CN107313636A - Construction method of annular three-dimensional intelligent garage - Google Patents
Construction method of annular three-dimensional intelligent garage Download PDFInfo
- Publication number
- CN107313636A CN107313636A CN201710565686.2A CN201710565686A CN107313636A CN 107313636 A CN107313636 A CN 107313636A CN 201710565686 A CN201710565686 A CN 201710565686A CN 107313636 A CN107313636 A CN 107313636A
- Authority
- CN
- China
- Prior art keywords
- rotating disk
- installation
- construction
- garage
- flat bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 130
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 115
- 239000010959 steel Substances 0.000 claims abstract description 115
- 238000009434 installation Methods 0.000 claims abstract description 104
- 238000004519 manufacturing process Methods 0.000 claims abstract description 22
- 210000002219 extraembryonic membrane Anatomy 0.000 claims description 16
- 238000009415 formwork Methods 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 11
- 238000009826 distribution Methods 0.000 claims description 9
- 238000011900 installation process Methods 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 238000009412 basement excavation Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 5
- 239000007787 solid Substances 0.000 claims description 5
- 238000005266 casting Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 230000005855 radiation Effects 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 230000007935 neutral effect Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 12
- 239000003795 chemical substances by application Substances 0.000 description 24
- 230000000694 effects Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001413 cellular effect Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 210000001519 tissue Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/08—Garages for many vehicles
- E04H6/12—Garages for many vehicles with mechanical means for shifting or lifting vehicles
- E04H6/18—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
- E04H6/28—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of turntables or rotary rings for horizontal transport
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a construction method of an annular three-dimensional intelligent garage, which can realize the alternate construction of steel structure installation and equipment installation and improve the construction efficiency. The construction method of the annular three-dimensional intelligent garage comprises the following steps: 1) constructing a mounting foundation of the three-dimensional intelligent garage; detecting and accepting the installation foundation of the three-dimensional intelligent garage; 2) then manufacturing and installing a steel structure; 3) mounting electromechanical equipment; 4) and installing the control system after the steps 2) and 3) are finished. By adopting the construction method of the annular three-dimensional intelligent garage, the electromechanical equipment can be installed while the steel structure is constructed, so that multiple processes can be performed simultaneously, the working efficiency is greatly improved, and the construction cost is reduced.
Description
Technical field
The present invention relates to the construction field of multi-storied garage, especially a kind of annular stereo intelligent garage construction method.
Background technology
It is well-known:In civil buildings, round intelligent three-dimensional garage is novel device;Take up an area to save, improve soil
Ground service efficiency and it is narrow area solve parking problem just rising, circular intelligent garage is also just in research and development test phase, intelligent vehicle
Storehouse basis, steel construction, flat bed conveying equipment circularize distribution, are so conducive to utilization space, and beneficial to the circulating of equipment
Vehicle is transported at nearest parking stall by row with the most short time.
The construction method of existing annular three-dimensional garage, typically take the parking number of plies according to annular three-dimensional garage by it is lower extremely
On carry out construction and installation successively.The installation crossed construction of Steel Structure Installation and equipment can not be realized;Therefore efficiency of construction reduction, is applied
Work cost is high.
The content of the invention
The technical problems to be solved by the invention, which are to provide one kind, can realize that Steel Structure Installation and equipment install interspersed construction,
Improve the annular stereo intelligent garage construction method of efficiency of construction.
The technical solution adopted for the present invention to solve the technical problems is:Annular stereo intelligent garage construction method, including
Following steps:
1) construction of intelligent three-dimensional garage installation foundation;Intelligent three-dimensional garage installation foundation is detected, checked and accepted;
2) then carry out steel construction fabrication and installation;
2.1 structure steel fabrication;
Steel construction takes fetal membrane to make, and the bracket on steel construction is made using digital control processing;
2.2 Steel Structure Installation;
Round multi-storied garage steel construction includes column and beam;The column is coaxially made up of from the bottom to top more piece pillar;Phase
Connected between adjacent two pillars by tie-beam;
Comprise the following steps:
2.2.1 by the round multi-storied garage steel construction in the vertical direction of circular distribution, it is according to every segmented column of column
Unit, is divided into multiple multi-storied garage steel structural layers by round multi-storied garage steel construction;Then by every layer of multi-storied garage steel structural layer
Multiple sector elements are divided into, and each sector element includes the pillar of in the vertical direction and each fanned in the horizontal direction
Tie-beam in shape unit between adjacent pillars, the edge of one end of the sector element is tie-beam, and the edge of the other end is
Pillar;
2.2.2 in basic over-assemble sector element;
All pillars that sector element includes are fixed on the basis of, and pillar is detachably connected with basis;Set up
Temporary platform, all tie-beams included in temporary platform over-assemble sector element;After sector element is completed, examined
Look into, check and accept, it is ensured that sector element meets construction requirement;
2.2.3 sector element is integrally dismantled on the basis of, then carries out integral hoisting, lifting to round stereoscopic vehicle
Installed on the installation foundation of storehouse steel construction;
In installation process, with every segmented column on column for one layer, layering from the bottom to top is installed;First by sector element
Installed in orlop, two neighboring sector element is assembled so that in two neighboring sector element, a sector element one
The tie-beam of end margin is connected with the pillar of another end margin of sector element one;The final peace in round multi-storied garage steel construction
Orlop annular multi-storied garage steel structural layer is formed on the basis of dress;Then sector element lifted again vertical to this layer of annular
On body garage steel structural layer, the assembling of the multi-storied garage steel structural layer of second layer annular is carried out, it is round vertical until being finally completed
The overall assembling of body garage steel construction;
It can be followed the steps below simultaneously during step 2 is carried out:
3) mechanical and electric equipment installation;
The installation of 3.1 rotating disks;
3.1.1 main body examination is carried out to the part that round intelligent three-dimensional garage agent structure has completed to install;The circle
Type intelligent three-dimensional garage agent structure, which has, hangs well, multilayer flat bed;The flat bed is multi-storied garage steel structural layer;The flat bed bag
The rotating disk for including inner ring installs flat bed and the parking flat bed of outer ring;Sector lifting region, and the fan-shaped hoisting area are reserved on flat bed
Domain to supreme from running through whole round intelligent three-dimensional garage agent structure;
3.1.2 the rotating disk, which installs flat bed, has inner ring and outer rings;Support wheel is installed in inner ring and inner ring;And cause
Support wheel is circumferentially uniformly distributed according to the spacing of regulation;
Install support wheel during, first according to round intelligent three-dimensional garage agent structure center target hang well with
The equal position of flat bed, the absolute altitude of levelling support wheel;Adjust support wheel and be in level;Detect the center of support wheel;Again to support
The circumferentially equally distributed position of wheel is adjusted;
3.1.3 the rotating disk is made up of polylith rotating disk assembling block;Installed first in the rotating disk for needing to install the flat bed of rotating disk
Mounting platform is set on flat bed;Then follow the steps below:
A, positioned at parking flat bed fan-shaped lifting region by hanging apparatus by rotating disk assembling block be lifted into mounting platform
Position;
B, on mounting platform adjacent two pieces of rotating disks assembling block is carried out it is assembled;Ensure the mark of the lower surface of rotating disk assembling block
It is high consistent with the absolute altitude on support wheel summit;
C, the center line by the rotating disk assembling block after assembly well on support wheel around round intelligent three-dimensional garage agent structure
Edge is rotated clockwise or counterclockwise;So that the rotating disk assembling block portion point after the completion of assembly is located on mounting platform, remainder
Rotate out mounting platform;And to have on mounting platform and accommodate the space that at least one piece rotating disk assembles block;
The rotating disk of the disk assembling block composition annular of D, repeat step A, B, C after the completion of the assembly in step C;
3.1.4 installed in rotating disk and the transmission device that driving rotating disk is rotated is installed on flat bed;
3.1.5 the second parking plate is installed on rotating disk installation flat bed, parking flat bed, and installed between the second parking plate
The track of travelling bogie traveling;
The installation of 3.2 other equipments;
The installation and transportation dolly on rotating disk;Hanging dolly hoistable platform in well;And drive lifting flat hanging to install in well
The lift of platform lifting;
3.3 install inner ring on hoistable platform turns around device;
The inner ring turns around device including being provided with two pieces of second parallel parking plates, institute in rotation dish, the rotation dish
State the track that travelling bogie traveling is provided between the second parking plate;It is provided with and is driven with device of rotation driving below the rotating disk
The fluted disc of connection;
Rotation dish support wheel is installed first on hoistable platform, then rotation dish be installed on rotation dish support wheel, then according to
Secondary attachment rail, the second parking plate;Device of rotation driving is finally installed on hoistable platform;
4) carrying out step 2) and step 3) after control system is installed.
