CN107288658A - Underground concrete water-proof engineering connects the casting method of stubble seam - Google Patents

Underground concrete water-proof engineering connects the casting method of stubble seam Download PDF

Info

Publication number
CN107288658A
CN107288658A CN201710660799.0A CN201710660799A CN107288658A CN 107288658 A CN107288658 A CN 107288658A CN 201710660799 A CN201710660799 A CN 201710660799A CN 107288658 A CN107288658 A CN 107288658A
Authority
CN
China
Prior art keywords
slip casting
pipe
slurry
built
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710660799.0A
Other languages
Chinese (zh)
Other versions
CN107288658B (en
Inventor
臧培刚
刘晓亭
樊联峰
米瑞华
李黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
Hebei Tianli Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Tianli Environmental Protection Technology Co Ltd filed Critical Hebei Tianli Environmental Protection Technology Co Ltd
Priority to CN201710660799.0A priority Critical patent/CN107288658B/en
Publication of CN107288658A publication Critical patent/CN107288658A/en
Application granted granted Critical
Publication of CN107288658B publication Critical patent/CN107288658B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses the casting method that underground concrete water-proof engineering connects stubble seam, the casting method that the underground concrete water-proof engineering described in it connects stubble seam is:The local built-in slip casting pipe for connecing batch gap is left between Jiu Bi and new set shaft wall structure;Described built-in slip casting pipe is inverted " u "-shaped pipe, the top of inverted " u "-shaped pipe, two middle side parts set the slip casting mouth of pipe, built-in slip casting pipe is φ 40mm coating steel pipes, built-in slip casting pipe sets four φ 5mm injected holes every 300mm in tube wall surrounding, four φ 5mm injected holes are clung with adhesive tape, and built-in slip casting pipe slip casting after wall is carried out again after newly set borehole wall concrete reaches design strength;This invention ensures that stubble seam is connect in concrete construction can reach impermeable effect, construction risk is reduced, it is ensured that construction quality.

Description

Underground concrete water-proof engineering connects the casting method of stubble seam
Technical field
The side of pouring of stubble seam is met the present invention relates to a kind of casting method, more particularly to a kind of underground concrete water-proof engineering Method.
Background technology
Cast-in-place concrete construction engineering in underground is more in recent years, has many down-hole water yields big, to underground Chamber Construction Waterproof requirement is high, and casting concrete is typically poured using supporting module, and 1.5-6m is generally per mould length, every mould it Between can leave and connect a batch gap, this gap is likely to cause infiltration, does not reach waterproof requirement.
The content of the invention
In order to make up the deficiencies in the prior art, it is anti-there is provided a kind of underground concrete that solution concrete connects stubble seam seepage problem Hydraulic Projects connect the casting method of stubble seam.
The present invention solve its technical problem technical scheme be:
Underground concrete water-proof engineering connects the casting method of stubble seam, and the underground concrete water-proof engineering described in it connects pouring for stubble seam Method is:1. the local built-in slip casting pipe for connecing batch gap, is left between Jiu Bi and new set shaft wall structure;Described pre-buried slip casting Manage as inverted " u "-shaped pipe, the top of inverted " u "-shaped pipe, two middle side parts set the slip casting mouth of pipe, built-in slip casting pipe is φ 40mm galvanized steels Pipe, built-in slip casting pipe sets four φ 5mm injected holes, four φ 5mm injected hole adhesive tapes every 300mm in tube wall surrounding Cling, built-in slip casting pipe slip casting after wall is carried out again after newly set borehole wall concrete reaches design strength;
2., slip casting proportioning parameter:Inject slurry material and use single slurry+dual slurry, cement selection P.OR42.5 cement, the ratio of mud For 1:1, or 1:0.5-0.75, dual slurry C:S=1:0.6~0.4, waterglass is 38~40 from liquid silicic acid sodium form, concentration Baume, modulus are 2.8 waterglass, and described single slurry refers to water and cement by 1:1 is made into cement mortar, described dual slurry Refer to 1:1 cement mortar adds water the slurries that two kinds of slurries of glass are mixed into proportion, and C is by 1:1 is made into cement mortar, and S is waterglass;
Cement mortar match ratio such as table 1 below
Table 1
3., grouting pressure:1.0~2.0MPa of grouting pressure is controlled, when slurries are obstructed, grouting pressure can be properly increased, but 1.4 times of hydrostatic pressure are not to be exceeded in maximum;
4., time for injecting:New set shaft wall structure maintenance, which reaches, starts slip casting after design strength;
5., slip casting ending standard:Final grouting pressure is reached after requirement;
6., grouting equipment:The equipment used during slip casting mainly includes, grouting pump one, grouting pump maximum grouting pressure 3Mpa, one, mixer;
7., slip casting operation:Before slip casting, the Grouting Pipe for the treating slip casting 2 slip casting tube valves adjacent with its are opened, the borehole wall will be newly covered Left and right side reserve injected hole be connected with built-in slip casting pipe in the borehole wall, during slip casting with the borehole wall two help reserve injected hole based on, top is pre- Stay injected hole after left and right side well wall clearance grouting terminates to examine slip casting effect and be used as supplement injected hole when needed, left, Single slurry, the ratio of mud 1 are noted between the borehole wall of right side:Based on 1, other ratio of muds are determined to use according to field condition change, and such as slip casting is led to Road is unimpeded, when grouting pressure is not pressed above, and the ratio of mud can be adjusted according to live slip casting situation, that is, increases cement proportion or reduce water Ratio is adjusted, and the cement mortar ratio of mud is 1 during note dual slurry:1, cement mortar is with waterglass volume ratio:1:0.6~0.4;Slip casting Based on single liquid cement mortar, supplemented by cement-waterglass dual slurry, dual slurry only is used when slip casting completes sealing of hole, will be stirred Good cement grout is pressed between Shaft Linings and connect a batch position, forms water shutoff curtain, and slip casting mainly reaches that the borehole wall is sealed to cut off the water supply For the purpose of water, while carrying out sealing of hole to reserved injected hole;Single hole once grouting amount is 1.3 m3- 1.6 m3, during slip casting, when Adjacent ports valve door is closed during the continuous pulp of adjacent holes, this hole slip casting can be stopped by being quantitatively pressed into after cement mortar, close valve, Ran Houjie To adjacent hole slip casting;Run into slurry consolidation is altered in Grouting Pipe and when causing plugging, need to be with lengthening drill hammer siphunculus;When running When starching, altering slurry, pass through interval slip casting(Interval 3-5 minutes), adjustment concentration of slurry, that is, increase cement proportion or reduce water ratio To adjust, dual slurry closure is finally injected, one piece pours shaping.
The beneficial effects of the invention are as follows:
1st, this invention ensures that stubble seam is connect in concrete construction can reach impermeable effect, construction risk is reduced, it is ensured that Construction quality.
Brief description of the drawings
Fig. 1 is built-in slip casting pipe layout drawing between underworkings cross section Jiu Bi and new set shaft wall structure.
Fig. 2 is cross-sectional view of the built-in slip casting pipe in underworkings.
Embodiment
In Fig. 1 Fig. 2, underground concrete water-proof engineering connects the casting method of stubble seam, the underground concrete water-proof work described in it Journey connect stubble seam casting method be:1. the local pre-buried slip casting for connecing batch gap, is left between old wall 1 and the new set structure of the borehole wall 3 Pipe 2;Described built-in slip casting pipe 2 is inverted " u "-shaped pipe, and the top of inverted " u "-shaped pipe, two middle side parts set the slip casting mouth of pipe, pre-buried note Slurry pipe 2 is φ 40mm coating steel pipes, and built-in slip casting pipe 2 sets four φ 5mm injected holes, four every 300mm in tube wall surrounding φ 5mm injected holes are clung with adhesive tape, and built-in slip casting pipe after wall is carried out again after the newly set concrete of the borehole wall 3 reaches design strength 2 slip castings;
2., slip casting proportioning parameter:Inject slurry material and use single slurry+dual slurry, cement selection P.OR42.5 cement, the ratio of mud For 1:1, or 1:0.5-0.75, dual slurry C:S=1:0.6~0.4, waterglass is 38~40 from liquid silicic acid sodium form, concentration Baume, modulus are 2.8 waterglass, and described single slurry refers to water and cement by 1:1 is made into cement mortar, described dual slurry Refer to 1:1 cement mortar adds water the slurries that two kinds of slurries of glass are mixed into proportion, and C is by 1:1 is made into cement mortar, and S is waterglass;
Cement mortar match ratio such as table 1 below
Table 1
3., grouting pressure:1.0~2.0MPa of grouting pressure is controlled, when slurries are obstructed, grouting pressure can be properly increased, but 1.4 times of hydrostatic pressure are not to be exceeded in maximum;
4., time for injecting:New set shaft wall structure maintenance, which reaches, starts slip casting after design strength;
5., slip casting ending standard:Final grouting pressure is reached after requirement;
6., grouting equipment:The equipment used during slip casting mainly includes, grouting pump one, grouting pump maximum grouting pressure 3Mpa, one, mixer;
7., slip casting operation:Before slip casting, the Grouting Pipe for the treating slip casting 2 slip casting tube valves adjacent with its are opened, the borehole wall will be newly covered 3 left and right sides are reserved injected hole and be connecteds with built-in slip casting pipe in the borehole wall, help to reserve based on the slip casting mouth of pipe with the borehole wall two during slip casting, push up The slip casting mouth of pipe is reserved after left and right side well wall clearance grouting terminates to examine slip casting effect and when needed as supplement slip casting in portion Hole, left and right side well wall clearance grouting note single slurry, the ratio of mud 1:Based on 1, other ratio of muds change determination according to field condition and adopted With such as slip casting passage is unimpeded, when grouting pressure is not pressed above, can adjust the ratio of mud according to live slip casting situation, that is, increase cement ratio Example reduces the ratio of water to adjust, and the cement mortar ratio of mud is 1 during note dual slurry:1, cement mortar is with waterglass volume ratio:1: 0.6~0.4;Slip casting is only used based on single liquid cement mortar, supplemented by cement-waterglass dual slurry when slip casting completes sealing of hole Dual slurry, the cement grout being stirred is pressed between Shaft Linings and a batch position is connect, and forms water shutoff curtain, and slip casting is mainly to cut off water Source is reached for the purpose of borehole wall water shutoff, while carrying out sealing of hole to reserved injected hole;Single hole once grouting amount is 1.3 m3- 1.6 m3, During slip casting, adjacent ports valve door is closed when the continuous pulp of adjacent holes, can stop this hole slip casting after being quantitatively pressed into cement mortar, close Valve closing door, is then followed by adjacent hole slip casting;Run into and slurry consolidation is altered in Grouting Pipe and when causing plugging, need to be led to drill hammer is lengthened Pipe;When running pulp occur, altering slurry, pass through interval slip casting(Interval 3-5 minutes), adjustment concentration of slurry, that is, increase cement proportion or Reduce the ratio of water to adjust, finally inject dual slurry closure, one piece pours shaping.

Claims (1)

1. underground concrete water-proof engineering connects the casting method of stubble seam, it is characterised in that:Described underground concrete water-proof engineering Connecing the casting method of stubble seam is:1., in Jiu Bi(1)With the new set borehole wall(3)The local pre-buried note for connecing batch gap is left between structure Slurry pipe(2);Described built-in slip casting pipe(2)For inverted " u "-shaped pipe, the top of inverted " u "-shaped pipe, two middle side parts set the slip casting mouth of pipe, Built-in slip casting pipe(2)For φ 40mm coating steel pipes, built-in slip casting pipe(2)Four φ 5mm are set to note in tube wall surrounding every 300mm Hole is starched, four φ 5mm injected holes are clung with adhesive tape, treat newly to cover the borehole wall(3)Concrete reaches carries out wall again after design strength Built-in slip casting pipe afterwards(2)Slip casting;
2., slip casting proportioning parameter:Inject slurry material and use single slurry+dual slurry, cement selection P.OR42.5 cement, the ratio of mud For 1:1, or 1:0.5-0.75, dual slurry C:S=1:0.6~0.4, waterglass is 38~40 from liquid silicic acid sodium form, concentration Baume, modulus are 2.8 waterglass, and described single slurry refers to water and cement by 1:1 is made into cement mortar, described dual slurry Refer to 1:1 cement mortar adds water the slurries that two kinds of slurries of glass are mixed into proportion, and C is by 1:1 is made into cement mortar, and S is waterglass;
Cement mortar match ratio such as table 1 below
Table 1
3., grouting pressure:1.0~2.0MPa of grouting pressure is controlled, when slurries are obstructed, grouting pressure can be properly increased, but 1.4 times of hydrostatic pressure are not to be exceeded in maximum;
4., time for injecting:New set shaft wall structure maintenance, which reaches, starts slip casting after design strength;
5., slip casting ending standard:Final grouting pressure is reached after requirement;
6., grouting equipment:The equipment used during slip casting mainly includes, grouting pump one, grouting pump maximum grouting pressure 3Mpa, one, mixer;
7., slip casting operation:Before slip casting, the built-in slip casting pipe of slip casting will be treated(2)The two slip casting mouth of pipe valves adjacent with its are opened, The borehole wall will newly be covered(3)Left and right side reserves the slip casting mouth of pipe and built-in slip casting pipe in the borehole wall(2)Connection, helps pre- during slip casting with the borehole wall two Stay based on the slip casting mouth of pipe, top reserve the slip casting mouth of pipe after left and right side well wall clearance grouting terminates to examine slip casting effect and As supplement injected hole when needing, left and right side well wall clearance grouting note single slurry, the ratio of mud 1:Based on 1, other ratio of muds are according to existing The change of situation determines to use, and such as slip casting passage is unimpeded, and grouting pressure is not upper when pressing, and water ash can be adjusted according to live slip casting situation Than increasing cement proportion or reducing the ratio of water to adjust, the cement mortar ratio of mud is 1 during note dual slurry:1, cement mortar and water Glass volume ratio is:1:0.6~0.4;Slip casting is based on single liquid cement mortar, supplemented by cement-waterglass dual slurry, only in note Slurry is completed to use dual slurry during sealing of hole, and a batch position is pressed between Shaft Linings and connects by the cement grout being stirred;Single hole once grouting Measure as 1.3m3- 1.6 m3, during slip casting, adjacent ports valve door is closed when the continuous pulp of adjacent holes, is quantitatively pressed into after cement mortar i.e. This hole slip casting can be stopped, valve is closed, be then followed by adjacent hole slip casting;Run into slurry consolidation is altered in Grouting Pipe and when causing plugging, Lengthening drill hammer siphunculus need to be used;When running pulp occur, altering slurry, by interval slip casting, slip casting in 3-5 minutes is spaced, slurries are adjusted Concentration, that is, increase cement proportion or reduce the ratio of water to adjust, finally inject dual slurry closure, one piece pours shaping.
CN201710660799.0A 2017-08-04 2017-08-04 Underground concrete water-proof engineering connects the casting method of stubble seam Expired - Fee Related CN107288658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710660799.0A CN107288658B (en) 2017-08-04 2017-08-04 Underground concrete water-proof engineering connects the casting method of stubble seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710660799.0A CN107288658B (en) 2017-08-04 2017-08-04 Underground concrete water-proof engineering connects the casting method of stubble seam

Publications (2)

Publication Number Publication Date
CN107288658A true CN107288658A (en) 2017-10-24
CN107288658B CN107288658B (en) 2019-04-26

Family

ID=60104431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710660799.0A Expired - Fee Related CN107288658B (en) 2017-08-04 2017-08-04 Underground concrete water-proof engineering connects the casting method of stubble seam

Country Status (1)

Country Link
CN (1) CN107288658B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667586A (en) * 2019-01-07 2019-04-23 中国矿业大学 A kind of double-layer wall of well grouting system and grouting method
CN110541718A (en) * 2019-09-20 2019-12-06 中国建筑土木建设有限公司 Secondary lining back backfill grouting pipe and grouting method
CN111946297A (en) * 2020-08-19 2020-11-17 新地能源工程技术有限公司 Filling and curing slurry and horizontal directional drilling grouting collapse prevention process
CN114875854A (en) * 2022-04-28 2022-08-09 河南安钢集团舞阳矿业有限责任公司 Anti-leakage method for overflow culvert of tailing pond
CN114991701A (en) * 2022-05-17 2022-09-02 湖北道泽勘测设计院有限公司 Method for plugging drilled hole by adopting cement paste and water glass mixed solution
WO2023202455A1 (en) * 2022-04-18 2023-10-26 中国矿业大学 Single-layer well wall having jointed water-stop structure and grouting system, and construction method therefor

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1904231A (en) * 2006-08-07 2007-01-31 上海市隧道工程轨道交通设计研究院 Water proof structure of open trench tunnel suitable for large value stratum ununiform settling or diastrophism
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101787892A (en) * 2010-03-17 2010-07-28 中铁隧道勘测设计院有限公司 Method for constructing maintainable tunnel waterproof system
CN101914917A (en) * 2010-08-10 2010-12-15 中铁一局集团有限公司 Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN102002950A (en) * 2010-11-11 2011-04-06 东南大学 Liquid division slip casting reinforcing method for subsurface structure construction joints
CN202483588U (en) * 2012-01-12 2012-10-10 中国市政工程西北设计研究院有限公司 Self water-proof drainage system of tunnel lining
CN103089274A (en) * 2013-01-15 2013-05-08 河南理工大学 Method capable of repeated grouting and reinforcing surrounding rocks of roadway
CN103266614A (en) * 2013-05-15 2013-08-28 北京市政建设集团有限责任公司 Sublevel retreating type two-fluid composite grouting construction method for deep foundation pit of sandy gravel stratum
CN103590425A (en) * 2013-11-28 2014-02-19 中铁二十局集团第五工程有限公司 Peaty soft soil stratum subway station construction technology
CN103953365A (en) * 2014-05-20 2014-07-30 中铁四局集团有限公司 Tunnel single-liquid and double-liquid alternate grouting reinforcement process and device
CN204000470U (en) * 2014-02-28 2014-12-10 中铁第四勘察设计院集团有限公司 The U-shaped waterproof construction of high stake
CN104453913A (en) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 Vertical shaft working face ahead pre-grouting method
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement
CN106351240A (en) * 2015-07-16 2017-01-25 中勘冶金勘察设计研究院有限责任公司 Shut-in method for dewatering well arranged below building or structure foundation
CN206346737U (en) * 2016-12-30 2017-07-21 河北健龙建筑设备有限公司 A kind of supporting major diameter curve pipe curtain

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1904231A (en) * 2006-08-07 2007-01-31 上海市隧道工程轨道交通设计研究院 Water proof structure of open trench tunnel suitable for large value stratum ununiform settling or diastrophism
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101787892A (en) * 2010-03-17 2010-07-28 中铁隧道勘测设计院有限公司 Method for constructing maintainable tunnel waterproof system
CN101914917A (en) * 2010-08-10 2010-12-15 中铁一局集团有限公司 Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN102002950A (en) * 2010-11-11 2011-04-06 东南大学 Liquid division slip casting reinforcing method for subsurface structure construction joints
CN202483588U (en) * 2012-01-12 2012-10-10 中国市政工程西北设计研究院有限公司 Self water-proof drainage system of tunnel lining
CN103089274A (en) * 2013-01-15 2013-05-08 河南理工大学 Method capable of repeated grouting and reinforcing surrounding rocks of roadway
CN103266614A (en) * 2013-05-15 2013-08-28 北京市政建设集团有限责任公司 Sublevel retreating type two-fluid composite grouting construction method for deep foundation pit of sandy gravel stratum
CN103590425A (en) * 2013-11-28 2014-02-19 中铁二十局集团第五工程有限公司 Peaty soft soil stratum subway station construction technology
CN204000470U (en) * 2014-02-28 2014-12-10 中铁第四勘察设计院集团有限公司 The U-shaped waterproof construction of high stake
CN103953365A (en) * 2014-05-20 2014-07-30 中铁四局集团有限公司 Tunnel single-liquid and double-liquid alternate grouting reinforcement process and device
CN104453913A (en) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 Vertical shaft working face ahead pre-grouting method
CN106351240A (en) * 2015-07-16 2017-01-25 中勘冶金勘察设计研究院有限责任公司 Shut-in method for dewatering well arranged below building or structure foundation
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement
CN206346737U (en) * 2016-12-30 2017-07-21 河北健龙建筑设备有限公司 A kind of supporting major diameter curve pipe curtain

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667586A (en) * 2019-01-07 2019-04-23 中国矿业大学 A kind of double-layer wall of well grouting system and grouting method
CN109667586B (en) * 2019-01-07 2020-07-28 中国矿业大学 Grouting method of double-layer well wall grouting system
CN110541718A (en) * 2019-09-20 2019-12-06 中国建筑土木建设有限公司 Secondary lining back backfill grouting pipe and grouting method
CN111946297A (en) * 2020-08-19 2020-11-17 新地能源工程技术有限公司 Filling and curing slurry and horizontal directional drilling grouting collapse prevention process
WO2023202455A1 (en) * 2022-04-18 2023-10-26 中国矿业大学 Single-layer well wall having jointed water-stop structure and grouting system, and construction method therefor
CN114875854A (en) * 2022-04-28 2022-08-09 河南安钢集团舞阳矿业有限责任公司 Anti-leakage method for overflow culvert of tailing pond
CN114991701A (en) * 2022-05-17 2022-09-02 湖北道泽勘测设计院有限公司 Method for plugging drilled hole by adopting cement paste and water glass mixed solution

Also Published As

Publication number Publication date
CN107288658B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN107288658A (en) Underground concrete water-proof engineering connects the casting method of stubble seam
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN101666234A (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN102536269A (en) Underground grouting and water-plugging process
CN102660952B (en) Controllable clay paste slurry grouting technique
CN107129221A (en) A kind of slurries suitable for low strength stratum shield duct piece grouting behind shaft or drift lining
CN106592614A (en) Water leakage point blockage method in foundation pit water stop curtain
CN103742172B (en) A kind of method of floor grouting shutoff hydrogen sulfide projective water point
CN207297034U (en) Tunnel double-lining concrete vault backfills grouting device
CN108716405A (en) Constructing tunnel dual slurry grouting construction method
CN108316950A (en) Tunnel vault concrete belt mould backfills filling system and its grouting method
CN204511371U (en) Blender at the bottom of underground coal mine two fluid grouting hole
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN110005432A (en) Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone
CN101929343B (en) Profile steel pulling and grouting method of SMW (Soil Mixing Wall) process
CN104328781A (en) Unfavorable geologic body controlling infiltration chemical grouting method
CN105442593B (en) U-tube grouting behind shaft or drift lining strengthening construction apparatus and method in coring hole
CN106837378B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting equipment
CN105735937A (en) Plugging device for water-inrush borehole by filtration flow and pressure relief of hole wall and grouting and fixing of in-hole bushing
CN206957765U (en) Water outburst treatment structure is built in a kind of vertical shaft pick
CN110158589A (en) The Water sealing method and its seal water structure of the anchor cable hole of water rich strata diaphram wall
CN106930237A (en) A kind of dam joint grouting fills construction method again
CN105735331B (en) A kind of underground engineering construction method for grouting reinforcement
CN109252878B (en) Single slurry and tunnel stabilizing method using same
CN106761823A (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180829

Address after: 056002 52 Cong Tai Road, contai District, Handan, Hebei

Applicant after: CHINA COAL FIRST CONSTRUCTION Co.,Ltd.

Address before: 056500 Handan, Cixian, Hebei, Shanxi, China, Shanxi Road, North America hardware family building 2 unit 2 floor East households

Applicant before: HEBEI TIANLI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190426

CF01 Termination of patent right due to non-payment of annual fee