CN107313814B CN201710491125.2A CN201710491125A CN107313814B CN 107313814 B CN107313814 B CN 107313814B CN 201710491125 A CN201710491125 A CN 201710491125A CN 107313814 B CN107313814 B CN 107313814B
Authority
CN
China
Prior art keywords
low
pressure
steam
condenser
turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710491125.2A
Other languages
Chinese (zh)
Other versions
CN107313814A (en
Inventor
张晓�
李德军
孙云国
韩爱民
范玉宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Qiquan Thermoelectricity Co Ltd
Original Assignee
Jinan Qiquan Thermoelectricity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Qiquan Thermoelectricity Co Ltd filed Critical Jinan Qiquan Thermoelectricity Co Ltd
Priority to CN201710491125.2A priority Critical patent/CN107313814B/en
Publication of CN107313814A publication Critical patent/CN107313814A/en
Application granted granted Critical
Publication of CN107313814B publication Critical patent/CN107313814B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses coal-fired mud power plant systems and method that a kind of energy is condenser Reduction of Students' Study Load, Turbo-generator Set is pure condensate unit, including middle-pressure steam turbine, medium pressure steam turbine is connect with generator, the blow-off line of medium pressure steam turbine is connect with condenser, while a plurality of branch in parallel, and every branch road is equipped with low-pressure turbine, the low-pressure turbine is connect with low voltage generator, and the exhaust steam end of all low-pressure turbines is connect with oxygen-eliminating device.This invention ensures that the steady load of unit, the ladder for realizing energy is utilized, that is, can provide low pressure station service, and can reduce condenser burden.

Description

A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load
Technical field
The present invention relates to coal-fired mud power plant system field more particularly to a kind of combustion electricity generation by coal sludge that can be lightened the burden for condenser Factory's system and method.
Background technique
In the production process in thermal power plant, according to the difference of the pressure and temperature of required steam, steam is divided into super face Boundary, subcritical, super-pressure, high pressure, middle pressure, low pressure.
Steam used in the Steam Turbine of general factory is high temperature and high pressure steam and two kinds of medium pressure steam, wherein high Warm high steam is directly generated by burning sludge with circulating fluidized-bed boiler, medium pressure steam respectively by back pressure unit steam discharge, subtract Warm decompressor and medium temperature and medium pressure boiler generate jointly.In addition to back pressure generating set, also possess pure condensate and extraction condensing type turbine generator Unit is medium pressure steam into vapour, and pumping/steam discharge is low-pressure steam, and wherein steam extraction is delivered to each use through low-pressure steam pipeline For its use, remaining steam discharge, which then enters after condenser is cooled to condensed water, to be re-used at family.In production usually, condenser Cooling cycle water lines due to fouling blockage, will cause condenser efficiency and be lower, and night outer net steam consumption reduce, make to take out Vapour amount is reduced, so that the quantity of steam for causing entry into condenser increases, to make condenser, the load becomes large.When condenser can not be timely The phenomenon that when steam discharge is cooled to condensed water and is drained, just will affect unit load, causing unit load down.
In production before, recirculated water dosing scale removal is usually used, compressor emergency shutdown dredges the method for condenser to improve Condenser efficiency, but dosing scale removal effect is not significant, lasting, and shutting down dredging must carry out again in turn(a)round, so in order to guarantee Unit load needs a kind of system that can reduce condenser burden.
Summary of the invention
The purpose of the present invention is to solve the above-mentioned problems, and providing a kind of to be the combustion electricity generation by coal sludge of condenser Reduction of Students' Study Load Factory's system and method ensure that the steady load of unit, and the ladder for realizing energy utilizes, that is, can provide low pressure station service, again It can reduce condenser burden.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of can be the coal-fired mud power plant system of condenser Reduction of Students' Study Load, and Turbo-generator Set is pure condensate unit, including middle pressure Steam turbine, medium pressure steam turbine are connect with generator, and the blow-off line of medium pressure steam turbine is connect with condenser, while simultaneously Join a plurality of branch, every branch road is equipped with low-pressure turbine, and the low-pressure turbine is connect with low voltage generator, all low pressure The exhaust steam end of steam turbine is connect with oxygen-eliminating device.
Including middle-pressure steam turbine, medium pressure steam turbine is connect with generator, the blow-off line of medium pressure steam turbine with Condenser connection, the extraction line of medium pressure steam turbine a plurality of branch in parallel, every branch road is equipped with low-pressure turbine, described Low-pressure turbine is connect with low voltage generator, and the exhaust steam end of all low-pressure turbines is connect with oxygen-eliminating device.
The blow-off line of medium pressure steam turbine connects a main branch, and a plurality of branch in parallel in main branch is described Main branch is equipped with blow-off line branch electrically operated gate branch electrically operated gate.
The extraction line of medium pressure steam turbine connects a main branch, and a plurality of branch in parallel in main branch is described Main branch is equipped with steam extraction branch electrically operated gate.
Every branch road is also in series with gate valve and electric control valve.
The low voltage generator and low-pressure turbine are installed at zero meter of the generator.
A kind of can be the working method of the coal-fired mud power plant system of condenser Reduction of Students' Study Load, and Turbo-generator Set is to take out solidifying machine Group, comprising:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be generated electricity in low pressure Steam condensate after machine completes passes through pipeline to oxygen-eliminating device, and realization recycles;
When night steam extraction amount be greatly decreased or condenser efficiency decline when, utilize extraction steam extraction push low pressure steamer hair Motor operation acting reduces the work load of condenser to reduce the steam amount into condenser, improves vacuum degree to mention High unit efficiency.
It further include that the electricity that low voltage generator issues is directly incorporated into low pressure station-service distribution section, provides electricity for station-service subsidiary engine Amount.
A kind of can be the working method of the coal-fired mud power plant system of condenser Reduction of Students' Study Load, and Turbo-generator Set is pure condensate machine Group, comprising:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be generated electricity in low pressure Steam condensate after machine completes passes through pipeline to oxygen-eliminating device, and realization recycles;
When night steam extraction amount be greatly decreased or condenser efficiency decline when, utilize extraction steam discharge push low pressure steamer hair Motor operation acting reduces the work load of condenser to reduce the steam amount into condenser, improves vacuum degree to mention High unit efficiency.
It further include that the electricity that low voltage generator issues is directly incorporated into low pressure station-service distribution section, provides electricity for station-service subsidiary engine Amount.
The beneficial effects of the present invention are:
By after extraction and condensing unit steam extraction branch electrically operated gate or on pure condensate unit blow-off line, increasing by a bypass jet chimney And in one to multiple low pressure Turbo-generator Set of zero meter of the generator of middle-pressure steam turbine installation, the quantity of steam for entering condenser is reduced To guarantee condenser efficiency, and realize the utilization again of low-pressure steam.
This invention ensures that the steady load of unit, the ladder for realizing energy is utilized, that is, can provide low pressure station service, again It can reduce condenser burden.
Detailed description of the invention
Fig. 1 is the system construction drawing of extraction and condensing unit;
Fig. 2 is the system construction drawing of pure condensate unit;
Wherein, 1 middle-pressure steam turbine, 2 generators, 3 blow-off lines, 4 condensers, 5 extraction lines, 6 steam extraction branch electrically operated gates, 7 gate valves, 8 electric control valves, 9 low voltage generators, 10 low-pressure turbines, 11 oxygen-eliminating devices, 12. blow-off line branch electrically operated gates.
Specific embodiment:
The present invention will be further described with embodiment with reference to the accompanying drawing:
As shown in Figure 1, a kind of can be the coal-fired mud power plant system of condenser Reduction of Students' Study Load, Turbo-generator Set is to take out solidifying machine Group, including middle-pressure steam turbine 1, medium pressure steam turbine 1 are connect with generator 2, the blow-off line 3 of medium pressure steam turbine 1 with Condenser 4 connects, and the extraction line 5 of medium pressure steam turbine 1 a plurality of branch in parallel, every branch road is equipped with low-pressure turbine 10, the low-pressure turbine 10 is connect with low voltage generator 9, and the exhaust steam end and oxygen-eliminating device 11 of all low-pressure turbines 10 connect It connects.
The extraction line 5 of medium pressure steam turbine 1 connects a main branch, a plurality of branch in parallel in main branch, institute Main branch is stated equipped with steam extraction branch electrically operated gate 6.
Every branch road is also in series with gate valve 7 and electric control valve 8.
The low voltage generator 9 and low-pressure turbine 10 are installed at zero meter of the generator 2.
A kind of can be the working method of the coal-fired mud power plant system of condenser Reduction of Students' Study Load, and Turbo-generator Set is to take out solidifying machine Group, comprising:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be generated electricity in low pressure Steam condensate after machine completes passes through pipeline to oxygen-eliminating device, and realization recycles;
When night steam extraction amount be greatly decreased or condenser efficiency decline when, utilize extraction steam extraction push low pressure steamer hair Motor operation acting reduces the work load of condenser to reduce the steam amount into condenser, improves vacuum degree to mention High unit efficiency.
The electricity that low voltage generator issues is directly incorporated into low pressure station-service distribution section, provides electricity for station-service subsidiary engine.
As shown in Fig. 2, a kind of can be the coal-fired mud power plant system of condenser Reduction of Students' Study Load, Turbo-generator Set is pure condensate machine Group, including middle-pressure steam turbine 1, medium pressure steam turbine 1 are connect with generator 2, the blow-off line 3 of medium pressure steam turbine 1 with Condenser 4 connects, while a plurality of branch in parallel, and every branch road is equipped with low-pressure turbine 10, the low-pressure turbine 10 with it is low Pressure motor 9 connects, and the exhaust steam end of all low-pressure turbines 10 is connect with oxygen-eliminating device 11.
The blow-off line 3 of medium pressure steam turbine 1 connects a main branch, a plurality of branch in parallel in main branch, institute Main branch is stated equipped with blow-off line branch electrically operated gate 12.
Every branch road is also in series with gate valve 7 and electric control valve 8.
The low voltage generator 9 and low-pressure turbine 10 are installed at zero meter of the generator 2.
A kind of can be the working method of the coal-fired mud power plant system of condenser Reduction of Students' Study Load, and Turbo-generator Set is pure condensate machine Group, comprising:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be generated electricity in low pressure Steam condensate after machine completes passes through pipeline to oxygen-eliminating device, and realization recycles;
When night steam extraction amount be greatly decreased or condenser efficiency decline when, utilize extraction steam discharge push low pressure steamer hair Motor operation acting reduces the work load of condenser to reduce the steam amount into condenser, improves vacuum degree to mention High unit efficiency.
It further include that the electricity that low voltage generator issues is directly incorporated into low pressure station-service distribution section, provides electricity for station-service subsidiary engine Amount.
The present invention is directed to medium temperature and medium pressure extraction condensing type or pure condensate formula Turbo-generator Set, mainly includes low-pressure turbine, asynchronous Generator, electrically operated gate, electric control valve, gate valve, oxygen-eliminating device and each steam/drain water piping.By in extraction and condensing unit steam extraction branch After electrically operated gate or on pure condensate unit blow-off line, increase by a bypass jet chimney.By that will be steamed after electrically operated gate-gate valve-regulating valve Vapour introducing is installed on the low voltage generator at zero meter of low-pressure turbine, and by the steam condensation after low voltage generator completes Water is recycled by pipeline to oxygen-eliminating device to realize.
When night steam extraction amount be greatly decreased or the decline of condenser efficiency when, utilize the steam extraction of extraction or steam discharge to push low pressure Generator operation acting reduces the work load of condenser to reduce the steam amount into condenser, improve vacuum degree to Improve unit efficiency.And the electricity that low voltage generator issues can be directly incorporated into low pressure station-service distribution section, it is provided for station-service subsidiary engine Electricity.The condensed water of low voltage generator discharge completes new steam/water circulating through pipeline to oxygen-eliminating device.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (8)

1. a kind of can be the coal-fired mud power plant system of condenser Reduction of Students' Study Load, Turbo-generator Set is pure condensate unit, characterized in that packet Middle-pressure steam turbine is included, medium pressure steam turbine is connect with generator, and the blow-off line of medium pressure steam turbine is connect with condenser, A plurality of branch in parallel simultaneously, every branch road are equipped with low-pressure turbine, and the low-pressure turbine is connect with low voltage generator, is owned The exhaust steam end of low-pressure turbine connect with oxygen-eliminating device;The blow-off line of medium pressure steam turbine connects a main branch, main branch The road a plurality of branch in parallel, the main branch are equipped with blow-off line branch electrically operated gate.
2. a kind of can be the coal-fired mud power plant system of condenser Reduction of Students' Study Load, Turbo-generator Set is extraction and condensing unit, characterized in that packet Middle-pressure steam turbine is included, medium pressure steam turbine is connect with generator, and the blow-off line of medium pressure steam turbine is connect with condenser, The extraction line of medium pressure steam turbine a plurality of branch in parallel, every branch road are equipped with low-pressure turbine, the low-pressure turbine It is connect with low voltage generator, the exhaust steam end of all low-pressure turbines is connect with oxygen-eliminating device;The extraction steam pipe of medium pressure steam turbine Road connects a main branch, a plurality of branch in parallel in main branch, and the main branch is equipped with steam extraction branch electrically operated gate.
3. a kind of coal-fired mud power plant system that can be lightened the burden for condenser as claimed in claim 1 or 2, characterized in that every The branch road is also in series with gate valve and electric control valve.
4. a kind of coal-fired mud power plant system that can be lightened the burden for condenser as claimed in claim 1 or 2, characterized in that described Low voltage generator and low-pressure turbine are installed at zero meter of the generator.
5. a kind of working method using coal-fired mud power plant system as claimed in claim 2, Turbo-generator Set are to take out solidifying machine Group, characterized in that include:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be done in low-pressure turbine By pipeline to oxygen-eliminating device, realization recycles steam condensate after completion;
When night steam extraction amount is greatly decreased or condenser efficiency declines, low-pressure turbine operation is pushed to do using the steam extraction of extraction Function reduces the work load of condenser to reduce the steam amount into condenser, improves vacuum degree to improve unit effect Rate.
6. working method as claimed in claim 5, characterized in that further include that the electricity for issuing low voltage generator is directly simultaneously Enter low pressure station-service distribution section, provides electricity for station-service subsidiary engine.
7. a kind of working method using coal-fired mud power plant system described in claim 1, Turbo-generator Set is pure condensate machine Group, characterized in that include:
The steam of middle-pressure steam turbine is introduced on the low-pressure turbine being installed at zero meter of generator, and will be done in low-pressure turbine By pipeline to oxygen-eliminating device, realization recycles steam condensate after completion;
When condenser efficiency declines, low-pressure turbine operation acting is pushed using the steam discharge of extraction, to reduce into condenser Steam amount, reduce the work load of condenser, improve vacuum degree to improve unit efficiency.
8. working method as claimed in claim 7, characterized in that further include that the electricity for issuing low voltage generator is directly simultaneously Enter low pressure station-service distribution section, provides electricity for station-service subsidiary engine.
CN201710491125.2A 2017-06-23 2017-06-23 A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load Active CN107313814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710491125.2A CN107313814B (en) 2017-06-23 2017-06-23 A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710491125.2A CN107313814B (en) 2017-06-23 2017-06-23 A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load

Publications (2)

Publication Number Publication Date
CN107313814A CN107313814A (en) 2017-11-03
CN107313814B true CN107313814B (en) 2019-08-20

Family

ID=60179456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710491125.2A Active CN107313814B (en) 2017-06-23 2017-06-23 A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load

Country Status (1)

Country Link
CN (1) CN107313814B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915222B (en) * 2019-03-08 2022-04-08 济南市琦泉热电有限责任公司 Opposite conveying device and method for medium-temperature and medium-pressure steam in cascade utilization power plant

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899999A (en) * 2009-05-31 2010-12-01 中国电力工程顾问集团华东电力设计院 Small turbine system in power plant and thermal cycle system in power plant containing same
CN102678207A (en) * 2011-03-18 2012-09-19 中国电力工程顾问集团华东电力设计院 Thermodynamic system with twice reheating
CN202813417U (en) * 2012-09-05 2013-03-20 华北电力大学 Energy-saving system for preheating air by utilizing exhaust steam of small steam turbine in power plant
CN103266925A (en) * 2013-05-10 2013-08-28 南京师范大学 System and method for supplying motive power for auxiliary machinery of thermal power plant
CN103498708A (en) * 2013-10-10 2014-01-08 中国电力工程顾问集团华东电力设计院 Air-cooling reheating unit system arranged in small back-pressure type steam turbine and used for driving feed pump
CN104405459A (en) * 2014-11-21 2015-03-11 华电国际电力股份有限公司技术服务中心 Backpressure machine acting and heat supply device for steam exhaust heat supply network of intermediate pressure cylinder of steam turbine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899999A (en) * 2009-05-31 2010-12-01 中国电力工程顾问集团华东电力设计院 Small turbine system in power plant and thermal cycle system in power plant containing same
CN102678207A (en) * 2011-03-18 2012-09-19 中国电力工程顾问集团华东电力设计院 Thermodynamic system with twice reheating
CN202813417U (en) * 2012-09-05 2013-03-20 华北电力大学 Energy-saving system for preheating air by utilizing exhaust steam of small steam turbine in power plant
CN103266925A (en) * 2013-05-10 2013-08-28 南京师范大学 System and method for supplying motive power for auxiliary machinery of thermal power plant
CN103498708A (en) * 2013-10-10 2014-01-08 中国电力工程顾问集团华东电力设计院 Air-cooling reheating unit system arranged in small back-pressure type steam turbine and used for driving feed pump
CN104405459A (en) * 2014-11-21 2015-03-11 华电国际电力股份有限公司技术服务中心 Backpressure machine acting and heat supply device for steam exhaust heat supply network of intermediate pressure cylinder of steam turbine

Also Published As

Publication number Publication date
CN107313814A (en) 2017-11-03

Similar Documents

Publication Publication Date Title
CN104358596B (en) Many steam turbines cogeneration ultra supercritical unit
CN104763484B (en) Air cooling turbine high back pressure heat supply power generating simultaneously method
CN103089439B (en) Boulez pauses-steam Rankine-organic Rankine combined cycle cogeneration device
CN104976671A (en) Wide-load heat supply energy-saving system of back pressure type small turbine drive water supply pump
CN108397247A (en) A kind of coaxial resuperheat axial exhaust type steam turbine of ready-package high speed
CN103982252A (en) Novel process combination of high-speed and efficient single reheating steam turbine and power generation of small power plant
CN113175367B (en) Master control system for improving peak regulation capacity and flexibility of unit and operation method
CN104612912A (en) Heat-pipe-based complementary electricity generation system for preheating condensed water of coal-fired unit through geothermal energy
CN204593353U (en) A kind of integrated system of deep exploitation residual heat from boiler fume
CN107313814B (en) A kind of can be the coal-fired mud power plant system and method for condenser Reduction of Students' Study Load
CN201826901U (en) Reheat type back pressure steam turbine
CN206440032U (en) A kind of recovery Steam Turbine exhaust steam residual heat system based on heat pump
CN210178429U (en) Heating system for steam extraction integration of gas-steam combined cycle unit
CN211174242U (en) Heating season cogeneration unit on-line electricity load adjusting system
CN210088955U (en) Combined cycle device for steam extraction integration and heat storage peak regulation coupling
CN210179723U (en) Combined cycle device based on heat supply and electric power peak regulation coupling
CN104329127B (en) Multicomputer associating capacity-enlarging system
CN103790793A (en) Ocean heat energy open circulation power generation system
CN110700909A (en) Heating season cogeneration unit on-line electricity load adjusting system and adjusting method
CN204786684U (en) Wide load of little steam turbine of backpressure formula drive water -feeding pump supplies heat energy -saving system
CN204436487U (en) A kind of low temperature exhaust heat efficient system for reclaiming
CN203717050U (en) Heat supply device high in heat supply reliability
CN103790814B (en) Heating network steam-driven circulation water pump system
CN202883026U (en) Power station backheating type steam-driven condensate pump system
CN207795327U (en) A kind of unit thermodynamic system for intergenerational upgrading

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220316

Granted publication date: 20190820