CN107328917A - The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel - Google Patents

The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel Download PDF

Info

Publication number
CN107328917A
CN107328917A CN201710693218.3A CN201710693218A CN107328917A CN 107328917 A CN107328917 A CN 107328917A CN 201710693218 A CN201710693218 A CN 201710693218A CN 107328917 A CN107328917 A CN 107328917A
Authority
CN
China
Prior art keywords
model
tunnel
frozen soil
face
excavation face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710693218.3A
Other languages
Chinese (zh)
Other versions
CN107328917B (en
Inventor
张军伟
黄新淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201710693218.3A priority Critical patent/CN107328917B/en
Publication of CN107328917A publication Critical patent/CN107328917A/en
Application granted granted Critical
Publication of CN107328917B publication Critical patent/CN107328917B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Analytical Chemistry (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to constructing tunnel model test field, it is specifically related to a kind of to be used to regulate and control simulation system and experimental method that frozen soil tunnel excavates face stability, simulation system includes model system, sensor-based system and processing system, model system includes being loaded with the model casing and tunnel model of frozen soil, tunnel model can insert frozen soil and can release, and then expose the excavation face of the simulation frozen soil tunnel communicated with the external world, sensor-based system includes the measuring apparatus being arranged in model casing frozen soil layer, the excavation face morphological parameters of measuring frozen simultaneously connect processing system, processing unit is sent data to by the data acquisition device of processing system, then processing data is exported after handling by analysis, the present invention simulates the operating mode of frozen soil tunnel construction, and morphological parameters measurement is carried out to excavation face and frozen soil, and drawn a conclusion after analyzing and handle through processing system, disclose excavation face Failure Mechanism, reference proposition is provided for engineering construction, reach and avoid Tunnel Landslide, the purpose that the accidents such as roof fall occur.

Description

The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel
Technical field
It is more particularly to a kind of to be used to regulate and control frozen soil tunnel excavation face stabilization the present invention relates to constructing tunnel model test field The simulation system and experimental method of property.
Background technology
Frozen soil is widely distributed in China, and its area accounts for 1/5th of China's land area.Public affairs are built in these areas Road and tunnel, are undoubtedly a challenge to engineers.During 13, country will build more high speeds in west area Highway, high-speed railway and city underground etc..Summarize successful experience in the past and carry out technological innovation, become engineers such as Modern vital task urgently to be resolved hurrily.
Frozen soil is extremely sensitive for temperature change, before permafrost tunnel country rock excavation face unstability is mainly due to excavation face Square frozen soil is in frozen soil country rock after hole internal-external heat exchange and in-cavity construction behavior double action, and excavation face is with frozen soil in front of excavation face The temperature difference is produced between country rock, heat spontaneously produces heat convection from frozen soil country rock depths transmission in front of excavation face, existed quickly The thawed core formed in frozen soil country rock.Thawed core is to cause frozen soil tunnel excavation face unstability " cause of all kinds of wickedness ".Therefore, if energy The dynamic evolution and excavation face Failure Mechanism of thawed core are grasped, can just correspond to and take corresponding measure to avoid Tunnel Landslide, emit How the generation of the disaster accidents such as top, therefore, obtain dynamic evolution, the Failure Mechanism of excavation face of thawed core, be frozen soil Area construction provides reliable technical proposal and data are supported, significant in the work progress of Frozen Ground Area as solving Target.
In the prior art, when being constructed in Frozen Ground Area, most of engineering is all suited measures to local conditions, according to engineering institute The actual conditions run into take Corresponding Countermeasures, do not form a set of effective method, countermeasure, and the engineering also having is built using finite element Formwork erection type is analyzed, but this finite element method theoretical property is too strong, can not replace the frozen soil tunnel excavation face of reality Construction operating mode, often through technical parameter is artificially introduced, reference significance and application value less, therefore, need a kind of laboratory badly System equipment, the system equipment energy simple operations, while thawed core drilling in Convective Heat Transfer in Practical Project can be simulated Change process.
The content of the invention
It is an object of the invention to:Development law and tunnel for thawed core can not be previously obtained during frozen soils construction The Failure Mechanism of road excavation face, cause during work progress can not to excavate for engineering construction regulation and control face stability provide with reference to and it is effective It is recommended that, and then it is used to regulate and control frozen soil tunnel there is provided one kind the problem of lead to not the disaster accidents such as advance preventing Tunnel Landslide, roof fall Road excavates the simulation system and experimental method of face stability, and the simulation system includes model system, sensor-based system and processing system, The operating mode of frozen soil tunnel construction and excavation face unstability is simulated by model system, and then by sensor-based system to excavation face and frozen soil Measure, obtain excavation face morphological parameters, and analyzed, handled using processing system, the dynamic for disclosing thawed core is drilled Become rule and excavation face Failure Mechanism, referred to and effectively suggestion so as to excavate face stability for engineering construction regulation and control and provide, effectively Avoid the generation of the disaster accidents such as Tunnel Landslide, roof fall.
In order to realize foregoing invention purpose, the invention provides following technical scheme:
It is a kind of to be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, including model system, sensor-based system and processing system System, wherein:
The model system includes offering installation tunnel on the model casing and tunnel model for being used to contain frozen soil, the model casing The large hole of model, enables the tunnel model to be released out of this large hole, and then makes the excavation face and extraneous phase of simulation frozen soil It is logical;
The sensor-based system includes temperature measuring set and seepage pressure measuring instrument, temperature measuring set and the seepage pressure measuring instrument It is connected in model casing and with processing system, temperature and seepage pressure for measuring frozen excavation face;
The processing system includes the data acquisition device for being used to gather the sensor-based system morphological parameters, the data acquisition device It is connected to store, analyze the processing unit of morphological parameters, the processing unit exports processing data.
Frozen soil is extremely sensitive to temperature change, during tunnel excavation, and the heat inside and outside tunnel is spontaneously from excavation face Front frozen soil country rock stretches out transmission and produces heat convection, so as to form thawed core in frozen soil country rock, thawed core makes frozen soil tunnel In the basic source of road excavation face unstability, this programme, after tunnel model is released out of frozen soil/skidded off, expose what is communicated with the external world The excavation face of frozen soil is simulated, excavation face both sides produce the temperature difference, carry out heat convection, melted so as to start thawing formation inside frozen soil Change the thawed core produced in area, simulation Frozen Ground Area work progress, and frozen soil is carried out by the sensor-based system in frozen soil Morphometry(Including temperature, seepage pressure etc.), analyzed by processing system and obtain the dynamic evolution of thawed core and open Digging face Failure Mechanism, provides for engineering construction regulation and control excavation face stability and refers to and effectively suggestion.
This programme simulates the excavation face of frozen soil tunnel by model system, by the sensor-based system in model casing Morphological parameters to frozen soil are measured, and these morphological parameters are gathered and transmitted to place by the harvester of processing system Device is managed, so that the analysis by processing unit is calculated, frozen soil tunnel excavation face unstability rule and Failure Mechanism, Jin Eryi is obtained By the unstability rule and the stability in Failure Mechanism regulation and control tunnel excavation face, it is to avoid tunnel caves in during practice of construction The disaster accidents such as roof fall.
Model system includes containing the model casing and the tunnel model in frozen soil of frozen soil, opens up large hole, makes tunnel Road model can be released/skidded off along the large hole, make excavation face(Specially face)Communicated with the external world, hand over the inside and outside heat that produces in hole Change, produce the temperature difference between square frozen soil and excavation face in face of excavation simulation, so as to produce the situation of heat convection, and make tunnel mould Type can be released from frozen soil/skidded off, and simulate in-cavity construction behavior, and the frozen soil in model casing is dual heat exchange and in-cavity construction Under effect, excavation face unstability, so as to simulate in tunnel excavation work progress, frozen soil fusing and excavation construction are lived in front of excavation face Dynamic to make the operating mode of frozen soil tunnel excavation face unstability, the frozen soil that the tunnel model of this programme is used can be selected according to actual conditions Select, the constructing tunnel operating mode of different Frozen Ground Areas can be simulated, flexibility is stronger, and the scope of application is widely.
Simulation system composition is simple, easy to operate, can simulate in Practical Project thawed core in Convective Heat Transfer Evolution process, so as to disclose the dynamic evolution and excavation face Failure Mechanism of thawed core.
It is preferred that, the tunnel model includes the supporting section being arranged in frozen soil and the control extended on the outside of large hole Lining model groove is provided with the outside of section, the supporting section, the lining model groove is used for the branch of solidification simulation tunnel lining structure The opening offered on model, the lining model groove for being separated with model for anchor is protected, the lining model groove is provided with installation branch Seat, and be connected to by the erection support in model casing.
The lining model groove is rectangular parallelepiped structure, and its length direction both ends of the surface is contacted with the inwall of model groove, lining cutting mould In six faces of type groove, in addition to upper surface and front end face, remaining four face closure, the front end face is the mould with offering large hole Molding box inwall laminating one side.According to this, the one side that large hole is opened up in model casing is also considered as front end face.
The lining model groove is cuboid metal trough.
Lining cutting during the model for anchor simulation tunnel construction, model for anchor is using the mixture warp for mixing a certain amount of iron wire Hardening by cooling is formed.
Lining model groove is arranged, for the model for anchor of solidification simulation tunnel-liner, the raw material of model for anchor is imported and served as a contrast Build in model groove, after after raw material hardening by cooling, take out model groove, form liner structure.In this way, it can simulate and freeze Lining cutting time of day under native environment, it is ensured that the true environment of the properer Frozen Ground Area construction of simulation system of this programme, is obtained Accurate excavation face morphological parameters, are that sufficient preparation is carried out in the analysis for carrying out excavation face instability Mechanism the later stage.In lining cutting mould Opening is set in type groove, after model for anchor solidification, lining model groove is separated with model for anchor by the opening, so as to take out lining Build model groove.
In the outside of tunnel model(That is outer wall)Lining model groove is provided with, makes more to press close to freeze by lining model groove The liner structure in soil area, it is ensured that the result obtained by this simulation system is correct reliable, so that with higher reference And break-up value.
Because the thawed core formed in frozen soil country rock is the basic source of excavation face unstability, by setting model for anchor, more Plus supporting role of the model for anchor to the frozen soil after generation thawed core is thoroughly analyzed, analysis obtains the lining cutting under frozen soil environment Structure is to preventing the effect of Tunnel Landslide.
It is preferred that, the model system also includes the track-type facilities for being used to support the tunnel model to slide.
Track-type facilities are set, for supporting tunnel model, tunnel model is entered line slip along track-type facilities, so as to ensure tunnel Road model is moved in fixed-direction, it is to avoid producing skew causes broken line to move.
It is preferred that, the track-type facilities include being arranged in the screw mandrels of tunnel model both sides, the screw mandrel through model casing from Frozen soil extends from inside to outside, and its bearing of trend is parallel with tunnel model, and the control section end of the tunnel model is connected with support and slided Plate, the screw mandrel is fixed after passing through support skid by screw mandrel spud pile.
The track-type facilities of aforesaid way are taken, tunnel model is entered line slip along screw mandrel, it is ensured that glide direction is fixed, are made Tunnel model do not shifted in sliding process, misorientation.
It is preferred that, support skid is welded as a whole with tunnel model.
One end of screw mandrel is located in frozen soil, and the other end is extended on the outside of model casing, and the screw mandrel spud pile is located at screw mandrel mould Molding box lateral ends.
It is preferred that, the model casing is the rectangular box that top is provided with back pressure plate, and the back pressure plate and model casing are removable Formula connection is unloaded, model casing is realized by back pressure plate and is opened and closed, the inwall of the model casing is provided with thermal insulation layer.
Model casing is opened and/or closed by back pressure plate, so as to carry out cloth to model system in experimentation Put and install, and fill the frozen soil of different attribute as needed, carry out the excavation face stability analysis under a variety of frozen soil environments.
Thermal insulation layer is set in model casing, effectively can prevent frozen soil from radiating, so that frozen soil keeps former in a long time It is stateful, it is ensured that there is simulation system time enough to carry out simulated experiment, it is ensured that data more closing to reality.
The thermal insulation layer is adiabatic coiled material, and adiabatic coiled material, the thermal insulation are arranged with along along six internal faces of rectangular box The thickness of coiled material is corresponding with the volume of model casing, it is ensured that the frozen soil in model casing is chronically at the trystate of needs.
It is preferred that, backpressure device is installed on the model casing, the backpressure device includes consolidating installed in model casing top Fixed board, the two ends of the fixed plate are connected with locking pull bar.
Installation locking pull bar, makes the fixed plate be strained and fixed by locking pull bar, and frozen soil is contained in model casing, works as frozen soil Fill after model casing, it is necessary to ensure frozen soil compacting fill up, using the backpressure device of this programme, can to frozen soil carry out compaction treatment.
The cable-through hole passed through for sensor-based system wiring is additionally provided with the model casing.
Due to being disposed with the sensor-based system for measuring frozen morphological parameters in frozen soil, sensor-based system includes a variety of measurements Equipment, measuring apparatus is needed to be connected with processing system, by opening up cable-through hole on model casing, and the wiring for measuring apparatus is led to Cross.
The cable-through hole is adapted to wiring, it is to avoid cable-through hole is excessive, prevents radiating serious.
It is preferred that, the sensor-based system also includes displacement meter, soil pressure cell and foil gauge, and the soil pressure cell is arranged on lining Structural outside layers are built, the position close to excavation face in frozen soil is also disposed with soil pressure cell, and the displacement meter is arranged close to model Also displacement meter is disposed with the frozen soil top layer of case upper surface inwall, and in the rear end face inwall frozen soil top layer of model casing, it is described to answer Become piece and be arranged in liner structure outer surface at excavation face.
Using soil pressure cell measuring frozen each time of measuring point pressure, so as to obtain pressure changing, displacement Count for the settling amount in measuring frozen layer, so as to analyze the steadiness of excavation face according to settling amount.
Foil gauge is arranged, the dependent variable of liner structure each point is measured by foil gauge, so that the dynamic to analyze thawed core Development law and excavation face Failure Mechanism provide basic data.
The foil gauge is low temperature uniaxial strain piece, and foil gauge is adopted is arranged on liner structure at excavation face in the method for paste Outer surface.
It is preferred that, the displacement is calculated as linear displacement transducer.
It is preferred that, the soil pressure cell is the special miniature soil pressure cell of model test.
It is preferred that, the smaller hole for installing brace rod is offered on the rear end face of the model casing, the brace rod connects Fixed plate is connected to, the brace rod and fixed plate are used to install soil pressure cell and displacement meter.
The brace rod is reinforcing bar, and the fixed plate is square plate, and reinforcing bar and square plate are welded to connect.
The end face that large hole is offered on model casing is front end face, and opposite side is rear end face, and branch is arranged on rear end face Muscle is supportted, and the brace rod is fixed by fixed plate, such structure is easily installed soil pressure cell and displacement meter, makes soil pressure Box and displacement meter are fixed.
The processing system includes the data acquisition device for being used to gather the sensor-based system morphological parameters, the data acquisition Device is connected to store, analyze the processing unit of morphological parameters, and the processing unit exports processing data.
It is preferred that, the data acquisition device includes data collecting instrument and deformeter, and the data collecting instrument is used to obtain Settling amount, the measuring point temperature of temperature measuring set measurement and the liner structure dependent variable of foil gauge measurement of displacement meter measurement, it is described Deformeter is used for the soil pressure for the seepage pressure and soil pressure cell measurement for gathering the measurement of seepage pressure measuring instrument, the data acquisition Instrument and deformeter are connected to processing unit, and the processing unit is computer system, and computer system can also store sensor-based system The data monitored, and built-in analysis module carries out data analysis.
Accordingly, it is used to regulate and control the experiment side in country rock temperature field in front of frozen soil tunnel excavation face present invention also offers a kind of Method, is regulated and controled to temperature field using simulation system described above, comprised the following steps:
A, composition model system, predefine the size of tunnel model, and open up on model casing it is corresponding with tunnel model compared with Macropore, while opening up smaller hole and cable-through hole, is ready to be fixed after model casing, and installs heat-insulated in the model chamber interior wall Layer;
B, tunnel model is moved to inside model casing, lining model groove is installed, and passes through lining model groove makes model for anchor;
C, removal lining model groove, and the frozen soil for needing to analyze is laid in model casing, while arranging sensor-based system;
D, tunnel model released, expose face and liner structure, be passed through the hot blast of different temperatures;
E, frozen soil tunnel excavation face Failure Mechanism is obtained by processing system.
When containing frozen soil in model casing, the type of frozen soil is similar to the frozen soil during practice of construction, different in analysis Frozen Ground Area tunnel excavation during excavation face stability when, correspondence take corresponding frozen ground types, so as to obtain the jelly The Tunnel Stability mechanism in soil area, and corresponding scheme is provided.The simulation system and experimental method of the present invention can be used for various The sunykatuib analysis of frozen ground types, and provide suggestion and advisory opinion to the construction of Practical Project.
After tunnel model is released, toward face and liner structure in be passed through the hot blast of different temperatures, can simulate different External environment condition, progress obtains the stabilization that same type of frozen soil carries out excavation face during heat exchange under different environmental conditions Implementations, so as to carry out many analyses, obtain more fully with wide in range data reference.
The experimental method of this programme is tested by foregoing simulation system, is obtained after the Failure Mechanism of tunnel excavation face, Corresponding Countermeasures can be just taken during practice of construction, the stability to frozen soil tunnel excavation face is adjusted, so as to effectively keep away Exempt from the generation of the disaster accidents such as Tunnel Landslide, roof fall.
It is preferred that, the temperature measuring set uses temperature sensor, and the seepage pressure measuring instrument uses osmometer, temperature Sensor and osmometer are arranged on multiple sections of tunnel model, including the section near excavation face, in each section On, extended with tunnel model centrally along multiple radial directions, each radial direction arranges multiple temperature sensors and many Temperature sensor and osmometer arrangement density near the individual osmometer, excavation face on section are higher than other sections.
Take aforesaid way to arrange temperature sensor and osmometer, temperature sensor and osmometer is arranged more comprehensive, The temperature variations and seepage pressure situation of change of all region frozen soil can be measured, makes data analysis, handle more accurate, Also the situation of change closer to frozen soil during practice of construction, the excavation face instability Mechanism for drawing the simulation system of this programme Analysis is more accurate.
The higher temperature sensor and osmometer of density is arranged in section near excavation face, so as to more accurately measure Excavate the permafrost change situation that surface construction is caused.
The temperature sensor and osmometer are sequentially arranged.
It is preferred that, the temperature sensor is popped one's head in for platinum resistance.
It is preferred that, the osmotic pressure is calculated as the special miniature osmometer of model test.
It is preferred that, in the step a, the size of tunnel model is determined according to Practical Project, and the size of tunnel model will expire The tunnel prototype of sufficient practice of construction and the similitude of tunnel model diabatic process, make in model the convection transfer rate likelihood ratio with it is several The product of what likelihood ratio is equal to the thermal conductivity factor likelihood ratio of frozen soil.
It is preferred that, in the step b, make model for anchor when, model for anchor using certain mass than water, gypsum, silicon Algae mixture and iron wire, which are made, to be formed, and model for anchor raw material is prepared in advance, is installed after lining model groove, by the original configured Material is poured into lining model groove, treats that it is cooled down, and hardening finally takes out lining model groove, so as to form the lining cutting knot of model system Structure.
It is preferred that, when model system is provided with backpressure device, increase step c ' after step c:Frozen soil is routed to mould During molding box tip position, thermal insulation layer is laid, and covers counter, then the frozen soil in model casing is pressed using backpressure device Crucial point is managed, and fixed backpressure device.
During the simulation system and experimental method of the present invention, the frozen soil used uses the refrigerator appliance system in laboratory , and in order to ensure freezing efficiency, frozen soil top layer is consistent with internal temperature, it is preferred that and frozen soil is using piecemeal realization, every piece Size be made as 30cm × 30cm × 30cm.
Compared with prior art, beneficial effects of the present invention:
1st, the excavation face of frozen soil tunnel is simulated by model system, by the sensor-based system in model casing to frozen soil Morphological parameters are measured, and these morphological parameters are gathered and transmitted to processing unit by the harvester of processing system, So as to which the analysis Jing Guo processing unit is calculated, frozen soil tunnel excavation face unstability rule and Failure Mechanism are obtained, and then rely on the mistake Steady rule and the stability in Failure Mechanism regulation and control tunnel excavation face, it is to avoid collapse and cave-in etc. occurs during practice of construction for tunnel Disaster accident;
2nd, lining model groove is arranged, for the model for anchor of solidification simulation tunnel-liner, the raw material of model for anchor is imported into lining cutting In model groove, after after raw material hardening by cooling, model groove is taken out, liner structure is formed.In this way, it can simulate in frozen soil Lining cutting time of day under environment, it is ensured that the true environment of the properer Frozen Ground Area construction of the simulation system of this programme, obtain compared with It is that sufficient preparation is carried out in the analysis for carrying out excavation face instability Mechanism the later stage for accurate excavation face morphological parameters;
3rd, temperature sensor and osmometer are arranged on multiple sections of tunnel model, including the section near excavation face, On each section, extended with tunnel model centrally along multiple radial directions, each radial direction arranges multiple temperature Spend the temperature sensor near sensor and multiple osmometers, excavation face on section and osmometer arrangement density is higher than other Section, this mode makes temperature sensor and osmometer arrange more comprehensive, can measure the temperature change of all region frozen soil Situation and seepage pressure situation of change, make data analysis, handle more accurate, also closer to frozen soil during practice of construction Situation of change, the excavation face Unstability Mechanism for drawing the simulation system of this programme is more accurate;
The 4th, thermal insulation layer is set in model casing, effectively can prevent frozen soil from radiating, so that frozen soil keeps original in a long time State, it is ensured that there is simulation system time enough to carry out simulated experiment, it is ensured that data more closing to reality;
When the 5th, containing frozen soil in model casing, the type of frozen soil is similar to the frozen soil during practice of construction, different analyzing During the tunnel excavation of Frozen Ground Area during the stability of excavation face, correspondence takes corresponding frozen ground types, so as to obtain the frozen soil The Tunnel Stability mechanism in area, and corresponding scheme is provided.The simulation system and experimental method of the present invention can be used for various jellies The sunykatuib analysis of great soil group type, and provide suggestion and advisory opinion to the construction of Practical Project;
6th, after tunnel model is released, toward face and liner structure in be passed through the hot blast of different temperatures, can simulate it is different outside Portion's environmental condition, progress obtains the stability that same type of frozen soil carries out excavation face during heat exchange under different environmental conditions Situation, so as to carry out many analyses, obtain more fully with wide in range data reference.
Brief description of the drawings:
Fig. 1 is the model system structural representation of simulation system of the present invention.
Fig. 2 is the sensor-based system of simulation system of the present invention(Temperature sensor and osmometer)Arrangement schematic diagram.
Fig. 3 is the arrangement schematic diagram at another visual angles of Fig. 2.
Fig. 4 is the sensor-based system of simulation system of the present invention(Temperature sensor, osmometer and foil gauge)Arrangement schematic diagram.
Fig. 5 is the sensor-based system of simulation system of the present invention(Displacement meter and soil pressure cell)Arrangement schematic diagram.
Fig. 6 is the arrangement schematic diagram at another visual angles of Fig. 5.
Fig. 7 is the step of country rock temperature field experimental method in front of the simulation system regulation and control frozen soil tunnel excavation face using the present invention Rapid flow chart.
Marked in figure:1- model casings, 2- tunnel models, 21- control sections, 3- excavation faces, 4- lining model grooves, 5- supporting moulds Type, 6- track-type facilities, 61- screw mandrels, 62- screw mandrel spud piles, 7- support skids, 8- back pressure plates, 9- thermal insulation layers, 10- backpressure devices, 101- fixed plates, 102- locking pull bars, 11- temperature measuring sets, 12- seepage pressure measuring instruments, 13- foil gauges, 14- displacement meters, 15- soil pressure cells, 16- brace rods, 17- fixed plates.
Embodiment
With reference to test example and embodiment, the present invention is described in further detail.But this should not be understood Following embodiment is only limitted to for the scope of above-mentioned theme of the invention, it is all that this is belonged to based on the technology that present invention is realized The scope of invention.
Embodiment 1
As shown in Fig. 1~Fig. 6:
The simulation system of face stability, including model system, sensor-based system and processing system are excavated for regulating and controlling frozen soil tunnel, its In, the model system includes offering installation tunnel on the model casing 1 and tunnel model 2 for being used to contain frozen soil, the model casing 1 The large hole of road model 2, enables the tunnel model 2 to be released out of this large hole, so make the excavation face 3 of simulation frozen soil with it is outer Boundary is communicated;
The sensor-based system includes temperature measuring set 11 and seepage pressure measuring instrument 12, the temperature measuring set 11 and seepage pressure Measuring instrument 12 is arranged in model casing 1 and is connected with processing system, temperature and seepage pressure for measuring frozen excavation face;
The processing system includes the data acquisition device for being used to gather the sensor-based system morphological parameters, the data acquisition device It is connected to store, analyze the processing unit of morphological parameters, the processing unit exports processing data.
Frozen soil is extremely sensitive to temperature change, during tunnel excavation, and the heat inside and outside tunnel is spontaneously from excavation face Front frozen soil country rock stretches out transmission and produces heat convection, so as to form thawed core in frozen soil country rock, thawed core makes frozen soil tunnel In the basic source of road excavation face unstability, this programme, after tunnel model is released out of frozen soil/skidded off, expose what is communicated with the external world The excavation face of frozen soil is simulated, excavation face both sides produce the temperature difference, carry out heat convection, melted so as to start thawing formation inside frozen soil Change the thawed core produced in area, simulation Frozen Ground Area work progress, and frozen soil is carried out by the sensor-based system in frozen soil Morphometry(Including temperature, seepage pressure etc.), analyzed by processing system and obtain the dynamic evolution of thawed core and open Digging face Failure Mechanism, provides for engineering construction regulation and control excavation face stability and refers to and effectively suggestion.
This programme simulates the excavation face of frozen soil tunnel by model system, by the sensor-based system in model casing Morphological parameters to frozen soil are measured, and these morphological parameters are gathered and transmitted to place by the harvester of processing system Device is managed, so that the analysis by processing unit is calculated, frozen soil tunnel excavation face unstability rule and Failure Mechanism, Jin Eryi is obtained By the unstability rule and the stability in Failure Mechanism regulation and control tunnel excavation face, it is to avoid tunnel caves in during practice of construction The disaster accidents such as roof fall.
Model system includes containing the model casing and the tunnel model in frozen soil of frozen soil, opens up large hole, makes tunnel Road model can be released/skidded off along the large hole, make excavation face(Specially face)Communicated with the external world, hand over the inside and outside heat that produces in hole Change, produce the temperature difference between square frozen soil and excavation face in face of excavation simulation, so as to produce the situation of heat convection, and make tunnel mould Type can be released from frozen soil/skidded off, and simulate in-cavity construction behavior, and the frozen soil in model casing is dual heat exchange and in-cavity construction Under effect, excavation face unstability, so as to simulate in tunnel excavation work progress, frozen soil fusing and excavation construction are lived in front of excavation face Dynamic to make the operating mode of frozen soil tunnel excavation face unstability, the frozen soil that the tunnel model of this programme is used can be selected according to actual conditions Select, the constructing tunnel operating mode of different Frozen Ground Areas can be simulated, flexibility is stronger, and the scope of application is widely.
Simulation system composition is simple, easy to operate, can simulate in Practical Project thawed core in Convective Heat Transfer Evolution process, so as to disclose the dynamic evolution and excavation face Failure Mechanism of thawed core.
Tunnel model 2 includes the supporting section being arranged in frozen soil and the control section 21 extended on the outside of large hole, the support Section outside is provided with lining model groove 4, Fig. 1, and because supporting section is stretched into inside lining model groove 4, therefore supporting section is in figure Invisible, the lining model groove 4 is used to open on the model for anchor 5 of solidification simulation tunnel lining structure, the lining model groove 4 Provided with the opening for being separated with model for anchor 5, the lining model groove 4 is provided with erection support, and by erection support connection In model casing 4.
As one of which preferred embodiment, lining model groove 4 be rectangular parallelepiped structure, its length direction both ends of the surface with In the inwall contact of model groove 1, six faces of lining model groove 4, in addition to upper surface and front end face, remaining four face closure is described Front end face is to be fitted simultaneously with offering the model chamber interior wall of large hole.According to this, the one side of large hole will be also opened up in model casing It is considered as front end face.
Further, the lining model groove 4 is cuboid metal trough, and tunnel model 2 is thin-walled Aluminum Drum.
The liner structure during simulation tunnel of model for anchor 5 construction, model for anchor 5 is mixed using a certain amount of iron wire of incorporation Compound is formed through hardening by cooling.
Lining model groove 4 is arranged, for the model for anchor 5 of solidification simulation tunnel lining structure, by the raw material of model for anchor 5 Import in lining model groove 4, after after raw material hardening by cooling, take out lining model groove 4, form liner structure, in this way, The lining cutting time of day under frozen soil environment can be simulated, it is ensured that it is true that the properer Frozen Ground Area of simulation system of this programme is constructed Real environment, obtains accurate excavation face morphological parameters, is that sufficient standard is carried out in the analysis for carrying out excavation face instability Mechanism the later stage It is standby.Opening is set on lining model groove, after model for anchor solidification, lining model groove and model for anchor point are made by the opening From so as to take out lining model groove.
In the outside of tunnel model 2(That is outer wall)Lining model groove 4 is provided with, supporting mould is made by lining model groove 4 Type 5, makes the structure of model system more press close to the actual condition of Frozen Ground Area, it is ensured that the result obtained by this simulation system is It is correct reliable, so that with higher reference and break-up value.
Because the thawed core formed in frozen soil country rock is the basic source of excavation face unstability, by setting model for anchor, more Plus supporting role of the model for anchor to the frozen soil after generation thawed core is thoroughly analyzed, analysis obtains the lining cutting under frozen soil environment Structure is to preventing the effect of Tunnel Landslide.
In order to ensure that tunnel model 2 is moved in fixed-direction, it is to avoid producing skew causes broken line to move, in tunnel model 2 The position of control section 21 be additionally provided with for support tunnel model 2 slide track-type facilities 6.
Track-type facilities 6 are set, for supporting tunnel model 2, tunnel model 2 is entered line slip along track-type facilities 6.
As one of which preferred embodiment, the track-type facilities 6 include the screw mandrel for being arranged in the both sides of tunnel model 2 61, the screw mandrel 61 extends from inside to outside through model casing 1 from frozen soil, and its bearing of trend is parallel with tunnel model 2, the tunnel mould The end of control section 21 of type 2 is connected with support skid 7, and the screw mandrel 61 passes through solid by screw mandrel spud pile 62 after support skid 7 Fixed, track-type facilities 6 enable tunnel model 2 to enter line slip along screw mandrel 61, it is ensured that glide direction is fixed so that tunnel model is being slided During do not shift, misorientation.
Further, support skid 7 is welded as a whole with tunnel model 2, and the material of support skid 7 and screw mandrel is stainless Steel, takes this material, can greatly improve the service life of model system.
One end of screw mandrel 61 is located in frozen soil, and the other end extends to the outside of model casing 1, and the screw mandrel spud pile 62 is located at silk The model casing lateral ends of bar 62.
As one of which preferred embodiment, model casing 1 is the rectangular box that top is provided with back pressure plate 8, described Back pressure plate 8 and the detachable connection of model casing 1, make model casing 1 be realized by back pressure plate 8 and are opened and closed, the inwall of the model casing 1 is set There is thermal insulation layer 9, model casing 1 is opened and/or closed by back pressure plate 8, so as to enter in experimentation to model system Row arrangement and installation, and the frozen soil of different attribute is filled as needed, carry out the excavation face analysis of stability under a variety of frozen soil environments Analysis.
Thermal insulation layer is set in model casing, effectively can prevent frozen soil from radiating, so that frozen soil keeps former in a long time It is stateful, it is ensured that there is simulation system time enough to carry out simulated experiment, it is ensured that data more closing to reality.
Further, the material of the back pressure plate 8 is iron, and the thermal insulation layer 9 is adiabatic coiled material, along along rectangular box six Adiabatic coiled material is arranged with wall, the thickness of the adiabatic coiled material is corresponding with the volume of model casing, it is ensured that the jelly in model casing Soil is chronically at the trystate of needs.
As one of which preferred embodiment, backpressure device 10 is installed on the model casing 1, the backpressure device 10 Including the fixed plate 101 installed in the top of model casing 1, the two ends of the fixed plate 101 are connected with locking pull bar 102.
Installation locking pull bar 102, makes the fixed plate 101 be strained and fixed by locking pull bar 102, is contained in model casing 1 Frozen soil,, can be to frozen soil using the backpressure device 10 of this programme, it is necessary to ensure that frozen soil compacting is filled up after frozen soil fills model casing 1 Carry out compaction treatment.
The cable-through hole passed through for sensor-based system wiring is additionally provided with the model casing 1, due to being disposed with use in frozen soil In the sensor-based system of measuring frozen morphological parameters, sensor-based system includes a variety of measuring apparatus, and measuring apparatus needs and processing system Connection, by opening up cable-through hole on model casing, the wiring for measuring apparatus passes through, and the size of cable-through hole is adapted to wiring, Avoid cable-through hole excessive, prevent radiating serious.
As a kind of embodiment therein, as shown in Figure 4, Figure 5 and Figure 6, sensor-based system also includes displacement meter 14, soil pressure Power box 15 and foil gauge 13, the soil pressure cell 15 are arranged on model for anchor 5(Equivalent to liner structure)Outer layer, is leaned in frozen soil The position of nearly excavation face 3 is also disposed with soil pressure cell, and the displacement meter 14 is arranged close to the frozen soil of the upper surface inwall of model casing 1 Also displacement meter 14 is disposed with top layer, and in the rear end face inwall frozen soil top layer of model casing 1, the foil gauge 13 is arranged in excavation The outer surface of model for anchor 5 at face 3.
Using soil pressure cell measuring frozen each time of measuring point pressure, so as to obtain pressure changing, displacement Count for the settling amount in measuring frozen layer, so as to analyze the steadiness of excavation face according to settling amount.
Foil gauge is arranged, the dependent variable of liner structure each point is measured by foil gauge, so that the dynamic to analyze thawed core Development law and excavation face Failure Mechanism provide basic data.
Further, the foil gauge 13 is low temperature uniaxial strain piece, and foil gauge 13 is adopted to be arranged in the method for paste and opened Model for anchor 5 at digging face 3(Liner structure)Outer surface.
Further, the displacement meter 14 is linear displacement transducer.
Further, the soil pressure cell 15 is the special miniature soil pressure cell of model test.
As one of which embodiment, offered on the rear end face of the model casing 1 for install brace rod 16 compared with Aperture, the brace rod 16 is connected with fixed plate 17, and the brace rod 16 and fixed plate 17 are used to install soil pressure cell 15 and displacement Meter 14.
The brace rod 16 is reinforcing bar, and the fixed plate 17 is square plate, and reinforcing bar and square plate are welded to connect.
The end face that large hole is offered on model casing is front end face, and opposite side is rear end face, and branch is arranged on rear end face Muscle is supportted, and the brace rod is fixed by fixed plate, such structure is easily installed soil pressure cell and displacement meter, makes soil pressure Box and displacement meter are fixed.
The processing system includes the data acquisition device for being used to gather the sensor-based system morphological parameters, the data acquisition Device is connected to store, analyze the processing unit of morphological parameters, and the processing unit exports processing data.
As a kind of embodiment therein, the data acquisition device includes data collecting instrument and deformeter, the number It is used for the lining cutting for obtaining the settling amount of displacement meter measurement, the measuring point temperature of temperature measuring set measurement and foil gauge measurement according to Acquisition Instrument Structural strain amount, the deformeter is used for the soil pressure for the seepage pressure and soil pressure cell measurement for gathering the measurement of seepage pressure measuring instrument Power, the data collecting instrument and deformeter are connected to processing unit, and the processing unit is computer system.
Embodiment 2
As shown in Figure 1 and Figure 7, for regulating and controlling the experimental method in country rock temperature field in front of frozen soil tunnel excavation face, using embodiment 1 In simulation system temperature field is regulated and controled, comprise the following steps:
A, composition model system, predefine the size of tunnel model 2, and open up corresponding with tunnel model 2 on model casing 1 Large hole, while opening up smaller hole and cable-through hole, is fixed after getting out model casing 1, and is installed in the inwall of model casing 1 Thermal insulation layer 9;
B, tunnel model 2 is moved to inside model casing 1, lining model groove 4 is installed, and passes through lining model groove 4 makes supporting It is close to the inwall of model casing 1 in model 5, the front end for building model groove 4, it is ensured that not spillage;
C, removal lining model groove 4, and the frozen soil for needing to analyze is laid in model casing 1, while arranging sensor-based system;
D, tunnel model 2 released, expose face and model for anchor 5(Liner structure), it is passed through the hot blast of different temperatures;
E, the Failure Mechanism of frozen soil tunnel excavation face 3 is obtained by processing system.
When containing frozen soil in model casing, the type of frozen soil is similar to the frozen soil during practice of construction, different in analysis Frozen Ground Area tunnel excavation during excavation face stability when, correspondence take corresponding frozen ground types, so as to obtain the jelly The Tunnel Stability mechanism in soil area, and corresponding scheme is provided.The simulation system and experimental method of the present invention can be used for various The sunykatuib analysis of frozen ground types, and provide suggestion and advisory opinion to the construction of Practical Project.
After tunnel model is released, toward face and liner structure in be passed through the hot blast of different temperatures, can simulate different External environment condition, progress obtains the stabilization that same type of frozen soil carries out excavation face during heat exchange under different environmental conditions Implementations, so as to carry out many analyses, obtain more fully with wide in range data reference.
The experimental method of the present embodiment is tested by foregoing simulation system, obtains tunnel excavation face Failure Mechanism Afterwards, Corresponding Countermeasures can be just taken during practice of construction, the stability to frozen soil tunnel excavation face is adjusted, so that effectively Avoid the generation of the disaster accidents such as Tunnel Landslide, roof fall.
As one of which preferred embodiment, as shown in Figures 2 and 3, the temperature measuring set 11 is passed using temperature Sensor, the seepage pressure measuring instrument 12 uses osmometer, and temperature sensor and osmometer are arranged in multiple sections of tunnel model On face, including the section near excavation face, on each section, extended with tunnel model centrally along multiple radial directions, Each radial direction arranges that the temperature near multiple temperature sensors and multiple osmometers, excavation face on section is passed Sensor and osmometer arrangement density are higher than other sections.
Take aforesaid way to arrange temperature sensor and osmometer, temperature sensor and osmometer is arranged more comprehensive, The temperature variations and seepage pressure situation of change of all region frozen soil can be measured, makes data analysis, handle more accurate, Also the situation of change closer to frozen soil during practice of construction, the excavation face instability Mechanism for drawing the simulation system of this programme Analysis is more accurate.
The higher temperature sensor and osmometer of density is arranged in section near excavation face, so as to more accurately measure Excavate the permafrost change situation that surface construction is caused.
Further, the temperature sensor and osmometer are sequentially arranged, and temperature sensor is popped one's head in using platinum resistance, is oozed Pressure meter uses the special miniature osmometer of model test.
In the step a, the size of tunnel model is determined according to Practical Project, and the size of tunnel model, which will be met, actually to be applied The tunnel prototype of work and the similitude of tunnel model diabatic process, make the convection transfer rate likelihood ratio and geometric similarity ratio in model Product be equal to frozen soil the thermal conductivity factor likelihood ratio.
In the step b, make model for anchor when, model for anchor using certain mass than water, gypsum, diatom mixture It is made and forms with iron wire, model for anchor raw material is prepared in advance, is installed after lining model groove, the raw material configured is poured into lining Build in model groove, treat that it is cooled down, hardening finally takes out lining model groove, so as to form the liner structure of simulation system.

Claims (10)

1. a kind of be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, including model system, sensor-based system and processing System, wherein:
The model system includes offering installation tunnel on the model casing and tunnel model for being used to contain frozen soil, the model casing The large hole of model, enables the tunnel model to be released out of this large hole, and then makes the excavation face and extraneous phase of simulation frozen soil It is logical;
The sensor-based system includes temperature measuring set and seepage pressure measuring instrument, temperature measuring set and the seepage pressure measuring instrument Install in model casing and be connected with processing system, the excavation face morphological parameters for measuring frozen;
The processing system includes the data acquisition device for being used to gather the sensor-based system morphological parameters, the data acquisition device It is connected to store, analyze the processing unit of morphological parameters, the processing unit exports processing data.
2. according to claim 1 be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, it is characterised in that institute Stating tunnel model includes setting on the outside of the supporting section being arranged in frozen soil and the control section extended on the outside of large hole, the supporting section Lining model groove is equipped with, the lining model groove is used for the model for anchor of solidification simulation tunnel lining structure, the lining model The opening for being separated with model for anchor is offered on groove, the lining model groove is provided with erection support.
3. according to claim 2 be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, it is characterised in that institute State the track-type facilities that model system also includes being used to support the tunnel model to slide.
4. it is used to regulate and control the simulation system that frozen soil tunnel excavates face stability, its feature according to one of claim 1-3 Be, the model casing rectangular box, the rectangular box top plate for can opening type back pressure plate, model casing is passed through back pressure plate real Now it is opened and closed, the inwall of the model casing is provided with thermal insulation layer.
5. it is used to regulate and control the simulation system that frozen soil tunnel excavates face stability, its feature according to one of claim 1-3 It is, backpressure device is installed on the model casing, the backpressure device includes the fixed plate installed in model casing top, described solid The two ends of fixed board are connected with locking pull bar.
6. it is used to regulate and control the simulation system that frozen soil tunnel excavates face stability, its feature according to one of claim 1-3 It is, the sensor-based system also includes displacement meter, soil pressure cell and foil gauge, the soil pressure cell is arranged on outside liner structure Layer, the position close to excavation face in frozen soil is also disposed with soil pressure cell, and the displacement meter is arranged close to model casing upper surface Also displacement meter, the foil gauge arrangement are disposed with the frozen soil top layer of inwall, and in the rear end face inwall frozen soil top layer of model casing The liner structure outer surface at excavation face.
7. according to claim 6 be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, it is characterised in that institute The smaller hole offered on the rear end face of model casing for installing brace rod is stated, the brace rod is connected with fixed plate, the support Muscle and fixed plate are used to install soil pressure cell and displacement meter.
8. according to claim 7 be used to regulate and control the simulation system that frozen soil tunnel excavates face stability, it is characterised in that institute Stating data acquisition device includes data collecting instrument and deformeter, and the data collecting instrument is used for the sedimentation for obtaining displacement meter measurement The liner structure dependent variable of amount, the measuring point temperature of temperature sensor measurement and foil gauge measurement, the deformeter oozes for collection The seepage pressure of flowing pressure measuring instrument measurement and the soil pressure of soil pressure cell measurement, the data collecting instrument and deformeter are connected to Processing unit, the processing unit is computer system.
9. a kind of be used to regulate and control the experimental method in country rock temperature field in front of frozen soil tunnel excavation face, it is characterised in that using as weighed Profit requires that the simulation system described in one of 1-8 regulates and controls to temperature field, comprises the following steps:
A, composition model system, predefine the size of tunnel model, and open up on model casing it is corresponding with tunnel model compared with Macropore, while opening up smaller hole and cable-through hole, is ready to be fixed after model casing, and installs heat-insulated in the model chamber interior wall Layer;
B, tunnel model is moved to inside model casing, lining model groove is installed, and passes through lining model groove makes model for anchor;
C, removal lining model groove, and the frozen soil for needing to analyze is laid in model casing, while arranging sensor-based system;
D, tunnel model released, expose face and liner structure, be passed through the hot blast of different temperatures;
E, frozen soil tunnel excavation face Failure Mechanism is obtained by processing system.
10. according to claim 9 be used to regulate and control the experimental method in country rock temperature field in front of frozen soil tunnel excavation face, it is special Levy and be, the temperature measuring set uses temperature sensor, the seepage pressure measuring instrument uses osmometer, temperature sensor and Osmometer is arranged on multiple sections of tunnel model, including the section near excavation face, on each section, with tunnel Model center extends along multiple radial directions, and each radial direction arranges multiple temperature sensors and multiple osmotic pressures Temperature sensor and osmometer arrangement density near meter, excavation face on section are higher than other sections.
CN201710693218.3A 2017-08-14 2017-08-14 The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel Expired - Fee Related CN107328917B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710693218.3A CN107328917B (en) 2017-08-14 2017-08-14 The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710693218.3A CN107328917B (en) 2017-08-14 2017-08-14 The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel

Publications (2)

Publication Number Publication Date
CN107328917A true CN107328917A (en) 2017-11-07
CN107328917B CN107328917B (en) 2019-11-05

Family

ID=60224950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710693218.3A Expired - Fee Related CN107328917B (en) 2017-08-14 2017-08-14 The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel

Country Status (1)

Country Link
CN (1) CN107328917B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989618A (en) * 2017-11-27 2018-05-04 河南工业大学 A kind of natural arch simulator
CN109000710A (en) * 2018-05-17 2018-12-14 西安理工大学 High rock temperature diversion tunnel scene lining temperature distribution and heat stress test method
CN111272980A (en) * 2020-02-29 2020-06-12 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN111537546A (en) * 2020-05-29 2020-08-14 招商局重庆交通科研设计院有限公司 Cold region tunnel lining simulated hot-cold alternative environment test system
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
WO2021142683A1 (en) * 2020-01-15 2021-07-22 山东大学 Stabilization and support model test system for surrounding rock of large, buried, and deep tunnel under complex conditions
CN114280273A (en) * 2021-12-16 2022-04-05 海南云时空信息科技有限公司 Big data-based intelligent analysis system for tunnel excavation face instability model simulation test

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202755980U (en) * 2012-08-08 2013-02-27 中交第一公路勘察设计研究院有限公司 Tunnel supporting structure suitable for warm permafrost region
CN103175729A (en) * 2013-03-06 2013-06-26 同济大学 Shield tunnel excavation surface stability centrifuge model test matching apparatus
US20130277017A1 (en) * 2012-03-28 2013-10-24 Daniel Mageau Zone freeze pipe
CN104597222A (en) * 2015-01-13 2015-05-06 河南大学 Large frozen soil model test system with moisturizing function and frost heaving test function
CN204877506U (en) * 2015-08-31 2015-12-16 长安大学 Indoor test device in han qu tunnel
CN205317708U (en) * 2016-01-29 2016-06-15 西南交通大学 Test device of han qu tunnel country rock and distinguished and admirable heat transfer
CN205384153U (en) * 2016-03-07 2016-07-13 武汉市市政建设集团有限公司 Tunnel excavation face unstability model test device based on transparent soil
CN106485975A (en) * 2016-11-15 2017-03-08 西南交通大学 A kind of tunnel in cold area temperature field laboratory experiment system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130277017A1 (en) * 2012-03-28 2013-10-24 Daniel Mageau Zone freeze pipe
CN202755980U (en) * 2012-08-08 2013-02-27 中交第一公路勘察设计研究院有限公司 Tunnel supporting structure suitable for warm permafrost region
CN103175729A (en) * 2013-03-06 2013-06-26 同济大学 Shield tunnel excavation surface stability centrifuge model test matching apparatus
CN104597222A (en) * 2015-01-13 2015-05-06 河南大学 Large frozen soil model test system with moisturizing function and frost heaving test function
CN204877506U (en) * 2015-08-31 2015-12-16 长安大学 Indoor test device in han qu tunnel
CN205317708U (en) * 2016-01-29 2016-06-15 西南交通大学 Test device of han qu tunnel country rock and distinguished and admirable heat transfer
CN205384153U (en) * 2016-03-07 2016-07-13 武汉市市政建设集团有限公司 Tunnel excavation face unstability model test device based on transparent soil
CN106485975A (en) * 2016-11-15 2017-03-08 西南交通大学 A kind of tunnel in cold area temperature field laboratory experiment system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989618A (en) * 2017-11-27 2018-05-04 河南工业大学 A kind of natural arch simulator
CN109000710A (en) * 2018-05-17 2018-12-14 西安理工大学 High rock temperature diversion tunnel scene lining temperature distribution and heat stress test method
WO2021142683A1 (en) * 2020-01-15 2021-07-22 山东大学 Stabilization and support model test system for surrounding rock of large, buried, and deep tunnel under complex conditions
CN111272980A (en) * 2020-02-29 2020-06-12 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN111272980B (en) * 2020-02-29 2024-04-19 西南石油大学 Simulation system and experimental method for regulating shield floating of mudstone stratum
CN111537546A (en) * 2020-05-29 2020-08-14 招商局重庆交通科研设计院有限公司 Cold region tunnel lining simulated hot-cold alternative environment test system
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
CN114280273A (en) * 2021-12-16 2022-04-05 海南云时空信息科技有限公司 Big data-based intelligent analysis system for tunnel excavation face instability model simulation test
CN114280273B (en) * 2021-12-16 2024-04-05 海南云时空信息科技有限公司 Tunnel excavation face unstability model simulation test intelligent analysis system based on big data

Also Published As

Publication number Publication date
CN107328917B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN107328917A (en) The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel
Weng et al. Centrifuge testing and numerical modeling of tunnel face stability considering longitudinal slope angle and steady state seepage in soft clay
CN104807975B (en) A kind of talus side slope freeze-thaw cycle effect deformation physical model test device and test method
Zhou et al. Centrifuge experimental study of thaw settlement characteristics of mucky clay after artificial ground freezing
Fan et al. Ground temperature characteristics during artificial freezing around a subway cross passage
CN108195723B (en) Permeation grouting test system and method for reinforcing loose gravel soil
Zhang et al. Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress
Liu et al. Thermal regime of frozen soil foundation affected by concrete base of transmission line tower on the Tibetan Plateau
CN103105310A (en) Testing device and method of ground deformation caused by simulating metro shield tunnel construction
CN107246023A (en) Tunneltron curtain construction freezing method physical model experiment device and experimental method
CN104614242A (en) Excavation and surrounding rock stress and strain monitoring model testing device for rock-soil chamber under complicated conditions, and method thereof
CN105954499B (en) Saturated yielding Loess Site carries out saturated yielding place evaluating method and device after fracture grouting reinforcing
CN106645261A (en) Large-sized multifunctional artificial freezing platform
Han et al. A fully coupled three-dimensional numerical model for estimating canal seepage with cracks and holes in canal lining damage
Zhu et al. Model experimental study of landslides based on combined optical fiber transducer and different types of boreholes
Divall et al. Ground movements generated by sequential twin-tunnelling in over-consolidated clay
Viggiani et al. Artificial Ground Freezing: from applications and case studies to fundamental research
Gurbuz A new approximation in determination of vertical displacement behavior of a concrete-faced rockfill dam
Wang et al. Modeling temperature change and water migration of unsaturated soils under seasonal freezing-thawing conditions
CN109100307A (en) For monitoring the experimental provision and system of simulation oil reservoir rock deformation
Zhou et al. Physical model tests of the surrounding rock deformation and fracture mechanism of mixed-face ground under TBM tunneling
Huang et al. Influence of seepage flow on temperature field around an artificial frozen soil through model testing and numerical simulations
CN107328861A (en) A kind of multi-functional physical parameter change modeling device in shield launching termination
Zhang et al. Research on the temperature field and frost heaving law of massive freezing engineering in coastal strata
Ng et al. A laboratory experimental study of enhanced geothermal systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20210814