CN107276180A - Charge control method, equipment, system and user equipment - Google Patents
Charge control method, equipment, system and user equipment Download PDFInfo
- Publication number
- CN107276180A CN107276180A CN201710661403.4A CN201710661403A CN107276180A CN 107276180 A CN107276180 A CN 107276180A CN 201710661403 A CN201710661403 A CN 201710661403A CN 107276180 A CN107276180 A CN 107276180A
- Authority
- CN
- China
- Prior art keywords
- user equipment
- equipment
- charge control
- request
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/00032—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
- H02J7/00036—Charger exchanging data with battery
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/342—The other DC source being a battery actively interacting with the first one, i.e. battery to battery charging
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/00032—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
- H02J7/00045—Authentication, i.e. circuits for checking compatibility between one component, e.g. a battery or a battery charger, and another component, e.g. a power source
Abstract
The present invention provides a kind of charge control method, equipment, system and user equipment.Charge control method includes:The charge information for indicating to be charged to second user equipment is obtained, the first user equipment is determined in default cluster tool;Sent to the first user equipment by the first configuring request that the first user device configuration is main equipment, the second configuring request by second user device configuration for slave unit is sent to second user equipment;If the second feedback information that the first feedback information and second user equipment that receive the transmission of the first user equipment are sent, the mark of the first user equipment is sent to second user equipment;If it is determined that the first user equipment is electrically connected with second user equipment, then the first voltage to the first user equipment is boosted, and obtains the second voltage that magnitude of voltage is preset voltage value, and using second voltage as second user equipment charge.Realize between OTG equipment electric energy transmission there is provided a kind of new charging modes.
Description
Technical field
The present invention relates to the communication technology, more particularly to a kind of charge control method, equipment, system and user equipment.
Background technology
The main charging modes of electronic equipment are to realize to charge from the AC power of fixed socket by charger.However,
Alternating current power supply charging usually requires fixed socket offer, is not easy to carry with charging, out of doors or can not find AC power
Shi Wufa charges for electronic equipment.
A kind of boost charge mode generally charged at present using portable power source as fixed socket.Portable power source is electronics
Equipment provides portable DC charging.Although however, portable power source has portable characteristics, still space-consuming, and typically
2~3 chargings can only be supported to exhaust electric energy.
If not carrying portable power source or portable power source electric energy exhausting, the emergency charged, current charging are needed again
Mode can not also provide more charging selections.
The content of the invention
There is the problem of charging modes are limited to solve prior art, the present invention provides a kind of charge control method, set
Standby, system and user equipment.
According to the first aspect of the invention there is provided a kind of charge control method, applied to charge control apparatus, methods described
Including:
The charge information for indicating to be charged to second user equipment is obtained, is determined in default cluster tool
Equipment in one user equipment, the cluster tool is all equipped with the user equipment of USB OTG interface circuits;
The first configuring request is sent to first user equipment, sending the second configuration to the second user equipment please
Ask, first configuring request is that by the request that the first user device configuration is main equipment, second configuring request is by the
Two user device configurations are the request of slave unit;
If receiving the first feedback information that first user equipment sends and the second user equipment being sent the
Two feedback informations, then send the mark of the first user equipment, the mark of first user equipment to the second user equipment
Equipment for indicating to charge to the second user equipment is the first user equipment, and first feedback information is used for
Indicate that first user equipment completes to configure according to first configuring request, second feedback information is described for indicating
Second user equipment completes to configure according to second configuring request;
If it is determined that first user equipment is electrically connected with second user equipment, then to the first of first user equipment
Boost in voltage, obtains the second voltage that magnitude of voltage is preset voltage value, and using the second voltage as the second user equipment
Charging.
Further, it is described determine the first user equipment in default cluster tool before, in addition to:
Connection request is broadcasted, the connection request is used to inquire whether other users equipment is configured with USBOTG interfaces electricity
Road;
Receive the response message of other users equipment feedback, however, it is determined that the response message is used to indicate the other users
Device configuration has USB OTG interface circuits, then according to the user equipment for being configured with USB OTG interface circuits, determines the equipment
Set.
Further, the basis is configured with the user equipment of USB OTG interface circuits, determines the cluster tool, bag
Include:
Obtain the distance of the charge control apparatus and the user equipment for being configured with USB OTG interface circuits;
In the distance, it is determined that less than or equal to the target range of pre-determined distance;
According to the corresponding user equipment of the target range, the equipment in the cluster tool, the cluster tool is obtained
For the corresponding user equipment of the target range.
Further, boosted in the first voltage to first user equipment, acquisition magnitude of voltage is predeterminated voltage
The second voltage of value, and using the second voltage as the second user equipment charge before, in addition to:
Obtain the sense of current electrically connected between first user equipment and second user equipment on path;
According to the sense of current, it is the main equipment on electrical connection path, described second to determine first user equipment
User equipment is the slave unit on electrical connection path.
According to the second aspect of the invention there is provided a kind of charge control method, applied to user equipment, including:
The configuring request that charge control apparatus is sent is received, the configuring request is to be set based on the user device configuration
Standby request;
According to the configuring request, the identification pin ground connection of the USB OTG interface circuits in the user equipment is set;
To the charge control apparatus send feedback information, the feedback information is used to indicate the user equipment according to institute
State configuring request and complete configuration.
According to the third aspect of the invention we there is provided a kind of charge control method, applied to user equipment, including:
Receive the configuring request that charge control apparatus is sent, it by the user device configuration is from setting that the configuring request, which is,
Standby request;
According to the configuring request, set the identification pin of USB OTG interface circuits in the user equipment hanging;
To the charge control apparatus send feedback information, the feedback information is used to indicate the user equipment according to institute
State configuring request and complete configuration.
According to the fourth aspect of the invention there is provided a kind of charge control apparatus, including:
First user equipment determining module, is used to indicate that the charging charged to second user equipment is believed for obtaining
Breath, determines that the equipment in the first user equipment, the cluster tool is all equipped with USB OTG and connect in default cluster tool
The user equipment of mouth circuit;
Sending module, for sending the first configuring request to first user equipment, sends out to the second user equipment
The second configuring request is sent, first configuring request is to match somebody with somebody the request that the first user device configuration is main equipment, described second
Put and ask to be the request by second user device configuration is slave unit;
Determining module is connected, if for receiving the first feedback information and described second that first user equipment is sent
The second feedback information that user equipment is sent, then send the mark of the first user equipment, described the to the second user equipment
The mark of one user equipment is used to indicate that the equipment that can charge to the second user equipment is the first user equipment, described
First feedback information is used to indicate that first user equipment completes to configure according to first configuring request, second feedback
Information is used to indicate that the second user equipment completes to configure according to second configuring request;
Boost charge module, for if it is determined that first user equipment is electrically connected with second user equipment, then to described
The first voltage boosting of first user equipment, obtains the second voltage that magnitude of voltage is preset voltage value, and with the second voltage
For the second user equipment charge.
According to the fifth aspect of the invention there is provided a kind of user equipment, including:
First receiving module, the configuring request for receiving charge control apparatus transmission, the configuring request is will be described
User device configuration is the request of main equipment;
First configuration module, for according to the configuring request, setting the USBOTG interface circuits in the user equipment
Identification pin ground connection;
First sending module, for the charge control apparatus send feedback information, the feedback information to be used to indicate
The user equipment completes to configure according to the configuring request.
According to the sixth aspect of the invention there is provided a kind of user equipment, including:
Second receiving module, the configuring request for receiving charge control apparatus transmission, the configuring request is will be described
User device configuration is the request of slave unit;
Second configuration module, for according to the configuring request, setting the USBOTG interface circuits in the user equipment
Identification pin it is hanging;
Second sending module, for the charge control apparatus send feedback information, the feedback information to be used to indicate
The user equipment completes to configure according to the configuring request.
According to the seventh aspect of the invention there is provided a kind of charge control system, including charge control apparatus, the first user are set
Standby and second user equipment, wherein
The charge control apparatus is used to perform method as described in the first aspect of the invention;
First user equipment is used to perform method as described in respect of the second aspect of the invention;
The second user equipment is used to perform the method as described in third aspect present invention.
The present invention is by obtaining the charge information for being used for indicating to be charged to second user equipment, in default equipment collection
Determine that the equipment in the first user equipment, the cluster tool is all equipped with the user equipment of USBOTG interface circuits in conjunction;
The first configuring request is sent to first user equipment, the second configuring request, described the are sent to the second user equipment
One configuring request is that, by the request that the first user device configuration is main equipment, second configuring request is by second user equipment
It is configured to the request of slave unit;If the first feedback information and the second user that receive the first user equipment transmission are set
The second feedback information that preparation is sent, then send the mark of the first user equipment, first user to the second user equipment
The mark of equipment is used to indicate that the equipment that can charge to the second user equipment is the first user equipment, and described first is anti-
Feedforward information is used to indicate that first user equipment completes to configure according to first configuring request, and second feedback information is used
Completed to configure according to second configuring request in the instruction second user equipment;If it is determined that first user equipment and
Two user equipmenies are electrically connected, then the first voltage to first user equipment is boosted, and it is preset voltage value to obtain magnitude of voltage
Second voltage, and the electric energy transmission between equipment is realized by the second user equipment charge of the second voltage, and then
Realize using the miscellaneous equipment for being configured as main equipment, to be configured to the second user equipment charge of slave unit.Pass through boosting
Realize the acceleration to charging.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention
Some embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with root
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of configuration diagram of charge control system provided in an embodiment of the present invention;
Fig. 2 is a kind of charge control method schematic flow sheet provided in an embodiment of the present invention;
Fig. 3 is another charge control method schematic flow sheet provided in an embodiment of the present invention;
Fig. 4 is another charge control method schematic flow sheet provided in an embodiment of the present invention;
Fig. 5 is a kind of charge control method signaling process schematic diagram provided in an embodiment of the present invention;
Fig. 6 is a kind of charge control method implement scene provided in an embodiment of the present invention;
Fig. 7 is another charge control method schematic flow sheet provided in an embodiment of the present invention;
Fig. 8 is another charge control method schematic flow sheet provided in an embodiment of the present invention;
Fig. 9 is a kind of charge control apparatus structural representation provided in an embodiment of the present invention;
Figure 10 is a kind of user device architecture schematic diagram provided in an embodiment of the present invention;
Figure 11 is another user device architecture schematic diagram provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only
Only it is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill
The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Term " first ", " second ", " the 3rd " " in description and claims of this specification and above-mentioned accompanying drawing
The (if present)s such as four " are for distinguishing similar object, without for describing specific order or precedence.It should manage
The data that solution is so used can be exchanged in the appropriate case, so as to embodiments of the invention described herein can with except
Here the order beyond those for illustrating or describing is implemented.
It should be appreciated that term " comprising " and " having " used herein and their any deformation, it is intended that cover
Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to
Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product
Or the intrinsic other steps of equipment or unit.
It should be appreciated that term "and/or" used herein is only a kind of incidence relation for describing affiliated partner, represent
There may be three kinds of relations, for example, A and/or B, can be represented:Individualism A, while there is A and B, individualism B these three
Situation.
Depending on linguistic context, as used in this " if " can be construed to " ... when " or " when ... " or
" in response to determining " or " in response to detection ".
Technical scheme is described in detail with specifically embodiment below.These specific implementations below
Example can be combined with each other, and may be repeated no more for same or analogous concept or process in some embodiments.
Fig. 1 is a kind of configuration diagram of charge control system provided in an embodiment of the present invention.Charging control as shown in Figure 1
System processed includes charge control apparatus 31, the first user equipment 21 and second user equipment 11.Charge control is set described in Fig. 1
Standby 31 are provided with two ports, and a port is connected with first user equipment 21, another port and the second user
Equipment 11, the charge control apparatus 31 is additionally provided with control panel, and control panel is displayed for the first user equipment 21
With the charge condition relevant information of second user equipment 11.Charge control apparatus 31 described in the present embodiment, the first user equipment
Information transfer relation between 21 and second user equipment 11, reference can be made to the embodiment shown in Fig. 2-8.
The charge control apparatus of the present embodiment can be the only special purpose device with charging control function, or be embedded
It is used for the attachment device of charge control in other equipment.Charge control apparatus for example can be embedded mobile phone, tablet personal computer,
Attachment device in the equipment such as camera.User does not carry portable power source or portable power source electric energy exhausts when outgoing if running into,
Need to charge in emergency circumstances again, the charge control system of the present embodiment provides a kind of USB OTG for equipment charge
The mode of (Universal Serial BusOn-The-Go) equipment discharge and recharge.USB otg standards are marked in completely compatible USB2.0
On the basis of standard, power management function is added, it allows equipment to can not only be used for main equipment, can also be operated as slave unit.USB
OTG equipment complies fully with USB2.0 standards, and can provide main equipment detectability, supports main equipment circular order agreement and session request
Agreement.For USB OTG equipment, initial main equipment is referred to as A equipment, and slave unit is referred to as B device.Can with the connected mode of cable come
Determine initial roles.USB OTG equipment determines the master of acquiescence generally according to the state of the 5th ID pin of detection USB OTG interfaces
Equipment, USB OTG equipment uses new mini-AB sockets, so that mini-A plugs, mini-B plugs and mini-AB sockets
The 5th pin (ID) is added, for recognizing different cable end points.ID pins ground connection in mini-A plugs, mini-B
ID pins in plug are hanging.When OTG equipment detects the ID pins of ground connection, represent acquiescence is A equipment (main equipment), and
Detect the hanging equipment of ID pins and be then considered B device (slave unit).
Fig. 2 is a kind of charge control method schematic flow sheet provided in an embodiment of the present invention.The executive agent of the present embodiment
For the charge control apparatus shown in Fig. 1 embodiments.The executive agent of embodiment is charge control apparatus.In the situation for needing to charge
Under, by the charge control apparatus of the present embodiment, user can be the relatively low equipment of electricity using the higher miscellaneous equipment of electricity
Charging, or utilize the not high miscellaneous equipment of frequency of use to be equipment charge to be charged.
S110, obtains the charge information for indicating to be charged to second user equipment, in default cluster tool
Determine that the equipment in the first user equipment, the cluster tool is all equipped with the user equipment of USB OTG interface circuits.
The charge information can be the information that second user equipment is sent to charge control apparatus, for example, being used second
When family equipment needs charging, user sends charge information by second user equipment to charge control apparatus.
The charge information can also be the information that charge control apparatus is obtained according to peripheral operation, for example, being used second
When family equipment needs charging, user is inputted by putting the peripheral operation modes such as tactile or slip in the control panel of charge control apparatus
The charge information.
Also include the determination of second user equipment before S110.The determination mode of second user equipment can be:Charging letter
Breath includes the mark of second user equipment, and charge control apparatus obtains the mark of second user equipment in the charge information, from
And determine second user equipment;Or, charge control apparatus responds the charge information, according to default corresponding relation obtain with
The corresponding second user equipment of the charge information.
The first user equipment is determined described in the present embodiment in default cluster tool, can be existed according to peripheral operation
First user equipment is determined in default cluster tool.For example, showing the list of the cluster tool, Yong Hugen to user
The list information shown according to charge control apparatus inputs the charge information by putting the peripheral operation modes such as tactile or slip, selectes
Expect the first user equipment as charging equipment.
The first user equipment or charge control apparatus are determined described in the present embodiment in default cluster tool
Automatically determine the first user equipment.The present embodiment additionally provides following two implementations and is automatically determined to charge control apparatus
One user equipment lays down a definition explanation:
A kind of implementation that charge control apparatus automatically determines the first user equipment can be:Charge control apparatus is
The first user equipment of acquiescence is determined in the cluster tool of preservation, for example, the most user equipment of linkage record is defined as first
User equipment;
Another implementation that charge control apparatus automatically determines the first user equipment can be:Charge control apparatus exists
Determine that with the closest user equipment of charge control apparatus be the first user equipment in cluster tool.
A kind of determination method of cluster tool can be:Charge control apparatus automatically searches for attachable USB nearby
OTG equipment sets up the cluster tool, and cluster tool is the set of attachable USB OTG equipment.
Another determination method of cluster tool can be:Charge control apparatus automatically searches for attachable USB nearby
OTG equipment, and the inquiry message for whether agreeing to provide electric energy is sent to attachable USB OTG equipment.If attachable USB
OTG equipment is received after the inquiry message, to charge control apparatus send agree to provide electric energy information, it is determined that it is described can
The USB OTG equipment of connection is the equipment in the cluster tool, and cluster tool provides the collection of electric energy USB OTG equipment for agreement
Close.
Heretofore described first user equipment and second user equipment are all the equipment with USB OTG interface circuits,
I.e. user equipment can or ground connection hanging by the ID pins of the USB OTG interfaces to oneself, control itself to be with main equipment
Role or the role of slave unit access electrical connection path.
For the ease of being clearly described to charge control method, this patent is in subsequent descriptions to being confirmed as main equipment
User equipment all illustrates with the first user equipment, for being confirmed as the user equipment of slave unit all with second user equipment
It is bright.
S120, the first configuring request is sent to first user equipment, and sending second to the second user equipment matches somebody with somebody
Request is put, first configuring request is that, by the request that the first user device configuration is main equipment, second configuring request is
By the request that second user device configuration is slave unit.
First user equipment can be the one's own another user equipment of user, and such as mobile phone is used when not having electricity
Tablet personal computer charges as the first user equipment for mobile phone;Can also be the equipment borrowed to other people, such as oneself mobile phone does not have electricity
When to borrow the mobile phones of other people full lattice electricity as the first user equipment be that oneself mobile phone carries out short time charging.The charge control
Equipment can be that WIFI network is connected transmission, movement with the signal transfer mode of first user equipment and second user equipment
Network connection is transmitted.Mobile network can be 2G, 3G or 4G network.Wherein, the mode that mobile network's connection is transmitted is for example
It can be the mode for receiving and dispatching short message.
There are 5 pins in USB OTG interface circuits:2 are used for transmitting differential data (D+ pins, D- pins);1 is electricity
Source pin (VBUS pins);1 is then grounding pin (GND pin);1 is identified pins (ID pins).ID pins are used to know
Not different cable end points.When USB OTG equipment detects ID pins ground connection, then acquiescence is that control is outwards supplied as main equipment
Electricity;And detect ID pins it is hanging when, then acquiescence is that control receives the charging of main equipment as slave unit.
First user equipment is received after the first configuring request, according to first configuring request by USB interface
The test side ground connection of ID pins, is main equipment by the first user device configuration.Correspondingly, the second user equipment receives
It is according to second configuring request that the test side of the ID pins of USB interface is hanging after two configuring requests, by second user equipment
It is configured to slave unit.
This step reduces manually operated by being automatically configured to the first user equipment and second user equipment,
Simplify charge arrangement process.
S130, if receiving the first feedback information and second user equipment transmission that first user equipment is sent
The second feedback information, then to the second user equipment send the first user equipment mark, first user equipment
It is the first user equipment, first feedback information to identify the equipment for indicating to charge to the second user equipment
For indicating that first user equipment completes to configure according to first configuring request, second feedback information is used to indicate
The second user equipment completes to configure according to second configuring request.
The first feedback information and the second feedback information are received, has shown first user equipment and second user equipment
The configuration of main equipment and slave unit is completed, the first user equipment is ready for the preparation of the power supply to second user equipment.
The mark rear line that second user equipment receives first user equipment shows that user is according to the first user
The mark of equipment finds the first user equipment, and the first user equipment, second user equipment are mutually interconnected with charge control apparatus
Connect, form the attachment structure shown in Fig. 1, form electrical connection path between the second and the first user equipment.Now,
Due to the first user equipment and second user equipment, equipment has been main equipment and slave unit respectively, thus the first user equipment and
There is the electric current that second user equipment is flowed to from the first user equipment in the electrical connection path between second user equipment.
S140, however, it is determined that first user equipment is electrically connected with second user equipment, then to first user equipment
First voltage boosting, obtain magnitude of voltage be preset voltage value second voltage, and using the second voltage be described second use
Family equipment charge.
In electrical connection path between the second and the first user equipment, by first user equipment
Output voltage boosting, can accelerate the charging rate of second user equipment, increase charging current.For example 4.2V voltages are raised
It is the second user equipment charge after to 5V voltages.The mode of the boosting can be in the first user equipment and second user
Direct current-direct current voltage boost circuit is set on the charging path of equipment.
In the present embodiment, by obtaining the charge information for being used for indicating to be charged to second user equipment, default
Determine that the equipment in the first user equipment, the cluster tool is all equipped with the use of USB OTG interface circuits in cluster tool
Family equipment;The first configuring request is sent to first user equipment, the second configuring request is sent to the second user equipment,
First configuring request is that, by the request that the first user device configuration is main equipment, second configuring request is to be used second
Family device configuration is the request of slave unit;If receiving the first feedback information and described second that first user equipment is sent
The second feedback information that user equipment is sent, then send the mark of the first user equipment, described the to the second user equipment
The mark of one user equipment is used to indicate that the equipment that can charge to the second user equipment is the first user equipment, described
First feedback information is used to indicate that first user equipment completes to configure according to first configuring request, second feedback
Information is used to indicate that the second user equipment completes to configure according to second configuring request;If it is determined that first user sets
Standby to be electrically connected with second user equipment, then the first voltage to first user equipment is boosted, and it is default electricity to obtain magnitude of voltage
The second voltage of pressure value, and using the second voltage as the second user equipment charge.Realize and set using based on being configured
Standby miscellaneous equipment, to be configured to the second user equipment charge of slave unit, and then realizes the biography of the electric energy between OTG equipment
Pass there is provided a kind of new charging modes, and the acceleration to charging is realized by boosting.The present embodiment is realized to charging electricity
The flexible selection in source, is no longer limited to existing fixed socket and portable power source.
Fig. 3 is another charge control method schematic flow sheet provided in an embodiment of the present invention.The executive agent of this method
For the first user equipment, first user equipment can be that mobile phone, tablet personal computer, camera etc. have USB OTG interface circuits
User equipment.Method shown in Fig. 3 includes:
S310, receives the first configuring request that charge control apparatus is sent, and first configuring request is by described first
User device configuration is the request of main equipment;
S320, according to first configuring request, sets the knowledge of the USB OTG interface circuits in first user equipment
Other pin ground connection;
S330, the first feedback information is sent to the charge control apparatus, and first feedback information is described for indicating
First user equipment completes to configure according to first configuring request.
In embodiment illustrated in fig. 3, by receiving the first configuring request that charge control apparatus is sent, first configuration please
Ask as by request that first user device configuration is main equipment;According to first configuring request, described first is set to use
The identification pin ground connection of USB OTG interface circuits in the equipment of family;The first feedback information, institute are sent to the charge control apparatus
Stating the first feedback information is used to indicate that first user equipment completes to configure according to first configuring request, realizes master and sets
Standby automatically configures, so as to coordinate the electric energy for realizing and being configured between the user equipment of slave unit to pass with charge control apparatus
Pass, to the second user equipment charge for being configured to slave unit.
Fig. 4 is another charge control method schematic flow sheet provided in an embodiment of the present invention.The executive agent of this method
To be configured to the other equipment of slave unit, the other equipment for being configured to slave unit can be mobile phone, tablet personal computer, camera etc.
USB OTG electronic equipments.The method of embodiment five includes:
S410, receives the second configuring request that charge control apparatus is sent, and second configuring request is by described second
User device configuration is the request of slave unit;
S420, according to second configuring request, sets the knowledge of the USB OTG interface circuits in the second user equipment
Other pin is hanging;
S430, the second feedback information is sent to the charge control apparatus, and second feedback information is described for indicating
Second user equipment completes to configure according to the configuring request.
In embodiment illustrated in fig. 4, by receiving the second configuring request that charge control apparatus is sent, second configuration please
Ask as by request that the second user device configuration is slave unit;According to second configuring request, described second is set to use
The identification pin of USB OTG interface circuits in the equipment of family is hanging;The second feedback information, institute are sent to the charge control apparatus
Stating the second feedback information is used to indicate that the second user equipment completes to configure according to the configuring request, realizes slave unit
Automatically configure, so as to coordinate the electric energy for realizing and being configured between the user equipment of main equipment to transmit with charge control apparatus.
Fig. 5 is a kind of charge control method signaling process schematic diagram provided in an embodiment of the present invention.Charging as shown in Figure 5
Control method includes:
S101, charge control apparatus obtains the charge information for indicating to be charged to second user equipment, default
Cluster tool in determine that the equipment in the first user equipment, the cluster tool is all equipped with USB OTG interface circuits
User equipment.
S102, charge control apparatus sends the first configuring request, first configuring request to first user equipment
For by request that the first user device configuration is main equipment.
S103, charge control apparatus sends the second configuring request, second configuring request to the second user equipment
For by request that second user device configuration is slave unit.Step S102 and S103 can be carried out simultaneously, be entered when can also be different
OK, the present embodiment not limited to this.
S104, the first user equipment receives the first configuring request that charge control apparatus is sent, first configuring request
For by request that first user device configuration is main equipment;First user equipment is set according to first configuring request
The identification pin ground connection of USB OTG interface circuits in first user equipment.
S105, second user equipment receives the second configuring request that charge control apparatus is sent, second configuring request
For by request that the second user device configuration is slave unit;Second user equipment is set according to second configuring request
The identification pin of USB OTG interface circuits in the second user equipment is hanging.The S104 and S105 can be carried out simultaneously,
Carried out when can also be different, the present embodiment not limited to this.
S106, the first user equipment sends the first feedback information, first feedback information to the charge control apparatus
For indicating that first user equipment completes to configure according to first configuring request.
S107, second user equipment sends the second feedback information, second feedback information to the charge control apparatus
For indicating that the second user equipment completes to configure according to the configuring request.The S106 and S107 can be carried out simultaneously,
Carried out when can also be different, the present embodiment not limited to this.
S108, if receiving the first feedback information and second user equipment transmission that first user equipment is sent
The second feedback information, then to the second user equipment send the first user equipment mark, first user equipment
It is the first user equipment to identify the equipment for indicating to charge to the second user equipment.
S109, however, it is determined that first user equipment is electrically connected with second user equipment, then to first user equipment
First voltage boosting, obtain magnitude of voltage be preset voltage value second voltage, and using the second voltage be described second use
Family equipment charge.
Embodiment shown in Fig. 5 is by the way that charge control apparatus is to the connection of the first user equipment and second user equipment and matches somebody with somebody
Put, realize pair can user's charging the first user equipment fast searching, and the charging to second user equipment, to boost
Realize the acceleration to second user equipment charge.
Fig. 6 is a kind of charge control method implement scene provided in an embodiment of the present invention.
As shown in fig. 6, equipment has the use such as mobile phone or tablet personal computer in router 41-46, room respectively in room 1-6
Family equipment all passes through the router and network connection in respective room.The use that second user equipment 11 charges for needs in the present embodiment
Family equipment, the first user that the first user equipment 21 can determine for charge control apparatus 31 in default cluster tool sets
Standby, the cluster tool in the present embodiment includes all user equipment 21-26 in six rooms.The road connected due to each room
It is different by device, therefore the position of each user equipment can be determined according to different routers.In the present embodiment in cluster tool
The mode of the first user equipment is determined, can be the user equipment of the router 42 of selection connection, connect with charge control apparatus 31
Connect on same router, then illustrate in same room with them, it is closest with second user equipment 11.
Fig. 7 is another charge control method schematic flow sheet provided in an embodiment of the present invention.In embodiment illustrated in fig. 2
On the basis of, embodiment illustrated in fig. 7 is determined in default cluster tool before the first user equipment, in addition to presets the equipment
The process of set.
S710, broadcasts connection request, and the connection request is used to inquire whether other users equipment is configured with USB OTG and connects
Mouth circuit;
S720, receives the response message of other users equipment feedback, however, it is determined that the response message be used to indicating it is described its
His user device configuration has USB OTG interface circuits, then according to the user equipment for being configured with USB OTG interface circuits, determines institute
State cluster tool.
In the present embodiment, charge control apparatus is according to the peripheral operation of user, or according to the charge information, outwards broadcast
Connection request.The peripheral operation can be the modes such as phonetic entry, gesture input, actuation of keys input.
On the basis of the cluster tool of embodiment illustrated in fig. 1 is the implementation of set of attachable USB OTG equipment,
In the present embodiment, the other users equipment of connection request is received according to whether generating the response with USBOTG interface circuits
Information, if other users equipment has USB OTG interface circuits, is generated for indicating that the other users device configuration has USB
The response message of OTG interface circuits;If if other users equipment does not have USB OTG interface circuits, not returning to response message
Or generate for indicating that the other users equipment is not configured with the response message of USB OTG interface circuits.Set with other users
Standby is mobile phone as a kind of example, after the mobile phone near charge control apparatus receives connection request, if itself possesses USB
OTG interface circuits, then send response message to charging equipment, if itself not possessing USB OTG interface circuits, do not set to charging
Preparation send response message.
The implementation base of the set of electric energy USB OTG equipment is provided in the cluster tool of embodiment illustrated in fig. 1 for agreement
On plinth, in the present embodiment, the other users equipment for receiving connection request first determines whether whether oneself has USB OTG interfaces electricity
Road;If without USB OTG interface circuits, not returning to response message;If with USB OTG interface circuits, further may be used
With to holder's display reminding information, if holder agrees to provide charge power supply using the other users equipment as main equipment,
Then the other users equipment for receiving connection request, oneself is configured to after main equipment, is sent and is used to charge control apparatus
In indicating that the other users device configuration has the response messages of USB OTG interface circuits.
Include the device identifying information of sender in above-mentioned response message, such as cell-phone number, equipment Serial Number, bluetooth connect
Message breath etc. is used for the information recognized.Charge control apparatus according to the response message that receives obtain can as charging source equipment
Set.Charging equipment receives several response messages and is shown to user in the form of list or icon.
The present embodiment is used to inquire whether other users equipment is configured with by broadcasting connection request, the connection request
USB OTG interface circuits;Receive the response message of other users equipment feedback, however, it is determined that the response message is described for indicating
Other users device configuration has USB OTG interface circuits, then according to the user equipment for being configured with USB OTG interface circuits, it is determined that
The cluster tool, realizes the automatic search to available devices around.Also achieve to neighbouring environment inquiry, improve and filled
The possibility of electricity.
Fig. 8 is another charge control method schematic flow sheet provided in an embodiment of the present invention.In embodiment illustrated in fig. 8
In, the basis is configured with the user equipment of USB OTG interface circuits, determines the cluster tool, including:
S810, obtains the distance of the charge control apparatus and the user equipment for being configured with USB OTG interface circuits.
The acquisition modes of distance in this step, can be by signal intensity, it is determined that the charge control apparatus and institute
The distance for the user equipment for being configured with USB OTG interface circuits is stated, such as distance is 5 meters, 13 meters and 20 meters;Can also be with
The LAN of family equipment connection is come the distance determined, such as each one room of router correspondence, and the position in each room is true
Fixed, then the router address connected according to the other users equipment knows the position of the other users equipment, and then determines
The distance, with continued reference to the example shown in Fig. 6, using the center in each room as the position of the user equipment in the room, from
And the distance of charge control apparatus and the user equipment for being configured with USB OTG interface circuits can be obtained.
S820, in the distance, it is determined that less than or equal to the target range of pre-determined distance.
S830, according to the corresponding user equipment of the target range, is obtained in the cluster tool, the cluster tool
Equipment is the corresponding user equipment of the target range.
With the determination of distance method of the other users equipment can by the base station distance that is connected, radiofrequency signal it is strong
Weak the method such as to compare to determine, the invention is not restricted to this.The present embodiment by according to the response message, it is determined that with it is described other
The distance of user equipment.Determine the cluster tool according to the distance of the other users equipment, the cluster tool is set
Standby is the other users equipment of the distance in pre-determined distance between charge control apparatus, is realized within pre-determined distance
User equipment inquiry, the possibility of charging can not be connected because of the first user equipment hypertelorism by reducing, and improve success
The probability of charging.
On the basis of any shown embodiment in Fig. 1~8, in the first voltage liter to first user equipment
Pressure, obtain magnitude of voltage be preset voltage value second voltage, and by the second user equipment charge of the second voltage it
Before, in addition to:Obtain the sense of current electrically connected between first user equipment and second user equipment on path;According to institute
The sense of current is stated, it is to electrically connect main equipment on path, the second user equipment to be electrically connected to determine first user equipment
The slave unit connected on road.The present embodiment can determine the first user equipment and second user by the detection to the sense of current
Equipment accesses the port of charge control apparatus, so that it is determined that the access direction of boost module, if detecting sense of current change,
Then show to electrically connect main equipment and the direction change of slave unit access on path, and then adaptive the changes boost module access
Port direction, realizes and adaptively adjusts booster circuit access direction according to the access device at electrical connection path two ends.
Fig. 9 is a kind of charge control apparatus structural representation provided in an embodiment of the present invention.The charge control of the present embodiment
Equipment can be the only special purpose device with charging control function, or be embedded in other equipment for charge control
Attachment device.Attachment device in charge control apparatus equipment such as can be to be embedded in mobile phone, tablet personal computer, camera.Fig. 9
Illustrated embodiment includes:
First user equipment determining module 910, for obtaining the charging for being used for indicating to be charged to second user equipment
Information, determines that the equipment in the first user equipment, the cluster tool is all equipped with USB OTG in default cluster tool
The user equipment of interface circuit;
Sending module 920, for sending the first configuring request to first user equipment, to the second user equipment
The second configuring request is sent, first configuring request is by the request that the first user device configuration is main equipment, described second
Configuring request is by request that second user device configuration is slave unit;
Determining module 930 is connected, if for receiving the first feedback information that first user equipment sends and described
The second feedback information that second user equipment is sent, then send the mark of the first user equipment, institute to the second user equipment
Stating the mark of the first user equipment is used to indicate that the equipment that can charge to the second user equipment is the first user equipment,
First feedback information is used to indicate that first user equipment completes to configure according to first configuring request, and described second
Feedback information is used to indicate that the second user equipment completes to configure according to second configuring request;
Boost charge module 940, for if it is determined that first user equipment is electrically connected with second user equipment, then to institute
The first voltage boosting of the first user equipment is stated, the second voltage that magnitude of voltage is preset voltage value is obtained, and with the described second electricity
Press as the second user equipment charge.
The device of embodiment illustrated in fig. 9 accordingly can be used for charge control apparatus in embodiment of the method shown in execution Fig. 2 to hold
Capable step, its implementing principle and technical effect are similar, and here is omitted.
Alternatively, on the basis of embodiment illustrated in fig. 9, in addition to broadcast module and response message receiving module;
Broadcast module, for it is described the first user equipment is determined in default cluster tool before, broadcast connection please
Ask, the connection request is used to inquire whether other users equipment is configured with USB OTG interface circuits;
Response message receiving module, the response message for receiving other users equipment feedback, however, it is determined that the response disappears
Cease for indicating that the other users device configuration there are USB OTG interface circuits, then basis is configured with USB OTG interface circuits
User equipment, determines the cluster tool.The device of the present embodiment accordingly can be used for performing filling in embodiment of the method shown in Fig. 7
The step of electrical control equipment is performed, its implementing principle and technical effect are similar, and here is omitted.
On the basis of above-described embodiment, the response message receiving module specifically can be used for:Obtain the charging control
The distance of control equipment and the user equipment for being configured with USB OTG interface circuits;In the distance, it is determined that being less than or equal to
The target range of pre-determined distance;According to the corresponding user equipment of the target range, the cluster tool, the equipment collection are obtained
Equipment in conjunction is the corresponding user equipment of the target range.The device of the present embodiment accordingly can be used for performing shown in Fig. 8
The step of charge control apparatus is performed in embodiment of the method, its implementing principle and technical effect are similar, and here is omitted.
Alternatively, on the basis of above-described embodiment, the boost charge module 940 is additionally operable to:Used to described first
Family equipment first voltage boosting, obtain magnitude of voltage be preset voltage value second voltage, and using the second voltage be described
Before second user equipment charge, the electric current on electrical connection path between first user equipment and second user equipment is obtained
Direction;According to the sense of current, it is the main equipment on electrical connection path, the second user to determine first user equipment
Equipment is the slave unit on electrical connection path.The present embodiment can determine the first user equipment by the detection to the sense of current
The port of charge control apparatus is accessed with second user equipment, so that it is determined that the access direction of boost module, if detecting electricity
Flow direction to change, then show to electrically connect main equipment and the direction change of slave unit access on path, and then adaptive change rises
The port direction of die block access, realizes and adaptively adjusts booster circuit access side according to the access device at electrical connection path two ends
To.
On the basis of any of the above-described embodiment, display module and detection module can also be included.Detection module detects institute
The information such as size of current, voltage swing between the first user equipment and second user equipment on charging path are stated, and are being passed through
The display module is shown.
On the basis of any of the above-described embodiment, Voltage stabilizing module can also be included.Used by the Voltage stabilizing module first
The electric signal put between family equipment and second user equipment on connecting path carries out voltage stabilizing, prevents surge.
Figure 10 is a kind of user device architecture schematic diagram provided in an embodiment of the present invention.User equipment in the present embodiment is
The first user equipment in any embodiment shown in Fig. 1~9.Embodiment shown in Figure 10 includes:
First receiving module 1010, the first configuring request for receiving charge control apparatus transmission, first configuration
Request is by request that first user device configuration is main equipment;
First configuration module 1020, for according to first configuring request, setting the USB in first user equipment
The identification pin ground connection of OTG interface circuits;
First sending module 1030, for sending the first feedback information, first feedback to the charge control apparatus
Information is used to indicate that the user equipment completes to configure according to first configuring request.
The user equipment of embodiment illustrated in fig. 10 accordingly can be used for the first user in embodiment of the method shown in execution Fig. 3 to set
The step of standby execution, its implementing principle and technical effect is similar, and here is omitted.
Figure 11 is another user device architecture schematic diagram provided in an embodiment of the present invention.User equipment in the present embodiment
Second user equipment in any embodiment shown in Fig. 1~9.Embodiment shown in Figure 11 includes:
Second receiving module 1110, the second configuring request for receiving charge control apparatus transmission, second configuration
Request is by request that the second user device configuration is slave unit;
Second configuration module 1120, for according to second configuring request, setting the USB in the second user equipment
The identification pin of OTG interface circuits is hanging;
Second sending module 1130, for sending the second feedback information, second feedback to the charge control apparatus
Information is used to indicate that the second user equipment completes to configure according to second configuring request.
The user equipment of embodiment illustrated in fig. 11 accordingly can be used for second user in embodiment of the method shown in execution Fig. 4 to set
The step of standby execution, its implementing principle and technical effect is similar, and here is omitted.
Signal transmission relation between above-mentioned charge control apparatus, the first user equipment and second user equipment refers to Fig. 5
Shown signaling process schematic diagram.
Deposited in addition, the embodiment of the present application is also provided in a kind of computer-readable recording medium, computer-readable recording medium
Computer executed instructions are contained, when at least one computing device of user equipment computer executed instructions, user equipment
Perform above-mentioned various possible methods.
Wherein, computer-readable medium includes computer-readable storage medium and communication media, and wherein communication media includes being easy to
Any medium of computer program is transmitted from a place to another place.Storage medium can be universal or special computer
Any usable medium that can be accessed.A kind of exemplary storage medium is coupled to processor, so as to enable a processor to from this
Read information, and information can be write to the storage medium.Certainly, storage medium can also be the composition portion of processor
Point.Processor and storage medium can be located in ASIC.In addition, the ASIC can be located in user equipment.Certainly, processor and
Storage medium can also be present in communication equipment as discrete assembly.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above-mentioned each method embodiment can lead to
The related hardware of programmed instruction is crossed to complete.Foregoing program can be stored in a computer read/write memory medium.The journey
Sequence upon execution, performs the step of including above-mentioned each method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or
Person's CD etc. is various can be with the medium of store program codes.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.
Claims (10)
1. a kind of charge control method, it is characterised in that applied to charge control apparatus, methods described includes:
The charge information for indicating to be charged to second user equipment is obtained, determines that first uses in default cluster tool
Equipment in family equipment, the cluster tool is all equipped with the user equipment of USB OTG interface circuits;
The first configuring request is sent to first user equipment, the second configuring request, institute are sent to the second user equipment
It is that, by the request that the first user device configuration is main equipment, second configuring request is by second user to state the first configuring request
Device configuration is the request of slave unit;
If receiving the first feedback information that first user equipment sends and second that the second user equipment is sent being anti-
Feedforward information, then send the mark of the first user equipment to the second user equipment, and the mark of first user equipment is used for
It is the first user equipment to indicate the equipment that can be charged to the second user equipment, and first feedback information is used to indicate
First user equipment completes to configure according to first configuring request, and second feedback information is used to indicate described second
User equipment completes to configure according to second configuring request;
If it is determined that first user equipment is electrically connected with second user equipment, then to the first voltage of first user equipment
Boosting, obtains the second voltage that magnitude of voltage is preset voltage value, and using the second voltage as the second user equipment charge.
2. according to the method described in claim 1, it is characterised in that described to determine that the first user sets in default cluster tool
Before standby, in addition to:
Connection request is broadcasted, the connection request is used to inquire whether other users equipment is configured with USB OTG interface circuits;
Receive the response message of other users equipment feedback, however, it is determined that the response message is used to indicate the other users equipment
USB OTG interface circuits are configured with, then according to the user equipment for being configured with USB OTG interface circuits, determine the cluster tool.
3. method according to claim 2, it is characterised in that the basis is configured with the user of USB OTG interface circuits
Equipment, determines the cluster tool, including:
Obtain the distance of the charge control apparatus and the user equipment for being configured with USB OTG interface circuits;
In the distance, it is determined that less than or equal to the target range of pre-determined distance;
According to the corresponding user equipment of the target range, it is institute to obtain the equipment in the cluster tool, the cluster tool
State the corresponding user equipment of target range.
4. according to the method described in claim 1, it is characterised in that in the first voltage liter to first user equipment
Pressure, obtain magnitude of voltage be preset voltage value second voltage, and by the second user equipment charge of the second voltage it
Before, in addition to:
Obtain the sense of current electrically connected between first user equipment and second user equipment on path;
According to the sense of current, it is the main equipment on electrical connection path, the second user to determine first user equipment
Equipment is the slave unit on electrical connection path.
5. a kind of charge control method, it is characterised in that applied to user equipment, including:
The configuring request that charge control apparatus is sent is received, it by the user device configuration is main equipment that the configuring request, which is,
Request;
According to the configuring request, the identification pin ground connection of the USB OTG interface circuits in the user equipment is set;
To the charge control apparatus send feedback information, the feedback information is used to indicate that the user equipment is matched somebody with somebody according to
Put request and complete configuration.
6. a kind of charge control method, it is characterised in that applied to user equipment, including:
The configuring request that charge control apparatus is sent is received, it by the user device configuration is slave unit that the configuring request, which is,
Request;
According to the configuring request, set the identification pin of USB OTG interface circuits in the user equipment hanging;
To the charge control apparatus send feedback information, the feedback information is used to indicate that the user equipment is matched somebody with somebody according to
Put request and complete configuration.
7. a kind of charge control apparatus, it is characterised in that including:
First user equipment determining module, for obtaining the charge information for being used for indicating to be charged to second user equipment,
Determine that the equipment in the first user equipment, the cluster tool is all equipped with USB OTG interfaces electricity in default cluster tool
The user equipment on road;
Sending module, for sending the first configuring request to first user equipment, the is sent to the second user equipment
Two configuring requests, first configuring request is that second configuration please by the request that the first user device configuration is main equipment
Ask as by request that second user device configuration is slave unit;
Determining module is connected, if for receiving the first feedback information and the second user that first user equipment is sent
The second feedback information that equipment is sent, then send the mark of the first user equipment to the second user equipment, and described first uses
The mark of family equipment is used to indicate that the equipment that can charge to the second user equipment is the first user equipment, described first
Feedback information is used to indicate that first user equipment completes to configure according to first configuring request, second feedback information
For indicating that the second user equipment completes to configure according to second configuring request;
Boost charge module, for if it is determined that first user equipment is electrically connected with second user equipment, then to described first
The first voltage boosting of user equipment, obtains the second voltage that magnitude of voltage is preset voltage value, and using the second voltage as institute
State second user equipment charge.
8. a kind of user equipment, it is characterised in that including:
First receiving module, the configuring request for receiving charge control apparatus transmission, the configuring request is by the user
Device configuration is the request of main equipment;
First configuration module, for according to the configuring request, setting the knowledge of the USB OTG interface circuits in the user equipment
Other pin ground connection;
First sending module, for the charge control apparatus send feedback information, the feedback information to be described for indicating
User equipment completes to configure according to the configuring request.
9. a kind of user equipment, it is characterised in that including:
Second receiving module, the configuring request for receiving charge control apparatus transmission, the configuring request is by the user
Device configuration is the request of slave unit;
Second configuration module, for according to the configuring request, setting the knowledge of the USB OTG interface circuits in the user equipment
Other pin is hanging;
Second sending module, for the charge control apparatus send feedback information, the feedback information to be described for indicating
User equipment completes to configure according to the configuring request.
10. a kind of charge control system, it is characterised in that including charge control apparatus, the first user equipment and second user
Equipment, wherein
The charge control apparatus is used to perform the method as described in Claims 1-4 is any;
First user equipment is used to perform method as claimed in claim 5;
The second user equipment is used to perform method as claimed in claim 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710661403.4A CN107276180B (en) | 2017-08-04 | 2017-08-04 | Charging control method, device and system and user equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710661403.4A CN107276180B (en) | 2017-08-04 | 2017-08-04 | Charging control method, device and system and user equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107276180A true CN107276180A (en) | 2017-10-20 |
CN107276180B CN107276180B (en) | 2020-09-29 |
Family
ID=60076025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710661403.4A Active CN107276180B (en) | 2017-08-04 | 2017-08-04 | Charging control method, device and system and user equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107276180B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109066906A (en) * | 2018-09-21 | 2018-12-21 | 潍坊歌尔电子有限公司 | A kind of charging circuit, integral type helmet and system |
CN111030226A (en) * | 2019-12-20 | 2020-04-17 | 维沃移动通信有限公司 | Equipment detection method and electronic equipment |
CN113616469A (en) * | 2020-05-08 | 2021-11-09 | 未来穿戴技术有限公司 | Control method and device of massage equipment, computer equipment and storage medium |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104184219A (en) * | 2014-07-30 | 2014-12-03 | 重庆邮电大学 | TR-based reverse cooperation RF power supply system and method |
CN104362687A (en) * | 2014-10-24 | 2015-02-18 | 福建联迪商用设备有限公司 | Bidirectional power balance method and device based on USB-OTG |
CN104682489A (en) * | 2014-12-26 | 2015-06-03 | 中兴新能源汽车有限责任公司 | Electric vehicle, wireless charging system and wireless charging method for electric vehicle |
CN104967174A (en) * | 2015-07-07 | 2015-10-07 | 小米科技有限责任公司 | Charging control method and device |
CN105071552A (en) * | 2015-08-10 | 2015-11-18 | 惠州Tcl移动通信有限公司 | Wireless charging method, system and device, energy emission device and energy reception device |
CN105099007A (en) * | 2015-09-29 | 2015-11-25 | 中国科学技术大学 | Interactive process state defining and converting method in radiation type wireless electric energy transmission system |
CN105098273A (en) * | 2015-07-20 | 2015-11-25 | 小米科技有限责任公司 | Charging method and device |
CN105099003A (en) * | 2015-07-28 | 2015-11-25 | 联想(北京)有限公司 | Wireless charging method and corresponding device |
CN105207284A (en) * | 2015-08-25 | 2015-12-30 | 青岛海信移动通信技术股份有限公司 | Power supply method of master equipment to slave equipment and master equipment |
CN105576753A (en) * | 2016-01-04 | 2016-05-11 | 联想(北京)有限公司 | Information processing method and electronic equipment |
CN106300466A (en) * | 2015-05-26 | 2017-01-04 | 联想移动通信科技有限公司 | Method, device and the terminal of a kind of OTG quick charge |
CN106532857A (en) * | 2016-12-26 | 2017-03-22 | 广东欧珀移动通信有限公司 | Wireless charging method and wireless charging device |
CN106658632A (en) * | 2016-10-21 | 2017-05-10 | 国网黑龙江省电力有限公司信息通信公司 | Wireless self-organizing network-based electric automobile charging method |
CN106786904A (en) * | 2016-12-26 | 2017-05-31 | 广东欧珀移动通信有限公司 | Charging system of selection, device and charging equipment |
CN106787252A (en) * | 2017-03-02 | 2017-05-31 | 深圳市尧元科技有限公司 | A kind of wireless charging device state perception system |
-
2017
- 2017-08-04 CN CN201710661403.4A patent/CN107276180B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104184219A (en) * | 2014-07-30 | 2014-12-03 | 重庆邮电大学 | TR-based reverse cooperation RF power supply system and method |
CN104362687A (en) * | 2014-10-24 | 2015-02-18 | 福建联迪商用设备有限公司 | Bidirectional power balance method and device based on USB-OTG |
CN104682489A (en) * | 2014-12-26 | 2015-06-03 | 中兴新能源汽车有限责任公司 | Electric vehicle, wireless charging system and wireless charging method for electric vehicle |
CN106300466A (en) * | 2015-05-26 | 2017-01-04 | 联想移动通信科技有限公司 | Method, device and the terminal of a kind of OTG quick charge |
CN104967174A (en) * | 2015-07-07 | 2015-10-07 | 小米科技有限责任公司 | Charging control method and device |
CN105098273A (en) * | 2015-07-20 | 2015-11-25 | 小米科技有限责任公司 | Charging method and device |
CN105099003A (en) * | 2015-07-28 | 2015-11-25 | 联想(北京)有限公司 | Wireless charging method and corresponding device |
CN105071552A (en) * | 2015-08-10 | 2015-11-18 | 惠州Tcl移动通信有限公司 | Wireless charging method, system and device, energy emission device and energy reception device |
CN105207284A (en) * | 2015-08-25 | 2015-12-30 | 青岛海信移动通信技术股份有限公司 | Power supply method of master equipment to slave equipment and master equipment |
CN105099007A (en) * | 2015-09-29 | 2015-11-25 | 中国科学技术大学 | Interactive process state defining and converting method in radiation type wireless electric energy transmission system |
CN105576753A (en) * | 2016-01-04 | 2016-05-11 | 联想(北京)有限公司 | Information processing method and electronic equipment |
CN106658632A (en) * | 2016-10-21 | 2017-05-10 | 国网黑龙江省电力有限公司信息通信公司 | Wireless self-organizing network-based electric automobile charging method |
CN106532857A (en) * | 2016-12-26 | 2017-03-22 | 广东欧珀移动通信有限公司 | Wireless charging method and wireless charging device |
CN106786904A (en) * | 2016-12-26 | 2017-05-31 | 广东欧珀移动通信有限公司 | Charging system of selection, device and charging equipment |
CN106787252A (en) * | 2017-03-02 | 2017-05-31 | 深圳市尧元科技有限公司 | A kind of wireless charging device state perception system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109066906A (en) * | 2018-09-21 | 2018-12-21 | 潍坊歌尔电子有限公司 | A kind of charging circuit, integral type helmet and system |
CN109066906B (en) * | 2018-09-21 | 2023-01-24 | 歌尔科技有限公司 | Charging circuit and integral type head-mounted apparatus |
CN111030226A (en) * | 2019-12-20 | 2020-04-17 | 维沃移动通信有限公司 | Equipment detection method and electronic equipment |
CN113616469A (en) * | 2020-05-08 | 2021-11-09 | 未来穿戴技术有限公司 | Control method and device of massage equipment, computer equipment and storage medium |
CN113616469B (en) * | 2020-05-08 | 2024-02-27 | 未来穿戴技术有限公司 | Control method and device of massage equipment, computer equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN107276180B (en) | 2020-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210367434A1 (en) | Method and apparatus for charging a battery | |
CN102138134B (en) | Intelligent power-enabled communications port | |
JP3811704B2 (en) | Universal serial bus charger for mobile devices | |
EP3389248A2 (en) | Method and apparatus for easy switching between wired and wireless headset with convenient charging | |
US7489102B2 (en) | Battery charger that identifies portable device type and rechargeable battery type and method | |
CN109313626A (en) | Universal serial bus (USB) type of cable detects and controls technology | |
JP2017520221A (en) | Baseband PD communication via USB standard A connector | |
US8729867B2 (en) | Sink current adaptation based on power supply detection | |
CN107276180A (en) | Charge control method, equipment, system and user equipment | |
WO2023197699A1 (en) | Charging circuit, charging control method and electronic device | |
CN109254210B (en) | Electronic equipment port type detection method and device, detection circuit and electronic equipment | |
CN108513715A (en) | Wirelessly communicate matching method, radio receiver and wireless transmitting device, system | |
CN110492575B (en) | Quick charging system and method for handheld device and handheld device | |
CN107885688B (en) | Signal switching method and device | |
CN113949167A (en) | Charging device and electronic equipment | |
CN108054794A (en) | It is a kind of for the charging/discharging thereof of intelligent terminal, device, terminal and storage medium | |
EP3330835A1 (en) | Power adapter, terminal device, charging system, and charging method | |
CN107124012A (en) | Charging method, device, charger, terminal and system | |
CN215818589U (en) | Circuit structure of charging box and charging box | |
CN209805461U (en) | Wire circuit and wire | |
US20170193993A1 (en) | Auxiliary apparatus and family smart system | |
US20150303725A1 (en) | Charging and discharging system among two portable devices | |
CN105449764A (en) | Charging method, charging apparatus and charging system | |
CN105006853A (en) | Method of outputting charging current, and power amplifier | |
RU145542U1 (en) | DEVICE FOR MULTIPLATFORM DATA EXCHANGE AND / OR USER IDENTIFICATION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |