CN103924814B - Be applied to the two open loop steel pipe poles in power transmission and transformation line - Google Patents

Be applied to the two open loop steel pipe poles in power transmission and transformation line Download PDF

Info

Publication number
CN103924814B
CN103924814B CN201410185584.4A CN201410185584A CN103924814B CN 103924814 B CN103924814 B CN 103924814B CN 201410185584 A CN201410185584 A CN 201410185584A CN 103924814 B CN103924814 B CN 103924814B
Authority
CN
China
Prior art keywords
cross
arm
supervisor
plate
open loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410185584.4A
Other languages
Chinese (zh)
Other versions
CN103924814A (en
Inventor
戴岳
万明玉
朱燕
沈嵘
乔杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU ELECTRIC POWER DESIGN RESEARCH INSTITUTE Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Original Assignee
SUZHOU ELECTRIC POWER DESIGN RESEARCH INSTITUTE Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU ELECTRIC POWER DESIGN RESEARCH INSTITUTE Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co filed Critical SUZHOU ELECTRIC POWER DESIGN RESEARCH INSTITUTE Co Ltd
Priority to CN201410185584.4A priority Critical patent/CN103924814B/en
Publication of CN103924814A publication Critical patent/CN103924814A/en
Application granted granted Critical
Publication of CN103924814B publication Critical patent/CN103924814B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The present invention relates to a kind of two open loop steel pipe poles be applied in power transmission and transformation line, it comprises supervisor, the in the horizontal direction setting of vertically setting and one end is connected to several cross-arms on supervisor; Cross-arm is arranged on the differing heights position of supervisor, each height and position comprises three cross-arms; In three cross-arms on each height and position, two cross-arm axis collinear are also distributed in the both sides of supervisor, and the axes normal of another cross-arm makes in other two cross-arms that three cross-arms are in T shape to be arranged in the circumference of supervisor.This pair open loop steel tube rod structure is succinct, profile is graceful, floor space is little, power transmission is clear and definite, can be applicable to double-circuit line preferably and cut-off the situation that ring enters; 2, this pair of open loop steel pipe pole avoids employing two base 90 degree of corner poles, replaces the large corner pole of two bases with a base shaft tower, reduces the engineering quantity on shaft tower and basis.

Description

Be applied to the two open loop steel pipe poles in power transmission and transformation line
Technical field
The present invention relates to a kind of power transmission tower be applied in power transmission and transformation line engineering, especially the power transmission tower of a kind of pair of open loop steel pipe pole form.
Background technology
Power transmission tower is the tall and slender structure that in a kind of power transmission and transformation line engineering, requirement is huge and very important, and it often can use the power transmission tower of all kinds and different purposes as the electric power facility of important lifeline engineering in work transmission line.
Along with improving constantly of transmission line of electricity transmission line capability and electric pressure, simultaneously because China's land resources is in short supply and the raising of environmental requirement, common-tower double-return and multi circuit transmission lines have become inevitable trend in developed area, therefore have occurred a lot of large load shaft tower, as combination angle steel tower etc.But the requirement of part developed area to line corridor is more and more harsher, such that circuit place is more and more less, line corridor is more and more narrower and small.In the recent period, in ultra-high-tension power transmission line design, along with the needs of power network development, cut-off to some existing double-circuit lines the situation that ring enters also progressively to increase, so, develop a kind of meet transmission line of electricity transmission line capability, electric pressure and line corridor requirement two open loop steel pipe pole patterns of brief and practical very necessary.
Summary of the invention
The object of this invention is to provide a kind of can meet transmission line capability and electric pressure be applied in electric line to require and the less two open loop steel pipe poles of required line corridor.
For achieving the above object, the technical solution used in the present invention is:
Be applied to the two open loop steel pipe poles in power transmission and transformation line, it comprises supervisor, the in the horizontal direction setting of vertically setting and one end is connected to several cross-arms on described supervisor; Described cross-arm is arranged on the differing heights position of described supervisor, each described height and position comprises the cross-arm described in three; In the cross-arm described in three on each described height and position, cross-arm axis collinear described in two is also distributed in the both sides of described supervisor, and the axes normal of the cross-arm described in another makes in the circumference being arranged in described supervisor in T shape of the cross-arm described in three in the cross-arm described in other two.
Preferably, described supervisor, described cross-arm are conical pipe; The sectional area of the bottom of described supervisor is greater than the sectional area on its top; The sectional area of one end be connected with described supervisor of described cross-arm is greater than the sectional area of its other end.
Preferably, the cross section of described supervisor, described cross-arm is regular polygon.
Preferably, the segmentation that described supervisor is divided into some ends to dock successively, the syndeton between two segmentations connected comprise the end being arranged at the segmentation described in two connected a pair flange, several connect described in the fastening bolt assembly of flange.
Preferably, the syndeton between described supervisor with each described cross-arm comprises the plate assembly be arranged on described cross-arm, be arranged at the upper gusset plate assembly of described supervisor, be connected described in plate assembly and the erection bolt assembly of described gusset plate assembly.
Preferably, described gusset plate assembly comprises the gusset plate that two of being fixedly connected on described supervisor parallel setting, and described plate assembly comprises the plate that two of being fixedly connected on described cross-arm parallel setting; Plate described in two inserts in the space between the gusset plate described in two, and described plate and described gusset plate are reclined mutually correspondingly and be fixedly connected by described erection bolt assembly.
Preferably, each described gusset plate is fixedly connected with horizontal-extending and around several ring stiffeners of described supervisor distribution.
Preferably, the cross-wise direction that described plate assembly also comprises along described cross-arm extends and is fixedly installed on the junction plate of the inner end that described cross-arm is connected with described supervisor, and described plate is fixedly installed on described junction plate.
Preferably, the radial direction described junction plate is provided with along the cross section of described cross-arm extends and several plate stiffeners distributed around described cross-arm.
Preferably, in the cross-arm described in three on each described height and position, the both sides at the middle part of the cross-arm described in two of axis collinear and the both sides of outer end be not connected with described supervisor thereof are provided with wire link plate, and the both sides of the outer end be not connected with described supervisor of the cross-arm described in perpendicular another of the cross-arm described in two of axis collinear are provided with wire link plate.
Because technique scheme is used, the present invention compared with prior art has following advantages:
1, this pair open loop steel tube rod structure is succinct, profile is graceful, floor space is little, power transmission is clear and definite, double-circuit line can be applicable to preferably and cut-off the situation that ring enters;
2, this pair of open loop steel pipe pole avoids employing two base 90 degree of corner poles, replaces the large corner pole of two bases with a base shaft tower, reduces the engineering quantity on shaft tower and basis.
Accompanying drawing explanation
Accompanying drawing 1 is the single line drawing of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 2 is the front view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 3 is the right view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 4 is the A-A view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 5 is the B portion zoomed-in view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 6 is the C portion zoomed-in view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
Accompanying drawing 7 is the D portion zoomed-in view of the two open loop steel pipe poles be applied in power transmission and transformation line of the present invention.
In above accompanying drawing: 1, be responsible for; 11, segmentation; 2, cross-arm; 21, horizontal ground wire cross-arm; 22, horizontal wire cross-arm; 23, longitudinal ground wire cross-arm; 24, longitudinal wire cross-arm; 3, flange; 41, plate; 42, junction plate; 43, plate stiffener; 51, gusset plate; 52, ring stiffener; 6, erection bolt assembly; 7, wire link plate.
