CN107328541A - Tunnel escape tube rock-fall impact experimental provision - Google Patents

Tunnel escape tube rock-fall impact experimental provision Download PDF

Info

Publication number
CN107328541A
CN107328541A CN201710529874.XA CN201710529874A CN107328541A CN 107328541 A CN107328541 A CN 107328541A CN 201710529874 A CN201710529874 A CN 201710529874A CN 107328541 A CN107328541 A CN 107328541A
Authority
CN
China
Prior art keywords
hanging basket
pressure pin
stone
sides
experimental provision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710529874.XA
Other languages
Chinese (zh)
Inventor
靳温学
付崇砚
申会杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Run Mu Science And Technology Ltd
Original Assignee
Tianjin Run Mu Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Run Mu Science And Technology Ltd filed Critical Tianjin Run Mu Science And Technology Ltd
Priority to CN201710529874.XA priority Critical patent/CN107328541A/en
Publication of CN107328541A publication Critical patent/CN107328541A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M7/00Vibration-testing of structures; Shock-testing of structures
    • G01M7/08Shock-testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to a kind of tunnel escape tube rock-fall impact experimental provision, including Hanging Basket, Hanging Basket upper end open, both sides are fixedly mounted with handle, the week side of boss wall of Hanging Basket four is set for fence bar, stone, which is formed with, in the middle of Hanging Basket bottom surface grows mouth, grow two two switch gates filled to being cut with scissors to sidewall symmetry of mouth in stone, mouthful both sides are grown in the both sides of the edge of switch gate to stone, and integrally extension is formed with fixture block, two fixture block ends are slidably installed a pressure pin, drawbar blocks fixture block, switch gate is closed in realization, four motors are installed in the corresponding Hanging Basket bottom surface side of pressure pin, motor piston rod end is coaxially fixedly mounted with bevel gear, bevel gear is intermeshed with pressure pin, realize the movement of pressure pin.It is two openings that can be opened moment after the opening of the tunnel escape tube rock-fall impact experimental provision that the present invention is provided, impact of the falling rocks moment to pipeline can be simulated, the authenticity of pipe detection data is improved.

Description

Tunnel escape tube rock-fall impact experimental provision
Technical field
The invention belongs to protect field, more particularly to a kind of tunnel escape tube rock-fall impact experimental provision.
Background technology
The tunnel in tunnel and mine, due to being influenceed by complicated geology and other factorses, happens occasionally in work progress Landslide phenomenon, wherein landslide phenomenon consequence of closing the door is the most serious, once the life for occurring to have a strong impact on in-cavity construction personnel is pacified Entirely.Therefore, it is to avoid personnel casualty accidentses as far as possible for the phenomenon of caving in tunnel, constructing tunnel, reduces unnecessary warp Ji loss, carries out the setting of tunnel pipe for escaping, it appears extremely important.
The problem of voltage-withstand test of pipe for escaping perplexs industry always, the application provides one kind being capable of multi-angle, many stress Detect pipe for escaping in face.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art part there is provided a kind of structure novelty, test wide in variety Tunnel escape tube rock-fall impact experimental provision.
The present invention is adopted the technical scheme that:
A kind of tunnel escape tube rock-fall impact experimental provision, including Hanging Basket, Hanging Basket upper end open, both sides are fixedly mounted with handle, hang The week side of boss wall of basket four is set for fence bar, it is characterised in that:Stone is formed with the middle of Hanging Basket bottom surface and grows mouth, and mouth is grown in stone Two grow a mouthful both sides one extension to stone and are formed with card to two switch gates that dress is cut with scissors to sidewall symmetry, the both sides of the edge of switch gate Block, two fixture block ends are slidably installed a pressure pin, and drawbar blocks fixture block, and switch gate is closed in realization, are hung pressure pin is corresponding Bottom surface side is provided with four motors in the key, and motor piston rod end is coaxially fixedly mounted with bevel gear, and bevel gear is intermeshed with pressure pin, real The movement of existing pressure pin.
Moreover, being easy to symmetrical hinge to fill four pulleys in Hanging Basket surrounding sidewall bottom.
Advantages and positive effects of the present invention are:
The tunnel escape tube rock-fall impact experimental provision that the present invention is provided has a larger Hanging Basket, and the inside can be held respectively Kind of shape and, the stone of size, weight, be capable of the scene of true simulation tunnel landslide, detection pipeline it is pressure-resistant, resistance to pound and time Reactivation power, it is ensured that the authenticity and accuracy of testing result.
It is two openings that can be opened moment after the opening of the tunnel escape tube rock-fall impact experimental provision that the present invention is provided, Impact of the falling rocks moment to pipeline can be simulated, the authenticity of pipe detection data is improved.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 and Fig. 1 upward view.
Embodiment
With reference to embodiment, the present invention is further described, and following embodiments are illustrative, be not it is limited, Protection scope of the present invention can not be limited with following embodiments.
A kind of tunnel escape tube rock-fall impact experimental provision, including Hanging Basket 1, Hanging Basket upper end open, both sides are fixedly mounted with handle 2, The week side of boss wall of Hanging Basket four is that fence bar is set, and can effectively place and be formed with stone in the middle of irregular stone etc., Hanging Basket bottom surface and grow Mouth 9, grows two two switch gates 8 filled to being cut with scissors to sidewall symmetry of mouth, the both sides of the edge of switch gate are grown to stone in stone Integrally extension is formed with fixture block 7 for mouthful both sides, and two fixture block ends are slidably installed a pressure pin 6, and drawbar blocks fixture block, and realizing will switch Door is closed, and is provided with four motors 4 in the corresponding Hanging Basket bottom surface side of pressure pin, motor piston rod end is coaxially fixedly mounted with bevel gear 5, Bevel gear is intermeshed with pressure pin, realizes the movement of pressure pin, folding switch gate.
For the ease of movable hanging basket, it is easy to symmetrical hinge to fill four pulleys 3 in Hanging Basket surrounding sidewall bottom, for quickly mobile Hanging Basket.
The working method of the present invention is as follows:
Switch gate is closed, pressure pin is mobile to centre, holds card soon, stone is placed inside Hanging Basket, size shape differs, The handle of Hanging Basket both sides is lifted with crane, certain altitude is mentioned, such as 20 meters, is then turned on motor, moment opens two and opened Close the door, stone falls, pound to the pipe for escaping being placed on below Hanging Basket, then record the degree of deformation of pipeline, degree of cracking and broken Bad degree, detection pipe for escaping it is anti-how ability.

Claims (2)

1. a kind of tunnel escape tube rock-fall impact experimental provision, including Hanging Basket, Hanging Basket upper end open, both sides are fixedly mounted with handle, Hanging Basket Four the week side of boss walls are set for fence bar, it is characterised in that:Stone is formed with the middle of Hanging Basket bottom surface and grows mouth, and the two of mouth are grown in stone To two switch gates that dress is cut with scissors to sidewall symmetry, the both sides of the edge of switch gate grow a mouthful both sides one extension to stone and are formed with card Block, two fixture block ends are slidably installed a pressure pin, and drawbar blocks fixture block, and switch gate is closed in realization, are hung pressure pin is corresponding Bottom surface side is provided with four motors in the key, and motor piston rod end is coaxially fixedly mounted with bevel gear, and bevel gear is intermeshed with pressure pin, real The movement of existing pressure pin.
2. escape tube rock-fall impact experimental provision in tunnel according to claim 1, it is characterised in that:In the week side of boss wall of Hanging Basket four It is easy to symmetrical hinge to fill four pulleys in bottom.
CN201710529874.XA 2017-07-03 2017-07-03 Tunnel escape tube rock-fall impact experimental provision Pending CN107328541A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710529874.XA CN107328541A (en) 2017-07-03 2017-07-03 Tunnel escape tube rock-fall impact experimental provision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710529874.XA CN107328541A (en) 2017-07-03 2017-07-03 Tunnel escape tube rock-fall impact experimental provision

Publications (1)

Publication Number Publication Date
CN107328541A true CN107328541A (en) 2017-11-07

Family

ID=60197658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710529874.XA Pending CN107328541A (en) 2017-07-03 2017-07-03 Tunnel escape tube rock-fall impact experimental provision

Country Status (1)

Country Link
CN (1) CN107328541A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112834151A (en) * 2020-12-31 2021-05-25 天津润木科技有限公司 Novel rock falling impact test device for tunnel escape pipe

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2276633Y (en) * 1996-07-19 1998-03-18 冶金工业部鞍山热能研究院 Coke dropping strength automatic determinating device
CN207528418U (en) * 2017-07-03 2018-06-22 天津润木科技有限公司 Tunnel escape tube rock-fall impact experimental provision

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2276633Y (en) * 1996-07-19 1998-03-18 冶金工业部鞍山热能研究院 Coke dropping strength automatic determinating device
CN207528418U (en) * 2017-07-03 2018-06-22 天津润木科技有限公司 Tunnel escape tube rock-fall impact experimental provision

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112834151A (en) * 2020-12-31 2021-05-25 天津润木科技有限公司 Novel rock falling impact test device for tunnel escape pipe
CN112834151B (en) * 2020-12-31 2022-11-01 天津润木科技有限公司 Tunnel escape pipe falling rock impact test device

Similar Documents

Publication Publication Date Title
CN109472067B (en) Method for judging toppling type collapse
CN101936823B (en) Method for sampling large-sized unsaturated structural undisturbed soil samples
CN203420700U (en) Measuring device for rock fracture steering simulation experiment
CN105571898B (en) Seabed water sample depth sampler
CN104849095A (en) Inertial differential unlocking spring impact type collector of bottom sediment sample
CN204228453U (en) The closed device fetched earth of a kind of double wall for weak soil
CN107328541A (en) Tunnel escape tube rock-fall impact experimental provision
CN207528418U (en) Tunnel escape tube rock-fall impact experimental provision
CN106442183B (en) Concrete component crack propagation loading device under a kind of reciprocating load
CN204630770U (en) A kind of water quality stratified sampler
CN213902806U (en) Novel stone falling impact test device for tunnel escape pipe
CN204832150U (en) Observation device of water guide crack height degree among three -dimensional similar material simulation experiment
CN207515640U (en) A kind of rock blasting means for loading
CN205919996U (en) Novel fault gas special drill rod that punches
CN112834151B (en) Tunnel escape pipe falling rock impact test device
CN203394572U (en) Liquid state and gas state pressurizing type gas hole packer
CN106523026B (en) A kind of subway work security protection escape robot
CN103507301B (en) A kind of the inner cylinder sealing compound method for packing and inner cylinder sealing compound machine of combined firework production
CN209230864U (en) A kind of natural gas pit shaft pressure test device convenient for folding and unfolding
CN203479492U (en) Impact test block for impact resistance test
CN103318586B (en) Bottom cover opening and closing mechanism of garbage collection device
CN207148082U (en) A kind of experimental rig of influence of the analysis bored tunnel construction to building
CN107247130B (en) A kind of obtaining value method of the Hoek-Brown parameter S of random defect rock mass
CN218628733U (en) Crane tension testing device
CN210483702U (en) Salvagable exploring tube type LWD system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107

RJ01 Rejection of invention patent application after publication