CN202579061U - Tower drum assembling structure - Google Patents

Tower drum assembling structure Download PDF

Info

Publication number
CN202579061U
CN202579061U CN201220196699XU CN201220196699U CN202579061U CN 202579061 U CN202579061 U CN 202579061U CN 201220196699X U CN201220196699X U CN 201220196699XU CN 201220196699 U CN201220196699 U CN 201220196699U CN 202579061 U CN202579061 U CN 202579061U
Authority
CN
China
Prior art keywords
tower drum
tower barrel
tower
nut
fixed base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220196699XU
Other languages
Chinese (zh)
Inventor
刘衍选
赵国斌
顾帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang China Creative Wind Energy Co Ltd
China Creative Wind Energy Co Ltd
Original Assignee
Shenyang China Creative Wind Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang China Creative Wind Energy Co Ltd filed Critical Shenyang China Creative Wind Energy Co Ltd
Priority to CN201220196699XU priority Critical patent/CN202579061U/en
Application granted granted Critical
Publication of CN202579061U publication Critical patent/CN202579061U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Abstract

The utility model relates to a tower drum structure and belongs to the technical field of wind power generation. The tower drum structure is formed by matching connection of at least two tower drum sections. The matching connection structure comprises an inner clamping plate, an outer clamping plate, bolts, nuts and a plurality of fixing seats. The bolts penetrate through a gasket, the inner clamping plate, tower drum walls and the outer clamping plate to be connected to the nuts arranged on the fixing seats. Each tower drum section is formed by combination connection of two or more than two arc-shaped piece type tower drum walls, and the adjacent piece type tower drum walls are in matched connection with each other. The two or more than two tower drum structure walls are assembled on site to form the tower drum section, a plurality of tower drum sections are in matched connection with each other to form the required tower drum, not only is transportation space saved, but also the transportation cost is reduced, in-plant production lifting is convenient, storage area on a factory is reduced, equipment limitation is reduced, and the large-diameter tower drum is easy to manufacture. The nuts connected with the bolts are fixed on the nut fixing seats, and influence on strength of a tower drum caused by rotation of the nuts is avoided.

Description

A kind of tower tube package assembly
Technical field
The invention belongs to technical field of wind power generation, particularly relate to a kind of tower tube package assembly.
Background technique
Along with the development of wind generating technology, the single-machine capacity of wind power generating set is increasing, to the diameter of its supporting tower tube, highly have higher requirement.Major diameter, heavy weight tower tube need main equipment when making, and its cost, machining cost are improved; Since all limit decision of transportation aspect tower tube merogenesis connect, the farad that will be welded on tower tube two ends through bolt between present stage wind power generating set tower tube two joints links together.In wind power generating set tower tube production link, flange fabrication technology requires high, and the manufacture cycle is long, and cost is high.And during owing to flange and tower body welding, there is the welding residual thermal stress, thereby can causes the concentrated tower tube of stress to lose efficacy, even rupture at connection part.Storage space to manufacturer is also had higher requirement.These difficulties impact the development of wind-powered electricity generation industry, become a bottleneck in the wind-powered electricity generation industry development.
Summary of the invention
To the technical problem of above-mentioned existence, the present invention provides the tower tube package assembly of a kind of convenient transportation and assembling.
The objective of the invention is to realize through following technological scheme:
A kind of structure of tower tube of the present invention is: being connected by at least two tower shell rings constitutes; Its structure that is connected is: comprise inner splint, external splint, bolt, nut and a plurality of fixed base, bolt passes packing ring, inner splint, tower barrel, external splint and is connected on the nut that places fixed base.
Said tower shell ring adopts the formation that is connected of the arc chip tower barrel more than two or two, is connected between adjacent chip tower barrel.Said nut is fixed on the fixed base.Said inside and outside clamping plate and nut fixed base are the corresponding arc plate of arc with adjacent chip tower barrel joint.Said chip tower barrel joint all has the equidistance bolt hole that cooperates with bolt.
The another kind of structure of tower tube of the present invention: adopt arc chip tower barrel more than two or two formation that is connected, be connected between adjacent chip tower barrel.
Linkage structure between said adjacent chip tower barrel is: comprise inside and outside clamping plate, bolt, nut and a plurality of fixed base, bolt passes packing ring, inner splint, chip tower barrel, external splint and is connected on the nut that places fixed base.Said nut is fixed on the fixed base.Said inside and outside clamping plate and nut fixed base are the corresponding arc plate of arc with adjacent chip tower barrel joint.Said chip tower barrel joint all has the equidistance bolt hole that cooperates with bolt.
Beneficial effect of the present invention is:
1. the present invention forms the tower shell ring by the tower barrel assembled on site more than two or two; Again a plurality of tower shell rings are connected and form required tower tube, not only practice thrift transport space, and practice thrift cost of transportation; Make and produce lifting in the factory conveniently; Reduce an interior storage space, reduce device-restrictive, be easy to make major diameter tower tube.
2. the nut of connecting bolt of the present invention is fixed on the nut fixed base, prevents that nut from rotating, and it is connected closely with the tower barrel, strengthens tower tube intensity.
Description of drawings
Fig. 1 is a sectional perspective structural representation of the present invention.
Fig. 2 is the side structure schematic representation of Fig. 1.
Fig. 3 is the floor map of Fig. 2.
Among the figure: 1. bolt, 2. packing ring, 3. inner splint, 4. tower barrel, 5. external splint, 6. fixed base, 7. nut.
Embodiment
Through embodiment and accompanying drawing the present invention is made further detailed description below.
Embodiment 1: referring to Fig. 1, Fig. 2, the present invention is connected by at least two tower shell rings by demand and constitutes, and said tower shell ring adopts the formation that is connected of the arc chip tower barrel 4 more than two or two, and 4 of adjacent chip tower barrels are connected.
Between said adjacent towers shell ring and the structure that is connected of 4 of adjacent chip tower barrels be: comprise inner splint 3, external splint 5, bolt 1, nut 7 and a plurality of fixed base 6, bolt 1 passes packing ring 2, inner splint 3, tower barrel 4, external splint 5 and is connected on the nut 7 that places fixed base 6.Said chip tower barrel 4 joints all have the equidistance bolt hole.
Concrete assembling: assembling tower shell ring earlier, after two adjacent chip tower barrels, 4 alignment, pass packing ring 2, inner splint 3, chip tower barrel 4, external splint 5 through high-strength bolt 1 and be connected on the nut 7 of nut fixed base 6.Two tower shell rings after the assembling winch to the top perpendicular to another tower shell ring with crane with a tower shell ring, and the alignment back is fixing with bolt 1 in the joint in tower barrel inside.
Nut 7 according to the invention is fixed on the fixed base 6, prevents that nut 7 from rotating.Inside and outside clamping plate 3,5 according to the invention and fixed base 6 are the corresponding arc plate of arc with adjacent chip tower barrel 4 joints, connect closely.
The chip tower barrel 4 that adopts is two when above, according to above-mentioned connecting means assembling.But the present invention is the burst transportation when transportation, assembled on site.
Embodiment 2: referring to Fig. 1: the present invention adopts arc chip tower barrel 4 more than two or two formation that is connected by demand; Chip tower barrel 4 both sides all have the equidistance bolt hole; After adjacent two chip tower barrels, 4 alignment; Pass packing ring 2, inner splint 3, chip tower barrel 4, external splint 5 through high-strength bolt 1 and be connected on the nut 7 of nut fixed base 6, prevent that nut 7 from rotating.Inside and outside clamping plate 3,5 according to the invention and nut fixed base 6 are the corresponding arc plate of arc with adjacent chip tower barrel joint, connect closely.The chip tower barrel 4 that adopts is two when above, according to above-mentioned connecting means assembling.

Claims (10)

1. tower barrel structure; It is characterized in that: being connected by at least two tower shell rings constitutes; Its structure that is connected is: comprise inner splint, external splint, bolt, nut and a plurality of fixed base, bolt passes packing ring, inner splint, tower barrel, external splint and is connected on the nut that places fixed base.
2. tower barrel structure according to claim 1 is characterized in that: said tower shell ring adopts the formation that is connected of the arc chip tower barrel more than two or two, is connected between adjacent chip tower barrel.
3. tower barrel structure according to claim 1 is characterized in that: said nut is fixed on the fixed base.
4. tower barrel structure according to claim 1 is characterized in that: said inside and outside clamping plate and nut fixed base are the corresponding arc plate of arc with adjacent chip tower barrel joint.
5. tower barrel structure according to claim 1 is characterized in that: said chip tower barrel joint all has the equidistance bolt hole that cooperates with bolt.
6. tower barrel structure is characterized in that: adopt arc chip tower barrel more than two or two formation that is connected, be connected between adjacent chip tower barrel.
7. according to claim 2 or 6 described tower barrel structures; It is characterized in that: the linkage structure between said adjacent chip tower barrel is: comprise inside and outside clamping plate, bolt, nut and a plurality of fixed base, bolt passes packing ring, inner splint, chip tower barrel, external splint and is connected on the nut that places fixed base.
8. tower barrel structure according to claim 6 is characterized in that: said nut is fixed on the fixed base.
9. tower barrel structure according to claim 6 is characterized in that: said inside and outside clamping plate and nut fixed base are the corresponding arc plate of arc with adjacent chip tower barrel joint.
10. tower barrel structure according to claim 6 is characterized in that: said chip tower barrel joint all has the equidistance bolt hole that cooperates with bolt.
CN201220196699XU 2012-05-03 2012-05-03 Tower drum assembling structure Expired - Fee Related CN202579061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220196699XU CN202579061U (en) 2012-05-03 2012-05-03 Tower drum assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220196699XU CN202579061U (en) 2012-05-03 2012-05-03 Tower drum assembling structure

Publications (1)

Publication Number Publication Date
CN202579061U true CN202579061U (en) 2012-12-05

Family

ID=47248479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220196699XU Expired - Fee Related CN202579061U (en) 2012-05-03 2012-05-03 Tower drum assembling structure

Country Status (1)

Country Link
CN (1) CN202579061U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720644A (en) * 2012-05-03 2012-10-10 沈阳华创风能有限公司 Tower tube structure
CN106988966A (en) * 2017-05-23 2017-07-28 北京三力新能科技有限公司 A kind of large diameter combined pylon
WO2023070934A1 (en) * 2021-10-25 2023-05-04 北京天杉高科风电科技有限责任公司 Assembling tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720644A (en) * 2012-05-03 2012-10-10 沈阳华创风能有限公司 Tower tube structure
CN106988966A (en) * 2017-05-23 2017-07-28 北京三力新能科技有限公司 A kind of large diameter combined pylon
WO2023070934A1 (en) * 2021-10-25 2023-05-04 北京天杉高科风电科技有限责任公司 Assembling tool

Similar Documents

Publication Publication Date Title
CA2713368C (en) Tower element
CN106836489B (en) A kind of assembled round steel pipe casing fiber concrete column connected node and installation method
EP3667079B1 (en) Hybrid wind power tower based on edge-stiffened combined shells
CN204456570U (en) A kind of Dome roof tank net shell of steel mixed type
WO2012025985A1 (en) Wind turbine device and method for constructing tower for blade wheel
CN202579061U (en) Tower drum assembling structure
CN102720644A (en) Tower tube structure
CN107366440A (en) A kind of reinforcing device and method of bolt-ball net frame pull bar and node
CN107975459A (en) The attachment device and its concrete tower of wind-driven generator tower frame and cabin
CN207144540U (en) A kind of bracing means of bolt-ball net frame pull bar and node
CN103967318A (en) Universal package ball type node of lattice type steel tube concrete wind power tower
CN103982077A (en) Universal wrapping board type joint of lattice type concrete filled steel tube wind power tower
CN201391104Y (en) Connecting flange for sectional electric pole
CN209854759U (en) Unilateral bolted connection structure of cavity intermediate layer steel pipe concrete structure shaft tower and basis
CN201443476U (en) Tower cylinder for wind power generation
CN203594106U (en) Upper-and-lower layer strut connecting component of integrated houses
CN105888986B (en) A kind of blower fan tower barrel component, tower and tower installation method
CN102071745B (en) Stylobate joint of framework column
CN208024047U (en) A kind of steel pipe tower structure of scalable installation
US20150068150A1 (en) Flange assembly for a tower segment
CN203161451U (en) Modular wind driven generator tower barrel
CN211116421U (en) Precast concrete fan tower barrel with spiral line connecting seam
CN204125957U (en) Flange transition interconnection system single-pile foundation structure
CN107620501B (en) Be applied to assembled node of double-deck steel construction cooling tower
CN202090659U (en) Flange and flange component used for AD (alternating current) EHV (extra-high voltage) steel tubular tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20190503