CN107271948A - Resident uses intelligent table status replacing options - Google Patents
Resident uses intelligent table status replacing options Download PDFInfo
- Publication number
- CN107271948A CN107271948A CN201710431901.XA CN201710431901A CN107271948A CN 107271948 A CN107271948 A CN 107271948A CN 201710431901 A CN201710431901 A CN 201710431901A CN 107271948 A CN107271948 A CN 107271948A
- Authority
- CN
- China
- Prior art keywords
- resident
- time interval
- meter
- batch
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of resident of the present invention uses intelligent table status replacing options, and specific implementation step is as follows:(1) batch resident is inspected by random samples with intelligent meter every year, check batch Measurement reliability R;(2) the R values measured according to previous step, calculate calibrating time interval, it is determined that extension or shortening re-testing periods interval, (3) reach the qualification time interval of previous step, checked again, repeat step is (1), (2).The present invention changes the outfit proposition under intelligent electric energy meter background for resident's high-volume, according to strict sampling observation technology, one kind dynamic adjustment batch intelligent meter re-testing periods method of proposition, this method can instruct resident to be changed the outfit with intelligent meter, make electric energy meter operational management more science.
Description
Technical field
The invention belongs to intelligent electric meter application field, especially a kind of resident uses intelligent table status replacing options.
Background technology
At present, resident manages Main Basiss JJG596-2012 with intelligent meter《Electronic type AC energy meter》, code regulation
" 1 grade, 2 grades of active electric energy meters and 2 grades, 3 grades of reactive energy-meters, its re-testing periods are usually no more than 8 years ", resident is with intelligent meter
2 grades of active electric energy meters, thus the re-testing periods also should be 8 years.Tianjin started resident in 2009 and changed the outfit with intelligent meter work, pressed
Required according to examining and determine for 8 annual periods, the intelligent meter changed the outfit for 2009 need to be torn open back to be examined and determine again, but Examined point is run according to intelligent meter
Analysis, even if most of meter will be run 8 years, its component is still stable, metering defect problem does not occur, therefore can
To combine a kind of intelligent table status replacing options of related electric energy meter administrative skill research under existing concerned countries code framework, prolong
The long running stable intelligent meter re-testing periods.
The content of the invention
The present invention is overcome in place of the deficiencies in the prior art, is proposed a kind of design science, is easy to operation, reliable and stable, saving
The resident of the energy uses intelligent table status replacing options.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of resident uses intelligent table status replacing options, it is characterised in that:Specific implementation step is as follows:
(1) batch resident is inspected by random samples with intelligent meter every year, check batch Measurement reliability R;
(2) the R values measured according to previous step, calculate calibrating time interval, it is determined that extension or shortening re-testing periods interval,
If R >=90%, extend the calibrating time interval of the batch meter, if R≤90%, when shortening batch meter calibrating
Between be spaced,
(3) the qualification time interval of previous step is reached, is checked again, repeat step is (1), (2).
Moreover, (2) middle calibrating time interval is △ to step, computational methods are as follows:
△=a (or b) × I0
In formula:I0For time interval before adjustment, a is time interval increment coefficient, and b is time interval decrement factor, a=
0.2, b=0.3.
Advantages and positive effects of the present invention are:
1st, the present invention changes the outfit proposition under intelligent electric energy meter background for resident's high-volume, according to strict sampling observation technology, carries
One kind dynamic adjustment batch intelligent meter re-testing periods method gone out, this method can instruct resident to be changed the outfit with intelligent meter, make electric energy
Table operational management more science.
2nd, by taking Tianjin as an example, the work that changes the outfit of intelligent electric energy meter starts from 2009, since 2017 every year on average
Reaching the re-testing periods needs the tool of civilian intelligent meter about 700,000 of rotation, using every electric energy meter cost as 200 yuan of budgets, implements state
Tianjin is annual after rotation changes the outfit saving about 1.4 hundred million yuan of cost, and it is dirty that what is more important will also reduce by about 400 tons of whites every year
Contaminate thing discharge.Carry out civilian intelligent table status and change technical research and will targetedly implement meter and change the outfit work, can realize
Social resources are distributed rationally, are saved social construction cost, are realized human and environment harmonious and sustainable development.
Brief description of the drawings
Fig. 1 is Measurement reliability R (t) change schematic diagrams.
Embodiment
Below in conjunction with the accompanying drawings and the invention will be further described by specific embodiment, following examples are descriptive
, it is not limited, it is impossible to which protection scope of the present invention is limited with this.
A kind of resident uses intelligent table status replacing options, and specific implementation method is as follows:
According to JJF1139-2005《Verification Cycle in Measuring Instruments defining prinple and method》Extension resident is examined and determine with intelligent meter
In the cycle, require, batch resident is inspected by random samples with intelligent meter according to national regulation every year, check batch Measurement reliability R, root
According to R values, it is determined that extend or shorten re-testing periods interval,
Firstly, it is necessary to which clear and definite meter Measurement reliability target R, current standard assert reliability objectives R >=90%;
According to fixed ladder adjustment method Computing Principle, a certain batch resident intelligent meter is through after a period of time, its globality
It can suitably shorten the calibrating time interval of the batch meter not less than defined Measurement reliability target R;If its globality
Defined Measurement reliability target R is can exceed that, can be with the calibrating time interval of the proper extension batch meter.
Calibrating time interval is △, and computational methods are as follows:
△=a (or b) × I0
In formula:I0For time interval before adjustment, a is time interval increment coefficient, and b is time interval decrement factor, according to
We can take a=0.2, b=0.3 to experience,
For example, according to Tianjin electric energy meter sampling check for quality situation in 2016, it can be assumed that batch intelligent meter measurement in 2009
Reliability R >=90%, therefore calibrating time interval △=0.2 × 96 month ≈ 19 months can be extended, you can to extend operation 19
The moon is examined and determine again.
For another example assuming batch intelligent meter Measurement reliability R=85% in 2010, i.e., less than 90%, therefore shorten
Examine and determine time interval △=0.3 × 96 month ≈ 28 months, i.e., must just be examined and determine within 28 months in advance.
Although disclosing embodiments of the invention and accompanying drawing for the purpose of illustration, those skilled in the art can manage
Solution:Do not departing from the present invention and spirit and scope of the appended claims in, it is various replace, change and modifications all be it is possible,
Therefore, the scope of the present invention is not limited to embodiment and accompanying drawing disclosure of that.
Claims (2)
1. a kind of resident uses intelligent table status replacing options, it is characterised in that:Specific implementation step is as follows:
(1) batch resident is inspected by random samples with intelligent meter every year, check batch Measurement reliability R;
(2) the R values measured according to previous step, calculate calibrating time interval, it is determined that extension or shortening re-testing periods interval,
If R >=90%, extend the calibrating time interval of the batch meter, if R≤90%, between shortening the batch meter calibrating time
Every,
(3) the qualification time interval of previous step is reached, is checked again, repeat step is (1), (2).
2. resident according to claim 1 uses intelligent table status replacing options, it is characterised in that:Step (2) middle calibrating time
At intervals of △, computational methods are as follows:
△=a (or b) × I0
In formula:I0For time interval before adjustment, a is time interval increment coefficient, and b is time interval decrement factor, a=0.2, b=
0.3。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431901.XA CN107271948A (en) | 2017-06-09 | 2017-06-09 | Resident uses intelligent table status replacing options |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431901.XA CN107271948A (en) | 2017-06-09 | 2017-06-09 | Resident uses intelligent table status replacing options |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107271948A true CN107271948A (en) | 2017-10-20 |
Family
ID=60065943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710431901.XA Pending CN107271948A (en) | 2017-06-09 | 2017-06-09 | Resident uses intelligent table status replacing options |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107271948A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0918230A1 (en) * | 1997-11-11 | 1999-05-26 | Ulf R. C. Nilsson | Method for finding errors of measurement in an energy distribution system |
CN102798836A (en) * | 2012-08-10 | 2012-11-28 | 江苏方天电力技术有限公司 | Standardized control device and control method for electric energy meter calibration device |
CN202815204U (en) * | 2012-10-15 | 2013-03-20 | 天津市电力公司 | A verification system for alternating current instrument inspection devices |
CN104933249A (en) * | 2015-06-19 | 2015-09-23 | 中国人民解放军91635部队 | Ship instrument verification period determination method and system |
CN105068036A (en) * | 2015-07-27 | 2015-11-18 | 国网重庆市电力公司电力科学研究院 | State examination strategy of electric energy meter |
CN106501763A (en) * | 2017-01-05 | 2017-03-15 | 云南电网有限责任公司电力科学研究院 | A kind of electric energy meter calibration method and system based on climatic simulation |
-
2017
- 2017-06-09 CN CN201710431901.XA patent/CN107271948A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0918230A1 (en) * | 1997-11-11 | 1999-05-26 | Ulf R. C. Nilsson | Method for finding errors of measurement in an energy distribution system |
CN102798836A (en) * | 2012-08-10 | 2012-11-28 | 江苏方天电力技术有限公司 | Standardized control device and control method for electric energy meter calibration device |
CN202815204U (en) * | 2012-10-15 | 2013-03-20 | 天津市电力公司 | A verification system for alternating current instrument inspection devices |
CN104933249A (en) * | 2015-06-19 | 2015-09-23 | 中国人民解放军91635部队 | Ship instrument verification period determination method and system |
CN105068036A (en) * | 2015-07-27 | 2015-11-18 | 国网重庆市电力公司电力科学研究院 | State examination strategy of electric energy meter |
CN106501763A (en) * | 2017-01-05 | 2017-03-15 | 云南电网有限责任公司电力科学研究院 | A kind of electric energy meter calibration method and system based on climatic simulation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104808168B (en) | A kind of electric energy meter fast calibration method based on segmented current technology | |
US8878549B2 (en) | AC impedance measuring device | |
CN104198949A (en) | Battery health state detection method | |
CN105629052B (en) | Chip power-consumption real-time detection method | |
CN105680860B (en) | Improve the circuit and method of microcontroller A/D conversion accuracy | |
CN104317683A (en) | Method for testing power consumption of memory | |
CN108572320A (en) | Battery minimum monomer and system available capacity, health status evaluation method and device | |
CN113780807B (en) | Calculation method for electric water diversion conversion coefficient | |
CN109856550A (en) | The evaluation method and system of the SOC of flow battery | |
CN106407592B (en) | A kind of System in Small Sample Situation data method measuring fatigue behaviour | |
CN114280527A (en) | Electric energy meter misalignment analysis method based on low-voltage Internet of things sensing terminal | |
CN103293424A (en) | Data center power usage efficiency (PUE) determination method | |
CN107271948A (en) | Resident uses intelligent table status replacing options | |
CN115754772A (en) | Battery capacity attenuation processing method, device, equipment and storage medium | |
CN107238347B (en) | The automatic correcting method of strain gauge connecting wire in stress-strain measurement system | |
CN202854214U (en) | Full-voltage loss measuring device and intelligent electric meter | |
CN205981414U (en) | A weighing device for electronic component | |
CN203758587U (en) | Calibrating device for small-flow gas flow meter | |
CN202929175U (en) | Cell electric quantity measuring instrument | |
CN207074127U (en) | A kind of device of cake of press method measure limit moisture content | |
CN101545935B (en) | Method for realizing analysis of electrical performance indexes in embedded type system | |
He et al. | Harmonic contribution assessment on the condition of background harmonic fluctuations | |
TWI658350B (en) | Early warning system and method for water distribution network | |
Sen et al. | The analysis of power meters' performance under nonsinusoidal conditions | |
CN204536509U (en) | Based on the button cell capacity checking apparatus of AVR |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |