CN107301278A - One kind simulation novel building project planning system - Google Patents
One kind simulation novel building project planning system Download PDFInfo
- Publication number
- CN107301278A CN107301278A CN201710417794.5A CN201710417794A CN107301278A CN 107301278 A CN107301278 A CN 107301278A CN 201710417794 A CN201710417794 A CN 201710417794A CN 107301278 A CN107301278 A CN 107301278A
- Authority
- CN
- China
- Prior art keywords
- hard spot
- module
- planning
- architectural engineering
- simulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Novel building project planning system is simulated the invention discloses one kind, including human-machine operation module, physical model structure module, hard spot table build module, architectural engineering and plan that tectonic model sets up module, parametrization architectural engineering planning tectonic model structure module, architectural engineering planning tectonic model structure module, analogue simulation planning module and central processing unit.The present invention can reduce the workload required when being designed change during design structure, the analysis of architectural engineering planning feasibility and performance can be completed while being designed, realize architectural design and the fusion of Performance Design, and the optimization of architectural engineering Structure Planning can be carried out according to different demands, realize and suit measures to local conditions.
Description
Technical field
The present invention relates to architectural engineering planning field, and in particular to one kind simulation novel building project planning system.
Background technology
Currently, with the development of society, it is the reasonable of architectural engineering in the external feature in city, city that various buildings, which are stood in great numbers,
Layout is directly connected to the sustainable development in city image and city.Therefore architectural engineering planning is played in urban planning to pass
Important effect.But, due to the problem of urban planning unreasonable causes various in real work.So in city
In city's planning process, the scheme of reasonable science is formulated, promotes the progress of urban construction.
Although architectural engineering planning is increasingly valued by people, and is due to lack effective architectural engineering
Conventional architectural engineering prcgramming ideas is still continued to use in planning and designing system, the planning of current architectural engineering, i.e., first have architectural engineering
Planning is calculated, the design method being then adjusted according to various requirement, and substantial amounts of architectural engineering planning and designing at present are
Design is come with evaluation criterion afterwards, this has just manufactured bottleneck for architectural engineering planning and designing, is also planned with architectural engineering
The core concept of " suiting measures to local conditions " has conflict.Existing planning and designing system, is accomplished by once running into design parameter change simultaneously
Do again from the beginning, there is substantial amounts of repeated work, considerably increase the workload and work difficulty of staff, cannot guarantee that and build
The reasonability of Project Planning Technique measure is built, architectural engineering planning and designing and the fusion of Performance Design are also not carried out, so that
In can not effectively improve building performance, it is impossible to the efficient benefit for realizing architectural engineering planning.
The content of the invention
To solve the above problems, simulating novel building project planning system the invention provides one kind, it is possible to reduce setting
Workload required during change is designed in meter configuration process, architectural engineering planning can be completed while being designed can
The analysis of row and performance, realizes architectural design and the fusion of Performance Design, and can be built according to different demands
The optimization of project planning structure, realizes and suits measures to local conditions.
To achieve the above object, the technical scheme taken of the present invention is:
One kind simulation novel building project planning system, including
Human-machine operation module, for User logs in, control system order and planning requirement data, program plan data and
The input of architectural engineering basic parameter to be planned;
Physical model builds module, for being wanted according to architectural engineering basic parameter data and regularity and stability parameter
Ask, set up architectural engineering planning physical model;
Hard spot table builds module, for obtaining hard spot file from constructed architectural engineering planning physical model, and reads
The coordinate values of each hard spot in hard spot file, form a revisable hard spot table;At least include the engineering in hard spot file
Plan the positional information of each hard spot of physical model;
Architectural engineering planning tectonic model sets up module, for according to hard spot table, setting up hard spot architectural engineering planning structure
Modeling type, hard spot architectural engineering planning tectonic model includes all hard spot coordinates that tectonic model is planned in architectural engineering;
Parameterize architectural engineering planning tectonic model and build module, for planning tectonic model to the hard spot architectural engineering
Parameterized treatment is carried out, the hard spot architectural engineering planning tectonic model is set up with hard spot table and associates, and issue hard spot building
Each hard spot associated in project planning tectonic model;
Architectural construction Point and Line Model builds module, and tectonic model is planned according to hard spot architectural engineering, sets up architectural engineering rule
Draw corresponding in the architectural construction Point and Line Model of each parameter, hard spot of the architectural construction Point and Line Model including the issue of each part
Part hard spot, and keep corresponding incidence relation;
Analogue simulation planning module, for passing through customized virtual parameter module, virtual parameter start module and emulation
Analysis module completes the simulation planning of architectural engineering, and program results is sent into central processing unit;
Central processing unit, for receiving the control command of man-machine operation module input, and is sent to according to default algorithm
The module specified;Simulation result for receiving analogue simulation planning module, and simulation result is sent to display screen shown
Show;For the modification of user's registration, rights management and account password.
