CN107324235A - A kind of tower barrel of wind generating set saddle platform cable hanging apparatus - Google Patents
A kind of tower barrel of wind generating set saddle platform cable hanging apparatus Download PDFInfo
- Publication number
- CN107324235A CN107324235A CN201710685388.7A CN201710685388A CN107324235A CN 107324235 A CN107324235 A CN 107324235A CN 201710685388 A CN201710685388 A CN 201710685388A CN 107324235 A CN107324235 A CN 107324235A
- Authority
- CN
- China
- Prior art keywords
- cable
- hanger
- steel wire
- wire rope
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 230000000149 penetrating effect Effects 0.000 claims abstract description 3
- 238000009434 installation Methods 0.000 claims description 8
- 239000003973 paint Substances 0.000 abstract description 5
- 230000005611 electricity Effects 0.000 description 4
- 230000005484 gravity Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/18—Power-operated hoists
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/18—Power-operated hoists
- B66D3/26—Other details, e.g. housings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A kind of tower barrel of wind generating set saddle platform cable hanging apparatus, including electric block, steel wire rope, fixed pulley and at least two hangers, the electric block is removably mounted on tower barrel platform, the steel wire rope is connected with electric block, the steel wire rope is used for crane cable, at least two hanger is arranged on tower wall, the fixed pulley is located in one of on hanger, the steel wire penetrating fixed pulley and end of the steel wire rope is with treating that crane cable is connected, another hanger temporarily positions the cable lifted.The present invention provides a kind of easy disassembly, is prevented effectively from the tower barrel of wind generating set saddle platform cable hanging apparatus for damaging paint in tower, saving the cable hoisting time.
Description
Technical field
The present invention relates to wind-driven generator field, more particularly to a kind of wind-driven generator tower inner cable hanging apparatus.
Background technology
At present, the laying form of cable has two kinds in wind power generating set:One is top-down laying, and two be under
And on laying.Wherein the first laying form is relatively simple, only need to be by cable toward decentralization, and second of laying form is then
Mechanical device is needed by upward lifting of the cable by root.Then for second of laying form, existing lifting mode is direct
An electric block is arranged above in tower top cable, hauling cable with pull rope up lifts.And such lifting mode has one
Fixed defect:One be electric block directly hang over existed on tower wall collision tower cause paint damage risk;Two be electricity
Need the position for installing electric block higher during the direct trailing cable of dynamic cucurbit, make its dismounting inconvenience.
The content of the invention
In order to overcome being easily damaged in tower for existing wind-driven generator tower inner cable lifting mode to paint, dismount inconvenience
Deficiency, the present invention provides a kind of easy disassembly, is prevented effectively from the wind-force hair for damaging paint in tower, saving the cable hoisting time
Group of motors tower saddle platform cable hanging apparatus.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of tower barrel of wind generating set saddle platform cable hanging apparatus, including electric block, steel wire rope, fixed pulley
With at least two hangers, the electric block is removably mounted on tower barrel platform, and the steel wire rope is connected with electric block,
The steel wire rope is used for crane cable, and at least two hanger is arranged on tower wall, and the fixed pulley is located therein one
On individual hanger, the steel wire penetrating fixed pulley and end of the steel wire rope is with treating that crane cable is connected, another hanger
Temporarily position the cable lifted.
Further, the installation of the electric block need to be parallel to cable present position;
Further, the hanger has two, and the hanger is preset on tower wall, and one of them is used to install institute
Fixed pulley is stated, another is used for temporarily fixation and has lifted cable.
In the present invention, when the hanger temporarily fixes the cable of lifting in place, the installation of this cable is fixed and next electricity
The lifting of cable can be carried out synchronously, save the substantial amounts of time.The length of described two hangers can just make to be arranged on described hang
The center of gravity of the fixed pulley on ear is in above the hoisting port of cable, it is ensured that cable can be lifted vertically upward.
Beneficial effects of the present invention are mainly manifested in:Simple in construction, installation and removal are convenient, and electric block is arranged on platform
On, it is convenient at any time with installing at any time, and will not damage in tower and paint, cable easily can be hung along the direction of steel wire rope
Dress;During crane cable, by being preset in hanger and fixed pulley on tower wall, thus it is possible to vary the direction of draw of cable, and another
The hanger for being fitted without fixed pulley can be used for the temporarily cable of fixed lifting in place, electric block is spared under lifting
A piece cable, can so be such that installation fixation cable and crane cable carries out simultaneously, save the substantial amounts of working time.
Brief description of the drawings
Fig. 1 be a kind of operating diagram of tower barrel of wind generating set saddle platform cable hanging apparatus, wherein, 1, electricity
Dynamic cucurbit;2nd, steel wire rope (the cable string bag);3rd, fixed pulley;4th, hanger;5th, hanger;6th, cable;7th, platform.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
Reference picture 1, a kind of tower barrel of wind generating set saddle platform cable hanging apparatus, including electric block 1, steel wire
Rope 2, fixed pulley 3, hanger 4 and hanger 5, the electric block 1 are installed on platform 7 parallel to cable testing bridge, the steel wire rope 2
Total length matching tower height, one end is wound on the electric block 1, and the other end pulls cable 6 through fixed pulley 3, described
Fixed pulley 3 is arranged on hanger 4, and the hanger 4 and hanger 5 are pre-welded on tower wall, and the hanger 5 is used for temporarily fixed
The cable 6 of lifting in place;
Further, when the hanger 5 temporarily fixes the cable 6 of lifting in place, the installation of this cable is fixed and next electricity
The lifting of cable can be carried out synchronously, save the substantial amounts of time;
Further, the fixed pulley 3 both may be mounted on hanger 4, can also be arranged on hanger 5, described to determine cunning
3 lighter weights are taken turns, are removed and installed simple and convenient;
Further, the length of the hanger 4 and hanger 5 can just make the fixed pulley being arranged on the hanger
3 center of gravity is in above the hoisting port of cable 6, than ensureing that cable can be lifted vertically upward;
In the present embodiment, the electric block 1 and the fixed pulley 3 are detachable, and the electric block 1 needs to hang in tower
It is arranged on when filling cable on platform 7, the fixed pulley 3 is arranged on hanger 4, and the steel wire rope 2 is wrapped in described electronic
On cucurbit 1;
In the hoisting process of cable, the steel wire rope 2 is passed through into the fixed pulley 3, starts the electric block 1, will
The steel wire rope 2 fixes the head end of the steel wire rope 2 and cable 6, with the electric block 1 afterwards in place toward rope is put under tower
Cable is up lifted, after lifting in place, the cable 6 is fixed on the hanger 5, the steel wire on cable 6 is removed
Rope 2, repeat more than action carry out the lifting of next cable, and simultaneously, being temporarily fixed to cable 6 on the hanger 5 can be with
Carry out the installation fixation work with crane span structure;
, can be by the fixed pulley 3 from the hanger after cable installation on the cable testing bridge of the side of hanger 5
Pull down, changed on the hanger 5 on 4, and the hanger 4 is used for temporarily fixed cable, is repeated in above work, completes all
The lifting work of cable.
Although by the present invention is described with reference to specific implementation, in personage known to the art, according to
The replacement mentioned above made, modification and change will be apparent.Therefore, fall in such replacement, modification and change
When entering in the spirit and scope by the claims of the present invention, it should be included in the present invention.
Claims (3)
1. a kind of tower barrel of wind generating set saddle platform cable hanging apparatus, it is characterised in that:Including electric block, steel wire
Rope, fixed pulley and at least two hangers, the electric block are removably mounted on tower barrel platform, the steel wire rope with it is electronic
Cucurbit is connected, and the steel wire rope is used for crane cable, and at least two hanger is arranged on tower wall, the fixed pulley position
In on one of hanger, the steel wire penetrating fixed pulley and end of the steel wire rope is with treating that crane cable is connected, in addition
One hanger temporarily positions the cable lifted.
2. a kind of tower barrel of wind generating set saddle platform cable hanging apparatus as claimed in claim 1, it is characterised in that:
The installation of the electric block need to be parallel to cable present position.
3. a kind of tower barrel of wind generating set saddle platform cable hanging apparatus as claimed in claim 1 or 2, its feature exists
In:The hanger has two, and the hanger is preset on tower wall, and one of them is used to install the fixed pulley, in addition
One is used for temporarily fixation and has lifted cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710685388.7A CN107324235A (en) | 2017-08-11 | 2017-08-11 | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710685388.7A CN107324235A (en) | 2017-08-11 | 2017-08-11 | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107324235A true CN107324235A (en) | 2017-11-07 |
Family
ID=60225628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710685388.7A Pending CN107324235A (en) | 2017-08-11 | 2017-08-11 | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107324235A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502922A (en) * | 2019-01-31 | 2020-08-07 | 西门子歌美飒可再生能源公司 | Lifting device for offshore wind turbine |
CN114204484A (en) * | 2021-11-16 | 2022-03-18 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406297Y (en) * | 2008-11-10 | 2010-02-17 | 河南省翔宇建材科技有限公司 | Lifting equipment for lath |
CN202643193U (en) * | 2012-05-21 | 2013-01-02 | 广东韶钢松山股份有限公司 | Movable hydraulic crane tripod |
CN203807089U (en) * | 2014-03-12 | 2014-09-03 | 张家港浦项不锈钢有限公司 | Lifting tool for replacing water cooling cables |
CN105565129A (en) * | 2016-03-09 | 2016-05-11 | 陕西彬长大佛寺矿业有限公司 | Coal bunker maintenance device |
CN205838410U (en) * | 2016-07-25 | 2016-12-28 | 河北大唐国际新能源有限公司 | Blower fan hoisting mechanism |
CN206188208U (en) * | 2016-11-24 | 2017-05-24 | 李雨兴 | Dual -purpose dolly of quadrature and conveyer |
CN207090875U (en) * | 2017-08-11 | 2018-03-13 | 浙江运达风电股份有限公司 | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus |
-
2017
- 2017-08-11 CN CN201710685388.7A patent/CN107324235A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406297Y (en) * | 2008-11-10 | 2010-02-17 | 河南省翔宇建材科技有限公司 | Lifting equipment for lath |
CN202643193U (en) * | 2012-05-21 | 2013-01-02 | 广东韶钢松山股份有限公司 | Movable hydraulic crane tripod |
CN203807089U (en) * | 2014-03-12 | 2014-09-03 | 张家港浦项不锈钢有限公司 | Lifting tool for replacing water cooling cables |
CN105565129A (en) * | 2016-03-09 | 2016-05-11 | 陕西彬长大佛寺矿业有限公司 | Coal bunker maintenance device |
CN205838410U (en) * | 2016-07-25 | 2016-12-28 | 河北大唐国际新能源有限公司 | Blower fan hoisting mechanism |
CN206188208U (en) * | 2016-11-24 | 2017-05-24 | 李雨兴 | Dual -purpose dolly of quadrature and conveyer |
CN207090875U (en) * | 2017-08-11 | 2018-03-13 | 浙江运达风电股份有限公司 | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502922A (en) * | 2019-01-31 | 2020-08-07 | 西门子歌美飒可再生能源公司 | Lifting device for offshore wind turbine |
CN111502922B (en) * | 2019-01-31 | 2021-11-16 | 西门子歌美飒可再生能源公司 | Lifting device for offshore wind turbine |
US11512680B2 (en) | 2019-01-31 | 2022-11-29 | Siemens Gamesa Renewable Energy A/S | Lifting apparatus for an offshore wind turbine |
CN114204484A (en) * | 2021-11-16 | 2022-03-18 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
CN114204484B (en) * | 2021-11-16 | 2024-01-05 | 重庆海装风电工程技术有限公司 | Power cable laying method for wind generating set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207339088U (en) | Transmission line of electricity straight line pole aerial earth wire overhauls stent | |
CN107399665A (en) | Fan blade is flat to hang and changes suspender | |
CN206502579U (en) | Power pole hoisting device | |
CN105305317B (en) | Live wire hangs the instrument of insulated flexible ladder | |
CN107324235A (en) | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus | |
CN107089600A (en) | The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching | |
CN207090875U (en) | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus | |
CN205838410U (en) | Blower fan hoisting mechanism | |
CN206650368U (en) | Fixed firm high altitude power maintenance gets thing ware | |
CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
CN208578674U (en) | The device for inhibiting superelevation blower fan tower barrel to swing | |
CN207098443U (en) | A kind of helicopter live-line maintenance operation hanging basket | |
CN107381397A (en) | A kind of tower barrel of wind generating set inner cable fast and safely hanging apparatus | |
CN215666631U (en) | Lifting device for hub of wind generating set | |
CN207090869U (en) | A kind of tower barrel of wind generating set inner cable fast and safely hanging apparatus | |
CN104724615A (en) | Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane | |
CN209009987U (en) | Wind generator set blade hanging apparatus | |
CN203423430U (en) | Insulator maintenance device | |
CN109809310B (en) | Swing arm tower crane pull rod and installation method thereof | |
CN202353095U (en) | Wire lifting arrangement structure for 8-bundled conductors on straight-path tower | |
CN203553744U (en) | An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus | |
CN103588131B (en) | Eight-point synchronous automatic lifting maintenance platform | |
CN206735628U (en) | Gantry electroplating assembly line Special running of standby suspender is installed | |
CN205802755U (en) | A kind of efficient lifting device for changing dust-removal cloth-bag | |
CN205668869U (en) | A kind of boom hoisting for dredge pump maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171107 |
|
RJ01 | Rejection of invention patent application after publication |