CN107332122A - A kind of data center's rack and data center's electric power system and method - Google Patents

A kind of data center's rack and data center's electric power system and method Download PDF

Info

Publication number
CN107332122A
CN107332122A CN201710756652.1A CN201710756652A CN107332122A CN 107332122 A CN107332122 A CN 107332122A CN 201710756652 A CN201710756652 A CN 201710756652A CN 107332122 A CN107332122 A CN 107332122A
Authority
CN
China
Prior art keywords
electric energy
data center
pdu
ups
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710756652.1A
Other languages
Chinese (zh)
Inventor
张立功
殷飞平
范长征
张明智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710756652.1A priority Critical patent/CN107332122A/en
Publication of CN107332122A publication Critical patent/CN107332122A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention provides a kind of data center's rack and data center's electric power system and method, data center's rack includes:Cabinet body, uninterrupted power source UPS and at least one consuming parts;The UPS and at least one described consuming parts are respectively positioned on inside the cabinet body;The UPS is connected with least one described consuming parts;The UPS, during for having electric energy input in outside, is powered using the electric energy of outside input at least one described consuming parts, and when outside is without electric energy input, the electric energy stored using included accumulator cell assembly is powered at least one described consuming parts.Data center's electric power system includes:At least two above-mentioned data center's racks, at least two data center rack is arranged side by side;The UPS in each described data center's rack is electrically connected with outside city.This programme can reduce requirement of the data center to computer room load-bearing.

Description

A kind of data center's rack and data center's electric power system and method
Technical field
The present invention relates to field of computer technology, more particularly to a kind of data center's rack and data center's electric power system and Method.
Background technology
Micromodule data center is as a kind of integrated data center, by the frame in traditional machine room, air-conditioning, fire-fighting, cloth Line, distribution, monitoring, lamp system becoming one product, have given full play to the advantage of modularized design, it is possible to achieve be Quick, the flexible deployment of system, with cost is low, construction period section the characteristics of.
At present, micromodule data center is typically using the power supply mode of centralization, i.e., by uninterrupted power source (Uninterruptible Power System/Uninterruptible Power Supply, UPS) and its accumulator cell assembly It is put together in a power distribution station, each data center's rack that each UPS includes with micromodule data center respectively is connected, Realization is powered to the server host in each data center's rack.
Because the weight of UPS and its accumulator cell assembly is larger, UPS and its accumulator cell assembly are subjected to concentration placement, can be right Supporting surface produces larger pressure, therefore the requirement to computer room load-bearing is higher.
The content of the invention
The embodiments of the invention provide data center's rack and data center feed system and method, it can reduce in data Requirement of the heart to computer room load-bearing.
In a first aspect, the embodiments of the invention provide a kind of data center's rack, including:Cabinet body, uninterrupted power source UPS and at least one consuming parts;
The UPS and at least one described consuming parts are respectively positioned on inside the cabinet body;
The UPS is connected with least one described consuming parts;
The UPS, during for having electric energy input in outside, using the electric energy of outside input at least one described electricity consumption portion Part is powered, and when outside is without electric energy input, and the electric energy stored using included accumulator cell assembly is to described at least one Individual consuming parts are powered.
Alternatively,
The UPS is located at the bottom of the cabinet body.
Alternatively,
Data center's rack further comprises:At least two power distribution unit PDU;
The first PDU at least two PDU is electrically connected with outside first via city;
The 2nd PDU at least two PDU is electrically connected by the UPS with the second outside tunnel city;
Each described consuming parts is connected with the first PDU and the 2nd PDU;
The consuming parts, for the electric energy inputted using the first via civil power, are powered by the first PDU;
The UPS, the electric energy for being inputted to second road civil power is carried out after voltage stabilizing processing, is handled using the voltage stabilizing Electric energy afterwards charges to the accumulator cell assembly, and transmits the electric energy after the voltage stabilizing processing to the 2nd PDU, and in institute When stating first via civil power and second road civil power without electric energy input, the electric energy stored in the accumulator cell assembly is transmitted To the 2nd PDU;
The consuming parts, for utilizing the electric energy from the UPS, are powered by the 2nd PDU.
Alternatively,
The UPS, is further used for being monitored the power supply parameter of the first via civil power and second road civil power, After the power supply parameter exceedes default threshold value, alert;
Wherein, the power supply parameter includes:It is any one or more in current value, magnitude of voltage and performance number.
Alternatively,
The consuming parts, for detecting on the first PDU and the 2nd PDU whether there is electric energy input, and,
When having electric energy input on the first PDU and the 2nd PDU, from the first PDU and the 2nd PDU Electric energy needed for upper acquisition is run;
When thering is electric energy to input on the first PDU and no electric energy is inputted on the 2nd PDU, from the first PDU Electric energy needed for upper acquisition is run;
When thering is electric energy to input on the 2nd PDU and no electric energy is inputted on the first PDU, from the 2nd PDU Electric energy needed for upper acquisition is run.
Second aspect, the embodiments of the invention provide a kind of data center's electric power system, including:At least two above-mentioned first Any one data center's rack that aspect is provided;
At least two data center rack is arranged side by side;
The UPS in each described data center's rack is electrically connected with outside city.
Alternatively,
When data center's rack includes at least two PDU, the system further comprises:At least two air conditioners Cabinet;
At least two Air conditioner cabinet is arranged side by side with least two data center rack, and the adjacent air-conditioning It is provided between rack, between adjacent data center's rack between adjacent data center's rack and Air conditioner cabinet Ventilating opening;
The first Air conditioner cabinet at least two Air conditioner cabinet is electrically connected with the outside first via city;
The second Air conditioner cabinet at least two Air conditioner cabinet is electrically connected with outside second tunnel city;
Each described Air conditioner cabinet, for the electric energy using the civil power input that is connected, at least two data center Temperature in rack is adjusted.
Alternatively,
The electric power system may further include:Distribution first cabinet of each row;
The distribution first cabinet of each row is arranged side by side with least two data center rack, and positioned at file leader;
The distribution first cabinet of each row, for by cable by outside civil power respectively with least two data center rack In the UPS be connected.
The third aspect, the embodiment of the present invention is additionally provided in a kind of any one data provided based on above-mentioned first aspect Data center's method of supplying power to of scheming cabinet, including:
External electric energy input has been detected whether using the UPS;
If it is, by the UPS, being powered using the electric energy of outside input at least one described consuming parts;
If not, by the UPS, the electric energy stored using the accumulator cell assembly is at least one described consuming parts Power supply.
Alternatively,
When data center's rack includes at least two PDU, further comprise:
The power supply parameter of the first via civil power and second road civil power is monitored, when the power supply parameter exceedes After default threshold value, alert;
Wherein, the power supply parameter includes:It is any one or more in current value, magnitude of voltage and performance number.
Data center's rack provided in an embodiment of the present invention and data center's electric power system and method, UPS and at least one Consuming parts are respectively positioned on inside cabinet body, and UPS is connected with each consuming parts.When having electric energy input in outside, UPS is outside The electric energy of portion's input is powered to each consuming parts;When outside is without electric energy input, UPS utilizes the batteries included by it The electric energy stored in part is powered to each consuming parts.As can be seen here, in a data center machine cabinet, UPS and its battery Component is responsible for each consuming parts and is powered, so as to realize the independently-powered of each data center's rack.With respect to UPS and its The mode of accumulator cell assembly centralized arrangement, the arrangement side in each data center's rack is distributed to by UPS and its accumulator cell assembly Formula, can reduce the pressure of UPS and its accumulator cell assembly to supporting surface, and computer room load-bearing is wanted so as to reduce data center Ask.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis These accompanying drawings obtain other accompanying drawings.
Fig. 1 is a kind of schematic diagram for data center's rack that one embodiment of the invention is provided;
Fig. 2 is the schematic diagram for another data center's rack that one embodiment of the invention is provided;
Fig. 3 is a kind of schematic diagram for data center's electric power system that one embodiment of the invention is provided;
Fig. 4 is the schematic diagram for another data center's electric power system that one embodiment of the invention is provided;
Fig. 5 is a kind of flow chart for data center's method of supplying power to that one embodiment of the invention is provided.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments, based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
As shown in figure 1, the embodiments of the invention provide a kind of data center's rack, data center's rack can include: Cabinet body 101, uninterrupted power source UPS102 and at least one consuming parts 103;
The UPS102 and at least one described consuming parts 103 are respectively positioned on inside the cabinet body 101;
The UPS102 is connected with least one described consuming parts 103;
The UPS102, during for having electric energy input in outside, using outside input electric energy to it is described at least one use Electric part 104 is powered, and when outside is without electric energy input, and the electric energy stored using included accumulator cell assembly is to described At least one consuming parts 103 is powered.
The embodiments of the invention provide a kind of data center's rack, UPS and at least one consuming parts are respectively positioned on rack sheet Internal portion, UPS is connected with each consuming parts.When having electric energy input in outside, UPS is used using the electric energy of outside input to each Electric part is powered;When outside is without electric energy input, UPS using the electric energy stored in the accumulator cell assembly included by device to each Consuming parts are powered.As can be seen here, in a data center machine cabinet, UPS and its accumulator cell assembly are responsible for each electricity consumption portion Part is powered, so as to realize the independently-powered of each data center's rack.With respect to UPS and its accumulator cell assembly centralized arrangement Mode, is distributed to the arrangement in each data center's rack by UPS and its accumulator cell assembly, can reduce UPS and its storage Battery component is to the pressure of supporting surface, so as to reduce requirement of the data center to computer room load-bearing.
Alternatively, in a data center machine cabinet, UPS and its accumulator cell assembly can be located at the bottom of cabinet body.
Because the weight of UPS and its accumulator cell assembly is larger, UPS and its accumulator cell assembly are placed on to the bottom of cabinet body Portion, makes UPS and its accumulator cell assembly press close to computer room ground, is supported by computer room in face of UPS and its accumulator cell assembly, can To reduce the pressure that cabinet body is born, so as to reduce the requirement to cabinet body intensity.Further, since UPS and its battery The weight of component is larger, and UPS and its accumulator cell assembly are placed on to the bottom of cabinet body, makes the weight of whole data center's rack The heart is reduced, and cabinet body can be made more to consolidate, and is reduced the vibration of cabinet body and is rocked.
Alternatively, as shown in Fig. 2
Data center's rack can also include:At least two power distribution units (Power Distribution Unit, PDU);
The first PDU2051 at least two PDU is connected with outside first via civil power AC1;
The 2nd PDU2052 at least two PDU is connected by UPS102 with the second outside road civil power AC2;
Each consuming parts 103 is connected with the first PDU2051 and the 2nd PDU2052;
Each consuming parts 103, for the electric energy inputted using first via civil power AC1, is powered by the first PDU2051;
UPS102, the electric energy for being inputted to the second road civil power AC2 is carried out after voltage stabilizing processing, the electricity after being handled using voltage stabilizing Its accumulator cell assembly can be charged, and the electric energy after voltage stabilizing processing is transmitted to the 2nd PDU;And in first via civil power AC1 When being inputted with the second road civil power AC2 without electric energy, the electric energy stored in its accumulator cell assembly is transferred to the 2nd PDU2052;
Each consuming parts 103, for utilizing the electric energy from UPS102, is powered by the 2nd PDU2052.
Each data center's rack can be electrically connected with two-way city, wherein, first via civil power AC1 is directly with first PDU2051 be connected, the second road civil power AC1 is connected with UPS102, and UPS102 is connected with the 2nd PDU2052, the 2nd PDU2052 and respectively Individual consuming parts 103 are connected.
As can be seen here, each consuming parts 103 is connected with the first PDU2051 and the 2nd PDU2052.When first via city When electric AC1 and the second road civil power AC2 have electric energy input, each consuming parts 103 is respectively from the first PDU2051 and second Electric energy needed for PDU2052 fetching portions, such as obtain the 50% of required electric energy from the first PDU2051 and the 2nd PDU2052 respectively Run.When only first via civil power AC1 has electric energy input, each consuming parts 103 obtains institute from the first PDU2051 The whole electric energy needed.When only the second road civil power AC2 has electric energy input, the electric energy that UPS102 is inputted to the second road civil power AC2 Carry out after voltage stabilizing processing, the electric energy after part voltage stabilizing is handled is transferred to the 2nd PDU2052, and utilizes remainder voltage stabilizing processing Electric energy afterwards charges to accumulator cell assembly, the whole needed for now each consuming parts 103 is obtained from the 2nd PDU2052 Electric energy.When first via civil power AC1 and the second road civil power AC2 are inputted without electric energy, UPS102 will be deposited in its accumulator cell assembly The electric energy of storage is converted to alternating current transmission to the 2nd PDU2052, and now each consuming parts 103 is needed for the 2nd PDU is obtained Whole electric energy.
On the one hand, each consuming parts is connected with two PDU, and each PDU is electrically connected with city all the way, when two-way city When electricity has electric energy input, electric energy needed for consuming parts can be obtained from two PDU, when wherein civil power does not have electric energy input all the way When, consuming parts can obtain required electric energy from the PDU that another road city is electrically connected, when two-way civil power is inputted without electric energy When, the electric energy that consuming parts are stored in can obtaining accumulator cell assembly from the PDU being connected with UPS.As can be seen here, two-way civil power and UPS accumulator cell assembly provides triple power supplies for consuming parts and ensured, it is ensured that the reliability being powered for consuming parts.
On the other hand, UPS is only connected on civil power all the way, while electrical stability is ensured, UPS needed for reducing Quantity, reduces the cost being powered for data center, and can reduce UPS gross weight, reduce further to machine The requirement of room load-bearing.
Alternatively, UPS can also be monitored to the power supply parameter of first via civil power and the second road civil power, such as to two-way The parameters such as electric current, voltage and the power of civil power are monitored, after power supply parameter exceedes default threshold value, alert. Specifically, warning message can be sent to operation maintenance personnel by way of short message, notify operation maintenance personnel in time to power supply trouble Repaired.
For example, when civil power all the way, two-way civil power or when being broken down with one or more of UPS itself, with light, police The mode of report sound sends alarm, and short message knows that operation maintenance personnel is safeguarded all, prevents UPS accumulator cell assembly internal electric energy from disappearing The still unrecovered situation of two-way civil power occurs when consumption is finished, and improves the reliability that data center powers.In addition, battery starts to release During electric discharge energy, the system of server signal can be sent into data center, server is preserved related data prevents loss of data, Ensure the security of data center's data.
Alternatively, whether each consuming parts can be detected on the first PDU and the 2nd PDU electric energy input, when first When having electric energy input on PDU and the 2nd PDU, consuming parts are carried out from fetching portion electric energy on the first PDU and the 2nd PDU respectively Operation;When having electric energy to input on the first PDU and no electric energy is inputted on the 2nd PDU, consuming parts obtain institute from the first PDU The whole electric energy needed are run;When thering is electric energy to input on the 2nd PDU and no electric energy is inputted on the first PDU, consuming parts Whole electric energy needed for being obtained from the 2nd PDU are run.
As can be seen here, when even a PDU has electric energy input, electrical equipment is respectively needed for each PDU fetching portion Electric energy is run, and reduces each PDU load, extends PDU service life.When only one PDU has electric energy input, Electrical equipment obtains required whole electric energy from the PDU, it is ensured that the stability of power supply.
As described in Figure 3, the embodiments of the invention provide a kind of data center's electric power system, including:At least two above-mentioned realities Any one data center's rack 301 of example offer is provided;
Each data center's rack 301 is arranged side by side, and the UPS in each data center's rack 301 with it is outside Civil power AC is connected.
The embodiments of the invention provide a kind of data center's electric power system, due to being equipped with each data center's rack There is UPS, it is not necessary to which the power distribution station or power distribution cabinet concentrated and place UPS and its accumulator cell assembly are set again, by UPS and its batteries Part is distributed in each data center's rack, reduces the pressure that UPS and its accumulator cell assembly are produced to supporting surface, so as to Reduce the requirement to computer room load-bearing.
Alternatively, when including at least two PDU in each data center's rack, also electric power system can also be wrapped Include at least two Air conditioner cabinets;
Each Air conditioner cabinet is arranged side by side with each data center, and between adjacent Air conditioner cabinet, adjacent data center machine Between cabinet ventilating opening is provided between adjacent data center rack and Air conditioner cabinet;
The first Air conditioner cabinet at least two Air conditioner cabinets is electrically connected with outside first via city;
The second Air conditioner cabinet at least two Air conditioner cabinets is electrically connected with the second outside tunnel city;
Each Air conditioner cabinet, for the electric energy using the civil power input that is connected, to the temperature in each data center's rack It is adjusted.
For example, as shown in figure 4, electric power system includes 13 data center machine cabinets 401 and 4 Air conditioner cabinets 402;
First row is disposed with 6 data center machine cabinets 401 and 2 Air conditioner cabinets 402, wherein, each Air conditioner cabinet 402 Both sides are arranged between 2 data center machine cabinets 401, adjacent data center rack 401 and are provided with ventilating opening, conjoint data Ventilating opening is provided between scheming cabinet 401 and Air conditioner cabinet 402;
Secondary series is disposed with 7 data center machine cabinets 401 and 2 Air conditioner cabinets 402, wherein, first Air conditioner cabinet 402 Both sides be arranged with 2 data center machine cabinets 401, the side of second Air conditioner cabinet 402 is disposed with 2 data center machine cabinets 401, opposite side is disposed with 3 data center machine cabinets 401;Ventilating opening is provided between adjacent data center rack 401, be connected number Ventilating opening is provided with according between center rack 401 and Air conditioner cabinet 402;
An Air conditioner cabinet 402 is connected with first via civil power AC1 in first row, another tunnel of Air conditioner cabinet 402 and second Civil power AC2 is connected;
An Air conditioner cabinet 402 is connected with first via civil power AC1 in secondary series, another tunnel of Air conditioner cabinet 402 and second Civil power AC2 is connected;
Each Air conditioner cabinet 402, for the electric energy using the civil power input that is connected, in each data included to column Temperature in scheming cabinet 401 is adjusted.
Air conditioner cabinet and data center rack are arranged side by side, Air conditioner cabinet using outside civil power input unified pair of electric energy Temperature in each data center's rack is adjusted, and the arrangement and dilatation for making data center more facilitate.In addition, same data In each Air conditioner cabinet that center includes, part Air conditioner cabinet is electrically connected with first via city, part Air conditioner cabinet and the second tunnel city It is electrically connected, so, when wherein civil power breaks down all the way, being partly connected to Air conditioner cabinet on another road civil power still can be after Reforwarding row, is that data center's rack is cooled, it is ensured that data center will not improve pair because temperature is too high and breaks down The reliability that data center is radiated.
Alternatively, as described in Figure 4,
Data center's electric power system can also include:Distribution first cabinet of each row 403;
Distribution first cabinet of each row 403 is arranged side by side with each data center's rack 401, and positioned at file leader;
Distribution first cabinet of each row 403 be used for by cable by outside civil power respectively with the UPS phases in each data center's rack Even.
One data center configuration, one distribution first cabinet of each row, civil power enters after distribution first cabinet of each row, from distribution first cabinet of each row to each PSU and PDU transmission electric energy in individual data center machine cabinet, realize the centralized management of distribution, lifting carries out distribution to data center The efficiency of management.In addition, distribution first cabinet of each row is located at file leader, it is convenient that dilatation is carried out to data center.
As shown in figure 5, one embodiment of the invention provides a kind of number based on any one foregoing data center's rack According to center feed method, this method may comprise steps of:
Step 501:External electric energy input has been detected whether using the UPS, if it is, performing step 502, has otherwise been performed Step 503;
Step 502:By the UPS, powered using the electric energy of outside input at least one described consuming parts, and tie Beam current process;
Step 503:By the UPS, the electric energy stored using included accumulator cell assembly is at least one described use Electric part is powered.
Data center's method of supplying power to provided in an embodiment of the present invention, due to being deployed with each data center's rack UPS, for each data center's rack, when having electric energy input in outside, the UPS included by data center's rack, Each consuming parts that data center's rack includes are powered using the electric energy of outside input;In outside without electric energy During input, the UPS included by data center's rack, the electric energy stored using UPS accumulator cell assembly is in the data Each consuming parts that scheming cabinet includes are powered.Because each rack can be independently powered, without setting Concentrate power distribution cabinet, the multiple UPS and its storage that same data center is included after the power distribution station of deployment UPS and its accumulator cell assembly The weight dispersed placement of battery component, reduces the pressure of UPS and its accumulator cell assembly to supporting surface, so as to reduce in data Requirement of the heart to computer room load-bearing.
Alternatively, can be to first via civil power and the second tunnel city when including at least two PDU in data center's rack The power supply parameter of electricity is monitored, after power supply parameter exceedes default threshold value, alert.Wherein, power supply parameter can With including current value, magnitude of voltage, performance number etc..
It is monitored by the power supply parameter to two-way civil power, when the part or all of failure in two-way civil power, It can notify that corresponding operation maintenance personnel is safeguarded in time, it is ensured that the stability and security of power supply.
Below by taking data center's rack shown in Fig. 2 as an example, data center's method of supplying power to provided in an embodiment of the present invention is made It is further described, as shown in Fig. 2
When the second road civil power AC2 has electric energy input, UPS102 carries out steady to the electric energy that the second road civil power AC2 is inputted first Pressure processing, detailed process is to be converted to the second road civil power AC2 alternating currents inputted after direct current, and conversion is obtained into direct current again Electricity is converted to alternating current.After the electric energy that UPS102 is inputted to the second road civil power AC2 carries out voltage stabilizing processing, if UPS102 storage The electric energy stored in battery component is not reaching to the upper limit, and the electric energy that part is carried out after voltage stabilizing processing is transferred to its electric power storage by UPS102 Pond component, to be charged to accumulator cell assembly, and the electric energy that remainder is carried out after voltage stabilizing processing is transferred to second PDU052;If the electric energy stored in UPS102 accumulator cell assembly has reached the upper limit, UPS102 will be carried out after voltage stabilizing processing Whole electric energy be transferred to the 2nd PDU1052.
When first via civil power AC1 has electric energy input, the first via realizes that electric energy is directly transferred to the first PDU1051 by AC1.
When first via civil power AC1 and the second road civil power AC2 have electric energy input, each consuming parts 103 simultaneously from First PDU2051 and the 2nd PDU2052 obtains required electric energy, from electric energy acquired in the first PDU2051 and the 2nd PDU2052 Summation is equal to the electric energy needed for the consuming parts 103.Such as, there is electric energy defeated in first via civil power AC1 and the second road civil power AC2 Fashionable, consuming parts 103 obtain the 50% of required electric energy from the first PDU2051, and required electric energy is obtained from the 2nd PDU2052 50%.
When first via civil power AC1 has electric energy input and the second road civil power AC2 does not have electric energy input, each consuming parts 103 obtain required whole electric energy from the first PDU2051.Now, UPS102 is waited for, if first via civil power AC1 No electric energy that breaks down is inputted, and the electric energy stored in its accumulator cell assembly is converted into alternating current transmission to second immediately PDU2052, so that consuming parts 103 can obtain required electric energy from the 2nd PDU2052.
When the second road civil power AC2 has electric energy input and first via civil power AC1 does not have electric energy input, each consuming parts 103 obtain required whole electric energy from the 2nd PDU2052.Now, UPS102 is monitoring the second road civil power AC2 power supply shape simultaneously State, the electric energy stored in its accumulator cell assembly when the no electric energy input of the second road civil power AC2 failures, changed strike a bargain immediately The 2nd PDU2052 is defeated by stream fax, so that consuming parts 103 can obtain required electric energy from the 2nd PDU2052.
When first via civil power AC1 and the second road civil power AC2 are inputted without electric energy, UPS102 is by its accumulator cell assembly The electric energy of storage, which is converted into after alternating current, is transferred to the 2nd PDU2052, temporarily maintains the utilization of consuming parts 103.Now, electricity consumption Part 103 obtains required whole electric energy from the 2nd PDU.
Data center's rack and data center's electric power system and method that each embodiment of the invention is provided, at least with such as Lower beneficial effect:
1st, in embodiments of the present invention, UPS and at least one consuming parts are respectively positioned on inside cabinet body, UPS and each Consuming parts are connected.When having electric energy input in outside, UPS is powered using the electric energy of outside input to each consuming parts;Outside When portion does not have electric energy input, UPS is powered using the electric energy stored in its accumulator cell assembly to each consuming parts.As can be seen here, In a data center machine cabinet, UPS and its accumulator cell assembly are responsible for each consuming parts and are powered, so as to realize each Data center's rack it is independently-powered.With respect to UPS and its mode of accumulator cell assembly centralized arrangement, by UPS and its batteries Part is distributed to the arrangement in each data center's rack, can reduce the pressure of UPS and its accumulator cell assembly to supporting surface, So as to reduce requirement of the data center to computer room load-bearing.
2nd, in embodiments of the present invention, each data center's rack has two-way city to be electrically accessed, wherein civil power is direct all the way Be connected with a PDU, another road civil power is connected by PSU with another PDU, and each consuming parts away from the two PDU It is connected.When two-way civil power has electric energy input, consuming parts obtain required electric energy from two PDU;When only wherein city all the way When electricity has electric energy input, consuming parts electric energy needed for being obtained with the PDU that the road city is electrically connected;When two-way civil power is without electric energy During input, consuming parts obtain the electric energy of accumulator cell assembly storage from the PDU being connected with UPS., can by such power supply mode To improve the reliability being powered to data center.
3rd, in embodiments of the present invention, each data center's rack has two-way city to be electrically accessed, wherein civil power passes through all the way UPS is powered to consuming parts, and another road civil power is directly powered to consuming parts.So, due to only being disposed on civil power all the way UPS, it is possible to reduce the total quantity of UPS included by data center, on the one hand reduces the cost of data center's electric power system, another Aspect can further reduce requirement of the data center to computer room load-bearing.
4th, in embodiments of the present invention, due to being equipped with UPS and its accumulator cell assembly in each data center's rack, Realize the independently-powered of each data center's rack.So, when carrying out dilatation to data center, it is only necessary to add one Or multiple data center's racks, the data center's rack added and city, which are electrically connected, can realize to new interpolation data center machine The power supply of cabinet, the relative arrangement being put together at UPS and its accumulator cell assembly in power distribution room or power distribution cabinet is improved pair Data center carries out the convenience of dilatation.
5th, in embodiments of the present invention, disposed in each data center's rack after UPS and its accumulator cell assembly, data Center eliminates integrated power supply cabinet and accumulator tank, only retains a distribution first cabinet of each row, can enter on the premise of not powering off Row maintenance, dilatation and replacing power module, improve data center's reliability of operation.
It should be noted that herein, such as first and second etc relational terms are used merely to an entity Or operation makes a distinction with another entity or operation, and not necessarily require or imply exist between these entities or operation Any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant be intended to it is non- It is exclusive to include, so that process, method, article or equipment including a series of key elements not only include those key elements, But also other key elements including being not expressly set out, or also include solid by this process, method, article or equipment Some key elements.In the absence of more restrictions, the key element limited by sentence " including one ", is not arranged Except also there is other identical factor in the process including the key element, method, article or equipment.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above method embodiment can pass through Programmed instruction related hardware is completed, and foregoing program can be stored in the storage medium of embodied on computer readable, the program Upon execution, the step of including above method embodiment is performed;And foregoing storage medium includes:ROM, RAM, magnetic disc or light Disk etc. is various can be with the medium of store program codes.
It is last it should be noted that:Presently preferred embodiments of the present invention is the foregoing is only, the skill of the present invention is merely to illustrate Art scheme, is not intended to limit the scope of the present invention.Any modification for being made within the spirit and principles of the invention, Equivalent substitution, improvement etc., are all contained in protection scope of the present invention.

Claims (10)

1. a kind of data center's rack, it is characterised in that including:Cabinet body, uninterrupted power source UPS and at least one electricity consumption portion Part;
The UPS and at least one described consuming parts are respectively positioned on inside the cabinet body;
The UPS is connected with least one described consuming parts;
The UPS, during for having electric energy input in outside, is supplied using the electric energy of outside input at least one described consuming parts Electricity, and when outside is without electric energy input, the electric energy stored using included accumulator cell assembly is at least one described use Electric part is powered.
2. data center's rack according to claim 1, it is characterised in that
The UPS is located at the bottom of the cabinet body.
3. data center's rack according to claim 1 or 2, it is characterised in that further comprise:At least two power supplys point With unit PDU;
The first PDU at least two PDU is electrically connected with outside first via city;
The 2nd PDU at least two PDU is electrically connected by the UPS with the second outside tunnel city;
Each described consuming parts is connected with the first PDU and the 2nd PDU;
The consuming parts, for the electric energy inputted using the first via civil power, are powered by the first PDU;
The UPS, the electric energy for being inputted to second road civil power is carried out after voltage stabilizing processing, after being handled using the voltage stabilizing Electric energy charges to the accumulator cell assembly, and transmits the electric energy after voltage stabilizing processing to the 2nd PDU, and described the When civil power and second road civil power are inputted without electric energy all the way, the electric energy stored in the accumulator cell assembly is transferred to institute State the 2nd PDU;
The consuming parts, for utilizing the electric energy from the UPS, are powered by the 2nd PDU.
4. data center's rack according to claim 3, it is characterised in that
The UPS, is further used for being monitored the power supply parameter of the first via civil power and second road civil power, works as institute State power supply parameter to exceed after default threshold value, alert;
Wherein, the power supply parameter includes:It is any one or more in current value, magnitude of voltage and performance number.
5. data center's rack according to claim 3, it is characterised in that
The consuming parts, for detecting on the first PDU and the 2nd PDU whether there is electric energy input, and,
When having electric energy input on the first PDU and the 2nd PDU, obtained from the first PDU and the 2nd PDU Electric energy needed for taking is run;
When thering is electric energy to input on the first PDU and no electric energy is inputted on the 2nd PDU, obtained from the first PDU Electric energy needed for taking is run;
When thering is electric energy to input on the 2nd PDU and no electric energy is inputted on the first PDU, obtained from the 2nd PDU Electric energy needed for taking is run.
6. a kind of data center's electric power system, it is characterised in that including:Any described number at least two claims 1 to 5 According to center rack;
At least two data center rack is arranged side by side;
The UPS in each described data center's rack is electrically connected with outside city.
7. system according to claim 6, it is characterised in that when data center's rack includes at least two PDU When, the system further comprises:At least two Air conditioner cabinets;
At least two Air conditioner cabinet is arranged side by side with least two data center rack, and the adjacent Air conditioner cabinet Between, between adjacent data center's rack be provided with ventilation between adjacent data center's rack and Air conditioner cabinet Mouthful;
The first Air conditioner cabinet at least two Air conditioner cabinet is electrically connected with the outside first via city;
The second Air conditioner cabinet at least two Air conditioner cabinet is electrically connected with outside second tunnel city;
Each described Air conditioner cabinet, for the electric energy using the civil power input that is connected, at least two data center rack In temperature be adjusted.
8. the system according to claim 6 or 7, it is characterised in that further comprise:Distribution first cabinet of each row;
The distribution first cabinet of each row is arranged side by side with least two data center rack, and positioned at file leader;
The distribution first cabinet of each row, for by cable by outside civil power respectively with least two data center rack The UPS is connected.
9. a kind of data center's method of supplying power to based on any data center's rack in claim 1 to 5, its feature exists In, including:
External electric energy input has been detected whether using the UPS;
If it is, by the UPS, being powered using the electric energy of outside input at least one described consuming parts;
If not, by the UPS, the electric energy stored using included accumulator cell assembly is at least one described consuming parts Power supply.
10. method according to claim 9, it is characterised in that when data center's rack includes at least two PDU When, further comprise:
The power supply parameter of the first via civil power and second road civil power is monitored, preset when the power supply parameter exceedes Threshold value after, alert;
Wherein, the power supply parameter includes:It is any one or more in current value, magnitude of voltage and performance number.
CN201710756652.1A 2017-08-29 2017-08-29 A kind of data center's rack and data center's electric power system and method Pending CN107332122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710756652.1A CN107332122A (en) 2017-08-29 2017-08-29 A kind of data center's rack and data center's electric power system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710756652.1A CN107332122A (en) 2017-08-29 2017-08-29 A kind of data center's rack and data center's electric power system and method

Publications (1)

Publication Number Publication Date
CN107332122A true CN107332122A (en) 2017-11-07

Family

ID=60204610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710756652.1A Pending CN107332122A (en) 2017-08-29 2017-08-29 A kind of data center's rack and data center's electric power system and method

Country Status (1)

Country Link
CN (1) CN107332122A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108429336A (en) * 2018-04-02 2018-08-21 郑州云海信息技术有限公司 A kind of data center and its method of supplying power to
CN108448564A (en) * 2018-05-23 2018-08-24 郑州云海信息技术有限公司 A kind of micromodule data center distributive high-voltage direct current power supply system
CN108631433A (en) * 2018-05-11 2018-10-09 香江科技股份有限公司 Energy dispatching management information system and method between a kind of data center module cabinet
CN110377137A (en) * 2019-07-09 2019-10-25 广东华保数据有限公司 Power capacity management system and management method based on PDU monitoring
CN110809195A (en) * 2019-11-13 2020-02-18 榆林学院 Network security monitoring equipment based on big data and monitoring method thereof

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202652737U (en) * 2012-04-11 2013-01-02 艾默生网络能源有限公司 Modular data center cabinet
CN202661924U (en) * 2012-04-28 2013-01-09 北京天地云箱科技有限公司 Container type data center system
CN103633729A (en) * 2013-01-23 2014-03-12 世源科技工程有限公司 Distribution system for machine room of data center
US20140247537A1 (en) * 2013-03-01 2014-09-04 Panduit Corp. Medium Voltage Power Distribution in Data Centers
CN104836327A (en) * 2014-10-24 2015-08-12 国家电网公司 Machine room commercial power/UPS integrated power distribution cabinet
CN104917286A (en) * 2015-06-09 2015-09-16 浪潮电子信息产业股份有限公司 High-reliability complete machine cabinet continuous power supply device and method
CN104993479A (en) * 2015-07-09 2015-10-21 浪潮电子信息产业股份有限公司 Power supply method and power supply system of data center, and IT cabinet
CN204903643U (en) * 2015-07-02 2015-12-23 国家计算机网络与信息安全管理中心 Data center PUE monitoring devices
CN105388986A (en) * 2015-12-24 2016-03-09 曙光信息产业(北京)有限公司 Power supply system of server
CN105468102A (en) * 2015-11-24 2016-04-06 浪潮电子信息产业股份有限公司 Modularization data center system capable of being quickly deployed
CN105658041A (en) * 2016-04-05 2016-06-08 浪潮电子信息产业股份有限公司 Data center and data center cooling system
CN205726869U (en) * 2016-07-01 2016-11-23 厦门科华恒盛股份有限公司 A kind of data center heat dissipation system
CN205901430U (en) * 2016-08-18 2017-01-18 联方云天科技(北京)有限公司 High reliability network deployment structure based on distributing type power supply system
CN106356841A (en) * 2016-09-13 2017-01-25 郑州云海信息技术有限公司 Power distribution and supply system and method of data center
CN106774771A (en) * 2017-01-04 2017-05-31 北京百度网讯科技有限公司 Electric power system and its method for controlling power supply
CN206402630U (en) * 2017-02-06 2017-08-11 深圳市艾特网能技术有限公司 A kind of modular data center temperature control system
CN207149927U (en) * 2017-08-29 2018-03-27 郑州云海信息技术有限公司 A kind of data center's rack and data center's electric power system

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202652737U (en) * 2012-04-11 2013-01-02 艾默生网络能源有限公司 Modular data center cabinet
CN202661924U (en) * 2012-04-28 2013-01-09 北京天地云箱科技有限公司 Container type data center system
CN103633729A (en) * 2013-01-23 2014-03-12 世源科技工程有限公司 Distribution system for machine room of data center
US20140247537A1 (en) * 2013-03-01 2014-09-04 Panduit Corp. Medium Voltage Power Distribution in Data Centers
CN104836327A (en) * 2014-10-24 2015-08-12 国家电网公司 Machine room commercial power/UPS integrated power distribution cabinet
CN104917286A (en) * 2015-06-09 2015-09-16 浪潮电子信息产业股份有限公司 High-reliability complete machine cabinet continuous power supply device and method
CN204903643U (en) * 2015-07-02 2015-12-23 国家计算机网络与信息安全管理中心 Data center PUE monitoring devices
CN104993479A (en) * 2015-07-09 2015-10-21 浪潮电子信息产业股份有限公司 Power supply method and power supply system of data center, and IT cabinet
CN105468102A (en) * 2015-11-24 2016-04-06 浪潮电子信息产业股份有限公司 Modularization data center system capable of being quickly deployed
CN105388986A (en) * 2015-12-24 2016-03-09 曙光信息产业(北京)有限公司 Power supply system of server
CN105658041A (en) * 2016-04-05 2016-06-08 浪潮电子信息产业股份有限公司 Data center and data center cooling system
CN205726869U (en) * 2016-07-01 2016-11-23 厦门科华恒盛股份有限公司 A kind of data center heat dissipation system
CN205901430U (en) * 2016-08-18 2017-01-18 联方云天科技(北京)有限公司 High reliability network deployment structure based on distributing type power supply system
CN106356841A (en) * 2016-09-13 2017-01-25 郑州云海信息技术有限公司 Power distribution and supply system and method of data center
CN106774771A (en) * 2017-01-04 2017-05-31 北京百度网讯科技有限公司 Electric power system and its method for controlling power supply
CN206402630U (en) * 2017-02-06 2017-08-11 深圳市艾特网能技术有限公司 A kind of modular data center temperature control system
CN207149927U (en) * 2017-08-29 2018-03-27 郑州云海信息技术有限公司 A kind of data center's rack and data center's electric power system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108429336A (en) * 2018-04-02 2018-08-21 郑州云海信息技术有限公司 A kind of data center and its method of supplying power to
CN108631433A (en) * 2018-05-11 2018-10-09 香江科技股份有限公司 Energy dispatching management information system and method between a kind of data center module cabinet
CN108448564A (en) * 2018-05-23 2018-08-24 郑州云海信息技术有限公司 A kind of micromodule data center distributive high-voltage direct current power supply system
CN110377137A (en) * 2019-07-09 2019-10-25 广东华保数据有限公司 Power capacity management system and management method based on PDU monitoring
CN110809195A (en) * 2019-11-13 2020-02-18 榆林学院 Network security monitoring equipment based on big data and monitoring method thereof

Similar Documents

Publication Publication Date Title
CN107332122A (en) A kind of data center's rack and data center's electric power system and method
US9377832B1 (en) Data center in a rack
CN102545355B (en) Cabinet power supply system
CN107579592A (en) A kind of data center's electric power system and method for supplying power to
CN104779634A (en) Micro-grid energy storage scheduling method
CN207149927U (en) A kind of data center's rack and data center's electric power system
CN101572426A (en) Charge-discharge control system of storage battery
CN107394883A (en) A kind of container-type data center and its method of supplying power to
CN202679050U (en) Communication base station centralized power supply system
CN107171199A (en) A kind of container-type data center and its method of supplying power to
CN206878337U (en) A kind of container-type data center
CN207408502U (en) Monitor and high-frequency switching power supply module based on communication power supply
CN104242428B (en) A kind of method of supplying power to and device for Information Technology Equipment
CN110212526B (en) Power supply system and micro-module data center
CN103312024A (en) Machine room distributed back-up DC power supply system
CN202455153U (en) Generator room distribution type backup direct current power supply system
CN106487067A (en) The power-supply management system of vehicle accident Emergency Command Vehicle and method
CN204243885U (en) The uninterruptible power system of a kind of plateau ambulance
CN207200374U (en) Reduce the distribution system of computer room electric cost
CN207200375U (en) A kind of container-type data center
CN206272276U (en) The power-supply management system of traffic accident Emergency Command Vehicle
CN108448564A (en) A kind of micromodule data center distributive high-voltage direct current power supply system
CN207184143U (en) A kind of rack and its data center
CN207074414U (en) A kind of server powersupply system
CN208226666U (en) A kind of data center's air-conditioning power supply system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107

RJ01 Rejection of invention patent application after publication