CN207148082U - A kind of experimental rig of influence of the analysis bored tunnel construction to building - Google Patents

A kind of experimental rig of influence of the analysis bored tunnel construction to building Download PDF

Info

Publication number
CN207148082U
CN207148082U CN201721182073.2U CN201721182073U CN207148082U CN 207148082 U CN207148082 U CN 207148082U CN 201721182073 U CN201721182073 U CN 201721182073U CN 207148082 U CN207148082 U CN 207148082U
Authority
CN
China
Prior art keywords
building
model support
steel
experimental rig
influence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721182073.2U
Other languages
Chinese (zh)
Inventor
郑召怡
张文
候登高
郝兴臣
张翼
周康静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Original Assignee
Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Municipal Engineering Design and Research Institute Group Co Ltd filed Critical Jinan Municipal Engineering Design and Research Institute Group Co Ltd
Priority to CN201721182073.2U priority Critical patent/CN207148082U/en
Application granted granted Critical
Publication of CN207148082U publication Critical patent/CN207148082U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building, including model support, reaction frame, hydraulic jack, steel emulation building foundation, tunneling mouth and data collecting system are reserved.Model support is a cube structure that skeleton is done by rigid material, bottom and surrounding around safety glass and do waterproof sealing processing, reaction frame is located at the top of model support and the left and right sides shares a bottom plate with model support, hydraulic jack connection reaction frame is fixed and steel emulation building foundation, there is reserved tunneling mouth in the positive front center position of safety glass, in the solid emulation construction material of safety glass;Emulating the building bottom of foundation and reserved tunneling mouth top surface in steel has data collecting system.Influence and surface buildingses load influence to tunnel excavation of the tunnel excavation to surface buildingses can be analyzed by data acquisition, analyze stratum changing rule, Optimizing construction measure.

Description

A kind of experimental rig of influence of the analysis bored tunnel construction to building
Technical field
The utility model patent is related to tunneling and underground engineering technical field, and be particularly suitable for use in analysis bored tunnel construction pair In terms of the impact analysis of existing building, and in particular to a kind of experiment dress for analyzing the influence that bored tunnel is constructed to building Put.
Background technology
China's subway construction in recent years is fast-developing, because constructing metro tunnel environment is complicated, is worn under bored tunnel, side is worn The situation of existing building happens occasionally.To ensure the normal use of surface buildingses, while ensure construction safety, it is necessary to grasp Influence situation of the tunnel excavation to building.Therefore, bored tunnel construction influences grinding for situation analysis method to existing building Study carefully with important practice significance.At present, conventional analysis method mainly has theoretical analysis, Method for Numerical, empirical equation Method, model testing method.But there is problems with the above method:
(1) theoretical analysis are generally basede on uniform dielectric it is assumed that not considering the influence of formation properties, have larger limitation Property.
(2) method for numerical simulation analog result is often relevant with parameter value, and influence of the analog parameter to final result Greatly, arbitrarily change parameter and be not often inconsistent with field condition.
(3) empirical formula method of main flow, such as Peck formula etc., by earth's surface no-load situation derive, it is necessary to and its His theory is combined the calculating that could carry out having load earth's surface, and calculating is cumbersome, and error is larger, studies at present less.
(4) such research is less in model test method, and earth's surface loading is indefinite.
The content of the invention
The utility model patent is in order to solve the above problems, it is proposed that one kind is used to analyze bored tunnel construction to building Influence experimental rig, the device can preferably simulate scene hair practice of construction situation, contribute to analyze constructing tunnel to building Build the influence degree of thing.
To achieve the above object, the utility model patent adopts the following technical scheme that:
A kind of experimental rig for being used to analyze influence of the bored tunnel construction to building, including model support, reaction frame and Hydraulic jack;The model support is a cube structure that skeleton is done by rigid material, and bottom and surrounding use tempering glass Glass seals, open top;The reaction frame is the cube structure with top surface, bottom surface and left and right face, and the reaction frame is located at The peripheral and model support of the model support shares a bottom plate;The top surface of the reaction frame by hydraulic jack with it is described Steel emulation building basis connection inside model support;There is reserved tunnel face in the positive front center position of model support, in mould The top surface on type frame internal steel emulation building basis fills up similar construction material with lower part;On steel emulation building basis Bottom surface and reserved tunnel face peripheral location have data collecting system.
Further, the hydraulic jack is driven by automatic control system, it is possible to provide constant or non-constant pressure;
Further, the steel emulation building basis includes some groups, can simulate different base forms;
Further, the safety glass is handled by waterproof sealing;
Further, steel emulation building foundation include grillage foundation under isolated footing, strip footing, post, The polytypes such as mat foundation, box foundation;
Further, the data collecting system includes strain acquisition system, multi-point displacement acquisition system, soil pressure collection System, water pressure acquisition system.
Beneficial effect acquired by the utility model is:
1st, the load to stratum is built to Math Simulation Study On Pressure earth's surface by hydraulic jack, so as to measure building Influence situation of the load to tunnel excavation.
2nd, by test datas such as the differential settlement amounts on gathering simulation basis, tunnel excavation is measured to building basis Influence situation, and then speculate building destruction situation.
3rd, the influence situation that bored tunnel is constructed to existing building is more truly simulated, is had to analysis and research important Practice significance.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are these Some embodiments of utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to these accompanying drawings.
Fig. 1 is the front view of this experimental rig;
Fig. 2 is the left view of this experimental rig;
Wherein, 1, model support (surrounding and bottom be safety glass), 2, reaction frame, 3, hydraulic jack, 4, steel emulation Building foundation, 5, similar construction material, 6, reserved tunnel face, 7, data acquisition instrument.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
Patent of the present invention is described further with embodiment below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building, including Model support 1, reaction frame 2, hydraulic jack 3, steel emulation building foundation 4, similar construction material 5, reserve tunnel face 6, data Acquisition system 7.
The model support 1 is a cube structure that skeleton is done by rigid material, and bottom and surrounding use safety glass Sealing, and do waterproof sealing processing, open top;The reaction frame 2 is the cube knot with top surface, bottom surface and left and right face Structure, front-back opening, the peripheral and model support 1 that the reaction frame 2 is located at the model support 1 share a bottom plate;It is described The top of hydraulic jack 3 is fixedly connected with reaction frame 2, and the bottom of the hydraulic jack 3 and steel emulation building foundation 4 are solid Fixed connection, has reserved tunnel face 6 in the positive front center position of safety glass, similar construction material is inserted inside safety glass 5;There is data collecting system 7 in basic 4 bottom surfaces of steel emulation building and the peripheral location of reserved tunnel face 6.
Further, the hydraulic jack 3 includes automatic control system, it is possible to provide constant or non-constant pressure;
Further, the steel emulation building basis 4 includes some groups, can simulate different base forms;
Further, steel emulation building foundation 4 be equipped with grillage foundation under isolated footing, strip footing, post, The polytypes such as mat foundation, box foundation;
Further, the data collecting system 7 includes strain acquisition system, multi-point displacement acquisition system, and soil pressure is adopted Collecting system, water pressure acquisition system.Carry out as needed embedding;
Further, the hydraulic jack 3 and the link position of reaction frame 2 are variable, and equipped with automatic control system To provide constant or non-constant upper load;
Further, the shape of the reserved tunneling mouth 6 has multiple, can specifically be added according to the specific form of fracture in tunnel Work.
Present apparatus specific work process is as follows:
The good model support 1 of mounting arrangements and reaction frame 2, model support 1 and reaction frame 2 are connected using hydraulic jack 3, Similar construction material is equipped with according to on-site actual situations, and construction material is filled in model support 1, treats material in model support 1 After tending towards stability, equipment acquisition system 7 and steel emulation building foundation 4 are embedded in analog material, and it is anti-using being fixed on Hydraulic jack 3 on power frame 2 applies constant or non-constant under the effect of its control system by a certain percentage according to actual conditions Load, after data stabilization to be monitored, then excavated by the reserved simulation tunnel of tunneling mouth 6 on safety glass, digging process The middle collection for paying attention to data.The present apparatus is built to stratum by hydraulic jack 3 to steel Math Simulation Study On Pressure earth's surface Load, so as to measure influence situation of the building load to tunnel excavation;Differential settlement amount by gathering simulation basis etc. Test data, influence situation of the tunnel excavation to building basis is measured, and then speculate building destruction situation;More truly mould The influence situation that bored tunnel is constructed to existing building is intended, there is important practice significance to analysis and research.
It is not special to the present invention although above-mentioned the embodiment of patent of the present invention is described with reference to accompanying drawing The limitation of sharp protection domain, one of ordinary skill in the art should be understood that on the basis of the technical scheme of patent of the present invention, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still protection scope of the present invention with It is interior.

Claims (6)

  1. A kind of 1. experimental rig for being used to analyze influence of the bored tunnel construction to building, it is characterised in that including model support, Reaction frame and hydraulic jack;The model support is a cube structure that skeleton is done by rigid material, and bottom and surrounding are adopted Sealed with safety glass, open top;The reaction frame is the cube structure with top surface, bottom surface and left and right face, front-back Opening, the peripheral and model support that the reaction frame is located at the model support share a bottom plate, and counter-force top of support passes through liquid Pressure jack is connected with the steel emulation building basis inside the model support;Have in the positive front center position of model support pre- Tunnel face is stayed, similar construction material is filled up with lower part in the internal steel emulation building basis top surface of model support;In steel The emulation building bottom of foundation and reserved tunnel portal peripheral location have data collecting system.
  2. 2. a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building as claimed in claim 1, it is special Sign is that the hydraulic jack is driven by automatic control system.
  3. 3. a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building as claimed in claim 1, it is special Sign is that the steel emulation building basis includes some groups.
  4. 4. a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building as claimed in claim 1, it is special Sign is that the safety glass is handled by waterproof sealing.
  5. 5. a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building as claimed in claim 1, it is special Sign is that the emulation building foundation includes grillage foundation, mat foundation, box base under isolated footing, strip footing, post Plinth.
  6. 6. a kind of experimental rig for being used to analyze influence of the bored tunnel construction to building as claimed in claim 1, it is special Sign is that the data collecting system includes strain acquisition system, multi-point displacement acquisition system, soil pressure acquisition system, hydraulic pressure Power acquisition system.
CN201721182073.2U 2017-09-15 2017-09-15 A kind of experimental rig of influence of the analysis bored tunnel construction to building Active CN207148082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721182073.2U CN207148082U (en) 2017-09-15 2017-09-15 A kind of experimental rig of influence of the analysis bored tunnel construction to building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721182073.2U CN207148082U (en) 2017-09-15 2017-09-15 A kind of experimental rig of influence of the analysis bored tunnel construction to building

Publications (1)

Publication Number Publication Date
CN207148082U true CN207148082U (en) 2018-03-27

Family

ID=61667741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721182073.2U Active CN207148082U (en) 2017-09-15 2017-09-15 A kind of experimental rig of influence of the analysis bored tunnel construction to building

Country Status (1)

Country Link
CN (1) CN207148082U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108956180A (en) * 2018-07-17 2018-12-07 中铁十二局集团第二工程有限公司 Tunnel excavation is simulated to the experimental rig and method for above covering effect on building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108956180A (en) * 2018-07-17 2018-12-07 中铁十二局集团第二工程有限公司 Tunnel excavation is simulated to the experimental rig and method for above covering effect on building

Similar Documents

Publication Publication Date Title
CN104458445B (en) Shear test device and shear test method in in-situ soil body pore
CN104569341B (en) The method of vacuum pre-pressed joint electric osmose test
CN106324226B (en) Monitor seepage action of ground water, sedimentation perfusion one laboratory testing rig and method
CN108195723B (en) Permeation grouting test system and method for reinforcing loose gravel soil
CN103117020B (en) Experimental facility for simulating shield tunnel dynamically boring causing ground loss and surface subsidence
CN105974056B (en) Tunnel water bursting disaster precursor information monitoring model pilot system and test method
CN105550441B (en) A kind of engineering rock mass rupture deterioration method for numerical simulation based on continuous media
CN107807051A (en) Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment
CN104931414B (en) A kind of swelled ground area slurry balance shield tunnel duct piece force analysis experimental rig
CN207379817U (en) A kind of weak soil pressure distribution laboratory testing rig for simulating various working
CN104727788A (en) Three-dimensional single-well gas injection oil replacement simulation experiment device for fracture-cavity reservoir
CN102628716A (en) Method and device for testing geo-stress in deep soft rock based on flow stress restoration principle
CN108491620B (en) Fitting degree test method for prediction of subway tunnel crossing pile foundation and roadbed settlement
CN108118725B (en) The experimental rig and method of base pit dewatering in equivalent material simulating artesian aquifer
CN206132761U (en) Monitoring groundwater seepage flow, subside fill integrative indoor test device
CN205317774U (en) Testing system of stratum loss extension in simulation shield tunnel vertical section
CN109682416A (en) Measure the experimental provision and method of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
Sun et al. Physical simulation of high-pressure water inrush through the floor of a deep mine
CN109975117B (en) Push pipe experiment box and experiment method
CN107436140A (en) The settling column test instrument and test method that vacuum preloading and piling prepressing are combined
CN209280028U (en) Measure the experimental provision of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
CN113089624B (en) Adjacent foundation pit asynchronous excavation simulation test device and test method
CN104636532A (en) Hole sealing depth and length determining method for coal mine gas extraction drilled hole
CN106525707B (en) Anchoring bedding slope model test system and method capable of simulating corrosion environment
CN106898231B (en) Goaf filling simulation experiment device and operation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant