CN107289893A - The measurement of large scale structure abnormity body construction and accuracy control method - Google Patents
The measurement of large scale structure abnormity body construction and accuracy control method Download PDFInfo
- Publication number
- CN107289893A CN107289893A CN201610193811.7A CN201610193811A CN107289893A CN 107289893 A CN107289893 A CN 107289893A CN 201610193811 A CN201610193811 A CN 201610193811A CN 107289893 A CN107289893 A CN 107289893A
- Authority
- CN
- China
- Prior art keywords
- building structure
- curve
- outline
- carried out
- structure outline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/20—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring contours or curvatures, e.g. determining profile
Abstract
The present invention is specifically measurement and the accuracy control method of a kind of special-shaped body construction of large scale structure;It is characterized in that:Including to measured building structure outline mapping, obtaining one group of original coordinates point data;Measured building structure outline is carried out curve fitting calculating by Matlab softwares;Curvature estimation is carried out by curve equation, the actual curvature and actual curvature radius of measured building structure outline is obtained, and is contrasted;The arbitrary coordinate for being measured building structure outline is selected using total powerstation, multifunctional calculator, calculated and setting-out;Step 5, the check of surveying setting-out progress precision, control by standard curvature radius to building outline.This accuracy control method its measurement, calculate easy, a curve matching is the coordinate data that can obtain arbitrfary point, and this measuring method is practical, and any obform body structure can all be promoted the use of;And curve precision controlling is on good grounds, very high precision can be obtained.
Description
Technical field
The present invention relates to the realm of building construction, the measurement of specifically a kind of special-shaped body construction of large scale structure and accuracy control method.
Background technology
Traditional large scale special-shaped body construction surveying setting-out mainly uses AutoCAD softwares to contour curve progress etc. point segmentation, by the positioning of each extreme coordinates, is attached using rounding off curve.This method is easy to operate, it is easy to which scene realizes that shortcoming is exactly that the radian of contour line is difficult to control to, and requires higher in large scale special-shaped body construction profile, is difficult to popularization and application in high-rise, Super High opposite sex building, quality control, Cost Control Target are difficult to.
The content of the invention
It is an object of the present invention to convenience of calculation, the measurement of the special-shaped body construction of large scale structure of strong applicability and accuracy control method.
In order to achieve the above object, the present invention is realized in:
A kind of measurement of the special-shaped body construction of large scale structure and accuracy control method;Including
Step 1, measured building structure outline is surveyed and drawn, one group of original coordinates point data of acquisition;
Step 2, measured building structure outline, which is carried out curve fitting, using common least square method or Orthogonal Least Square principle by Matlab softwares calculates and obtains each coordinate points gross data of measured building structure outline;Wherein, by the requirement of control accuracy, common least square method is to make the residual sum of squares (RSS) of curve in the Y direction minimum, and Orthogonal Least Square make it that the residual distance error quadratic sum for prolonging orthogonal direction is minimum;
Step 3, using two original coordinates point datas obtained by step 1, curvature estimation is carried out by curve equation, the actual curvature and actual curvature radius of measured building structure outline is obtained, and is contrasted with step 2 the data obtained;
Step 4, using total powerstation, multifunctional calculator the arbitrary coordinate for being measured building structure outline is selected, calculated and setting-out;
Step 5, obtain using step 2 data that curve matching obtained curvature estimation is carried out by curve equation and standard curvature radius is obtained, precision check, control are carried out to the surveying setting-out of building outline by standard curvature radius.
This accuracy control method its measurement, calculate easy, a curve matching is the coordinate data that can obtain arbitrfary point, and this measuring method is practical, and any obform body structure can all be promoted the use of;And curve precision controlling is on good grounds, very high precision can be obtained.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of measurement of the special-shaped body construction of large scale structure and accuracy control method;Including
Step 1, measured building structure outline is surveyed and drawn, one group of original coordinates point data of acquisition;
Step 2, measured building structure outline, which is carried out curve fitting, using common least square method or Orthogonal Least Square principle by Matlab softwares calculates and obtains each coordinate points gross data of measured building structure outline;Wherein, by the requirement of control accuracy, common least square method is to make the residual sum of squares (RSS) of curve in the Y direction minimum, and Orthogonal Least Square make it that the residual distance error quadratic sum for prolonging orthogonal direction is minimum;
Step 3, using two original coordinates point datas obtained by step 1, curvature estimation is carried out by curve equation, the actual curvature and actual curvature radius of measured building structure outline is obtained, and is contrasted with step 2 the data obtained;
Step 4, using total powerstation, multifunctional calculator the arbitrary coordinate for being measured building structure outline is selected, calculated and setting-out;
Step 5, obtain using step 2 data that curve matching obtained curvature estimation is carried out by curve equation and standard curvature radius is obtained, precision check, control are carried out to the surveying setting-out of building outline by standard curvature radius.
This accuracy control method its measurement, calculate easy, a curve matching is the coordinate data that can obtain arbitrfary point, and this measuring method is practical, and any obform body structure can all be promoted the use of;And curve precision controlling is on good grounds, very high precision can be obtained.
Claims (1)
1. measurement and the accuracy control method of a kind of special-shaped body construction of large scale structure;It is characterized in that:Including
Step 1, measured building structure outline is surveyed and drawn, one group of original coordinates point data of acquisition;
Step 2, measured building structure outline, which is carried out curve fitting, using common least square method or Orthogonal Least Square principle by Matlab softwares calculates and obtains each coordinate points gross data of measured building structure outline;Wherein, by the requirement of control accuracy, common least square method is to make the residual sum of squares (RSS) of curve in the Y direction minimum, and Orthogonal Least Square make it that the residual distance error quadratic sum for prolonging orthogonal direction is minimum;
Step 3, using two original coordinates point datas obtained by step 1, curvature estimation is carried out by curve equation, the actual curvature and actual curvature radius of measured building structure outline is obtained, and is contrasted with step 2 the data obtained;
Step 4, using total powerstation, multifunctional calculator the arbitrary coordinate for being measured building structure outline is selected, calculated and setting-out;
Step 5, obtain using step 2 data that curve matching obtained curvature estimation is carried out by curve equation and standard curvature radius is obtained, precision check, control are carried out to the surveying setting-out of building outline by standard curvature radius.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610193811.7A CN107289893A (en) | 2016-03-31 | 2016-03-31 | The measurement of large scale structure abnormity body construction and accuracy control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610193811.7A CN107289893A (en) | 2016-03-31 | 2016-03-31 | The measurement of large scale structure abnormity body construction and accuracy control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107289893A true CN107289893A (en) | 2017-10-24 |
Family
ID=60088045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610193811.7A Pending CN107289893A (en) | 2016-03-31 | 2016-03-31 | The measurement of large scale structure abnormity body construction and accuracy control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107289893A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107918178A (en) * | 2017-12-14 | 2018-04-17 | 中国航空工业集团公司洛阳电光设备研究所 | The method that one kind improves the aspherical glued precision of 100mm ~ 150mm bores |
CN113722331A (en) * | 2021-09-09 | 2021-11-30 | 中国铁建国际集团有限公司 | Scanning method, device and system based on total station |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101324428A (en) * | 2008-07-25 | 2008-12-17 | 北京城建集团有限责任公司 | Method for measuring construction steel structure special-shaped component three-dimensional coordinates |
CN103162671A (en) * | 2011-12-13 | 2013-06-19 | 永升建设集团有限公司 | Measurement and construction method for special-shaped buildings |
CN103591944A (en) * | 2013-11-13 | 2014-02-19 | 江西建工第一建筑有限责任公司 | Measurement construction method of arc building |
US20140144981A1 (en) * | 2012-03-01 | 2014-05-29 | Trimble Navigation Limited | Integrated imaging and rfid system for virtual 3d scene construction |
CN104200212A (en) * | 2014-06-25 | 2014-12-10 | 西安煤航信息产业有限公司 | Building outer boundary line extraction method based on onboard LiDAR (Light Detection and Ranging) data |
-
2016
- 2016-03-31 CN CN201610193811.7A patent/CN107289893A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101324428A (en) * | 2008-07-25 | 2008-12-17 | 北京城建集团有限责任公司 | Method for measuring construction steel structure special-shaped component three-dimensional coordinates |
CN103162671A (en) * | 2011-12-13 | 2013-06-19 | 永升建设集团有限公司 | Measurement and construction method for special-shaped buildings |
US20140144981A1 (en) * | 2012-03-01 | 2014-05-29 | Trimble Navigation Limited | Integrated imaging and rfid system for virtual 3d scene construction |
CN103591944A (en) * | 2013-11-13 | 2014-02-19 | 江西建工第一建筑有限责任公司 | Measurement construction method of arc building |
CN104200212A (en) * | 2014-06-25 | 2014-12-10 | 西安煤航信息产业有限公司 | Building outer boundary line extraction method based on onboard LiDAR (Light Detection and Ranging) data |
Non-Patent Citations (4)
Title |
---|
令锋 等: "《数值计算方法(第2版)》", 31 March 2015, 国防工业出版社 * |
周恩度 等: "多弧度不规则曲线结构施工技术", 《建筑施工》 * |
李井永: "最小二乘法在施工放线方面的应用", 《辽宁高职学报》 * |
李超 等: "望京SOHO超高层异形结构施工测量放线技术", 《施工技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107918178A (en) * | 2017-12-14 | 2018-04-17 | 中国航空工业集团公司洛阳电光设备研究所 | The method that one kind improves the aspherical glued precision of 100mm ~ 150mm bores |
CN113722331A (en) * | 2021-09-09 | 2021-11-30 | 中国铁建国际集团有限公司 | Scanning method, device and system based on total station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102589533B (en) | Method for measuring hidden point position coordinates by utilizing total-station instrument | |
RU2695642C1 (en) | Method for determining the location of a ground-based radiation source | |
US10705225B2 (en) | Preparation system for surveying operation | |
CN102607511B (en) | Method for performing engineering surveying by employing method for solving triangle through cosine law | |
CN104483891A (en) | Method for improving machine tool space movement precision | |
CN107289893A (en) | The measurement of large scale structure abnormity body construction and accuracy control method | |
CN109541606A (en) | The underwater synchronous positioning of single acoustic beacon ranging auxiliary and patterning process | |
CN104182512A (en) | Transformation and verification methods of GPS (global positioning system) coordinates and local coordinates | |
CN105423915A (en) | Accurate positioning method of planar target for ground laser scanning data registration | |
CN102927973B (en) | Quick edge locating method of sub pixel image of target celestial body for deep space exploration autonomous navigation | |
CN105547241A (en) | A measuring method of a receiver provided with laser range finders | |
CN104931027A (en) | Facing pattern projection setting-out method | |
CN107643038B (en) | Tool for accurately measuring axis position of pipe | |
CN106546229B (en) | A kind of surveying and locating method convenient for floor manager | |
CN103884319B (en) | Exempt from tower base sectional drawing measuring method and the equipment of total powerstation | |
US10337833B2 (en) | Method and system for the acquisition of high-accuracy coordinate information without the use of directed electromagnetic radiation | |
CN204313844U (en) | A kind of noncontact monitoring measurement controls flag-rod | |
CN104330078B (en) | Combined measuring method based on three-point resection model | |
CN104391272A (en) | Method and system for target positioning by using direction finding data | |
CN205384024U (en) | Portable engineering measuring and sampling centering rod | |
CN202420497U (en) | Auxiliary measuring device for measuring point position coordinate by using total station | |
CN104330077A (en) | Combined measuring method based on two-point center-alignment model | |
CN205066771U (en) | Some signs are controlled mutually to photogrammetric survey | |
CN106483501B (en) | One kind being based on DOP value analytical acoustics positioning system multiple-answering machine optimal distribution method | |
TWI431251B (en) | Distance measuring equipment and measuring method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |