CN107352578A - The charging system of chlorination furnace and there is its chlorination furnace - Google Patents

The charging system of chlorination furnace and there is its chlorination furnace Download PDF

Info

Publication number
CN107352578A
CN107352578A CN201710626390.7A CN201710626390A CN107352578A CN 107352578 A CN107352578 A CN 107352578A CN 201710626390 A CN201710626390 A CN 201710626390A CN 107352578 A CN107352578 A CN 107352578A
Authority
CN
China
Prior art keywords
batcher
emergent
normal
chlorination furnace
charging system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710626390.7A
Other languages
Chinese (zh)
Inventor
江书安
杨明
李建军
唐仁杰
龙翔
刘海龙
孙浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Metallurgy Xin Litai Industry Co Ltd
Original Assignee
Yunnan Metallurgy Xin Litai Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Metallurgy Xin Litai Industry Co Ltd filed Critical Yunnan Metallurgy Xin Litai Industry Co Ltd
Priority to CN201710626390.7A priority Critical patent/CN107352578A/en
Publication of CN107352578A publication Critical patent/CN107352578A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01GCOMPOUNDS CONTAINING METALS NOT COVERED BY SUBCLASSES C01D OR C01F
    • C01G23/00Compounds of titanium
    • C01G23/02Halides of titanium
    • C01G23/022Titanium tetrachloride

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Inorganic Chemistry (AREA)
  • Furnace Charging Or Discharging (AREA)

Abstract

The invention discloses a kind of charging system of chlorination furnace and there is its chlorination furnace, the charging system includes:Feed bin;Reversing piece, the reversing piece are connected with the feed bin;Emergent batcher, the emergent batcher are connected with the reversing piece;Normal batcher, the normal batcher are connected with the reversing piece, wherein, the reversing piece makes the emergent batcher and the normal batcher switchably connect the feed bin.According to the charging system of the chlorination furnace of the present invention, by setting emergent batcher, material is promptly supplemented so as to body of heater that is convenient, being timely chlorination furnace, the environmentally friendly accident for avoiding material transportation problem from causing chlorine to empty.