Detailed description of the invention
Below in conjunction with embodiment shown in the drawings, the invention will be further described.
Embodiment one: shown in accompanying drawing 1.Be applied to the two open loop steel pipe poles in power transmission and transformation line, it comprises the supervisor 1 that vertically arranges and to arrange in the horizontal direction and one end is connected to several cross-arms 2 on supervisor 1.
Supervisor 1 for cross section be the conical pipe of regular polygon, the sectional area of its underpart is greater than the sectional area on its top, namely supervisor 1 sectional area reduce gradually from the bottom to top.The segmentation 11 that supervisor 1 is divided into some ends to dock successively, the syndeton between two segmentations 11 connected comprises a pair flange 3 of the end being arranged at two segmentations 11 connected, the fastening bolt assembly (not shown) of several axis vertical ground adpting flanges 3.The bottom of the segmentation 11 of foot can mounting seat, supervisor 1 can be fixedly installed on its installed surface.
Cross-arm 2 is arranged on the differing heights position of supervisor 1, in the present embodiment, supervisor 1 is provided with altogether four height and positions installed for cross-arm 2.Each height and position comprises three cross-arms 2, in these three cross-arms 2, two cross-arm 2 axis collinear are also distributed in the both sides of supervisor 1, and can be called horizontal cross-arm, the axes normal of another cross-arm 2, in other two cross-arms 2, can be called longitudinal cross-arm.In three cross-arm 2 circumferences being arranged in supervisor 1 in T shape, wherein, two cross-arms 2 of axis collinear form the horizontal of T, and another cross-arm 2 forms one of T and erects, and the arrangement orientation of three cross-arms 2 on each height and position is identical.The cross-arm 2 being positioned at the height and position place of the top is the ground wire cross-arm of erection ground wire, and the cross-arm 2 at all the other height and position places is the wire cross-arm of erection wire.Therefore, in each horizontal cross-arm, the horizontal cross-arm being positioned at the top is referred to as horizontal ground wire cross-arm 21, and all the other horizontal cross-arms are referred to as horizontal wire cross-arm 22; In each longitudinal cross-arm, the longitudinal cross-arm being positioned at the top is referred to as longitudinal ground wire cross-arm 23, and all the other longitudinal cross-arms are referred to as longitudinal wire cross-arm 24.
Cross-arm 2 is also the conical pipe that cross section is regular polygon, and the sectional area of one end be connected with supervisor 1 of cross-arm 2 is greater than the sectional area of its other end.One end that definition cross-arm 2 is connected with supervisor 1 is its inner end, and the end be not connected with supervisor 1 is its outer end, then the sectional area of cross-arm 2 is reduced gradually by the outside end of its inner end.In three cross-arms 2 on each height and position, two cross-arms 2 of axis collinear, i.e. horizontal cross-arm, the both sides in the middle part of it and the both sides of outer end thereof are provided with the wire link plate 7 opening hole; With another cross-arm 2 that two cross-arms 2 of axis collinear are perpendicular, i.e. longitudinal cross-arm, it is only provided with the wire link plate 7 opening hole in the both sides of outer end.
Syndeton between supervisor 1 and each cross-arm 2 comprises the plate assembly be arranged on cross-arm 2, is arranged at the erection bolt assembly 6 of upper gusset plate assembly, even patch panel assemblies and the gusset plate assembly of supervisor 1.
Gusset plate assembly is made up of the gusset plate 51 be fixedly connected with supervisor 1, gusset plate 51 is fixedly connected with horizontal-extending and several ring stiffeners 52 distributed around supervisor 1.In the present embodiment, each gusset plate assembly comprises two gusset plates vertically be arranged in parallel mutually 51 be fixedly connected on supervisor 1, and the spatial placement between two adjacent gusset plate assemblies has ring stiffener 52.
Plate assembly at least comprises the plate 41 paralleling setting with gusset plate 51.In the present embodiment, each plate assembly cross-wise direction comprised along cross-arm 2 is extended and the junction plate 42 being fixedly installed on the inner end of cross-arm 2, two plates vertically be arranged in parallel mutually 41 being fixedly connected on cross-arm 2 by junction plate 42.Two plates 41 insert in the space between two gusset plates 51, and plate 41 reclines correspondingly mutually with gusset plate 51.Radial direction junction plate 42 is provided with along the cross section of cross-arm 2 extends and several plate stiffeners 43 distributed around cross-arm 2.
The gusset plate 51 reclined mutually correspondingly and plate 41 are fixedly connected by several erection bolt assemblies 6, each erection bolt assembly 6 comprises screw rod and two nuts matched with screw rod of the screw run through on gusset plate 51 and plate 41, two nuts lay respectively at the both sides of the assembly that a plate 41 and gusset plate 51 are formed, thus by the relative position locking of plate 41 and gusset plate 51.
The steel material of this pair of open loop steel pipe pole both can select the common iron of Q235, Q345, also the high strength steel of Q390, Q420 or Q460 can be adopted, the blanking of each rod member, punching, zinc-plated operation is carried out according to construction drawing, part-connection location (link position as the link position of gusset plate 51 and supervisor 1, plate 41 and junction plate 42) adopts and is welded to connect, and each component completion of processing is transported to that scene carries out installing, stringing.Bolt assembly can adopt 6.8 grades of plain bolts or 8.8 grades of high-strength bolts, and high-strength bolt tightens by certain pretightning force.
This Novel double open ring steel pipe pole simple structure, replaces the large corner pole of two bases with a base open loop shaft tower, decreases the quantity of material on steel tower and basis, effectively reduces shaft tower floor space simultaneously, reduce line corridor width.And the monnolithic case of this Novel double open ring steel pipe pole is attractive in appearance, can be used in the middle of 110kV, 220kV double back power transmission and transformation line engineering.
Above-described embodiment, only for technical conceive of the present invention and feature are described, its object is to person skilled in the art can be understood content of the present invention and implement according to this, can not limit the scope of the invention with this.All equivalences done according to Spirit Essence of the present invention change or modify, and all should be encompassed within protection scope of the present invention.

Claims (8)

1. be applied to the two open loop steel pipe poles in power transmission and transformation line, it is characterized in that: it comprises supervisor, the in the horizontal direction setting of vertically setting and one end is connected to several cross-arms on described supervisor; Described cross-arm is arranged on the differing heights position of described supervisor, each described height and position comprises the cross-arm described in three; In the cross-arm described in three on each described height and position, cross-arm axis collinear described in two is also distributed in the both sides of described supervisor, and the axes normal of the cross-arm described in another makes in the circumference being arranged in described supervisor in T shape of the cross-arm described in three in the cross-arm described in other two;
Syndeton between described supervisor with each described cross-arm comprises the plate assembly be arranged on described cross-arm, be arranged at the upper gusset plate assembly of described supervisor, be connected described in plate assembly and the erection bolt assembly of described gusset plate assembly;
Described gusset plate assembly comprises the gusset plate that two of being fixedly connected on described supervisor parallel setting, and described plate assembly comprises the plate that two of being fixedly connected on described cross-arm parallel setting; Plate described in two inserts in the space between the gusset plate described in two, and described plate and described gusset plate are reclined mutually correspondingly and be fixedly connected by described erection bolt assembly.
2. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 1, is characterized in that: described supervisor, described cross-arm are conical pipe; The sectional area of the bottom of described supervisor is greater than the sectional area on its top; The sectional area of one end be connected with described supervisor of described cross-arm is greater than the sectional area of its other end.
3. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 1 and 2, is characterized in that: the cross section of described supervisor, described cross-arm is regular polygon.
4. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 1, it is characterized in that: the segmentation that described supervisor is divided into some ends to dock successively, the syndeton between two segmentations connected comprise the end being arranged at the segmentation described in two connected a pair flange, several connect described in the fastening bolt assembly of flange.
5. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 1, is characterized in that: each described gusset plate is fixedly connected with horizontal-extending and around several ring stiffeners of described supervisor distribution.
6. be applied to the two open loop steel pipe poles in power transmission and transformation line according to claim 1 or 5, it is characterized in that: the cross-wise direction that described plate assembly also comprises along described cross-arm extends and is fixedly installed on the junction plate of the inner end that described cross-arm is connected with described supervisor, and described plate is fixedly installed on described junction plate.
7. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 6, is characterized in that: the radial direction described junction plate is provided with along the cross section of described cross-arm extends and several plate stiffeners distributed around described cross-arm.
8. the two open loop steel pipe poles be applied in power transmission and transformation line according to claim 1, it is characterized in that: in the cross-arm described in three on each described height and position, the both sides at the middle part of the cross-arm described in two of axis collinear and the both sides of outer end be not connected with described supervisor thereof are provided with wire link plate, and the both sides of the outer end be not connected with described supervisor of the cross-arm described in perpendicular another of the cross-arm described in two of axis collinear are provided with wire link plate.
CN201410185584.4A 2014-05-05 2014-05-05 Be applied to the two open loop steel pipe poles in power transmission and transformation line Active CN103924814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410185584.4A CN103924814B (en) 2014-05-05 2014-05-05 Be applied to the two open loop steel pipe poles in power transmission and transformation line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410185584.4A CN103924814B (en) 2014-05-05 2014-05-05 Be applied to the two open loop steel pipe poles in power transmission and transformation line

Publications (2)

Publication Number Publication Date
CN103924814A CN103924814A (en) 2014-07-16
CN103924814B true CN103924814B (en) 2016-03-09

Family

ID=51143190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410185584.4A Active CN103924814B (en) 2014-05-05 2014-05-05 Be applied to the two open loop steel pipe poles in power transmission and transformation line

Country Status (1)