Wherein, the analogue simulation planning module completes simulation analysis by following steps:
S1, insertion virtual parameter module and virtual parameter start module in the architectural construction Point and Line Model of gained, virtually
Parameter start module drive Parameters variation, after each element opening relationships in architectural construction Point and Line Model, in specified scope
It is interior that parameter is changed, carry out calculating solution for different parameters so as to driving simulation analysis module;Result is anti-
Feed simulation analysis module, the simulation analysis module automatically extracts data to virtual-sensor, and the virtual-sensor is shown
As a result;
S2, the detailed digital-to-analogue according to each parameter of simulation analysis result design;
S3, set up architectural engineering planning dotted line DMU models, and by the detailed digital-to-analogue of each parameter decoration to architectural engineering planning
On the corresponding dotted line part of dotted line DMU models, architectural engineering projecting parameter DMU models are obtained.
Wherein, the virtual parameter module can obtain corresponding knot for what is inserted in constructing Point and Line Model in green building
The logic unit of the target of fruit or information.
Wherein, the simulation analysis module, which is used for input, can be decomposed into design variable, design object and design constraint
Parameter, all design variable, design object and design constraints have directly with coherent element in simulation analysis module
Or indirect corresponding relation.
Wherein, the hard spot table includes each hard spot fix name, and the corresponding coordinate values of each hard spot, Yi Jixiang
In distance value between adjacent two coordinates.
Wherein, the hard spot table is set up by following steps:
Imported using the Matlab coordinate values for reading each hard spot in the hard spot file in an EXCEL file, described
Storage has the distance between each hard spot title, coordinate values and two neighboring coordinate in first list of EXCEL file;
Hard spot fix name is placed in the first row of the second list of the EXCEL file, secondary series is linked in the first list accordingly
Coordinate values, the 3rd row are connected to the distance between corresponding two coordinates in the first list, and the EXCEL file is
The revisable hard spot table.
Wherein, in addition to a display screen, for carrying out needing the display of display data.
The invention has the advantages that:
It can be reduced by the foundation of revisable hard spot table required when being designed change during design structure
Workload;By the design of customized virtual-sensor, virtual parameter start module and simulation analysis module, it is being designed
While realize architectural engineering planning feasibility and performance analysis, realize melting for architectural design and Performance Design
Close, so as to carry out the optimization of architectural engineering Structure Planning according to different demands, realize and suit measures to local conditions.
Brief description of the drawings
Fig. 1 is a kind of system block diagram for simulating novel building project planning system of the embodiment of the present invention.
Embodiment
In order that objects and advantages of the present invention are more clearly understood, the present invention is carried out with reference to embodiments further
Describe in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this hair
It is bright.
As shown in figure 1, novel building project planning system is simulated the embodiments of the invention provide one kind, including:
Human-machine operation module, for User logs in, control system order and planning requirement data, program plan data and
The input of architectural engineering basic parameter to be planned;
Physical model builds module, for being wanted according to architectural engineering basic parameter data and regularity and stability parameter
Ask, set up architectural engineering planning physical model;
Hard spot table builds module, for obtaining hard spot file from constructed architectural engineering planning physical model, and reads
The coordinate values of each hard spot in hard spot file, form a revisable hard spot table;At least include the engineering in hard spot file
Plan the positional information of each hard spot of physical model;
Architectural engineering planning tectonic model sets up module, for according to hard spot table, setting up hard spot architectural engineering planning structure
Modeling type, hard spot architectural engineering planning tectonic model includes all hard spot coordinates that tectonic model is planned in architectural engineering;It is described
Hard spot table include between each hard spot fix name, and the corresponding coordinate values of each hard spot and two neighboring coordinate
Distance value;The hard spot table is set up by following steps:
Imported using the Matlab coordinate values for reading each hard spot in the hard spot file in an EXCEL file, described
Storage has the distance between each hard spot title, coordinate values and two neighboring coordinate in first list of EXCEL file;
Hard spot fix name is placed in the first row of the second list of the EXCEL file, secondary series is linked in the first list accordingly
Coordinate values, the 3rd row are connected to the distance between corresponding two coordinates in the first list, and the EXCEL file is
The revisable hard spot table.
Parameterize architectural engineering planning tectonic model and build module, for planning tectonic model to the hard spot architectural engineering
Parameterized treatment is carried out, the hard spot architectural engineering planning tectonic model is set up with hard spot table and associates, and issue hard spot building
Each hard spot associated in project planning tectonic model;Specifically, being completed by following steps:
Using the parameter input function of CATIA softwares by the fix name and its numerical value in the hard spot table with length parameter
Form import in hard spot architectural engineering planning tectonic model;
The hard spot table hard spot is imported into the form of designing table using the design table instrument of CATIA softwares to build
Project planning tectonic model, indicates importing hard spot table the second list of EXCEL file during importing;
Hard spot architectural engineering is planned the coordinate of each hard spot in tectonic model using the formula editors instrument of CATIA softwares
Numerical value changes corresponding design parameter into;
Each hard spot in the hard spot architectural engineering planning tectonic model is issued using the publishing tool of CATIA softwares.
Architectural construction Point and Line Model builds module, and tectonic model is planned according to hard spot architectural engineering, sets up architectural engineering rule
Draw corresponding in the architectural construction Point and Line Model of each parameter, hard spot of the architectural construction Point and Line Model including the issue of each part
Part hard spot, and keep corresponding incidence relation;
Analogue simulation planning module, for passing through customized virtual parameter module, virtual parameter start module and emulation
Analysis module completes the simulation planning of architectural engineering, and program results is sent into central processing unit;Specifically, the emulation mould
Intend planning module and complete simulation analysis by following steps:
S1, insertion virtual parameter module and virtual parameter start module in the architectural construction Point and Line Model of gained, virtually
Parameter start module drive Parameters variation, after each element opening relationships in architectural construction Point and Line Model, in specified scope
It is interior that parameter is changed, carry out calculating solution for different parameters so as to driving simulation analysis module;Result is anti-
Feed simulation analysis module, the simulation analysis module automatically extracts data to virtual-sensor, and the virtual-sensor is shown
As a result;
S2, the detailed digital-to-analogue according to each parameter of simulation analysis result design;
S3, set up architectural engineering planning dotted line DMU models, and by the detailed digital-to-analogue of each parameter decoration to architectural engineering planning
On the corresponding dotted line part of dotted line DMU models, architectural engineering projecting parameter DMU models are obtained.
The virtual parameter module be green building construct Point and Line Model in insert can obtain corresponding result or
The logic unit of the target of information, the simulation analysis module be used for input can be decomposed into design variable, design object and
The parameter of design constraint, all design variable, design object and design constraint with coherent element in simulation analysis module
There is direct or indirect corresponding relation.
Central processing unit, for receiving the control command of man-machine operation module input, and is sent to according to default algorithm
The module specified;Simulation result for receiving analogue simulation planning module, and simulation result is sent to display screen shown
Show;For the modification of user's registration, rights management and account password.
Also include a display screen, for carrying out needing the display of display data.
Database, the classified storage for needing preservation data.
Data sharing module, is total to for carrying out data in database in user right by way of downloading or printing
Enjoy.
Include in the simulation analysis module:Element:Macroelement is the real object of simulation analysis, this carrier
The practical structures or part being mainly physically present;Property:Characteristic is shared attribute letter static on some analysis objects
Breath, such as material, section;Load:Load is is carried in external influence factors or condition in these analysis load, and such as stress is carried
Lotus, temperature loading, boundary condition etc.;Analysis:Analyze as all kinds of specific simulating analysis and appraisal procedure;
Result:The data that calculating is obtained and the form based on data processing, cloud atlas, report;Variable:Design variable is model
The mark of middle variable, including structural parameters, characterisitic parameter and load parameter etc.;Target:Design object be eventually for
Weigh the fine or not or rational index of model or the result of index;Constraint:Design constraint is system in consideration
The rule observed is needed during optimization, such as margin of safety needs to meet minimum requirements;OptAlgorithm:Optimization Design is
All kinds of specific algorithms for optimizing design;OptResult:Optimum results calculate the optimal of obtained design variable by optimizing
Value.
It the above is only the preferred embodiment of the present invention, it is noted that come for those skilled in the art
Say, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should be regarded as
Protection scope of the present invention.
Claims (7)
1. one kind simulation novel building project planning system, it is characterised in that including:
Human-machine operation module, for User logs in, control system order and planning requirement data, program plan data and waits to advise
Draw the input of architectural engineering basic parameter;
Physical model builds module, for according to architectural engineering basic parameter data and regularity and stability parameter request,
Set up architectural engineering planning physical model;
Hard spot table builds module, for obtaining hard spot file from constructed architectural engineering planning physical model, and reads hard spot
The coordinate values of each hard spot in file, form a revisable hard spot table;At least include the project planning in hard spot file
The positional information of each hard spot of physical model;
Architectural engineering planning tectonic model sets up module, for according to hard spot table, setting up hard spot architectural engineering planning construction mould
Type, hard spot architectural engineering planning tectonic model includes all hard spot coordinates that tectonic model is planned in architectural engineering;
Parameterize architectural engineering planning tectonic model and build module, for being carried out to hard spot architectural engineering planning tectonic model
Parameterized treatment, makes the hard spot architectural engineering planning tectonic model be set up with hard spot table and associates, and issue hard spot architectural engineering
Each hard spot associated in planning tectonic model;
Architectural construction Point and Line Model builds module, and tectonic model is planned according to hard spot architectural engineering, sets up architectural engineering planning each
Appropriate section in the architectural construction Point and Line Model of parameter, hard spot of the architectural construction Point and Line Model including the issue of each part
Hard spot, and keep corresponding incidence relation;
Analogue simulation planning module, for passing through customized virtual parameter module, virtual parameter start module and simulation analysis
Module completes the simulation planning of architectural engineering, and program results is sent into central processing unit;
Central processing unit, the control command for receiving the input of man-machine operation module, and be sent to according to default algorithm specified
Module;Simulation result for receiving analogue simulation planning module, and simulation result is sent to display screen shown;With
In the modification of user's registration, rights management and account password.
2. a kind of simulation novel building project planning system according to claim 1, it is characterised in that the analogue simulation
Planning module completes simulation analysis by following steps:
S1, insertion virtual parameter module and virtual parameter start module, virtual parameter in the architectural construction Point and Line Model of gained
It is right in specified scope after start module drive Parameters variation, with each element opening relationships in architectural construction Point and Line Model
Parameter is changed, and calculating solution is carried out for different parameters so as to driving simulation analysis module;Result is fed back to
Simulation analysis module, the simulation analysis module automatically extracts data to virtual-sensor, and the virtual-sensor shows result;
S2, the detailed digital-to-analogue according to each parameter of simulation analysis result design;
S3, architectural engineering planning dotted line DMU models are set up, and the detailed digital-to-analogue of each parameter decoration is planned into dotted line to architectural engineering
On the corresponding dotted line part of DMU models, architectural engineering projecting parameter DMU models are obtained.
3. a kind of simulation novel building project planning system according to claim 1, it is characterised in that the virtual parameter
Module is the logic unit that the target that can obtain corresponding result or information inserted in Point and Line Model is constructed in green building.
4. a kind of simulation novel building project planning system according to claim 1, it is characterised in that the simulation analysis
Module, which is used to input, can be decomposed into design variable, design object and the parameter of design constraint, all design variable, design
Target and design constraint have direct or indirect corresponding relation with coherent element in simulation analysis module.
5. a kind of simulation novel building project planning system according to claim 1, it is characterised in that in the hard spot table
Including between each hard spot fix name, and the corresponding coordinate values of each hard spot and two neighboring coordinate in distance value.
6. a kind of simulation novel building project planning system according to claim 1, it is characterised in that the hard spot table leads to
Cross following steps foundation:
Imported using the Matlab coordinate values for reading each hard spot in the hard spot file in an EXCEL file, in the EXCEL
Storage has the distance between each hard spot title, coordinate values and two neighboring coordinate in first list of file;Institute
The first row for stating the second list of EXCEL file places hard spot fix name, and secondary series is linked in the first list and sat accordingly
Numerical value is marked, the 3rd row are connected to the distance between corresponding two coordinates in the first list, and the EXCEL file is described
Revisable hard spot table.
7. a kind of simulation novel building project planning system according to claim 1, it is characterised in that also including a display
Screen, for carrying out needing the display of display data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710417794.5A CN107301278A (en) | 2017-05-26 | 2017-05-26 | One kind simulation novel building project planning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710417794.5A CN107301278A (en) | 2017-05-26 | 2017-05-26 | One kind simulation novel building project planning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107301278A true CN107301278A (en) | 2017-10-27 |
Family
ID=60135788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710417794.5A Pending CN107301278A (en) | 2017-05-26 | 2017-05-26 | One kind simulation novel building project planning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107301278A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108121866A (en) * | 2017-12-07 | 2018-06-05 | 山东工艺美术学院 | A kind of city planning design intelligent noumenon model building method |
CN108334724A (en) * | 2018-05-08 | 2018-07-27 | 滨州学院 | A kind of construction method of civil engineering BIM quantities models |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101908232A (en) * | 2010-07-30 | 2010-12-08 | 重庆埃默科技有限责任公司 | Interactive scene simulation system and scene virtual simulation method |
CN102004963A (en) * | 2010-12-02 | 2011-04-06 | 张磊 | Digital city generation method and system |
CN106023044A (en) * | 2016-08-03 | 2016-10-12 | 西安科技大学 | Ecological city planning system |
CN106169006A (en) * | 2016-08-05 | 2016-11-30 | 西北工业大学明德学院 | A kind of model library building method based on reverse-engineering |
CN106650069A (en) * | 2016-12-12 | 2017-05-10 | 黄河科技学院 | Analysis and design method for green building |
-
2017
- 2017-05-26 CN CN201710417794.5A patent/CN107301278A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101908232A (en) * | 2010-07-30 | 2010-12-08 | 重庆埃默科技有限责任公司 | Interactive scene simulation system and scene virtual simulation method |
CN102004963A (en) * | 2010-12-02 | 2011-04-06 | 张磊 | Digital city generation method and system |
CN106023044A (en) * | 2016-08-03 | 2016-10-12 | 西安科技大学 | Ecological city planning system |
CN106169006A (en) * | 2016-08-05 | 2016-11-30 | 西北工业大学明德学院 | A kind of model library building method based on reverse-engineering |
CN106650069A (en) * | 2016-12-12 | 2017-05-10 | 黄河科技学院 | Analysis and design method for green building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108121866A (en) * | 2017-12-07 | 2018-06-05 | 山东工艺美术学院 | A kind of city planning design intelligent noumenon model building method |
CN108334724A (en) * | 2018-05-08 | 2018-07-27 | 滨州学院 | A kind of construction method of civil engineering BIM quantities models |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104778753B (en) | The three-dimensional modeling implementation method of bridge reinforcement | |
CN106650069A (en) | Analysis and design method for green building | |
CN107748824A (en) | A kind of concrete frame core-tube system design method based on BIM technology | |
CN110276555A (en) | Residential housing entity Life cycle analysis method based on internet and BIM | |
CN110750823A (en) | BIM visual display method | |
Tsiutsiura et al. | Formation of a generalized information model of a construction object | |
CN108694260A (en) | Application process of the BIM technology in Steel Bridge processing and manufacturing | |
CN107301278A (en) | One kind simulation novel building project planning system | |
Peng et al. | The Application of Artificial Intelligence in Architectural Design and Planning | |
CN106295006A (en) | A kind of product design system | |
Wang | Design and optimization of prefabricated component system based on BIM technology | |
CN110321596A (en) | A kind of rolling stock structure simulation method based on finite element analysis | |
Liu et al. | Research on virtual construction in the construction phase and its 4D LOD analysis | |
Xing et al. | Design and application of green building based on BIM | |
Yu et al. | Research and Development of Building Construction Safety Management System Based on BIM Technology | |
CN108121866A (en) | A kind of city planning design intelligent noumenon model building method | |
Bi | Application Research of Building Information Model in the Construction Project Life Cycle | |
Gao | Application of Computer Aided Design in Winter Costume Design | |
Hong | BIM Implementation for Temporary Medical Facility: A Case Study in Huoshengshan and Leishengshan Hospital in Wuhan | |
Semenyuk et al. | BIM technologies-New design options in architecture | |
JP2000112504A (en) | System for optimizing parameter of production factory and its medium for calculation | |
Xue et al. | Research on diffusion behaviour of the computer integrated manufacturing philosophy | |
Juan et al. | Research on the methods of BIM reliability prediction with the construction schedule in the application of project of Chushandian reservoir | |
Lin | Application of Computer Aided Design in Mechanical Design and Manufacture | |
Xia et al. | Application of BIM Technology in the Design and Construction of Wooden Buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171027 |
|
RJ01 | Rejection of invention patent application after publication |