Description

The charging system of chlorination furnace and there is its chlorination furnace
Technical field
The present invention relates to metallurgical, chemical technology field, a kind of charging system more particularly, to chlorination furnace and with its Chlorination furnace.
Background technology
Molten salt chlorination furnace is used to produce one of raw material of magnesium reduction production titanium sponge in titanium sponge industry:Thick four chlorination Titanium.Primary raw material is high titanium slag, petroleum coke, chlorine.The solid materials such as high titanium slag, petroleum coke pour into respective feed bin, through burying scraper plate Conveyer is sent to bucket elevator, then is sent to respective feed bin by bucket elevator.It is continuous by screw(-type) feeder after progress dispensing Material is sent to fused salt surface with being fed to by chlorine spray gun in fused salt by ground from stokehold feed bin, at a certain temperature in chlorination furnace In fused-salt medium in carry out chlorination reaction.
The mode that Molten salt chlorination furnace solid material high titanium slag, the addition generally use screw(-type) feeder of petroleum coke convey at present Carry out.But equipment is more in whole piece material conveying process in actual production, easily there is equipment breakdown and the phenomenon of fracture or Material proportion metering belt claim to be forbidden, cause the raw material of Molten salt chlorination furnace can not convey in time or transferring raw material deficiency, In this case, a large amount of chlorine are caused to fail to react in time due into the chlorine of chlorination furnace inlet can not be reduced in time And enter exhaust system and empty, cause serious environmentally friendly accident after chlorine emptying.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art.Therefore, the invention reside in propose one The charging system of kind chlorination furnace, the charging system can be that chlorination furnace promptly supplement material, avoid the occurrence of environmentally friendly accident.
The present invention also proposes a kind of chlorination furnace with above-mentioned charging system.
The charging system of chlorination furnace according to a first aspect of the present invention, including:Feed bin;Reversing piece, the reversing piece It is connected with the feed bin;Emergent batcher, the emergent batcher are connected with the reversing piece;Normal batcher, it is described Normal batcher is connected with the reversing piece, wherein, the reversing piece makes the emergent batcher and the normal batcher can Switching ground connects the feed bin.
According to the charging system of the chlorination furnace of the present invention, by setting emergent batcher, so as to be conveniently, timely The body of heater of chlorination furnace promptly supplements material, the environmentally friendly accident for avoiding material transportation problem from causing chlorine to empty.
In certain embodiments, the reversing piece includes:First switch valve, the both ends of the first switch valve connect respectively The feed bin and the normal batcher;Second switch valve, the both ends of the second switch valve connect the charging respectively Feed bin and the emergent batcher.
In certain embodiments, the first switch valve and second switch valve are push-pull valve.
In certain embodiments, the feed bin includes normal feeding bin and emergent feeding bin, the reversing piece The normal feeding bin is connected with the normal batcher or separate and make the emergent feeding bin to be met an urgent need with described Batcher connects or cut-off.
In certain embodiments, the feed bin is in from top to bottom to the shape of contract, and in the feed bin With extension from top to bottom and the separator separated with the bottom of the feed bin, the bio-occlusion is separated out between the separator Expect feed bin and emergent feeding bin.
In certain embodiments, formed in the normal feeding bin and the emergent feeding bin on the lateral wall of one First chute, another bottom has the along lateral wall extension in the normal feeding bin and the emergent feeding bin Two chutes, first chute and second chute connect the reversing piece respectively.
In certain embodiments, the charging system also includes being used for the hopper to the emergent feeding bin charging, institute Hopper is stated as one or more.
In certain embodiments, at least one in the emergent batcher and the normal batcher is screw feeder Machine.
Chlorination furnace according to a second aspect of the present invention, including:Body of heater;Charging system, the charging system and the body of heater It is connected, the charging system is the charging system according to the chlorination furnace of first aspect present invention, the emergent batcher and described Normal batcher is all connected with the body of heater.
According to the chlorination furnace of the present invention, the charging system of the chlorination furnace by setting above-mentioned first aspect, so as to improve The overall performance of chlorination furnace.
In certain embodiments, in the emergent batcher and the normal batcher discharging opening of one be connected to it is described The bottom of body of heater and another discharging opening are connected to the top of the body of heater.
In certain embodiments, the body of heater is provided with and one in the emergent batcher and the normal batcher The relative charging observation panel of discharging opening
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Fig. 1 is the schematic diagram of chlorination furnace according to embodiments of the present invention.
Reference:
Chlorination furnace 100,
Body of heater 1,
Feed bin 21, normal feeding bin 211, the first chute 2111, feeding bin 212 of meeting an urgent need, the second chute 2121,
Reversing piece 22, first switch valve 221, second switch valve 222,
Emergent batcher 23, normal batcher 24,
Hopper 25, feed observation panel 26, normal material conveyor 27.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
The charging system of the chlorination furnace 100 of embodiment according to a first aspect of the present invention is described below with reference to Fig. 1.
As shown in figure 1, the charging system of the chlorination furnace 100 of embodiment according to a first aspect of the present invention, including:Feed bin 21st, reversing piece 22, emergent batcher 23 and normal batcher 24.Preferably, in emergent batcher 23 and normal batcher 24 At least one is screw(-type) feeder.
Specifically, reversing piece 22 is connected with feed bin 21;Emergent batcher 23 is connected with reversing piece 22;Normal batcher 24 are connected with reversing piece 22, that is to say, that reversing piece 22 respectively with feed bin 21, emergent batcher 23 and normal batcher 24 It is connected.Wherein, reversing piece 22 is used to make emergent batcher 23 and normal batcher 24 switchably connect feed bin 21.
For example, reversing piece 22 has an import and two outlets, wherein, import and the phase of feed bin 21 of reversing piece 22 Even, two outlets of reversing piece 22 are connected with emergent batcher 23 and normal batcher 24 respectively.And the import of reversing piece 22 can Switching ground exported with two in one of connect.
During normal feed, reversing piece 22 makes feed bin 21 be connected with normal batcher 24, passes through bio-occlusion Material machine 24 feeds into chlorination furnace 100;When normal batcher 24 hinders for some reason to work, reversing piece 22 can be by feed bin 21 switch to and are connected with emergent batcher 23, at this point it is possible to be added materials by emergent batcher 23 into chlorination furnace 100.
Thus, it is possible to avoid the proportioning of fracture or material deficiency in chlorination furnace 100, guarantee has enough materials can be with entering Enter the chlorine reaction in chlorination furnace 100, reaction in time is not emptied and caused as tail gas due to a large amount of chlorine so as to avoid the occurrence of Environmentally friendly accident.
The charging system of chlorination furnace 100 according to embodiments of the present invention, by setting emergent batcher, so as to side Just material promptly timely, is supplemented for the body of heater of chlorination furnace, the environmentally friendly accident for avoiding material transportation problem from causing chlorine to empty.
In one embodiment of the invention, reversing piece 22 can include:First switch valve 221 and second switch valve 222. Preferably, first switch valve 221 and second switch valve 222 are push-pull valve.
Wherein, the both ends of first switch valve 221 connect feed bin 21 and normal batcher 24, first switch valve respectively 221 can be used between control feed bin 21 and normal batcher 24 connecting or disconnecting.The both ends difference of second switch valve 222 Feed bin 21 and emergent batcher 23 are connected, second switch valve 222 can be used for controlling feed bin 21 and emergent batcher Connect or disconnect between 23.Thus, it is possible to separately control the break-make of feed bin 21 and normal batcher 24 and add Expect the break-make between feed bin 21 and emergent batcher 23, improve the reliability of charging system, simplify structure, reduce cost.
For example, when conveying material into chlorination furnace 100 by normal batcher 24, first switch valve 221 is opened, and the Two switch valves 222 are closed;When needing to convey material into chlorination furnace 100 by emergent batcher 23, first switch valve 221 closes Close, and second switch valve 222 is opened.
In some embodiments of the invention, feed bin 21 can include:Normal feeding bin 211 and emergent feed are expected Storehouse 212, wherein, normal feeding bin 211 be used for normal batcher 24 supply material, meet an urgent need feeding bin 212 be used for should Anxious batcher 23 supplies material.Reversing piece 22 is used to make normal feeding bin 211 connect or separate with normal batcher 24, and Reversing piece 22 is used to make emergent feeding bin 212 connect or separate with emergent batcher 23.
For example, when conveying material into chlorination furnace 100 using normal batcher 24, reversing piece 22 makes normal feeding bin 211 connect with normal batcher 24, and emergent feeding bin 212 is separated with emergent batcher 23;When need using meet an urgent need to When material machine 23 conveys material into chlorination furnace 100, reversing piece 22 makes emergent feeding bin 212 separate with emergent batcher 23, and Normal feeding bin 211 is set to separate with normal batcher 24.
Further, as shown in figure 1, feed bin 21 is in from top to bottom to the shape of contract, and in feed bin 21 With extension from top to bottom and the separator separated with the bottom of feed bin 21, bio-occlusion material feed bin 211 is separated out between separator With emergent feeding bin 212.That is, feed bin 21 can be divided into by cut piece, top is spaced apart and bottom is connected Two feed bins:Normal feeding bin 211 and emergent feeding bin 212, so, when normal 24 failure of batcher, Ke Yiyi Old to supply material into normal feeding bin 211 using normal material conveyor 27, now, reversing piece 22 will can be normally fed Feed bin 211 connects with emergent batcher 23, passes through " normal material conveyor 27 → normal feeding bin 211 → emergent batcher The route of the body of heater 1 " of 23 → chlorination furnace 100 is fed into chlorination furnace 100.Thus, it is possible to improve the transfer efficiency of material.
In addition, when normal 27 failure of material conveyor, emergent device for transporting objects can be utilized (such as described below Hopper 25) added materials into emergent feeding bin 212, now, meet an urgent need feeding bin 212 in material can be by normal Batcher 24 conveys material into the body of heater 1 of chlorination furnace 100, naturally it is also possible to by emergent batcher 23 to the body of heater 1 of chlorination furnace 100 Interior conveying material.
Advantageously, the first chute is formed on the lateral wall of one in normal feeding bin 211 and emergent feeding bin 212 2111, another bottom has the second chute extended along lateral wall in normal feeding bin 211 and emergent feeding bin 212 2121, the first chute 2111 and the second chute 2121 connect reversing piece 22 respectively.
Specifically as shown in figure 1, formed with the first chute 2111, the first chute on the lateral wall of normal feeding bin 211 2111 other end is connected with normal batcher 24, and the first chute 2111 is provided with first switch valve 221;Emergent feeding bin 212 bottom is formed with the second chute 2121, and the other end of the second chute 2121 is connected with emergent batcher 23, and the second chute 2121 are provided with second switch valve 222.By setting the first chute 2111 and the second chute 2121, the normal He of feeding bin 211 Material in emergent feeding bin 212 can slide to normal batcher 24 and emergent batcher 23 under gravity.
In some embodiments of the invention, charging system also includes being used for the hopper to feed to emergent feeding bin 212 25, hopper 25 can be one, and hopper 25 can also be multiple.And the raw material group configured is pre-loaded with each hopper 25 Part.By setting multiple hoppers 25, standby inventory can be increased, be further ensured that in normal material transmission failure there is foot Enough materials are used to promptly supplement into the body of heater 1 of chlorination furnace 100.
Preferably, hopper 25 by driving can feed into emergent feeding bin 212.That is, it can lead to Driving conveying and batch turning are crossed to emergent feeding bin 212.
Preferably, hopper 25 can also connect axis with moveable base, and axis realizes that driving is hung by the intermediate support of hopper 25 Hook lifts pattern, and feed of the driving to emergent feeding bin 212 can be utilized so as to realize.
In certain embodiments, meet an urgent need batcher 23 and normal batcher 24 in it is at least one be screw(-type) feeder.Enter One step, screw(-type) feeder is driven by variable-frequency motor, so, can be according to the size of conditioning of BF feeding coal.
The chlorination furnace 100 of embodiment according to a second aspect of the present invention, including:Body of heater 1 and according to the above-mentioned first party of the present invention The charging system of the chlorination furnace 100 of face embodiment, charging system are connected with body of heater 1, and emergent batcher 23 and normal batcher 24 are connected to body of heater 1.
Preferably, the discharging opening of one in batcher 23 and normal batcher 24 of meeting an urgent need is connected to the bottom of body of heater 1 and another The discharging opening of one is connected to the top of body of heater 1.Such as shown in Fig. 1, the discharging opening of emergent batcher 23 is connected to the top of body of heater 1 Portion, the discharging opening of normal batcher 24 are connected to the bottom of body of heater 1.
Chlorination furnace 100 according to embodiments of the present invention other form and operate for those of ordinary skill in the art and Speech is all known, is not detailed herein.
Chlorination furnace 100 according to embodiments of the present invention, by set above-mentioned first aspect embodiment chlorination furnace 100 plus Material system, so as to improve the security performance of chlorination furnace 100.
In some embodiments of the invention, body of heater 1 is provided with and one in emergent batcher 23 and normal batcher 24 The relative charging observation panel 26 of individual discharging opening.As shown in figure 1, body of heater 1 is provided with charging observation panel 26, charging observation panel 26 is set It is placed in emergent batcher 23 and conveys the top that material enters the entrance of chlorination furnace 100.Feeding observation panel 26 should for manually observing Anxious material enters the situation of chlorination furnace 100, in order to adjust feeding coal at any time.
Chlorination furnace 100 below with reference to Fig. 1 descriptions according to a specific embodiment of the invention.
Reference picture 1, the emergent feeding device of chlorination furnace 100 of the invention include:Emergent charging hopper 25, emergent feed material Storehouse 212, the second push-pull valve, emergent screw(-type) feeder 23, charging observation panel 26.
The normal feeding device of the chlorination furnace 100 of the present invention includes:Normal material conveyor 27, normal feeding bin 211, First push-pull valve, normal erect type spin batcher 24.
Wherein, feeding bin 212 of meeting an urgent need connects with normal feeding bin 211.Emergent feeding bin 212 passes through the second chute 2121 feed into emergent screw(-type) feeder 23, and the second push-pull valve is provided among the second chute 2121, and charging observation panel 26 is set Material is conveyed into the top of the entrance of 100 body of heater of chlorination furnace 1 in emergent batcher 23.
Further, emergent charging hopper 25 has multiple, and multiple emergent charging hoppers 25 are pre-loaded with what is prepared Raw material components.The hopper 25 of emergent charging by driving can feed into feed bin, it is also possible to and moveable base connects axis, Axis realizes driving hook lifting pattern by the intermediate support of hopper 25, it is therefore intended that the feed of feed bin can be carried out with driving by realizing.
Preferably, feeding bin 212 of meeting an urgent need connects with normal feeding bin 211, when normal erect type spin 24 failure of batcher, It can take and close the first push-pull valve, open the second push-pull valve, then fed by emergent batcher 23.
The situation that observation panel 26 is used to manually observe the body of heater 1 that emergent material enters chlorination furnace 100 is fed, to adjust at any time Feeding coal.
Screw(-type) feeder is that the size that can be adjusted feeding coal according to the working of a furnace at any time is driven by variable-frequency motor.
When outlet and the inlet communication of normal batcher of the first chute 2111 of normal batcher, i.e. the first push-pull valve During opening, the normal production charging of chlorination furnace 100 is carried out.
Chlorination furnace 100 according to embodiments of the present invention, can solve the fracture of equipment breakdown in material conveying process or The proportioning deficiency of material.Conveniently, timely Molten salt chlorination furnace 100 can be carried out promptly supplementing material, avoided because material conveys The environmentally friendly accident that chlorine caused by problem empties.
In the description of the invention, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " top ", " bottom ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position Relation is put, it is of the invention necessary with simplified description, rather than the device or element of instruction or hint meaning to be for only for ease of description With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the invention, " multiple " are meant that two or more, Unless otherwise specifically defined.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects Connect or electrically connect, can also be communication;Can be joined directly together, can also be indirectly connected by intermediary, can be with It is connection or the interaction relationship of two elements of two element internals.For the ordinary skill in the art, may be used To understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment or example of the present invention.In this manual, to the schematic representation of above-mentioned term not Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area Art personnel can be tied the different embodiments or example and the feature of different embodiments or example described in this specification Close and combine.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this The scope of invention is limited by claim and its equivalent.

Claims (11)

  1. A kind of 1. charging system of chlorination furnace, it is characterised in that including:
    Feed bin;
    Reversing piece, the reversing piece are connected with the feed bin;
    Emergent batcher, the emergent batcher are connected with the reversing piece;
    Normal batcher, the normal batcher are connected with the reversing piece,
    Wherein, the reversing piece makes the emergent batcher and the normal batcher switchably connect the feed bin.
  2. 2. the charging system of the chlorination furnace according to right will go 1, it is characterised in that the reversing piece includes:
    First switch valve, the both ends of the first switch valve connect the feed bin and the normal batcher respectively;
    Second switch valve, the both ends of the second switch valve connect the feed bin and the emergent batcher respectively.
  3. 3. the charging system of chlorination furnace according to claim 2, it is characterised in that the first switch valve and second switch Valve is push-pull valve.
  4. 4. the charging system of the chlorination furnace according to any one of claim 1-3, it is characterised in that the feed bin bag Normal feeding bin and emergent feeding bin are included, the reversing piece makes the normal feeding bin be connected with the normal batcher Or separate and the emergent feeding bin is connected or is separated with the emergent batcher.
  5. 5. the charging system of chlorination furnace according to claim 4, it is characterised in that the feed bin in from top to bottom to The shape of contract, and the separation separated with extension from top to bottom in the feed bin and with the bottom of the feed bin Part, the normal feeding bin and emergent feeding bin are separated out between the separator.
  6. 6. the charging system of chlorination furnace according to claim 4, it is characterised in that the normal feeding bin and it is described should Form the first chute in anxious feeding bin on the lateral wall of one, it is another in the normal feeding bin and the emergent feeding bin The bottom of one has the second chute extended along lateral wall, and first chute and second chute connect described change respectively To part.
  7. 7. the charging system of chlorination furnace according to claim 4, it is characterised in that the charging system also include be used for The hopper of the emergent feeding bin charging, the hopper is one or more.
  8. 8. the charging system of chlorination furnace according to claim 1, it is characterised in that the emergent batcher and described normal At least one in batcher is screw(-type) feeder.
  9. A kind of 9. chlorination furnace, it is characterised in that including:
    Body of heater;
    Charging system, the charging system are connected with the body of heater, and the charging system is according to any one of claim 1-8 The charging system of described chlorination furnace, the emergent batcher and the normal batcher are all connected with the body of heater.
  10. 10. the charging system of chlorination furnace according to claim 9, it is characterised in that the emergent batcher and it is described just The discharging opening of one is connected to the bottom of the body of heater in normal batcher and another discharging opening is connected to the top of the body of heater Portion.
  11. 11. the charging system of the chlorination furnace according to claim 9 or 10, it is characterised in that the body of heater is provided with and institute State the relative charging observation panel of the discharging opening of one in emergent batcher and the normal batcher.
CN201710626390.7A 2017-07-27 2017-07-27 The charging system of chlorination furnace and there is its chlorination furnace Withdrawn CN107352578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710626390.7A CN107352578A (en) 2017-07-27 2017-07-27 The charging system of chlorination furnace and there is its chlorination furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710626390.7A CN107352578A (en) 2017-07-27 2017-07-27 The charging system of chlorination furnace and there is its chlorination furnace

Publications (1)

Publication Number Publication Date
CN107352578A true CN107352578A (en) 2017-11-17

Family

ID=60285763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710626390.7A Withdrawn CN107352578A (en) 2017-07-27 2017-07-27 The charging system of chlorination furnace and there is its chlorination furnace

Country Status (1)

Country Link
CN (1) CN107352578A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109052461A (en) * 2018-10-18 2018-12-21 成都先进金属材料产业技术研究院有限公司 Handle the big production capacity fused salt chlorimation device and production method of high calcium magnesium titanium slag
CN109650699A (en) * 2019-02-27 2019-04-19 郑州旭飞光电科技有限公司 A kind of automatic-exchanging system of charger
CN114132694A (en) * 2021-12-23 2022-03-04 重庆华彬伟玻璃有限公司 Emergency feeder for glass bottle raw materials

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201598016U (en) * 2010-01-13 2010-10-06 鞍钢股份有限公司 Emergency feeding device
CN202704600U (en) * 2012-08-13 2013-01-30 攀钢集团攀枝花钢铁研究院有限公司 Powder feeding system and feeding system of chlorination furnace
CN103465090A (en) * 2013-09-19 2013-12-25 浙江金火机床有限公司 Lathe feeding system
CN103625941A (en) * 2013-11-14 2014-03-12 攀钢集团研究院有限公司 Powdery material feeding system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201598016U (en) * 2010-01-13 2010-10-06 鞍钢股份有限公司 Emergency feeding device
CN202704600U (en) * 2012-08-13 2013-01-30 攀钢集团攀枝花钢铁研究院有限公司 Powder feeding system and feeding system of chlorination furnace
CN103465090A (en) * 2013-09-19 2013-12-25 浙江金火机床有限公司 Lathe feeding system
CN103625941A (en) * 2013-11-14 2014-03-12 攀钢集团研究院有限公司 Powdery material feeding system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109052461A (en) * 2018-10-18 2018-12-21 成都先进金属材料产业技术研究院有限公司 Handle the big production capacity fused salt chlorimation device and production method of high calcium magnesium titanium slag
CN109650699A (en) * 2019-02-27 2019-04-19 郑州旭飞光电科技有限公司 A kind of automatic-exchanging system of charger
CN114132694A (en) * 2021-12-23 2022-03-04 重庆华彬伟玻璃有限公司 Emergency feeder for glass bottle raw materials

Similar Documents

Publication Publication Date Title
CN107352578A (en) The charging system of chlorination furnace and there is its chlorination furnace
CN103349930A (en) Fertilizer distributing machine
CN213864488U (en) Clean grain business turn over silo system
CN203372726U (en) Automatic discharging hopper and hopper-type conveyor
CN209125989U (en) A kind of production line for magnesia carbon brick product
CN210128625U (en) Automatic feeding system of brown corundum smelting furnace
CN201567296U (en) Automatic firework and medicine mixing equipment
CN101513878A (en) Automatic unloading line for recrement
CN208103405U (en) It is a kind of for producing the automated feeding transportation system of fused cast refractories
CN210128624U (en) Automatic material preparation system of brown corundum smelting furnace
CN102826319B (en) Stock yard
CN109353838A (en) A kind of bucket-wheel stacker reclaimer with transport function
CN104044832A (en) Material storage and feeding device for movable grouting station
CN206154496U (en) Automatic molding system of prebaked anode unburned bricks
CN105415502B (en) A kind of mixing plant
CN205499484U (en) Automatic dispenser material flow reinforcing means that packs of phosphate
CN208307962U (en) Mechanical feed compensation device
CN209160974U (en) Distributing structure and broken building material-distributing system
CN208103404U (en) It is a kind of for producing the automatic feeding device of fused cast refractories
CN205932549U (en) Feeding system gathers materials
CN220643223U (en) Intermediate material processing system for double-flash copper smelting
CN206407561U (en) A kind of multiple discharge elevator of self-cleaning
CN210700563U (en) Cross-unit mixture conveying system
CN218595393U (en) Stable shunt system for material conveying
CN216377886U (en) Glass production batching transfer chain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171117

WW01 Invention patent application withdrawn after publication