Country Link
CN (1) CN103924814B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155911B (en) * 2015-09-07 2018-03-13 安徽华电工程咨询设计有限公司 A kind of double loop bilateral using triangle cross-arm arrangement cut-offs steel pipe tower
CN105257067A (en) * 2015-09-07 2016-01-20 安徽华电工程咨询设计有限公司 Double-circuit double-sided breaking steel-tube tower using V-shaped combined strings
CN106567595A (en) * 2016-09-26 2017-04-19 安徽华电工程咨询设计有限公司 Four-loop cable breaking strain tower
CN106677589B (en) * 2017-03-15 2018-11-20 青岛正为能源科技有限公司 A kind of power steel pipe rod
CN108343305A (en) * 2018-03-26 2018-07-31 青岛林辉钢构有限公司 A kind of steel pipe pole cross-arm

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5855103A (en) * 1995-09-01 1999-01-05 Fwt, Inc. Antenna support for power transmission tower
CN202520040U (en) * 2012-04-10 2012-11-07 佛山南海电力设计院工程有限公司 Bifurcated pole tower for realizing double-T connection of double circuit power transmission line
CN103046791A (en) * 2012-11-29 2013-04-17 安徽华电工程咨询设计有限公司 Transmission line tangent tower using double-loop cable T guide
CN202990533U (en) * 2012-12-31 2013-06-12 温州泰昌铁塔制造有限公司 Same-tower multi-loop power transmission tower
CN203795935U (en) * 2014-05-05 2014-08-27 国家电网公司 Double-open-loop steel pipe rod applied to electric transmission and distribution circuit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101018845B1 (en) * 2008-09-17 2011-03-04 한국전력공사 Iron tower for power transmission

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5855103A (en) * 1995-09-01 1999-01-05 Fwt, Inc. Antenna support for power transmission tower
CN202520040U (en) * 2012-04-10 2012-11-07 佛山南海电力设计院工程有限公司 Bifurcated pole tower for realizing double-T connection of double circuit power transmission line
CN103046791A (en) * 2012-11-29 2013-04-17 安徽华电工程咨询设计有限公司 Transmission line tangent tower using double-loop cable T guide
CN202990533U (en) * 2012-12-31 2013-06-12 温州泰昌铁塔制造有限公司 Same-tower multi-loop power transmission tower
CN203795935U (en) * 2014-05-05 2014-08-27 国家电网公司 Double-open-loop steel pipe rod applied to electric transmission and distribution circuit

Also Published As

Publication number Publication date
CN103924814A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103924814B (en) Be applied to the two open loop steel pipe poles in power transmission and transformation line
CN203150936U (en) Power distribution cabinet pedestal
CN102535646A (en) Multidirectional error-adjustable node suitable for suspend-dome space structure
CN104563578A (en) Combined framework pillar for 500kV transformer substation and mounting method of combined framework pillar
CN206769520U (en) A kind of firm formula power network supporting construction
CN206319631U (en) A kind of shear wall vertical adjustment mechanism
CN103122723A (en) Novel wine glass composite material tower
CN104314355B (en) A kind of T connection steel pipe pole of cross-arm abnormity
CN204386242U (en) For the combined type truss column of 500kV transformer station
CN203795935U (en) Double-open-loop steel pipe rod applied to electric transmission and distribution circuit
CN205046911U (en) Triangle -shaped section steel pylons
CN204663111U (en) For setting up single open loop steel pipe pole of power transmission and transformation line
CN204597399U (en) Outdoor version horizontal corner steel chute
CN209472359U (en) A kind of power distribution route pipe laying structure
CN205296966U (en) Transmission line iron tower
CN105064760A (en) Four tube-single tube switching joint for narrow-foundation steel tube poles
CN104533115B (en) For the outlet of 500kV transformer station, inlet wire, the integrated form framework of transition
CN204402097U (en) For the integrated form framework of the outlet of 500kV transformer station, inlet wire, transition
CN203081021U (en) Novel wine glass composite material tower
CN203742030U (en) Stone curtain wall keel structure
CN103291112B (en) Three post steel tube towers
CN104563554A (en) Combined lattice beam for integrated framework of 500kV transformer substation
CN105089282A (en) Tool special for wire drawing installation of electric transmission line guyed tower and wire drawing method
CN206035064U (en) Steel pylons suitable for adopt influence district
CN204386223U (en) For the combined type lattice girder of 500kV transformer station integrated form framework

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant