CN107354876A - Underwater pier stud reinforcing bar derusting and concrete surface prosthetic device - Google Patents

Underwater pier stud reinforcing bar derusting and concrete surface prosthetic device Download PDF

Info

Publication number
CN107354876A
CN107354876A CN201710611665.XA CN201710611665A CN107354876A CN 107354876 A CN107354876 A CN 107354876A CN 201710611665 A CN201710611665 A CN 201710611665A CN 107354876 A CN107354876 A CN 107354876A
Authority
CN
China
Prior art keywords
convex edge
reinforcing bar
prosthetic device
concrete surface
pier stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710611665.XA
Other languages
Chinese (zh)
Other versions
CN107354876B (en
Inventor
刘朵
张建东
张骁
季超
冯晓楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
JSTI Group Co Ltd
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201710611665.XA priority Critical patent/CN107354876B/en
Publication of CN107354876A publication Critical patent/CN107354876A/en
Priority to PCT/CN2018/095089 priority patent/WO2019019910A1/en
Application granted granted Critical
Publication of CN107354876B publication Critical patent/CN107354876B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, including hanger bracket, displaceable sleeve and control cabinet;Hanger bracket is fixedly installed on pier coping portion, and displaceable sleeve is circumferentially spliced by identical at least two modules of shape, and joint is provided with pressing device and rubber strip;Module includes body, and body upper part and bottom are provided with convex edge, and the joint place of convex edge and bridge pier is again provided with rubber strip, and connecting portion is provided with left and right sides of body;Relative to passage and osculum is provided with the inside of displaceable sleeve, body, which is located on the medial surface among upper and lower two convex edge, is evenly distributed with some whitewashing mouths and some spray nozzles for convex edge;Passage, osculum, whitewashing mouth and spray nozzle are connected by pipeline with control cabinet;Body interior is additionally provided with drying unit.Prosthetic device automaticity in the present invention is high, versatile and reusable, effectively reduces construction cost.

Description

Underwater pier stud reinforcing bar derusting and concrete surface prosthetic device
Technical field
The present invention relates to a kind of bridge pier recovery technique field, more particularly to a kind of underwater pier stud reinforcing bar derusting and concrete table Face prosthetic device.
Background technology
Bridge pier is safeguarded in water when repairing, it is necessary to dry and comfortable operating environment, and the common method that dry and comfortable operating environment is formed It is to use cofferdam.But in complex condition, especially smaller under-clearance, larger flow velocity cobble river course under, to bridge pier When safeguarding transformation, limited by flow rate of water flow, earth cofferdam and earth-bag cofferdam can not meet the requirement of construction;Because of steel sheet-pile cofferdam and steel The sinking of reinforced concrete sheet-pile cofferdam needs certain head room, therefore is limited by space, can not equally meet to require;Sink Formula steel cofferdam can overcome above mentioned problem, but need the cooperation of lifting device, waste time and energy.
The defects of safeguarding in view of above-mentioned existing bridge pier present in restorative procedure, the present inventor are based on being engaged in such product Manufacture and design abundant for many years practical experience and professional knowledge, and coordinate the utilization of scientific principle, be actively subject to research and innovation, to create If underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, make it have more practicality.
The content of the invention
By the technical scheme in the present invention, the defects of existing underwater foundation repairing construction is present is overcome, and is provided A kind of new underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, present apparatus automaticity is high, versatile, and It is reusable, construction cost is effectively reduced, thus more suitable for practicality, there is the value in industry.
The present invention solve its technical problem technical scheme be:
Underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, including hanger bracket, displaceable sleeve and control cabinet;
Hanger bracket is fixedly installed on pier coping portion, for hanging and adjusting the height of displaceable sleeve;
Displaceable sleeve is circumferentially spliced by identical at least two modules of shape, and joint is provided with pressing device And rubber strip, wherein, module includes body, and body upper part and bottom are provided with convex edge, and convex edge is same with the joint place of bridge pier Rubber strip is provided with, connecting portion is provided with left and right sides of body, for the device that is fixed and clamped;
Convex edge is located at interior among upper and lower two convex edge relative to passage and osculum, body is provided with the inside of displaceable sleeve Some whitewashing mouths and some spray nozzles are evenly distributed with side;Passage, osculum, whitewashing mouth, spray nozzle and pressing device It is connected by pipeline with control cabinet, is respectively used to realize that ventilation, draining, water spray cement mortar, spray turn rust agent and compress each module Purpose;
Body interior is additionally provided with drying unit.
Further, pressing device includes bolt, nut and jack;
The adjacent connecting portion of bolt-through two, and its screw rod end is connected with nut, jack is arranged on the nut and phase of bolt Between adjacent connecting portion.
Further, rubber strip is set by groove card.
Further, hydraulic pump, suction pump, spray pump and Liquid spraying pump are provided with control cabinet, respectively with jack, draining Hole, whitewashing mouth connect with spray nozzle;
Also include control system, be electrically connected respectively with hydraulic pump, suction pump, the control terminal and drying unit of spray pump and Liquid spraying pump Connect.
Further, hanger bracket includes steelframe, hoist engine and guy wire;
Steelframe is fixed on pier coping portion, and wire rope hoist, and hoist engine drives displaceable sleeve to move up and down by guy wire.
Further, passage is located at top convex edge, and osculum is located at bottom convex edge.
After employing above-mentioned technical proposal, the present invention has following beneficial effect:
When being constructed using the present apparatus, need to only the switch on control cabinet be used to complete remote control, it is not necessary to which more people assist, pole The big quantity for reducing workmen;And device is reusable and meets a variety of different engineering sizes, is applicable to section For the bridge pier of any shape, it is only necessary to the module for selecting suitable shape and quantity according to bridge pier size and dimension is spliced, Greatly cost is saved.
Brief description of the drawings
Fig. 1 is the scheme of installation of the underwater pier stud reinforcing bar derusting of the present invention and concrete surface prosthetic device;
Fig. 2 is the top view of displaceable sleeve;
Fig. 3 is the sectional view of displaceable sleeve;
Fig. 4 is the side view of displaceable sleeve module;
Fig. 5 is the connection diagram of module in displaceable sleeve;
Fig. 6 is the distribution schematic diagram of whitewashing mouth and spray nozzle on body;
Reference:Hanger bracket 1, steelframe 11, hoist engine 12, guy wire 13, connector 14, displaceable sleeve 2, body 21, rubber Adhesive tape 22, connecting portion 23, passage 24, osculum 25, whitewashing mouth 26, spray nozzle 27, drying unit 28, control cabinet 3, hydraulic pump 31, suction pump 32, spray pump 33, Liquid spraying pump 34, switch 35, sparge pipe 36, shotcrete pipe 37, breather pipe 38, drainpipe 39, hydraulic pressure Pipe 310, bridge pier 4, bolt 51, nut 52, jack 53, cushion cap 6.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.It is common based on the embodiment in the application, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, it should all belong to the application protection Scope.
Embodiment one
As shown in Fig. 1, Fig. 3 ~ Fig. 6, the derusting of underwater pier stud reinforcing bar and concrete surface prosthetic device, including it is hanger bracket 1, removable Sleeve 2 and control cabinet 3;Hanger bracket 1 is fixedly installed on the top of bridge pier 4, can be fixed by the cushion cap 6 of pars basilaris pontis, for hanging simultaneously In the present embodiment, hanger bracket 1 includes steelframe 11, hoist engine 12 and guy wire 13, steelframe to the height of regulation displaceable sleeve 2 11 are fixed on the top of bridge pier 4, and wire rope hoist 12, hoist engine 12 drive displaceable sleeve 2 to move up and down by guy wire 13. For the ease of producing and installing, displaceable sleeve 2 is circumferentially spliced square ring body by the identical four pieces of modules of shape, It is sheathed on bridge pier 4, and joint is provided with pressing device and rubber strip 22, wherein, module includes body 21, the top of body 21 Convex edge is provided with bottom, convex edge and the joint place of bridge pier 4 are again provided with rubber strip 22, and the left and right sides of body 21 is all provided with Connecting portion 23 is equipped with, for the device that is fixed and clamped.Wherein, pressing device includes bolt 51, nut 52 and jack 53;Bolt 51 The connecting portion 23 adjacent through two, and its screw rod end is connected with nut 52, jack 53 is arranged on the nut and phase of bolt 51 Between adjacent connecting portion 23;Convex edge is provided with passage 24 and osculum 25, body 21 relative to the inner side of displaceable sleeve 2 Some whitewashing mouths 26 and some spray nozzles 27 are evenly distributed with medial surface among upper and lower two convex edge;Passage 24, draining Hole 25, whitewashing mouth 26 and spray nozzle 27 are connected by pipeline with control cabinet 3, are respectively used to realize ventilation, draining, water spray silt particle Slurry and spray turn the purpose of rust agent;Drying unit 28 is additionally provided with inside body 21.
Certain bridge is located at a reinforced concrete bridge pier in river course because long-term river washes away, and causes underwater somewhere concrete Sag of protecting coating, reinforcing bar exposes and corrosion, it is necessary to repair under water.Repaired using the device of the present invention, it is specific as follows:
Hanger bracket 1 is fixed on pier coping portion, and will be fixed on the module number identical hoist engine 12 in displaceable sleeve 2 On hanger bracket 1.Guy wire 13 is connected on the connector 14 on each module top;Then bolt 51 is passed through on connecting portion 23 Bolt hole on fixed jack 53 and abutting connection 23, the screw rod end nut 52 of bolt 51 is fixed, made Adjacent two connecting portion 23 contacts, and can not tighten completely.In this approach, remaining module is connected two-by-two around the surface of bridge pier 4. Open hoist engine 12 to switch, displaceable sleeve 2 is dropped at bridge pier dew muscle.Hydraulic pump 31 in operation control box 3 switchs, and makes Hydraulic pump 31 works, and so as to drive jack 53 to work, forces the module of two adjacent displaceable sleeves 2 to be completely embedded;When When all modules are all completely embedded, displaceable sleeve 2 can extrude each rubber strip 22 so that upper and lower two convex edge, body 21 and bridge pier 4 Between form confined space.
Hydraulic pump 31 is closed, and opens suction pump 32 and switchs, makes the water in displaceable sleeve 2 by osculum 25, through row Water pipe 39 discharges displaceable sleeve 2, and osculum 25 is located at bottom convex edge;When water exhausts in displaceable sleeve 2, can be produced in sleeve Raw negative pressure, now opening breather pipe 38 makes air pressure in sleeve recover normal.By drying unit 28, make the reinforcing bar and bridge at dew muscle Pier dry tack free, drying unit 28 are the heater being arranged in body 21, are heated by external power source so that reinforcing bar at dew muscle And the moisture on bridge pier surface is evaporated and discharged by passage 24 through breather pipe 38, wherein for the ease of the discharge of gas, Passage 24 is arranged at top convex edge.Liquid spraying pump 34 is opened afterwards to switch, and will turn rust agent by sparge pipe 36 by spray nozzle 27 Spray, be uniformly sprayed onto the position of dew muscle.Turning rust agent can be handled the rebar surface of corrosion herein and rust preventing;Then beat Open spray pump 33 to switch, make corrosion resistance cement mortar by shotcrete pipe 37, the position of sag of protecting coating is sprayed onto by whitewashing mouth 26. Cement mortar is dried processing by drying unit 28 again;After corrosion resistance cement mortar is dried, hydraulic pump is opened 31, jack 53 is unloaded power, now adjacent module is unclamped mutually.Open hoist engine 12 to switch, lift sleeve, it is exposed water Face.
In order to facilitate the replacing of rubber strip 22, rubber strip 22 is set by groove card;Simultaneously in order that obtaining whole tool construction It is compact, it is readily transported and manipulates, hydraulic pump 31, suction pump 32, spray pump 33 and Liquid spraying pump 34 is provided with control cabinet 3, point It is not connected with jack 53, osculum 25, whitewashing mouth 26 and spray nozzle 27;Also include switch 35, respectively with hydraulic pump 31, draw water Control terminal and the drying unit electrical connection of pump 32, spray pump 33 and Liquid spraying pump 34.
Embodiment two
As shown in Fig. 2 underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, being with the difference part of embodiment one can Moving sleeve 2 is circumferentially spliced rounded ring body by the identical four pieces of modules of shape, is sheathed on bridge pier 4.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (6)

1. underwater pier stud reinforcing bar derusting and concrete surface prosthetic device, it is characterised in that including hanger bracket(1), Moveable-jacket Cylinder(2)And control cabinet(3);
The hanger bracket(1)It is fixedly installed on bridge pier(4)Top, for hanging and adjusting the displaceable sleeve(2)Height;
The displaceable sleeve(2)Circumferentially it is spliced by identical at least two modules of shape, and joint is provided with Pressing device and rubber strip(22), wherein, the module includes body(21), the body(21)Upper and lower part is provided with Convex edge, the convex edge and the bridge pier(4)Joint place be again provided with rubber strip(22), the body(21)The left and right sides It is provided with connecting portion(23), for fixing the pressing device;
The convex edge is relative to the displaceable sleeve(2)Inner side be provided with passage(24)And osculum(25), described Body(21)Some whitewashing mouths are evenly distributed with the medial surface among upper and lower two convex edge(26)With some spray nozzles(27);Institute State passage(24), osculum(25), whitewashing mouth(26), spray nozzle(27)Pass through pipeline and the control cabinet with pressing device (3)Connection, it is respectively used to realize that ventilation, draining, water spray cement mortar, spray turn rust agent and compress the purpose of each module;
The body(21)Inside is additionally provided with drying unit(28).
2. underwater pier stud reinforcing bar derusting according to claim 1 and concrete surface prosthetic device, it is characterised in that described Pressing device includes bolt(51), nut(52)And jack(53);
The bolt(51)The connecting portion adjacent through two(23), and its screw rod end and the nut(52)Connection, described thousand Jin top(53)It is arranged on the bolt(51)Nut and the adjacent connecting portion(23)Between.
3. underwater pier stud reinforcing bar derusting according to claim 1 and concrete surface prosthetic device, it is characterised in that described Rubber strip(22)Set by groove card.
4. underwater pier stud reinforcing bar derusting according to claim 1 and concrete surface prosthetic device, it is characterised in that described Control cabinet(3)Inside it is provided with hydraulic pump(31), suction pump(32), spray pump(33)And Liquid spraying pump(34), respectively with it is described very heavy Top(53), osculum(25), whitewashing mouth(26)And spray nozzle(27)Connection;
Also include control system(35), respectively with the hydraulic pump(31), suction pump(32), spray pump(33)And Liquid spraying pump(34) Control terminal and drying unit electrical connection.
5. underwater pier stud reinforcing bar derusting according to claim 1 and concrete surface prosthetic device, it is characterised in that described Hanger bracket(1)Including steelframe(11), hoist engine(12)And guy wire(13);
The steelframe(11)It is fixed on the bridge pier(4)Top, and the fixed hoist engine(12), the hoist engine(12)Pass through The guy wire(13)Drive the displaceable sleeve(2)Move up and down.
6. underwater pier stud reinforcing bar derusting according to claim 1 and concrete surface prosthetic device, it is characterised in that described Passage(24)Positioned at top convex edge, the osculum(25)Positioned at bottom convex edge.
CN201710611665.XA 2017-07-25 2017-07-25 Underwater pier column reinforcing steel bar rust removal and concrete surface repair device Active CN107354876B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710611665.XA CN107354876B (en) 2017-07-25 2017-07-25 Underwater pier column reinforcing steel bar rust removal and concrete surface repair device
PCT/CN2018/095089 WO2019019910A1 (en) 2017-07-25 2018-07-10 Device for removing rust on underwater pier column steel bars and repairing concrete surfaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710611665.XA CN107354876B (en) 2017-07-25 2017-07-25 Underwater pier column reinforcing steel bar rust removal and concrete surface repair device

Publications (2)

Publication Number Publication Date
CN107354876A true CN107354876A (en) 2017-11-17
CN107354876B CN107354876B (en) 2023-02-24

Family

ID=60285449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710611665.XA Active CN107354876B (en) 2017-07-25 2017-07-25 Underwater pier column reinforcing steel bar rust removal and concrete surface repair device

Country Status (2)

Country Link
CN (1) CN107354876B (en)
WO (1) WO2019019910A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019019910A1 (en) * 2017-07-25 2019-01-31 苏交科集团股份有限公司 Device for removing rust on underwater pier column steel bars and repairing concrete surfaces
CN109778789A (en) * 2018-04-04 2019-05-21 水利部交通运输部国家能源局南京水利科学研究院 A kind of Face Slab of Concrete-faced Rockfill is come to nothing the underwater repair system in area
CN110952464A (en) * 2019-12-20 2020-04-03 沈靖林 Bridge pier repairing and reinforcing construction method
CN113026837A (en) * 2021-03-19 2021-06-25 哈尔滨工业大学 Restoration, reinforcement and anticorrosion construction method for port RC pile foundation in alpine region
CN113062207A (en) * 2021-04-14 2021-07-02 浙江大学 Novel repairing method for bridge pier cracks immersed under water
CN114351582A (en) * 2022-01-10 2022-04-15 中交路桥南方工程有限公司 Deepwater pier crack detection and repair device
CN114541285A (en) * 2022-03-08 2022-05-27 招商局重庆交通科研设计院有限公司 Deep sea pier crack detection and repair device and repair method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1425978A (en) * 1973-07-31 1976-02-25 Hollandsche Betongroep Nv Method of and apparatus for constructing underwater foundations
US5682635A (en) * 1992-02-26 1997-11-04 Tolliver; Wilbur E. Bridge and road construction and method of removing worn deck structure
KR20030013101A (en) * 2001-08-07 2003-02-14 선암산업개발주식회사 Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
US6923600B1 (en) * 2001-08-07 2005-08-02 Suk-Dong Bae Method of repairing and reinforcing piers using stones
WO2009102119A1 (en) * 2008-02-11 2009-08-20 Seoung Kyu Kim Bridge-raising device incorporating a raising guide, and a bridge-raising work method using the said bridge-raising device
CN101550677A (en) * 2009-05-08 2009-10-07 四川路桥建设股份有限公司 Underwater pier wall cleaning method and movable bracket thereof
CN103205988A (en) * 2013-03-22 2013-07-17 中交四航工程研究院有限公司 Device suitable for mending and strengthening underwater portion of pile foundation and construction method employing device
CN203960885U (en) * 2014-07-17 2014-11-26 北京翔鲲水务建设有限公司 Seal cofferdam structure under water
CN205604095U (en) * 2016-05-06 2016-09-28 卡本复合材料(天津)有限公司 Fine sleeve of glass is consolidated and is restoreed pier under water
CN207047721U (en) * 2017-07-25 2018-02-27 苏交科集团股份有限公司 A kind of portable underwater concrete is damaged to repair equipment

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4917542A (en) * 1988-06-17 1990-04-17 Hickey Edwin W Pneumatic grout removal method for forming foundation structures
CN102039995B (en) * 2009-10-20 2013-11-06 中交上海三航科学研究院有限公司 Steel pile anticorrosion operation equipment
JP2011111885A (en) * 2009-11-25 2011-06-09 Kyoryo Techno Kk Drainage system of floor slab for pedestrian bridge and bridge
CN102605795B (en) * 2012-04-06 2014-02-26 山东高速青岛公路有限公司 Waterproof sleeve for repairing concrete surface of water table fluctuation region and application method of waterproof sleeve
CN106968262B (en) * 2017-06-05 2019-04-02 黄河勘测规划设计研究院有限公司 The channel steel cofferdam system quickly repaired for the slope lining cutting of water channel canal
CN107354876B (en) * 2017-07-25 2023-02-24 苏交科集团股份有限公司 Underwater pier column reinforcing steel bar rust removal and concrete surface repair device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1425978A (en) * 1973-07-31 1976-02-25 Hollandsche Betongroep Nv Method of and apparatus for constructing underwater foundations
US5682635A (en) * 1992-02-26 1997-11-04 Tolliver; Wilbur E. Bridge and road construction and method of removing worn deck structure
KR20030013101A (en) * 2001-08-07 2003-02-14 선암산업개발주식회사 Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
US6923600B1 (en) * 2001-08-07 2005-08-02 Suk-Dong Bae Method of repairing and reinforcing piers using stones
WO2009102119A1 (en) * 2008-02-11 2009-08-20 Seoung Kyu Kim Bridge-raising device incorporating a raising guide, and a bridge-raising work method using the said bridge-raising device
CN101550677A (en) * 2009-05-08 2009-10-07 四川路桥建设股份有限公司 Underwater pier wall cleaning method and movable bracket thereof
CN103205988A (en) * 2013-03-22 2013-07-17 中交四航工程研究院有限公司 Device suitable for mending and strengthening underwater portion of pile foundation and construction method employing device
CN203960885U (en) * 2014-07-17 2014-11-26 北京翔鲲水务建设有限公司 Seal cofferdam structure under water
CN205604095U (en) * 2016-05-06 2016-09-28 卡本复合材料(天津)有限公司 Fine sleeve of glass is consolidated and is restoreed pier under water
CN207047721U (en) * 2017-07-25 2018-02-27 苏交科集团股份有限公司 A kind of portable underwater concrete is damaged to repair equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
廖飞强: "水下工程施工方法及技术措施", 《中国西部科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019019910A1 (en) * 2017-07-25 2019-01-31 苏交科集团股份有限公司 Device for removing rust on underwater pier column steel bars and repairing concrete surfaces
CN109778789A (en) * 2018-04-04 2019-05-21 水利部交通运输部国家能源局南京水利科学研究院 A kind of Face Slab of Concrete-faced Rockfill is come to nothing the underwater repair system in area
CN110952464A (en) * 2019-12-20 2020-04-03 沈靖林 Bridge pier repairing and reinforcing construction method
CN110952464B (en) * 2019-12-20 2020-10-27 江苏骏豪建设工程有限公司 Bridge pier repairing and reinforcing construction method
CN113026837A (en) * 2021-03-19 2021-06-25 哈尔滨工业大学 Restoration, reinforcement and anticorrosion construction method for port RC pile foundation in alpine region
CN113062207A (en) * 2021-04-14 2021-07-02 浙江大学 Novel repairing method for bridge pier cracks immersed under water
CN113062207B (en) * 2021-04-14 2022-03-11 浙江大学 Novel repairing method for bridge pier cracks immersed under water
CN114351582A (en) * 2022-01-10 2022-04-15 中交路桥南方工程有限公司 Deepwater pier crack detection and repair device
CN114351582B (en) * 2022-01-10 2024-01-23 中交路桥南方工程有限公司 Deepwater pier crack detection and repair device
CN114541285A (en) * 2022-03-08 2022-05-27 招商局重庆交通科研设计院有限公司 Deep sea pier crack detection and repair device and repair method thereof

Also Published As

Publication number Publication date
WO2019019910A1 (en) 2019-01-31
CN107354876B (en) 2023-02-24

Similar Documents

Publication Publication Date Title
CN107354876A (en) Underwater pier stud reinforcing bar derusting and concrete surface prosthetic device
CN207047721U (en) A kind of portable underwater concrete is damaged to repair equipment
CN102888991B (en) Large-scale profile steel beam and concrete combined house roof constructing method
CN101705697A (en) Diaphragm wall joint flexible water stop installing device and method
CN103343577B (en) The shear wall water-stopping method of removable docking screw rod
CN210369766U (en) Precast concrete fast-assembling exhaust pipe well structure
CN104328898A (en) Rendering maintenance device for building external wall
CN111851987A (en) Construction method of attached short-limb I-steel flower basket pull rod knot type cantilever frame
CN206769350U (en) Outer on large-sized station boiler Steel Structure chooses net scaffold
CN207595188U (en) A kind of ship fabrication hole temporary blocking device
CN207974027U (en) A kind of shape-setting clamp for concrete guardrail skin patching
CN206174481U (en) Jack -up instrument is used in fan hoist and mount of tuber pipe and suspension type installation
CN110541567A (en) Plugging die for pipeline hanging hole gap and construction method
CN104649121A (en) Adjustable clamp for hoisting in air hoses
CN206418861U (en) A kind of switch base for facing skirt shield and multiduty skirt of facing are protected
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN211666310U (en) Multifunctional hoisting device for long and narrow deformation joint
CN204212380U (en) A kind of external wall whitewashes curing means
CN207660296U (en) A kind of precast concrete hanging apparatus
CN107152026B (en) A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
CN208372709U (en) A kind of tower crane spray equipment
CN205530721U (en) Outspoken fast plugging device of concrete wall opening
CN207349576U (en) Mobile toilet's fire protection pipeline system
CN205917847U (en) Steel structural system
CN105672687B (en) A kind of substation truss concrete frame reinforcement means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant