CN107301269A - 基于bim技术进行配电装置数据交互的方法 - Google Patents
基于bim技术进行配电装置数据交互的方法 Download PDFInfo
- Publication number
- CN107301269A CN107301269A CN201710356639.7A CN201710356639A CN107301269A CN 107301269 A CN107301269 A CN 107301269A CN 201710356639 A CN201710356639 A CN 201710356639A CN 107301269 A CN107301269 A CN 107301269A
- Authority
- CN
- China
- Prior art keywords
- power distribution
- distribution equipment
- model
- information
- carried out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了基于BIM技术进行配电装置数据交互的方法,属于变电站设计领域,主要包括以下步骤:a,电气专业在三维数字化设计平台内布置配电装置模型;b,将配电装置模型的模型信息和布置配电装置后产生的数据信息汇总为交互信息保存到数据库中;c,土建专业在数据库中提取交互信息;d,土建专业将交互信息传递到土建计算软件中完成计算,得到适合的配电装置支架和基础的尺寸,在三维平台内完成支架和基础模型的建立。本发明通过立体模型实现不同专业间数据交互,脱离了平面设计的束缚,减少了设计人员的工作量,信息量更充分。
Description
技术领域
本发明涉及变电站设计领域,尤其是一种配电装置数据交互的方法。
背景技术
目前,在变电站设计中采用绘图工具仍然是二维平面设计方式,比如autoCAD绘图,专业间的“数据交互”设计人员采用绘制平面配电装置外形结合标注信息,并通过图纸传递的方式进行“设计交互”。采用这种方式的缺点,需要设计人员绘制图纸,增加了设计人员的工作量,效率较低,而且涉及传递信息的数据需要手动输入,容易出错。
发明内容
本发明需要解决的技术问题是提供一种基于BIM技术进行配电装置数据交互的方法,过立体模型实现不同专业间数据交互,脱离了平面设计的束缚,减少了设计人员的工作量,信息量更充分。
为解决上述技术问题,本发明所采用的技术方案是:
基于BIM技术进行配电装置数据交互的方法,主要包括以下步骤:
a,电气专业在三维数字化设计平台内布置配电装置模型;
b,将配电装置模型的模型信息和布置配电装置后产生的数据信息汇总为交互信息保存到数据库中;
c,土建专业在数据库中提取交互信息;
d,土建专业将交互信息传递到土建计算软件中完成计算,得到适合的配电装置支架和基础的尺寸,在三维平台内完成支架和基础模型的建立。
本发明技术方案的进一步改进在于:还包括步骤e,土建专业将建立的支架和基础模型反馈给电气专业。
本发明技术方案的进一步改进在于:还包括步骤f,将支架和基础模型与配电装置模型完成装配,进行碰撞试验。
本发明技术方案的进一步改进在于:所述步骤b中的模型信息包括额定电压、额定电流、电流比、热稳定倍数、热稳定时间、动稳倍数、物料编码,所述布置配电装置后产生的数据信息包括空间定位信息、配电装置外轮廓占位置信息、配电装置带电信息。
由于采用了上述技术方案,本发明取得的技术进步是:
本发明是在立足三维数字化设计平台,脱离了平面设计的束缚,配电装置采用立体设计建模,由之前的使用平面图纸方式进行“信息交互”改为自动提取模型的数据信息并自动传递数据信息,达到专业间的数据交互。通过这种方式减少了设计人员的工作量,信息量更充分,杜绝手动输入计算数据可能出现的差错。
具体实施方式
下面结合实施例对本发明做进一步详细说明:
基于BIM技术进行配电装置数据交互的方法,主要包括以下步骤:
a,电气专业在在采用BIM技术的三维数字化设计平台内布置配电装置模型。在布置配电装置模型之前,在三维数字化设计平台内保存了所有配电装置的基础模型,然后根据实际的配电装置的基础尺寸、位置、荷载、设备标高、长度、接地端子高度、开孔情况等对基础建模的大小和位置进行定义,完成建模。
b,将配电装置模型的模型信息和布置配电装置后产生的数据信息汇总为交互信息保存到数据库中;
模型信息包括额定电压、额定电流、电流比、热稳定倍数、热稳定时间、动稳倍数、物料编码,这些模型信息保存在模型的数据库中,设计人只需要调用模型设备,其信息就携带了。布置配电装置后产生的数据信息包括空间定位信息(XYZ的具体位置点)、配电装置外轮廓占位置信息(设备占用空间体积)、配电装置带电信息。
c,土建专业在数据库中提取交互信息。
d,土建专业将交互信息传递到土建计算软件中完成计算,得到适合的配电装置支架和基础的尺寸,在三维平台内完成支架和基础模型的建立。
e,土建专业将建立的支架和基础模型反馈给电气专业。
f,将支架和基础模型与配电装置模型进行装配,进行碰撞试验。
同时将提出的资料保存在数据库中,可以保存多个版本作为设计依据。保存为多个版本主要是两个目的,首先满足专业间交互数据存档,为以后工程追责可查。其次,多个版本数据交互,程序自动进行对比,程序对比主要是,程序提取最新和次新两个版本,对两个数据进行比较,比如,程序发现同样一个配电装置,有个两个版本提资,然后对比模型信息、布置配电装置后产生的数据信息,假如都相同,认为是一样的,再判断次新版本提资处理状态,假如已经处理,就标记最新版中这个配电装置提资已经处理,并在最新提资屏蔽,避免重复提资。
本发明是变电站设计中电气和土建两个专业进行数据交互的具体方法,由于各专业人员都清楚自己设计领域,但是对其他专业并不清楚,需要通过“数据交互”的方式进行协同设计,主要是完成专业之间信息的传递。本发明是在立足三维数字化设计平台(比如revit),脱离了平面设计的束缚,配电装置采用立体设计建模,由之前的使用平面图纸方式进行“信息交互”改为自动提取模型的数据信息并自动传递数据信息,达到专业间的数据交互。通过这种方式减少了设计人员的工作量,信息量更充分,杜绝手动输入计算数据可能出现的差错。
Claims (4)
1.基于BIM技术进行配电装置数据交互的方法,其特征在于:主要包括以下步骤:
a,电气专业在三维数字化设计平台内布置配电装置模型;
b,将配电装置模型的模型信息和布置配电装置后产生的数据信息汇总为交互信息保存到数据库中;
c,土建专业在数据库中提取交互信息;
d,土建专业将交互信息传递到土建计算软件中完成计算,得到适合的配电装置支架和基础的尺寸,在三维平台内完成支架和基础模型的建立。
2.根据权利要求1所述的基于BIM技术进行配电装置数据交互的方法,其特征在于:还包括步骤e,土建专业将建立的支架和基础模型反馈给电气专业。
3.根据权利要求2所述的基于BIM技术进行配电装置数据交互的方法,其特征在于:还包括步骤f,将支架和基础模型与配电装置模型完成装配,进行碰撞试验。
4.根据权利要求1所述的基于BIM技术进行配电装置数据交互的方法,其特征在于:所述步骤b中的模型信息包括额定电压、额定电流、电流比、热稳定倍数、热稳定时间、动稳倍数、物料编码,所述布置配电装置后产生的数据信息包括空间定位信息、配电装置外轮廓占位置信息、配电装置带电信息。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710356639.7A CN107301269B (zh) | 2017-05-19 | 2017-05-19 | 基于bim技术进行配电装置数据交互的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710356639.7A CN107301269B (zh) | 2017-05-19 | 2017-05-19 | 基于bim技术进行配电装置数据交互的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107301269A true CN107301269A (zh) | 2017-10-27 |
CN107301269B CN107301269B (zh) | 2021-01-22 |
Family
ID=60137007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710356639.7A Active CN107301269B (zh) | 2017-05-19 | 2017-05-19 | 基于bim技术进行配电装置数据交互的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107301269B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457504A (zh) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | 一种bim装配集成智能变电站的建设方法 |
CN111241455A (zh) * | 2020-01-22 | 2020-06-05 | 北京字节跳动网络技术有限公司 | 数据处理装置、计算机设备及存储介质 |
CN113434940A (zh) * | 2021-06-29 | 2021-09-24 | 广联达科技股份有限公司 | 跨专业模型构件同步方法、装置、计算机设备和存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105528497A (zh) * | 2016-01-12 | 2016-04-27 | 国网上海市电力公司 | 一种三维变电站设计平台 |
JP2016163481A (ja) * | 2015-03-04 | 2016-09-05 | 清水建設株式会社 | 電気設備管理システム |
CN106383956A (zh) * | 2016-09-23 | 2017-02-08 | 四川电力设计咨询有限责任公司 | 火力发电厂土建模型数据的转换系统及方法 |
-
2017
- 2017-05-19 CN CN201710356639.7A patent/CN107301269B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016163481A (ja) * | 2015-03-04 | 2016-09-05 | 清水建設株式会社 | 電気設備管理システム |
CN105528497A (zh) * | 2016-01-12 | 2016-04-27 | 国网上海市电力公司 | 一种三维变电站设计平台 |
CN106383956A (zh) * | 2016-09-23 | 2017-02-08 | 四川电力设计咨询有限责任公司 | 火力发电厂土建模型数据的转换系统及方法 |
Non-Patent Citations (1)
Title |
---|
李辉: "基于BIM技术的变电站建设项目管理研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457504A (zh) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | 一种bim装配集成智能变电站的建设方法 |
CN111241455A (zh) * | 2020-01-22 | 2020-06-05 | 北京字节跳动网络技术有限公司 | 数据处理装置、计算机设备及存储介质 |
CN111241455B (zh) * | 2020-01-22 | 2023-08-25 | 抖音视界有限公司 | 数据处理装置、计算机设备及存储介质 |
CN113434940A (zh) * | 2021-06-29 | 2021-09-24 | 广联达科技股份有限公司 | 跨专业模型构件同步方法、装置、计算机设备和存储介质 |
CN113434940B (zh) * | 2021-06-29 | 2024-04-26 | 广联达科技股份有限公司 | 跨专业模型构件同步方法、装置、计算机设备和存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN107301269B (zh) | 2021-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106127453B (zh) | 一种基于bim和vr的建筑设计管理系统及其管理方法 | |
CN102999671B (zh) | 标准化配网线路的计算机设计方法 | |
CN107301269A (zh) | 基于bim技术进行配电装置数据交互的方法 | |
CN105528497A (zh) | 一种三维变电站设计平台 | |
CN108984965A (zh) | 基于gis和bim的电网线路规划设计方法 | |
CN106447116A (zh) | Bim技术在地铁铺轨施工中的应用 | |
CN107610227A (zh) | 室内三维地图的制作方法 | |
CN103218753B (zh) | 一种特高压电网信息模型的建模方法及信息交互方法 | |
CN104318402A (zh) | 基于电网gis平台的一体化规划设计信息系统 | |
CN103646154A (zh) | 三维数字化总装工艺协同设计系统 | |
CN106372293A (zh) | 一种基于三维基准线的构筑物bim模型创建方法 | |
CN103093007A (zh) | 输电铁塔三维虚拟装配方法 | |
CN104866613A (zh) | 一种电网设备设施三维组件化模型数据库的建立方法 | |
CN103034703A (zh) | 基于规则配置的多系统间数据交换的方法 | |
CN106708941A (zh) | 电网多任务在线协同编辑方法 | |
CN107368972A (zh) | 一种基于bim技术的派工平台及其使用方法 | |
CN109992684A (zh) | 预制构件生产线自动投影方法、装置、设备、系统及介质 | |
CN107844620B (zh) | 基于目标导向的故障站点专题图自动生成方法 | |
CN110941867A (zh) | 基于bim的标准化场地布置的施工方法 | |
CN113762724A (zh) | 一种基于bim技术协同设计和管理输变电工程的方法 | |
CN104615794B (zh) | 用于三维电气布线软件中的数字模型构建方法 | |
CN105654401A (zh) | 酒店报价自动化系统及其实现方法 | |
CN110232258B (zh) | Cad图纸在可编辑环境下查看引用变化的方法、系统、计算机可读存储介质及计算机终端 | |
CN106599373A (zh) | 基于三维设计平台的变电站短路电流计算系统及其方法 | |
KR20130044880A (ko) | 자재 물량 관리 시스템 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 050031 Changan District, Hebei, China, North Street, building No. 6, No. Applicant after: China Electric Power Construction Group Hebei electric survey and Design Research Institute Co., Ltd. Address before: 050031 Changan District, Hebei, China, North Street, building No. 6, No. Applicant before: Hebei Province Power Surveying Design & Research Institute |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |