Summary of the invention
In view of the above-mentioned problems, the fuse can the purpose of the present invention is to provide a kind of automatic recovery type power fuse
Fuse rapidly in circuit overloads, and can after a period of time that is delayed automatic restoring circuit.
The technical solution adopted by the present invention to solve the technical problems is: the automatic recovery type power fuse includes by two
The fusing group that a above fusing unit is formed in parallel;Each fusing unit includes the fuse and Zener diode being serially connected
Group, the Zener diode group include two Zener diodes reversely concatenated;The fusing group connects module with a delay
The power fuse is constituted after mutually concatenating;It is normally closed switch that module is connected in the delay, and where the power fuse
Circuit open circuit suddenly after, delay connection module jumps and is maintained at off-state for a period of time.
Preferably, the breakdown reverse voltage of two Zener diodes in the same Zener diode group is identical, and
The breakdown reverse voltage of the Zener diode of different Zener diode groups is different.
Preferably, it includes the electrothermal relay being serially connected, mutual inductor that module is connected in the delay;The mutual inductor output
To a bridge rectifier, the bridge rectifier is exported to polarity storage capacitor;The anode of the polarity storage capacitor
Concatenate one end that the electrothermal relay is electrically connected to after a Zener diode, the cathode concatenation one of the polarity storage capacitor
The other end of the electrothermal relay is electrically connected to after a impedance inductance.
Preferably, it includes the normally closed switch being serially connected, mutual inductor that module is connected in the delay;The mutual inductor output
To a bridge rectifier, the bridge rectifier is exported to polarity storage capacitor;The polarity storage capacitor and one
Zener diode and an electromagnet form series loop;The shaft of the moving contact of the normally closed switch is spring shaft, natural shape
Under state, which be pressed in moving contact on static contact, remains closed normally closed switch;And it is reversed in the Zener diode
Breakdown, when the polarity storage capacitor powers to the electromagnet, the electromagnet is to the normally closed switch, comprising armature
Moving contact attracts, and moving contact is made to be drawn to electromagnet, and disconnects the normally closed switch, until the voltage of the polarity storage capacitor
Drop to critical value.
Preferably, it includes the normally closed switch being serially connected, mutual inductor that module is connected in the delay;The mutual inductor output
To a bridge rectifier, the output end and a Zener diode of the bridge rectifier output and an electromagnetism bodily form
At series loop;The shaft of the moving contact of the normally closed switch is winder, and under natural conditions, which is in half relaxation shape
State is pressed in moving contact on static contact, remains closed normally closed switch;And it is reversed breakdown in the Zener diode, it is described
When electromagnet is powered, the electromagnet to the normally closed switch, moving contact comprising armature attract, so that moving contact is drawn to electromagnetism
Body, and disconnect the normally closed switch, and tighten winder.
The beneficial effects of the present invention are: the automatic recovery type power fuse is serially connected in operating circuit, when circuit quilt
When connection, due to receiving the limitation of manufacturing process, the parameter of each Zener diode group leads to always have one there is always difference
The conducting breakdown first of Zener diode group, so that the fusing unit where making it is connected, this makes entire power fuse two
The voltage dip at end, thus make other fusing units can not be switched on, even if only one fusing unit participate in work;And work as
When participating in the fusing unit fusing of work, the delay connects module and jumps and be maintained at off-state for a period of time, can be used
Some overload electric appliances are closed at family;Then, module recovery on-state is connected in delay, hereafter, as previously mentioned, another fusing unit
It is first switched on, then alone bear fusing insurance work, to ensure that quick overload responds.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figure 1, this automatic recovery type power fuse includes the fusing being formed in parallel by more than two fusing units 1
Group;Each fusing unit 1 includes the fuse 11 being serially connected and Zener diode group 12, the Zener diode group 12 include
Two Zener diodes reversely concatenated;It is molten that the fusing group constitutes the electric power after concatenating with delay connection 2 phase of module
Disconnected device;It is normally closed switch that module 2 is connected in the delay, and after the circuit where the power fuse suddenly open circuit, described
Delay connects module 2 and jumps and be maintained at off-state for a period of time.
Above-mentioned power fuse, the reverse breakdown electricity of two Zener diodes in the same Zener diode group 12
Press identical, and the breakdown reverse voltage of the Zener diode of different Zener diode group 12 is different.To make breakdown reverse voltage
Minimum Zener diode group punctures at first.
Above-mentioned power fuse connects module for the delay, and embodiment one is as shown in Figure 2: in Fig. 2, institute
Stating delay and connecting module 2 includes electrothermal relay FR, the mutual inductor CT being serially connected;The mutual inductor CT exports whole to a bridge-type
Current circuit UR, the bridge rectifier UR are exported to polarity storage capacitor C;The anode concatenation one of the polarity storage capacitor C
One end of the electrothermal relay FR, the cathode concatenation one of the polarity storage capacitor C are electrically connected to after a Zener diode D1
The other end of the electrothermal relay FR is electrically connected to after a impedance inductance L.
According to embodiment one, during the circuit where the power fuse works normally, the polarity energy storage electricity
Hold C and gradually stores up full electric energy, and due to the presence of Zener diode D1, polarity storage capacitor C does not discharge to electrothermal relay FR;When molten
Silk 11 is blown, and when circuit is breaking suddenly, mutual inductor CT generates an inductive impulse, to make two pole of Zener since magnetic flux is mutated
Pipe D1 is punctured by moment, and polarity storage capacitor C discharges to electrothermal relay FR, so that electrothermal relay FR is rapidly heated and disconnects, and protects
Hold off-state for a period of time, make user within this time to overload electric appliance into removing.In embodiment one, for institute
Impedance inductance L is stated, effect is, to the exchange huge impedance of electric forming, to make the both ends impedance inductance L shape after electrothermal relay FR disconnection
At biggish voltage drop, reduce the partial pressure at fusing group both ends, so that it is guaranteed that when relay FR is disconnected, in each unit 1 that fuses
Zener diode group 12 can not puncture.
Module is connected in the delay, and embodiment two is as shown in Figure 3: in example 2, module packet is connected in the delay
Include the normally closed switch K1 being serially connected, mutual inductor CT;The mutual inductor CT is exported to a bridge rectifier UR, the bridge-type
Rectification circuit UR is exported to polarity storage capacitor C;A polarity storage capacitor C and Zener diode D1 and an electromagnet
YA forms series loop;The shaft 20 of the moving contact of the normally closed switch K1 is spring shaft, and under natural conditions, which makes
Contact is pressed on static contact, remains closed normally closed switch K1;And breakdown, the polarity are reversed in the Zener diode D1
When storage capacitor C powers to the electromagnet YA, the electromagnet YA is to the normally closed switch K1, moving contact comprising armature
Attract, moving contact is made to be drawn to electromagnet YA, and disconnect the normally closed switch K1, until the voltage of the polarity storage capacitor C
Drop to critical value.
According to embodiment two, as embodiment one, only when circuit disconnects suddenly, the Zener diode D1 is just hit
It wears, to make electromagnet YA obtain a period of time magnetism, to the moving contact of normally closed switch K1 is attracted at electromagnet YA, directly
Voltage to polarity storage capacitor C drops to critical value, and the exciting current of electromagnet YA is not enough to overcome returning for the spring shaft
Multiple power.
Module is connected in the delay, and embodiment three is as shown in Figure 4: for embodiment three, unlike embodiment two,
There is no the polarity storage capacitor C in embodiment two;The shaft 20 of the moving contact of the normally closed switch K1 is winder, nature
Under, which is in half relaxed state, is pressed in moving contact on static contact, remains closed normally closed switch;And described
Zener diode D1 is reversed breakdown, when the electromagnet YA is powered, the electromagnet YA to the normally closed switch, include rank
The moving contact of iron attracts, and moving contact is made to be drawn to electromagnet YA, and disconnects the normally closed switch K1, and tighten winder.And
The recovery needs of normally closed switch K1 are gradually unclamped to the winder, until the moving contact is returned to the shape being pressed on static contact
State equally meets the effect that delay is connected;And compared to embodiment two, structure is more simplified.
Above-mentioned automatic recovery type power fuse is serially connected in operating circuit, when circuit is switched on, due to each described neat
The parameter of diode group 12 received has differences, and leads to always have the conducting breakdown first of a Zener diode group 12, to make it
The fusing unit 1 at place is connected, this makes the voltage dip at entire power fuse both ends, to make other fusing units can not
Be switched on, though only one fusing unit 1 participate in work;And when participating in the fusing unit fusing of work, the delay
It connects module 2 to jump and be maintained at off-state for a period of time, family can be used to close some overload electric appliances;Then, delay is connected
Module 2 restores on-state, hereafter, as previously mentioned, another fusing unit is first switched on, and then alone bear fusing insurance
Work, to ensure that quick overload responds.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, made any modification, equivalent replacement be should all be included in the protection scope of the present invention.