of ride original position and final position of riding, and The cost information is sent to user terminal;User terminal, for confirming and payment is ridden expense.
  2. 2. shared bicycle message accounting as claimed in claim 1, it is characterised in that the remote platform have processing unit and Database, the database are used for the elevation data for storing shared bicycle geographic location and shared bicycle operational area, The processing unit determines altogether according to the elevation data of the shared bicycle geographic location and shared bicycle operational area The height above sea level of bicycle geographic location is enjoyed, and is calculated according to the slope change amount of ride original position and final position of riding Ride expense.
  3. 3. a kind of charging method of bicycle message accounting shared as claimed in claim 1, it is characterised in that comprise the following steps:
    Step 1, the locating module for sharing bicycle is determined to share the geographical position where bicycle, and the geographical position is sent to far Cheng Pingtai;
    Step 2, the remote platform determines the height above sea level of shared bicycle geographic location;
    Step 3, the remote platform calculates expense of riding according to the slope change amount of ride original position and final position of riding, And the cost information is sent to user terminal;Wherein, the height above sea level of first position is less than the second place, then from first position The expense ridden to the second place, which is less than from the second place, rides to the expense of first position;Or the height above sea level of first position Degree is less than the second place, also, slope change amount is more than given threshold between first position and the second place, then from first position The expense ridden to the second place, which is less than from the second place, rides to the expense of first position.
    Step 4, user terminal confirms and payment is ridden expense.
CN201710572916.8A 2017-07-14 2017-07-14 A kind of message accounting and charging method of the shared bicycle based on slope change amount Withdrawn CN107358423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710572916.8A CN107358423A (en) 2017-07-14 2017-07-14 A kind of message accounting and charging method of the shared bicycle based on slope change amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710572916.8A CN107358423A (en) 2017-07-14 2017-07-14 A kind of message accounting and charging method of the shared bicycle based on slope change amount

Publications (1)

Publication Number Publication Date
CN107358423A true CN107358423A (en) 2017-11-17

Family

ID=60292470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710572916.8A Withdrawn CN107358423A (en) 2017-07-14 2017-07-14 A kind of message accounting and charging method of the shared bicycle based on slope change amount

Country Status (1)

Country Link
CN (1) CN107358423A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921371A (en) * 2018-05-15 2018-11-30 平安科技(深圳)有限公司 Method, device and equipment for releasing shared bicycle and computer readable storage medium
CN109285054A (en) * 2018-09-19 2019-01-29 山东建筑大学 A kind of shared bicycle charging method for encouraging user's scheduling
CN109754603A (en) * 2019-01-21 2019-05-14 石家庄铁道大学 Travel time computation method, device and terminal device
CN112330205A (en) * 2020-11-25 2021-02-05 詹桂亭 Shared bicycle release position analysis system based on big data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251495A (en) * 2016-08-08 2016-12-21 滁州学院 The management system of a kind of portable city public bicycle and dispatching method
CN106600348A (en) * 2017-01-22 2017-04-26 上海量明科技发展有限公司 Method, device and system for charging path-triggered shared transportation tools
CN106600349A (en) * 2017-01-22 2017-04-26 上海量明科技发展有限公司 Road-condition-triggered shared transportation tool charging method, device and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251495A (en) * 2016-08-08 2016-12-21 滁州学院 The management system of a kind of portable city public bicycle and dispatching method
CN106600348A (en) * 2017-01-22 2017-04-26 上海量明科技发展有限公司 Method, device and system for charging path-triggered shared transportation tools
CN106600349A (en) * 2017-01-22 2017-04-26 上海量明科技发展有限公司 Road-condition-triggered shared transportation tool charging method, device and system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921371A (en) * 2018-05-15 2018-11-30 平安科技(深圳)有限公司 Method, device and equipment for releasing shared bicycle and computer readable storage medium
CN109285054A (en) * 2018-09-19 2019-01-29 山东建筑大学 A kind of shared bicycle charging method for encouraging user's scheduling
CN109754603A (en) * 2019-01-21 2019-05-14 石家庄铁道大学 Travel time computation method, device and terminal device
CN112330205A (en) * 2020-11-25 2021-02-05 詹桂亭 Shared bicycle release position analysis system based on big data
CN112330205B (en) * 2020-11-25 2021-09-21 乐清市辰卓电气有限公司 Shared bicycle release position analysis system based on big data

Similar Documents

Publication Publication Date Title
CN107358423A (en) A kind of message accounting and charging method of the shared bicycle based on slope change amount
US10274337B2 (en) Method and system for dynamic estimation and predictive route generation
US5694322A (en) Method and apparatus for determining tax of a vehicle
CN103971507A (en) Taxi calling method, platform and system
CN105701634A (en) Logistics monitoring and dispatching system based on mobile terminal
CN101673460B (en) Traffic information quality evaluation method, device and system therefor
WO2015096379A1 (en) Bus station optimization evaluation method and system
CN101458088A (en) Portable electronic device and traffic information enquiry method thereof
JP2010176500A (en) Parking lot information providing system, server and navigation apparatus
US9749930B2 (en) Method for delivering optimum path including plurality of passage places and apparatus therefor
CN102027523A (en) Virtual traffic sensors
CN207367382U (en) A kind of bus stop board with route planning
CN106960406A (en) A kind of bus service coverage rate computational methods for considering resident trip OD
CN104270721B (en) The method for improving AIS location information precision by intelligent mobile terminal
CN104751312A (en) System and method for actively acquiring logistic freight source information based on LBS
CN101989382A (en) Real-time road condition acquisition method based on positioning devices and data network
CN109863765A (en) Information is provided by the vehicle group of more motor vehicles
CN106023582A (en) BRT passenger traveling information acquisition and guiding scheme publishing system and method
CN111931079A (en) Method and system for recommending online booking getting-on points
CN115728802A (en) Spatial layout method for regional CORS reference station
CN107392657A (en) A kind of message accounting and charging method of the shared motor bicycle distributed rationally
CN101813482A (en) Vehicle-mounted navigation device and navigation method thereof
CN107369213A (en) A kind of message accounting and charging method of the shared bicycle based on height above sea level difference
TWI471582B (en) Road side data exchange net and method thereof
CN116307580A (en) Method and device for scheduling capacity, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171117

WW01 Invention patent application withdrawn after publication