CN107355122A - A kind of universal cross-arm of steel tube tower - Google Patents

A kind of universal cross-arm of steel tube tower Download PDF

Info

Publication number
CN107355122A
CN107355122A CN201710645996.5A CN201710645996A CN107355122A CN 107355122 A CN107355122 A CN 107355122A CN 201710645996 A CN201710645996 A CN 201710645996A CN 107355122 A CN107355122 A CN 107355122A
Authority
CN
China
Prior art keywords
cross
arm
seat
arm seat
tower body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710645996.5A
Other languages
Chinese (zh)
Inventor
张国东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710645996.5A priority Critical patent/CN107355122A/en
Publication of CN107355122A publication Critical patent/CN107355122A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The present invention provides a kind of universal cross-arm of steel tube tower, belongs to long strands field.During installation,First on the ground by bolt by the first cross-arm,Second cross-arm,3rd cross-arm,4th cross-arm,5th cross-arm and the 6th cross-arm are separately mounted to the first cross-arm seat of point valve,On second cross-arm seat and the 3rd cross-arm seat,Then the cross-arm seat for dividing valve is bolted together,And three layers of cross-arm seat are linked together by connecting rod,After cross-arm is completed,The second anchor ear of split-type is arranged on tower body first and locked by bolt,Cross-arm is locked by loading at the top of tower body to the second snap ring,Finally by the first anchor ear installation locking,Designed using mechanism,Power transmission line can be from adjacent layer or phase interlayer cross-arm hanging wire point outlet after one layer of cross-arm inlet wire,So it is achieved that the tension to power transmission line,Transmission line of electricity galloping can be reduced,Large-sized cage structure can be used as the platform of workmen's rest and operation simultaneously,Be advantageous to construction safety.

Description

A kind of universal cross-arm of steel tube tower
Technical field
The present invention relates to long strands field, specifically a kind of universal cross-arm of steel tube tower.
Background technology
Traditional steel tube tower uses box cross-arm as hanging wire point more, on a cross-arm can only piece electric wire of carry, simultaneously The outlet of electric wire and enter line angle degree and cross-arm must must be added on tower body more than this scope within certain amplitude range Number, but due to the limitation of tower body diameter itself, orthogonal two cross-arms can only be installed on the tower body of sustained height, no Beneficial to the extension and construction of power circuit.
The content of the invention
The technical assignment of the present invention is that solve the deficiencies in the prior art, there is provided a kind of universal cross-arm of steel tube tower.
The technical solution adopted for the present invention to solve the technical problems is:
The core concept of the design is to design a kind of cross-arm seat of mouse cage shape, is stretched out on cross-arm seat on 360 degree of directions More cross-arms enter line and outlet requirement with meet multi-angle in power circuit, while overall cross-arm seat passes through upper and lower two kinds and embraced Bind round to realize fixation.
A kind of universal cross-arm of steel tube tower, including the first cross-arm seat, the second cross-arm seat and the 3rd cross-arm seat, the first cross-arm seat, Second cross-arm seat and the 3rd cross-arm seat are annular, are had on the periphery of the first cross-arm seat, the second cross-arm seat and the 3rd cross-arm seat The plane of annular array, there is gusset in plane, and gusset passes through bolt and installs the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th horizontal Load, the 5th cross-arm and the 6th cross-arm, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm It is respectively directed to six different orientation, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm On have a conducting wire hanging point, conducting wire hanging point is that butterfly ceramic disk is in series;First cross-arm seat, the second cross-arm seat and the 3rd cross-arm seat There is connecting hole between cross-arm, the internal diameter of the first cross-arm seat, the second cross-arm seat and the 3rd cross-arm seat is more than in cross-arm seat setting height(from bottom) The external diameter height of corresponding tower body.
Preferably, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm length phase Together, the air line distance on cross-arm between conducting wire hanging point should be outside high-tension current breakdown region.
Preferably, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm are segment separator Structure, it is bolted between two valves.
Second anchor ear bottom is conical sleeve, and the taper of conical sleeve is equal to outside the taper of tower body and the minimum of conical sleeve Footpath is equal to the external diameter that the 3rd cross-arm seat lower surface corresponds to tower body, is the second snap ring at the top of the second anchor ear, the second snap ring external diameter is equal to 3rd cross-arm seat internal diameter, the second snap ring periphery have the second locking hole.
Preferably, the bending edges number of the second anchor ear is equal to tower body bending edges number.
Preferably, the second anchor ear is segment separator structure, is bolted between two valves.
It is conical sleeve at the top of first anchor ear, the taper of conical sleeve is equal to outside the taper of tower body and the maximum of conical sleeve Footpath is equal to the external diameter that the first cross-arm seat upper surface corresponds to tower body, and the first anchor ear bottom is the first snap ring, and the first snap ring external diameter is equal to First cross-arm seat internal diameter, the first snap ring periphery have the first locking hole.
Preferably, the bending edges number of the first anchor ear is equal to tower body bending edges number.
Preferably, the first anchor ear is segment separator structure, is bolted between two valves.
A kind of universal cross-arm of steel tube tower of the present invention, prior art, which compares caused beneficial effect, is:
1) between traditional tower body cross-arm it is independently installed, structural strength deficiency, and the first cross-arm seat in the design, the Three-decker above and below two cross-arm seats and the 3rd cross-arm seat composition, difference carry ground wire, live wire and zero line, bulk strength is high, can Meet the transmission line of electricity requirement of senior middle school's low pressure different size.
2) traditional tower body cross-arm enters line and outlet angle after the completion of welding and can only be limited in the range of a very little, And each layer of cross-arm can receive the inlet wire in 360 directions in the design, can also disclosure satisfy that various to any direction outlet The transmission of electricity requirement of landform.
3) traditional transmission line of electricity is required for adding wire extra strainer, and power transmission line is from one layer in the design The tension to power transmission line, energy can be so achieved that after cross-arm inlet wire from adjacent layer or phase interlayer cross-arm hanging wire point outlet Enough effectively reduce the phenomenon of transmission line of electricity galloping.
4) extra soldered construction operation platform is needed on traditional tower body, and large-sized cage structure can in the design As workmen rest and operation platform, be advantageous to construction safety.
5) traditional tower body cross-arm needs successively welding one by one, and cross-arm mechanism whole in the design can be on ground Face be completed after from tower top integral hoisting, modularization assembling can be realized, can greatly accelerating construction progress.
Brief description of the drawings
Fig. 1 is structure three-dimensional figure of the present invention;
Fig. 2 is structure top view of the present invention;
Fig. 3 is structural front view of the present invention;
Fig. 4 is the first anchor ear of structure graphics of the present invention;
Fig. 5 is the second anchor ear of structure graphics of the present invention;
Each label represents in figure:
1st, the first cross-arm seat, the 2, second cross-arm seat, 3, conducting wire hanging point, the 4, the 3rd cross-arm seat, the 5, first anchor ear, 51, first Snap ring, the 52, first locking hole, the 53, first conical ring, the 6, second anchor ear, the 61, second snap ring, the 62, second conical ring, the 63, second locking Hole, the 7, first cross-arm, 8, gusset, the 9, second cross-arm, the 10, the 3rd cross-arm, the 11, the 4th cross-arm, the 12, the 5th cross-arm, the 13, the 6th is horizontal Load, 14, tower body, 15, connecting hole, 16, connecting rod 1
Embodiment
Embodiments of the present invention are described with reference to the accompanying drawings.
A kind of universal cross-arm of steel tube tower, it is characterised in that including the first cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4, the first cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4 are annular, the first cross-arm seat 1, the second cross-arm seat 2 and the 3rd There is the plane of annular array on the periphery of cross-arm seat 4, there is gusset 8 in plane, gusset 8 installs the first cross-arm 7, the by bolt Two cross-arms 9, the 3rd cross-arm 10, the 4th cross-arm 11, the 5th cross-arm 12 and the 6th cross-arm 13, the first cross-arm 7, the second cross-arm the 9, the 3rd Cross-arm 10, the 4th cross-arm 11, the 5th cross-arm 12 and the 6th cross-arm 13 are respectively directed to six different orientation, the first cross-arm 7, second There is conducting wire hanging point 3 on cross-arm 9, the 3rd cross-arm 10, the 4th cross-arm 11, the 5th cross-arm 12 and the 6th cross-arm 13, conducting wire hanging point 3 is butterfly Shape ceramic disk is in series;There is connecting hole 15 between the cross-arm of first cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4, the The internal diameter of one cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4 is more than the outer of corresponding tower body 14 in cross-arm seat setting height(from bottom) Footpath height, is connected between the first cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4 by connecting rod 16.
Further, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm length phase Together, the air line distance on cross-arm between conducting wire hanging point should be outside high-tension current breakdown region.
Further, the first cross-arm, the second cross-arm, the 3rd cross-arm, the 4th cross-arm, the 5th cross-arm and the 6th cross-arm are segment separator Structure, it is bolted between two valves.
The bottom of second anchor ear 6 is conical sleeve, the taper of conical sleeve be equal to the taper of tower body 14 and conical sleeve most Small external diameter is equal to the external diameter that the lower surface of the 3rd cross-arm seat 4 corresponds to tower body 14, and the top of the second anchor ear 6 is the second snap ring 61, and second blocks The external diameter of ring 61 is equal to the internal diameter of the 3rd cross-arm seat 4, and the periphery of the second snap ring 61 has the second locking hole 63.
Further, the bending edges number of the second anchor ear is equal to tower body bending edges number.
Further, the second anchor ear is segment separator structure, is bolted between two valves.
The top of first anchor ear 5 is conical sleeve, and the taper of conical sleeve is equal to taper and the taper of claim 1 tower body 14 The maximum outside diameter of sleeve is equal to the external diameter that the upper surface of the first cross-arm seat 1 corresponds to tower body 14, and the bottom of the first anchor ear 5 is the first snap ring 51, the external diameter of the first snap ring 51 is equal to the internal diameter of the first cross-arm seat 1, and the periphery of the first snap ring 51 has the first locking hole 52.
Further, the bending edges number of the first anchor ear is equal to tower body bending edges number.
Further, the first anchor ear is segment separator structure, is bolted between two valves.
During installation, first on the ground by bolt by the first cross-arm 7, the second cross-arm 9, the 3rd cross-arm 10, the 4th cross-arm 11st, the 5th cross-arm 12 and the 6th cross-arm 13 are separately mounted to the first cross-arm seat 1, the second cross-arm seat 2 and the 3rd cross-arm seat 4 of point valve On, then the cross-arm seat for dividing valve is bolted together, then by connecting rod 16 by the first cross-arm seat 1, the second cross-arm The cross-arm seat 4 of seat 2 and the 3rd links together.
After cross-arm is completed, the second anchor ear 6 of split-type is arranged on tower body 14 first and locked by bolt, it is horizontal Load is locked by loading at the top of tower body to the second snap ring 61, finally by the installation locking of the first anchor ear 5.
It should be noted that above content is merely illustrative of the technical solution of the present invention, rather than to the scope of the present invention Limitation, although the specific embodiment part explains to the present invention, one of ordinary skill in the art should Understand, technical scheme can be modified or equivalent substitution, without departing from the essence of technical solution of the present invention And scope.

Claims (3)

1. a kind of universal cross-arm of steel tube tower, it is characterised in that including the first cross-arm seat (1), the second cross-arm seat (2) and the 3rd cross-arm Seat (4), the first cross-arm seat (1), the second cross-arm seat (2) and the 3rd cross-arm seat (4) are annular, the first cross-arm seat (1), there is the plane of annular array on the periphery of the second cross-arm seat (2) and the 3rd cross-arm seat (4), have gusset in the plane (8), the gusset (8) by bolt install the first cross-arm (7), the second cross-arm (9), the 3rd cross-arm (10), the 4th cross-arm (11), 5th cross-arm (12) and the 6th cross-arm (13), first cross-arm (7), the second cross-arm (9), the 3rd cross-arm (10), the 4th cross-arm (11), the 5th cross-arm (12) and the 6th cross-arm (13) orientation that to be respectively directed to six different, it is first cross-arm (7), second horizontal There is conducting wire hanging point (3) on load (9), the 3rd cross-arm (10), the 4th cross-arm (11), the 5th cross-arm (12) and the 6th cross-arm (13), institute Conducting wire hanging point (3) is stated to be in series for butterfly ceramic disk;The first cross-arm seat (1), the second cross-arm seat (2) and the 3rd cross-arm seat (4) have connecting hole (15) between cross-arm, the first cross-arm seat (1), the second cross-arm seat (2) and the 3rd cross-arm seat (4) it is interior Footpath is more than the external diameter height of corresponding tower body (14) in cross-arm seat setting height(from bottom), the first cross-arm seat (1), the second cross-arm seat (2) connected between the 3rd cross-arm seat (4) by connecting rod (16).
A kind of 2. universal cross-arm of steel tube tower according to claim 1, it is characterised in that including the second anchor ear (6), described Two anchor ears (6) bottom is conical sleeve, and the taper of the conical sleeve is equal to the taper of tower body (14) and institute described in claim 1 The minimum outer diameter for stating conical sleeve is equal to the 3rd cross-arm seat (4) lower surface and corresponds to the external diameters of the tower body (14), described second armful It is the second snap ring (61) at the top of hoop (6), the second snap ring (61) external diameter is equal to the 3rd cross-arm seat (4) internal diameter, and described the Two snap rings (61) periphery has the second locking hole (63).
A kind of 3. universal cross-arm of steel tube tower according to claim 1, it is characterised in that including the first anchor ear (5), described It is conical sleeve at the top of one anchor ear (5), the taper of the conical sleeve is equal to the taper of tower body (14) and institute described in claim 1 The maximum outside diameter for stating conical sleeve is equal to first cross-arm seat (1) upper surface and corresponds to the external diameters of the tower body (14), described first armful Hoop (5) bottom is the first snap ring (51), and the first snap ring (51) external diameter is equal to the first cross-arm seat (1) internal diameter, described One snap ring (51) periphery has the first locking hole (52).
CN201710645996.5A 2017-08-01 2017-08-01 A kind of universal cross-arm of steel tube tower Withdrawn CN107355122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710645996.5A CN107355122A (en) 2017-08-01 2017-08-01 A kind of universal cross-arm of steel tube tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710645996.5A CN107355122A (en) 2017-08-01 2017-08-01 A kind of universal cross-arm of steel tube tower

Publications (1)

Publication Number Publication Date
CN107355122A true CN107355122A (en) 2017-11-17

Family

ID=60286854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710645996.5A Withdrawn CN107355122A (en) 2017-08-01 2017-08-01 A kind of universal cross-arm of steel tube tower

Country Status (1)

Country Link
CN (1) CN107355122A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886521A (en) * 2021-01-28 2021-06-01 徐州常武智能科技有限公司 Power line cross arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886521A (en) * 2021-01-28 2021-06-01 徐州常武智能科技有限公司 Power line cross arm

Similar Documents

Publication Publication Date Title
CN103871693B (en) UHV transmission line 550kN tri-V-type suspension insulator
CN107355122A (en) A kind of universal cross-arm of steel tube tower
US20190161991A1 (en) Connecting element for connecting tower portions, tower portion, tower, wind turbine, and method for producing a tower portion and for connecting tower portions
CN103924814B (en) Be applied to the two open loop steel pipe poles in power transmission and transformation line
CN103967317B (en) A kind of transmission line of electricity emergent repairing tower tower body
CN207160727U (en) A kind of universal cross-arm of steel tube tower
CN106948477B (en) A kind of oblique grid system node
CN107476640A (en) A kind of method using the universal cross-arm bearing multi-angle outlet of steel tube tower
CN107240478B (en) Bushing supporting device and arrangement method for extra-high voltage direct current engineering converter transformer
CN105804447A (en) Spoke type steel structure cooling tower
CN110494649A (en) Flange section and method for wind energy plant head tower ring segment
CN102312606A (en) Multi-prism cross arm
CN207160726U (en) A kind of universal cross-arm of steel tube tower
CN102001579B (en) Lifting appliance for lifting steel lining of containment vessel in nuclear power station
CN103195660B (en) A kind of pylon of truss structure
CN204230831U (en) A kind of wear-resistant ground wire string based on trench structure
CN102094543B (en) Pneumatic lifting communication tower
CN208024047U (en) A kind of steel pipe tower structure of scalable installation
CN202579061U (en) Tower drum assembling structure
CN206600042U (en) A kind of inner suspended holding pole
CN203159027U (en) A prefabricated iron tower foundation spreader
CN205206050U (en) Company's of passing through node of pipe and I shaped steel roof beam
CN103762045B (en) Suspension insulator string for extra-high-voltage alternating current circuit
CN106049886A (en) Rigid pull rod heavy load lifting and lowering device
CN205908028U (en) Heavy load of rigidity pull rod promotes and transfers device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171117

WW01 Invention patent application withdrawn after publication