It is preferred that, the construction of step 1 neutral body intelligent garage installation foundation is carried out successively according to the following steps:
A, foundation excavation, use the scope for excavating edge and slope on total station survey basis before civil engineering is carried out;
Then voucher and the examination of ground are carried out;
The measurement at center is carried out after the completion of b, raft foundation construction, foundation excavation, is then marked;Start to use mixed mud
Pour bed course;
The radiation of raft slab muscle is carried out after the completion of cushion construction, must not be low by centre mark number on bed course before laying
In plank thickness, all cheek boards of circular raft plate are installed, line laying work is then measured;Basic pillar is determined on bed course
Reinforcement location and equipment raise reinforcement location and joint bar;
D, progress raft plate are poured;In casting process, the detection duration of pouring and mixed mud slump, it is ensured that the matter of junction
Amount;
E, basic pillar, the construction of foundation beam and the installation of foundation bolt;
Basic pillar carries out improving reinforcing bar, and formwork according to the position of joint bar;Formwork and reinforcing bar are carried out to foundation beam simultaneously
Fabrication and installation, when carrying out formwork to foundation beam, set up complete scaffold and carry out operation;
F, equipment raise and basic pillar are poured after reinforcing bar formwork is completed to the part below mounting foot bolt,
Mounting foot bolt above section is not poured;The annular at garage center hangs well pouring completely;
G, the mounting foot bolt in foundation columns;
H, poured after foundation bolt installation;
Backfilled after the completion of i, basis.
Further, structure steel fabrication takes numerical control drilling and fetal membrane to control in step 2.1;Assembling parts use master die
Plate line blanking, assembled component takes fixed fetal membrane to make assembling, reaches one fetal membrane of same class component, standard welding production goes out
.
Further, step is also included after the completion of step 3.1.3 to lead in the outside installation that rotating disk installs flat bed top rotary table
To wheel;So that the outer circumference surface of directive wheel and rotating disk is tangent.
Specifically, the transmission device in step 3.1.4 includes being provided with driving cog on motor and reduction box, the rotating disk
Travelling gear is provided with circle, the reduction box, the travelling gear is engaged with gear ring, using clearance gauge to travelling gear and gear ring
Engagement detected.
It is preferred that, by setting fixing bolt to realize the fixation to pillar on the basis of in step 2.2.2;The fixation
Bolt inserts bottom of the pillar.
Specifically, the connection described in step 2.2.2 between pillar and tie-beam is connected by screw bolts.
The beneficial effects of the invention are as follows:Annular stereo intelligent garage construction method of the present invention is due to carrying out steel knot
During the fabrication and installation of structure, round multi-storied garage steel construction is divided into multiple sector elements, by the way that single sector is single
Member is assembled on ground, is then again assembled sector element lifting, so as to complete to round multi-storied garage steel construction
Construction;Therefore Steel Structure Installation efficiency is improved, structure manufacture quality is checked in advance, work high above the ground is reduced, reduced in the past
The time span of independent lifting components, improves the efficiency of lifting.
In the installation especially installation process of rotating disk of electromechanical equipment is carried out, due in round intelligent three-dimensional garage main body
Structure is reserved with fan-shaped lifting region, and rotating disk assembling block is lifted in fan-shaped lifting region, and is put down in the installation of flat bed
Platform realizes that adjacent two pieces of rotating disks assemble the assembly of block, is then rotated, passage technique realizes the partial installation of rotating disk;Therefore
The installation of rotating disk can be carried out independently, not interfere with later process construction, so that efficiency is improved, while all rotating disk assemblings
Block is lifted by fan-shaped lifting region, it is therefore desirable to operating personnel it is less, can be with continuous productive process.Greatly improve efficiency,
One layer has been checked and accepted than general structure installation and has carried out equipment hoisting again, is carried out structure after the completion of lifting again and is installed more efficient, and
And can synchronously carry out;To the reduction of operating personnel's operation difficulty, operating efficiency improves more than 80%, effectively raises work effect
Rate, reduces construction cost.
Therefore, annular stereo intelligent garage construction method of the present invention can be realized while Construction of Steel Structure pair
Electromechanical equipment is installed, so that working procedures are carried out simultaneously, is greatly improved operating efficiency, is reduced simultaneously
Construction cost.
Brief description of the drawings
Fig. 1 is the structural representation of round intelligent three-dimensional garage agent structure in the embodiment of the present invention;
Fig. 2 is the top view of body intelligent garage installation foundation in the embodiment of the present invention;
Fig. 3 is the structural representation of body intelligent garage installation foundation in the embodiment of the present invention;
Fig. 4 is the top view of single layered stereo garage steel structural layer in the embodiment of the present invention;
Fig. 5 is the partial enlarged drawing in Fig. 4;
Fig. 6 is the dimensional structure diagram of sector element in the embodiment of the present invention;
Fig. 7 is the top view of fan-shaped cellular construction schematic diagram in the embodiment of the present invention;
Fig. 8 is the partial enlarged drawing of A in Fig. 1;
Fig. 9 is the partial enlarged drawing of B in Fig. 8;
Figure 10 is the partial enlarged drawing of C in Fig. 9;
Figure 11 is the partial enlarged drawing of D in Fig. 9;
Figure 12 is the top view of individual layer flat bed turntable installation flat bed in the embodiment of the present invention;
Figure 13 is the partial enlarged drawing of E in Figure 12;
Figure 14 is the structure of mounting disc tissue block on individual layer flat bed in the embodiment of the present invention;
Figure 15 is the structural representation that turntable of the embodiment of the present invention assembles block;
Figure 16 is after rotating after the completion of mounting platform top rotary table assembling block is assembled on individual layer flat bed in the embodiment of the present invention
Top view;
Figure 17 is to install the top view after parking plate again after individual layer flat bed top rotary table installation in the embodiment of the present invention;
Figure 18 is that inner ring turns around the stereogram of device in the embodiment of the present invention;
Figure 19 is that inner ring turns around the top view of device in the embodiment of the present invention;
Indicated in figure:1- intelligent three-dimensional garage installation foundations, 11- hangs well, 12- bases pillar, 13- foundation bolts, 14- bases
Plinth beam, 15- hoistable platforms, the round intelligent three-dimensional garage agent structures of 2-, 21- mounting platforms, 3- rotating disks are installed outside flat bed, 31-
Circle, 32- inner rings, 33- support wheels, 34- parking flat beds, 35- connecting cross beams, 311- sector elements, 312- pillars, 313- tie-beams
4- rotating disks, 41- rotating disks assembling block, 42- stopping means, 43- channel-section steels, 5- transmission devices, 6- directive wheels, 61- is oriented to wheeling support, 7-
Parking plate, 8- travelling bogies, 9- lifts, 10- inner ring turns around device, 101- rotation dish, the parking plates of 102- second, 103- rails
Road, 104- fluted discs.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As shown in Fig. 1 to Figure 19, annular stereo intelligent garage construction method of the present invention comprises the following steps:
1) construction of intelligent three-dimensional garage installation foundation 1;Intelligent three-dimensional garage installation foundation 1 is detected, checked and accepted;
2) then carry out steel construction fabrication and installation;
2.1 structure steel fabrication;
Steel construction takes fetal membrane to make, and the bracket on steel construction is made using digital control processing;
2.2 Steel Structure Installation;
Round multi-storied garage steel construction includes column and beam;The column is coaxially made up of from the bottom to top more piece pillar 312;
Connected between adjacent two pillars by tie-beam 313;
Comprise the following steps:
2.2.1 by the round multi-storied garage steel construction in the vertical direction of circular distribution, according to every segmented column 312 of column
For unit, round multi-storied garage steel construction is divided into multiple multi-storied garage steel structural layers;Then by every layer of multi-storied garage steel construction
Layer is divided into multiple sector elements 311, and each sector element 311 includes the pillar 312 of in the vertical direction and in level
Tie-beam 313 on direction in each sector element 313 between adjacent pillars, the edge of one end of the sector element 11 is company
Beam 2 is connect, the edge of the other end is pillar 312;
2.2.2 in basic over-assemble sector element 311;
All pillars 312 that sector element 311 includes are fixed on the basis of, and pillar 312 and basis are detachable
Connection;Temporary platform is set up, all tie-beams 313 included in temporary platform over-assemble sector element 311;Sector element 311
After being completed, checked, checked and accepted, it is ensured that sector element 311 meets construction requirement;
2.2.3 the entirety of sector element 311 is dismantled on the basis of, then carries out integral hoisting, lifting is stood to round
Installed on the installation foundation of body garage steel construction;
In installation process, with every segmented column 312 on column for one layer, layering from the bottom to top is installed;First by sector
Unit 311 is arranged on orlop, two neighboring sector element 311 is assembled so that in two neighboring sector element 311,
The tie-beam 313 of one end margin of sector element 311 1 is connected with the pillar 312 of another end margin of sector element 311 1;Most
Orlop annular multi-storied garage steel structural layer is formed on the installation foundation of round multi-storied garage steel construction eventually;Then again will fan
Shape unit 311 is lifted to the multi-storied garage steel structural layer of this layer of annular, carries out the multi-storied garage steel knot of second layer annular
The assembling of structure layer, until being finally completed the overall assembling of round multi-storied garage steel construction;
It can be followed the steps below simultaneously during step 2 is carried out:
3) mechanical and electric equipment installation;
The installation of 3.1 rotating disks 4;
3.1.1 main body examination is carried out to the part that round intelligent three-dimensional garage agent structure 2 has completed to install;The circle
Type intelligent three-dimensional garage agent structure 2, which has, hangs well 11, multilayer flat bed;The flat bed is multi-storied garage steel structural layer;It is described flat
The rotating disk that layer includes inner ring installs flat bed 3 and the parking flat bed 35 of outer ring;Sector lifting region, and the sector are reserved on flat bed
Lifting region to supreme from running through whole round intelligent three-dimensional garage agent structure 2;
3.1.2 the rotating disk, which installs flat bed 3, has inner ring 32 and outer shroud 31;Support wheel is installed in inner ring 32 and inner ring 31
33;And support wheel 33 is circumferentially uniformly distributed according to the spacing of regulation;
During support wheel 33 is installed, hung first according to the round center target of intelligent three-dimensional garage agent structure 2
The position equal with flat bed of well 11, the absolute altitude of levelling support wheel 33;Adjust support wheel 33 and be in level;Detect in support wheel 33
The heart;The circumferentially equally distributed position of support wheel 33 is adjusted again;
3.1.3 the rotating disk 4 is made up of polylith rotating disk assembling block 41;Needing to install the rotating disk peace of the flat bed of rotating disk first
Fill and mounting platform 21 is set on flat bed 3;Then follow the steps below:
A, positioned at parking flat bed 35 fan-shaped lifting region by hanging apparatus by rotating disk assembling block 41 be lifted into installation
The position of platform 21;
B, on mounting platform 21 to adjacent two pieces of rotating disks assembling block 41 carry out assembly;Ensure that rotating disk assembles the following table of block 41
The absolute altitude in face is consistent with the absolute altitude on the summit of support wheel 33;
C, will be assembled good after rotating disk assemble block 41 on support wheel 33 in round intelligent three-dimensional garage agent structure 2
Heart line edge is rotated clockwise or counterclockwise;So that rotating disk assembling block 41 part after the completion of assembly is located on mounting platform 21,
Remainder rotates out mounting platform 21;And to have on mounting platform 21 and accommodate the sky that at least one piece rotating disk assembles block 41
Between;
The disk assembling block 41 of D, repeat step A, B, C after the completion of the assembly in step C constitutes the rotating disk 4 of annular;
3.1.4 installed in rotating disk and the transmission device 5 that driving rotating disk is rotated is installed on flat bed 3;
3.1.5 second parking plate 102 is installed on rotating disk installation flat bed 3, parking flat bed 35, and in the second parking plate
The track 103 that installation and transportation dolly 8 is travelled between 102;
The installation of 3.2 other equipments;
The installation and transportation dolly 8 on rotating disk;Hanging dolly hoistable platform 15 in well 11;And hanging driving is installed in well 11
The lift 9 that hoistable platform 15 is lifted;
3.3 install inner ring on hoistable platform 15 turns around device 10;
The inner ring device 10 that turns around is provided with two pieces parallel second including rotation dish 101, in the rotation dish 101 and stopped
The track 103 of the traveling of travelling bogie 8 is provided between sweep 102, second parking plate 102;The lower section of rotating disk 101 is set
There is the fluted disc 104 being connected with device of rotation driving;
Rotation dish support wheel is installed first on hoistable platform 15, then rotation dish 101 is installed on rotation dish support wheel,
Attachment rail 103, the second parking plate 102 successively again;Device of rotation driving finally is installed on hoistable platform 15;
4) carrying out step 2) and step 3) after control system is installed.
In step 1) in the construction of intelligent three-dimensional garage installation foundation 1 can be realized by a variety of forms of construction work;To solid
Intelligent garage installation foundation 1 is detected, checked and accepted.It is follow-up by being constructed first to intelligent three-dimensional garage installation foundation 1
The installation of round multi-storied garage steel construction provides basis.
In step 2) in realize the making and installation of steel construction, specifically:
2.1 structure steel fabrication;
Steel construction takes fetal membrane to make, and the bracket on steel construction is made using digital control processing;
2.2 Steel Structure Installation;
Round multi-storied garage steel construction includes column and beam;The column is coaxially made up of from the bottom to top more piece pillar 312;
Connected between adjacent two pillars by tie-beam 313;
Comprise the following steps:
2.2.1 by the round multi-storied garage steel construction in the vertical direction of circular distribution, according to every segmented column 312 of column
For unit, round multi-storied garage steel construction is divided into multiple multi-storied garage steel structural layers;Then by every layer of multi-storied garage steel construction
Layer is divided into multiple sector elements 311, and each sector element 311 includes the pillar 312 of in the vertical direction and in level
Tie-beam 313 on direction in each sector element 313 between adjacent pillars, the edge of one end of the sector element 11 is company
Beam 2 is connect, the edge of the other end is pillar 312;
2.2.2 in basic over-assemble sector element 311;
All pillars 312 that sector element 311 includes are fixed on the basis of, and pillar 312 and basis are detachable
Connection;Temporary platform is set up, all tie-beams 313 included in temporary platform over-assemble sector element 311;Sector element 311
After being completed, checked, checked and accepted, it is ensured that sector element 311 meets construction requirement;
2.2.3 the entirety of sector element 311 is dismantled on the basis of, then carries out integral hoisting, lifting is stood to round
Installed on the installation foundation of body garage steel construction;
In installation process, with every segmented column 312 on column for one layer, layering from the bottom to top is installed;First by sector
Unit 311 is arranged on orlop, two neighboring sector element 311 is assembled so that in two neighboring sector element 311,
The tie-beam 313 of one end margin of sector element 311 1 is connected with the pillar 312 of another end margin of sector element 311 1;Most
Orlop annular multi-storied garage steel structural layer is formed on the installation foundation of round multi-storied garage steel construction eventually;Then again will fan
Shape unit 311 is lifted to the multi-storied garage steel structural layer of this layer of annular, carries out the multi-storied garage steel knot of second layer annular
The assembling of structure layer, until being finally completed the overall assembling of round multi-storied garage steel construction.
Specifically, steel construction takes fetal membrane to make in step 2.1, the bracket on steel construction is made using digital control processing;
Assembling parts are taken fixed fetal membrane to make assembling, are reached same class component one using standard form line blanking, assembled component
Fetal membrane, standard welding production appears on the scene.The inspection of bolt hole and angle is carried out before part assembly welding using particular manufacturing craft, it is ensured that every
One angle and corresponding bolt hole are all errorless before welding, and check correction is carried out to relative dimensions after welding.It is female including pillar
Assembly welding post-equalization is corrected and organized before the assembling of material, it is ensured that the linearity of pillar and the relative dimensions of bracket, perpendicularity etc..
In step 2.2.1, by the round multi-storied garage steel construction in the vertical direction of circular distribution, by circular distribution
Round multi-storied garage steel construction in the vertical direction, is unit according to every segmented column 312 of column, by round multi-storied garage steel knot
Structure is divided into multiple multi-storied garage steel structural layers;Then every layer of multi-storied garage steel structural layer is divided into multiple sector elements 311, and
Each sector element 311 includes the pillar 312 of in the vertical direction and adjacent in each sector element 313 in the horizontal direction
Tie-beam 313 between pillar, the edge of one end of the sector element 11 is tie-beam 2, and the edge of the other end is pillar
312;
Because the column is coaxially made up of from the bottom to top more piece pillar 312, therefore by the round stereoscopic vehicle of circular distribution
Storehouse steel construction in the vertical direction, is unit according to every segmented column 312 of column, round multi-storied garage steel construction is divided into multiple
Multi-storied garage steel structural layer;Consequently facilitating realizing that the layering of the round multi-storied garage steel construction of circular distribution from the bottom to top is installed.
Multi-storied garage steel structural layer is divided into multiple sector elements 311 simultaneously, so as to realize every layer of multi-storied garage
The combination of steel structural layer 1 is installed;Each sector element 311 is individually assembled on ground, finally in multi-storied garage steel construction
Assembled on installation foundation.
In basic over-assemble sector element 311 in step 2.2.2;
All pillars 312 that sector element 311 includes are fixed on the basis of, and pillar 312 and basis are detachable
Connection;Temporary platform is set up, all tie-beams 313 included in temporary platform over-assemble sector element 311;Sector element 311
After being completed, checked, checked and accepted, it is ensured that sector element 311 meets construction requirement;
By on the basis of, the assembling to sector element 311 being realized, so as to avoid substantial amounts of work high above the ground, Neng Gouyou
The reduction potential safety hazard of effect.
In step 2.2.3, the entirety of sector element 311 is dismantled on the basis of, integral hoisting is then carried out, is lifted
Installed on to the installation foundation of round multi-storied garage steel construction;
The entirety of sector element 311 is dismantled on the basis of, integral hoisting, lifting to round multi-storied garage is then carried out
Installed on the installation foundation of steel construction;
In installation process, with every segmented column 312 on column for one layer, layering from the bottom to top is installed;First by sector
Unit 311 is arranged on orlop, two neighboring sector element 311 is assembled so that in two neighboring sector element 311,
The tie-beam 313 of one end margin of sector element 311 1 is connected with the pillar 312 of another end margin of sector element 311 1;Most
Orlop annular multi-storied garage steel structural layer is formed on the installation foundation of round multi-storied garage steel construction eventually;Then again will fan
Shape unit 311 is lifted to the multi-storied garage steel structural layer of this layer of annular, carries out the multi-storied garage steel knot of second layer annular
The assembling of structure layer, until being finally completed the overall assembling of round multi-storied garage steel construction.
Sector element 311 is lifted to the installation foundation of round multi-storied garage steel construction and installed;By using by
The lower mode successively assembled upwards, consequently facilitating construction, improves operating efficiency.
In summary, during the fabrication and installation of steel construction are carried out, round multi-storied garage steel construction is divided into multiple
Sector element, by the way that single sector element is assembled on ground, is then again assembled sector element lifting, so that
Complete the construction to round multi-storied garage steel construction;Therefore Steel Structure Installation efficiency is improved, structure manufacture quality is checked in advance,
Work high above the ground is reduced, the individually time span of lifting components was reduced in the past, and improved the efficiency of lifting.
The installation of rotating disk and other equipment is realized in step 3, specifically,
3) mechanical and electric equipment installation;
The installation of 3.1 rotating disks 4;
3.1.1 main body examination is carried out to the part that round intelligent three-dimensional garage agent structure 2 has completed to install;The circle
Type intelligent three-dimensional garage agent structure 2, which has, hangs well 11, multilayer flat bed;The flat bed is multi-storied garage steel structural layer;It is described flat
The rotating disk that layer includes inner ring installs flat bed 3 and the parking flat bed 35 of outer ring;Sector lifting region, and the sector are reserved on flat bed
Lifting region to supreme from running through whole round intelligent three-dimensional garage agent structure 2;
3.1.2 the rotating disk, which installs flat bed 3, has inner ring 32 and outer shroud 31;Support wheel is installed in inner ring 32 and inner ring 31
33;And support wheel 33 is circumferentially uniformly distributed according to the spacing of regulation;
During support wheel 33 is installed, hung first according to the round center target of intelligent three-dimensional garage agent structure 2
The position equal with flat bed of well 11, the absolute altitude of levelling support wheel 33;Adjust support wheel 33 and be in level;Detect in support wheel 33
The heart;The circumferentially equally distributed position of support wheel 33 is adjusted again;
3.1.3 the rotating disk 4 is made up of polylith rotating disk assembling block 41;Needing to install the rotating disk peace of the flat bed of rotating disk first
Fill and mounting platform 21 is set on flat bed 3;Then follow the steps below:
A, positioned at parking flat bed 35 fan-shaped lifting region by hanging apparatus by rotating disk assembling block 41 be lifted into installation
The position of platform 21;
B, on mounting platform 21 to adjacent two pieces of rotating disks assembling block 41 carry out assembly;Ensure that rotating disk assembles the following table of block 41
The absolute altitude in face is consistent with the absolute altitude on the summit of support wheel 33;
C, will be assembled good after rotating disk assemble block 41 on support wheel 33 in round intelligent three-dimensional garage agent structure 2
Heart line edge is rotated clockwise or counterclockwise;So that rotating disk assembling block 41 part after the completion of assembly is located on mounting platform 21,
Remainder rotates out mounting platform 21;And to have on mounting platform 21 and accommodate the sky that at least one piece rotating disk assembles block 41
Between;
The disk assembling block 41 of D, repeat step A, B, C after the completion of the assembly in step C constitutes the rotating disk 4 of annular;
3.1.4 installed in rotating disk and the transmission device 5 that driving rotating disk is rotated is installed on flat bed 3;
3.1.5 second parking plate 102 is installed on rotating disk installation flat bed 3, parking flat bed 35, and in the second parking plate
The track 103 that installation and transportation dolly 8 is travelled between 102;
The installation of 3.2 other equipments;
The installation and transportation dolly 8 on rotating disk;Hanging dolly hoistable platform 15 in well 11;And hanging driving is installed in well 11
The lift 9 that hoistable platform 15 is lifted;
3.3 install inner ring on hoistable platform 15 turns around device 10;
The inner ring device 10 that turns around is provided with two pieces parallel second including rotation dish 101, in the rotation dish 101 and stopped
The track 103 of the traveling of travelling bogie 8 is provided between sweep 102, second parking plate 102;The lower section of rotating disk 101 is set
There is the fluted disc 104 being connected with device of rotation driving;
Rotation dish support wheel is installed first on hoistable platform 15, then rotation dish 101 is installed on rotation dish support wheel,
Attachment rail 103, the second parking plate 102 successively again;Device of rotation driving finally is installed on hoistable platform 15.
The part progress main body that round intelligent three-dimensional garage agent structure 2 has completed to install is tested in step 3.1.1
Receive;The round intelligent three-dimensional garage agent structure 2, which has, hangs well 11, multilayer flat bed;The flat bed is multi-storied garage steel construction
Layer;The rotating disk that the flat bed includes inner ring installs flat bed 3 and the parking flat bed 35 of outer ring;Sector hoisting area is reserved on flat bed
Domain, and the fan-shaped lifting region to supreme from running through whole round intelligent three-dimensional garage agent structure 2;
By reserving sector lifting region on flat bed, and the fan-shaped lifting region to supreme from running through whole round solid
Intelligent garage agent structure 1;Consequently facilitating when installing rotating disk 4 on flat bed, being lifted to the equipment that needs are installed;Can
To avoid interference of lower floor's flat bed to installation equipment on the flat bed of upper strata.
In step 3.1.2 as shown in Figure 12,13, the rotating disk, which installs flat bed 3, has inner ring 32 and outer shroud 31;In outer shroud
31 and inner ring 32 on install support wheel 2;And support wheel 2 is circumferentially uniformly distributed according to the spacing of regulation;
During support wheel 33 is installed, hung first according to the round center target of intelligent three-dimensional garage agent structure 1
The position equal with flat bed of well 11, the absolute altitude of levelling support wheel 33;Adjust support wheel 33 and be in level;Detect in support wheel 33
The heart;The circumferentially equally distributed position of support wheel 33 is adjusted again;
By being installed in rotating disk support wheel 33 is installed on the outer shroud 31 and inner ring 32 of flat bed 3, consequently facilitating in subsequent step
Rotation after the completion of the rotating disk assembling splicing of block 41.
The rotating disk 4 is made up of polylith rotating disk assembling block 41 in step 3;First in turn for the flat bed for needing to install rotating disk
Disk, which is installed, sets mounting platform 21 on flat bed 3;Then follow the steps below:
As shown in figure 14, A, positioned at parking flat bed 34 fan-shaped lifting region by hanging apparatus by rotating disk assemble block 41
It is lifted into the position of mounting platform 21;
B, on mounting platform 21 to adjacent two pieces of rotating disks assembling block 41 carry out assembly;Ensure that rotating disk assembles the following table of block 41
The absolute altitude in face is consistent with the absolute altitude on the summit of support wheel 33;
C, will be assembled good after rotating disk assemble block 41 on support wheel 33 in round intelligent three-dimensional garage agent structure 1
Heart line edge is rotated clockwise or counterclockwise;As shown in figure 15 so that rotating disk assembling block 41 part after the completion of assembled is located at peace
On assembling platform 21, remainder rotates out mounting platform 21;And to have on mounting platform 21 and accommodate at least one piece rotating disk
Assemble the space of block 41;
The disk assembling block 41 of D, repeat step A, B, C after the completion of the assembly in step C constitutes the rotating disk 4 of annular;
Specifically by assembling the lower surface of block 41 in rotating disk stopping means 42 can be set to block main support wheel in stepb
33, so that support wheel 32 can not only realize the support that block 41 is assembled to rotating disk, moreover it is possible to assemble the rotation of block 41 to rotating disk
Positioned.
The lifting of block 41 is assembled to rotating disk by being realized in above-mentioned steps in lifting region, and is put down in the installation of flat bed
Platform realizes that adjacent two pieces of rotating disks assemble the assembly of block 41, is then rotated, passage technique, so as to realize the split peace of rotating disk 4
Dress;The influence for avoiding lower floor's flat bed from installing upper strata flat bed equipment.
In step 3.1.4, finally installed in rotating disk and the transmission device 5 that driving rotating disk is rotated is installed on flat bed 3.Pass through peace
Dress transmission device 5 realizes the installation of rotating disk 4 so as to provide power for the rotation of rotating disk 4.
In step 3.1.5, flat bed 3 is installed in rotating disk, the second parking plate 102 is installed on parking flat bed 35, and the
The track 103 that installation and transportation dolly 8 is travelled between two parking plates 102;
The installation of other equipment is carried out in step 3.2;
The installation and transportation dolly 8 on rotating disk;Hanging dolly hoistable platform 15 in well 11;And hanging driving is installed in well 11
The lift 9 that hoistable platform 15 is lifted;By pacifying with fill travelling bogie 8, hoistable platform 15 and hoistable platform 15 so as to
The transport to dolly is realized, the installation of dolly transporting equipment is realized.
In step 3.3, on hoistable platform 15 inner ring is installed and turned around device 10;
The inner ring device 10 that turns around is provided with two pieces parallel second including rotation dish 101, in the rotation dish 101 and stopped
The track 103 of the traveling of travelling bogie 8 is provided between sweep 102, second parking plate 102;The lower section of rotating disk 101 is set
There is the fluted disc 104 being connected with device of rotation driving;
Rotation dish support wheel is installed first on hoistable platform 15, then rotation dish 101 is installed on rotation dish support wheel,
Attachment rail 103, the second parking plate 102 successively again;Device of rotation driving finally is installed on hoistable platform 15;
Garage is enabled to be turned around to dolly by installing the inner ring device 10 that turns around.
In summary, in the installation especially installation process of rotating disk of electromechanical equipment is carried out, due in round three-dimensional intelligence
Energy garage agent structure is reserved with fan-shaped lifting region, and rotating disk assembling block is lifted in fan-shaped lifting region, and flat
The mounting platform of layer realizes that adjacent two pieces of rotating disks assemble the assembly of block, is then rotated, passage technique realizes the split of rotating disk
Install;Therefore the installation of rotating disk can be carried out independently, not interfere with later process construction, so as to improve efficiency, be owned simultaneously
Rotating disk assembling block lifted by fan-shaped lifting region, it is therefore desirable to operating personnel it is less, can be with continuous productive process.Significantly
Efficiency is improved, checked and accepted one layer than general structure installation carries out equipment hoisting again, carries out structure after the completion of lifting again and installs more
Increase effect, and can synchronously carry out;To the reduction of operating personnel's operation difficulty, operating efficiency improves more than 80%, effectively carried
High operating efficiency, reduces construction cost.
In step 4) in carrying out step 2) and step 3) after control system is installed.So as to realize whole solid
The installation in garage.
In summary, installation process of the annular stereo intelligent garage construction method of the present invention in main body steel construction
In, installed, used in the installation process of rotating disk using split type, reserve lifting interval, the mounting process of passage can from youngster
Realization is installed while Construction of Steel Structure to electromechanical equipment, so that working procedures are carried out, greatly simultaneously
Operating efficiency is improved, while reducing construction cost.
In step 1) in the construction of intelligent three-dimensional garage installation foundation 1 can be realized by a variety of forms of construction work;To solid
Intelligent garage installation foundation 1 is detected, checked and accepted.Existing foundation working process can be such as used, is constructed into reduce
This, improves efficiency of construction, and a kind of preferred form of construction work therein is:The construction of intelligent three-dimensional garage installation foundation 1, by following step
Suddenly carry out successively:
A, foundation excavation, use the scope for excavating edge and slope on total station survey basis before civil engineering is carried out;
Then voucher and the examination of ground are carried out;
The measurement at center is carried out after the completion of b, raft foundation construction, foundation excavation, is then marked;Start to use mixed mud
Pour bed course;
The radiation of raft slab muscle is carried out after the completion of cushion construction, must not be low by centre mark number on bed course before laying
In plank thickness, all cheek boards of circular raft plate are installed, line laying work is then measured;Basic pillar is determined on bed course
12 reinforcement location and the reinforcement location of equipment raise and joint bar;
D, progress raft plate are poured;In casting process, the detection duration of pouring and mixed mud slump, it is ensured that the matter of junction
Amount;
E, basic pillar 12, the construction of foundation beam 14 and the installation of foundation bolt 13;
Basic pillar 12 carries out improving reinforcing bar, and formwork according to the position of joint bar;Simultaneously to foundation beam 14 carry out formwork and
Reinforcement fabrication is installed, when carrying out formwork to foundation beam 14, is set up complete scaffold and is carried out operation;
F, equipment raise and basic pillar 2 are poured part of the mounting foot bolt below 13 after reinforcing bar formwork is completed
Build, the above section of mounting foot bolt 13 is not poured;The annular at garage center hangs that well 11 is complete to be poured;
G, the mounting foot bolt 13 in foundation columns 12;
H, poured after 13 installation of foundation bolt;
Backfilled after the completion of i, basis.
In order to ensure the quality of steel construction and ensure the accuracy of connection, specifically, the structure steel fabrication in step 2.1
Numerical control drilling and fetal membrane is taken to control;Assembling parts take fixed fetal membrane making group using standard form line blanking, assembled component
Dress, reaches one fetal membrane of same class component, and standard welding production appears on the scene.
Also include step after the completion of step 3.1.3 and directive wheel 6 is installed in the outside that rotating disk installs the top rotary table 4 of flat bed 3;Make
The outer circumference surface for obtaining directive wheel 6 and rotating disk 4 is tangent.
Specific directive wheel 6 includes directive wheel mounting seat 61, and directive wheel base 61 is installed first, directive wheel is then adjusted
The absolute altitude of base 61 is radial position so that the outer circumference surface of directive wheel 6 and rotating disk 4 is tangent.
In order to simplify operation, and installation effectiveness is improved, further, the transmission device 5 in step 3.1.4 includes electricity
It is provided with machine and reduction box, the rotating disk on transmission gear ring, the reduction box and is provided with travelling gear 51, the travelling gear
51 are engaged with gear ring, and travelling gear 51 is detected with engaging for gear ring using clearance gauge.
For the ease of pillar 312 is fixed, and lifting easy to disassemble, it is preferred that on basis in step 2.2.2
On by setting fixing bolt to realize fixation to pillar 312;Fixing bolt insertion pillar 312 bottom.
For the ease of the assembling of sector element 311, specifically, the pillar 312 described in step 2.2.2 and tie-beam 313
Between connection be connected by screw bolts.
Claims (7)
1. annular stereo intelligent garage construction method, it is characterised in that comprise the following steps:
1) construction of intelligent three-dimensional garage installation foundation;Intelligent three-dimensional garage installation foundation (1) is detected, checked and accepted;
2) then carry out steel construction fabrication and installation;
2.1 structure steel fabrication;
Steel construction takes fetal membrane to make, and the bracket on steel construction is made using digital control processing;
2.2 Steel Structure Installation;
Round multi-storied garage steel construction includes column and beam;The column is coaxially made up of from the bottom to top more piece pillar (312);Phase
Connected between adjacent two pillars by tie-beam (313);
Comprise the following steps:
2.2.1 by the round multi-storied garage steel construction in the vertical direction of circular distribution, it is according to every segmented column (312) of column
Unit, is divided into multiple multi-storied garage steel structural layers by round multi-storied garage steel construction;Then by every layer of multi-storied garage steel structural layer
Be divided into multiple sector elements (311), and each sector element (311) include in the vertical direction pillar (312) and
Tie-beam (313) in horizontal direction between the interior adjacent pillars of each sector element (313), one end of the sector element (11)
Edge be tie-beam (2), the edge of the other end is pillar (312);
2.2.2 in basic over-assemble sector element (311);
All pillars (312) that sector element (311) includes are fixed on the basis of, and pillar (312) and basis are removable
Unload connection;Temporary platform is set up, all tie-beams (313) included in temporary platform over-assemble sector element (311);It is fan-shaped single
After first (311) are completed, are checked, checked and accepted, it is ensured that sector element (311) meets construction requirement;
2.2.3 sector element (311) is integrally dismantled on the basis of, then carries out integral hoisting, lifting to round solid
Installed on the installation foundation of garage steel construction;
In installation process, with every segmented column (312) on column for one layer, layering from the bottom to top is installed;First will be fan-shaped single
First (311) are arranged on orlop, two neighboring sector element (311) are assembled so that two neighboring sector element (311)
In, the pillar of the tie-beam (313) of an end margin of sector element (311) one and another end margin of sector element (311) one
(312) connect;Orlop annular multi-storied garage steel construction is finally formed on the installation foundation of round multi-storied garage steel construction
Layer;Then second layer annular is carried out by sector element (311) lifting to the multi-storied garage steel structural layer of this layer of annular again
Multi-storied garage steel structural layer assembling, until being finally completed the overall assembling of round multi-storied garage steel construction;
Carry out step 2) during can follow the steps below simultaneously:
3) mechanical and electric equipment installation;
The installation of 3.1 rotating disks (4);
3.1.1 main body examination is carried out to the part that round intelligent three-dimensional garage agent structure (2) has completed to install;It is described round
Intelligent three-dimensional garage agent structure (2), which has, hangs well (11), multilayer flat bed;The flat bed is multi-storied garage steel structural layer;It is described
The rotating disk that flat bed includes inner ring installs flat bed (3) and the parking flat bed (35) of outer ring;Sector lifting region is reserved on flat bed, and
The fan-shaped lifting region to supreme from running through whole round intelligent three-dimensional garage agent structure (2);
3.1.2 the rotating disk, which installs flat bed (3), has inner ring (32) and outer shroud (31);Installed in inner ring (32) and inner ring (31)
Support wheel (33);And support wheel (33) is circumferentially uniformly distributed according to the spacing of regulation;
During support wheel (33) is installed, hung first according to round intelligent three-dimensional garage agent structure (2) center target
Well (11) position equal with flat bed, the absolute altitude of levelling support wheel (33);Adjust support wheel (33) and be in level;Detect support wheel
(33) center;The circumferentially equally distributed position of support wheel (33) is adjusted again;
3.1.3 the rotating disk (4) assembles block (41) by polylith rotating disk and constituted;Needing to install the rotating disk peace of the flat bed of rotating disk first
Fill and mounting platform (21) is set on flat bed (3);Then follow the steps below:
A, positioned at parking flat bed (35) fan-shaped lifting region by hanging apparatus by rotating disk assemble block (41) be lifted into installation
The position of platform (21);
B, on mounting platform (21) adjacent two pieces of rotating disks are assembled block (41) carry out it is assembled;Ensure under rotating disk assembling block (41)
The absolute altitude on surface is consistent with the absolute altitude on support wheel (33) summit;
C, will be assembled good after rotating disk assemble block (41) on support wheel (33) around round intelligent three-dimensional garage agent structure (2)
Center line edge is rotated clockwise or counterclockwise;So that the rotating disk assembling block (41) after the completion of assembly is partly located at mounting platform
(21) on, remainder rotates out mounting platform (21);And to have on mounting platform (21) and accommodate at least one piece rotating disk
Assemble the space of block (41);
The rotating disk (4) of disk assembling block (41) the composition annular of D, repeat step A, B, C after the completion of the assembly in step C;
3.1.4 installed in rotating disk and the transmission device (5) that driving rotating disk is rotated is installed on flat bed (3);
3.1.5 the second parking plate (102) is installed on rotating disk installation flat bed (3), parking flat bed (35), and in the second parking plate
(102) track (103) that installation and transportation dolly (8) is travelled between;
The installation of 3.2 other equipments;
Installation and transportation dolly (8) on rotating disk;Hanging the interior dolly hoistable platform (15) of well (11);And hanging installation in well (11)
Drive the lift (9) of hoistable platform (15) lifting;
3.3 install inner ring on hoistable platform (15) turns around device (10);
The inner ring turns around device (10) including being provided with two pieces parallel second in rotation dish (101), the rotation dish (101)
The track (103) of travelling bogie (8) traveling is provided between parking plate (102), second parking plate (102);The rotating disk
(101) lower section is provided with the fluted disc (104) being connected with device of rotation driving;
Rotation dish support wheel is installed first on hoistable platform (15), rotation dish (101) is then installed on rotation dish support wheel,
Attachment rail (103), the second parking plate (102) successively again;Device of rotation driving finally is installed on hoistable platform (15);
4) carrying out step 2) and step 3) after control system is installed.
2. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:Step 1) neutral body intelligent vehicle
The construction of storehouse installation foundation (1), is carried out successively according to the following steps:
A, foundation excavation, use the scope for excavating edge and slope on total station survey basis before civil engineering is carried out;Then
Carry out voucher and the examination of ground;
The measurement at center is carried out after the completion of b, raft foundation construction, foundation excavation, is then marked;Start to be poured with mixed mud
Bed course;
The radiation of raft slab muscle is carried out after the completion of cushion construction, by centre mark number on bed course before laying, raft must not be less than
Plate thickness, installs all cheek boards of circular raft plate, then measures line laying work;Basic pillar (12) is determined on bed course
Reinforcement location and equipment raise reinforcement location and joint bar;
D, progress raft plate are poured;In casting process, the detection duration of pouring and mixed mud slump, it is ensured that the quality of junction;
E, basic pillar (12), the construction of foundation beam (14) and the installation of foundation bolt (13);
Basic pillar (12) carries out improving reinforcing bar, and formwork according to the position of joint bar;Simultaneously to foundation beam (14) carry out formwork and
Reinforcement fabrication is installed, when carrying out formwork to foundation beam (14), is set up complete scaffold and is carried out operation;
F, equipment raise and basic pillar (2) are poured the part of mounting foot bolt (13) below after reinforcing bar formwork is completed
Build, mounting foot bolt (13) above section is not poured;The annular at garage center hangs that well (11) is complete to be poured;
G, the mounting foot bolt (13) in foundation columns (12);
H, poured after foundation bolt (13) installation;
Backfilled after the completion of i, basis.
3. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:The steel construction in step 2.1
Making takes numerical control drilling and fetal membrane to control;Assembling parts take fixed fetal membrane system using standard form line blanking, assembled component
Assemble, reach one fetal membrane of same class component, standard welding production appears on the scene.
4. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:After the completion of step 3.1.3
Also include step and directive wheel (6) is installed in the outside that rotating disk installs flat bed (3) top rotary table (4);So that directive wheel (6) and rotating disk
(4) outer circumference surface is tangent.
5. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:Biography in step 3.1.4
Dynamic device (5), which includes being provided with transmission gear ring, the reduction box on motor and reduction box, the rotating disk, is provided with travelling gear
(51), the travelling gear (51) is engaged with gear ring, and travelling gear (51) is detected with engaging for gear ring using clearance gauge.
6. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:In base in step 2.2.2
By setting fixing bolt to realize the fixation to pillar (312) on plinth;The fixing bolt inserts pillar (312) bottom.
7. annular stereo intelligent garage construction method as claimed in claim 1, it is characterised in that:Described in step 2.2.2
Connection between pillar (312) and tie-beam (313) is connected by screw bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710565686.2A CN107313636B (en) | 2017-07-12 | 2017-07-12 | Construction method of annular three-dimensional intelligent garage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710565686.2A CN107313636B (en) | 2017-07-12 | 2017-07-12 | Construction method of annular three-dimensional intelligent garage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107313636A true CN107313636A (en) | 2017-11-03 |
CN107313636B CN107313636B (en) | 2019-03-19 |
Family
ID=60178519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710565686.2A Active CN107313636B (en) | 2017-07-12 | 2017-07-12 | Construction method of annular three-dimensional intelligent garage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107313636B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2701987Y (en) * | 2004-04-27 | 2005-05-25 | 深圳怡丰自动化停车设备有限公司 | Double vehicle bedplate simultaneously exchanging type mechanical multi-level parking garage |
CN202970069U (en) * | 2012-08-02 | 2013-06-05 | 胡新宜 | Integrated intelligent control multi-layer circular contraposition mobile parking tower and intelligent control device thereof |
CN203296427U (en) * | 2013-05-02 | 2013-11-20 | 中冶南方工程技术有限公司 | Novel circular stereo garage with rotary trolley and multiple exchange areas |
CN103615133A (en) * | 2013-11-01 | 2014-03-05 | 陈�光 | Multilayer rotating disc type stereoscopic garage and control method |
CN203977941U (en) * | 2014-07-11 | 2014-12-03 | 杭州南联地基基础工程有限公司 | Push pipe formula strip underground garage |
US20140373942A1 (en) * | 2013-06-25 | 2014-12-25 | Istvan Nagy | Portable device for capturing and collecting liquids and other particles dripping off of a stationary vehicle |
-
2017
- 2017-07-12 CN CN201710565686.2A patent/CN107313636B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2701987Y (en) * | 2004-04-27 | 2005-05-25 | 深圳怡丰自动化停车设备有限公司 | Double vehicle bedplate simultaneously exchanging type mechanical multi-level parking garage |
CN202970069U (en) * | 2012-08-02 | 2013-06-05 | 胡新宜 | Integrated intelligent control multi-layer circular contraposition mobile parking tower and intelligent control device thereof |
CN203296427U (en) * | 2013-05-02 | 2013-11-20 | 中冶南方工程技术有限公司 | Novel circular stereo garage with rotary trolley and multiple exchange areas |
US20140373942A1 (en) * | 2013-06-25 | 2014-12-25 | Istvan Nagy | Portable device for capturing and collecting liquids and other particles dripping off of a stationary vehicle |
CN103615133A (en) * | 2013-11-01 | 2014-03-05 | 陈�光 | Multilayer rotating disc type stereoscopic garage and control method |
CN203977941U (en) * | 2014-07-11 | 2014-12-03 | 杭州南联地基基础工程有限公司 | Push pipe formula strip underground garage |
Also Published As
Publication number | Publication date |
---|---|
CN107313636B (en) | 2019-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202899136U (en) | Rail sliding type piling machine | |
US10584448B1 (en) | Continuous serpentine concrete beamway forming system and a method for creating a hollow continuous serpentine concrete beamway | |
CN102888843B (en) | Rail sliding type piling machine and construction method thereof | |
CN207130723U (en) | A kind of adjustable drilled pile reinforcing cage decentralization construction platform device | |
CN109518615A (en) | A kind of steel reinforced concrete combination formed precast concrete floorings and girder steel high-precision folding method | |
CN108331429A (en) | A kind of tubulose highrise steel structure installation method | |
CN113585743B (en) | Building construction method | |
CN209919190U (en) | Rib-free top plate mounting device for storage tank flip-chip mounting method | |
CN115369778A (en) | Construction method of steel cross beam rotating body structure | |
CN107313636A (en) | Construction method of annular three-dimensional intelligent garage | |
CN102815606B (en) | Device for realizing operation of mobile tower crane on structural floor and construction method | |
CN102146492A (en) | Method for installing converter body equipment and tooling platform | |
CN202139255U (en) | Tooling platform for assembling converter body equipment | |
CN106703073B (en) | Super High building hoist exempts from return back to top steel beam foundation and its construction method | |
CN104786002B (en) | The method for maintaining and device in gantry crane pivoting support portion | |
CN109930858A (en) | A kind of method and apparatus in building integral jacking bottom transformation market | |
CN110985091A (en) | Flue plate laying machine suitable for large-diameter flue plates and laying method thereof | |
CN206737521U (en) | Multi-storied garage with steel structure | |
CN106978929B (en) | Steel structure system of stereo garage for parallelly storing and taking cars | |
CN206512533U (en) | A kind of empty rail of suspension type installs positioning underground frock | |
CN202099311U (en) | Backing ring assembling platform for four-point suspension type mammoth converter | |
CN106245531B (en) | Steel structural bridge installation method is hung under bilateral derrick type | |
CN106988581B (en) | Steel structure stereo garage and assembling method thereof | |
CN202543243U (en) | Special assembling platform for hanging backing ring of four-point suspension type mammoth converter | |
CN202099312U (en) | Elevated bracket for installation of four-point suspension type mammoth converter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |