CN107268878A - The fabrication and installation method of prefabricated sandwich wallboard - Google Patents

The fabrication and installation method of prefabricated sandwich wallboard Download PDF

Info

Publication number
CN107268878A
CN107268878A CN201710481405.5A CN201710481405A CN107268878A CN 107268878 A CN107268878 A CN 107268878A CN 201710481405 A CN201710481405 A CN 201710481405A CN 107268878 A CN107268878 A CN 107268878A
Authority
CN
China
Prior art keywords
lobe wall
warming plate
connector
mould
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710481405.5A
Other languages
Chinese (zh)
Other versions
CN107268878B (en
Inventor
刘艳强
牛化宪
王良超
陈前钟
赵海峰
张志刚
张先磊
吕灿
苗祥青
毕经通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Technology Jinan Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201710481405.5A priority Critical patent/CN107268878B/en
Publication of CN107268878A publication Critical patent/CN107268878A/en
Application granted granted Critical
Publication of CN107268878B publication Critical patent/CN107268878B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • E04C2/2885Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material with the insulating material being completely surrounded by, or embedded in, a stone-like material, e.g. the insulating material being discontinuous
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention provides a kind of fabrication and installation method of prefabricated sandwich wallboard, belongs to construction engineering technical field, including the construction of siphonal lobe wall, warming plate laying, connector installation, the construction of internal lobe wall, maintenance, the demoulding, handling, and each processing step is specifically:Siphonal lobe wall working procedure flow:Die station and mold cleaning → siphonal lobe wall mould positioning and assembly → brushing releasing agent → siphonal lobe wall reinforced mesh enter mould → built-in fitting positioning, installation → siphonal lobe wall concreting → and vibrated;Warming plate is laid:Internal lobe wall working procedure flow:Die station and mold cleaning → internal lobe wall mould positioning and assembly → brushing releasing agent or retarder → internal lobe wall bar-mat reinforcement enter mould → built-in fitting positioning, installation → internal lobe wall concreting → vibrate → receipts face polishes;Component is secondary pour after the completion of, setting time carries out precuring and steam-cured on request.Effectively shorten the duration, construction quality is effectively ensured, it is to avoid monolithic architecture construction speed produces conflict, effectively reduces labor intensity, effectively improves Construction Quality.

Description

The fabrication and installation method of prefabricated sandwich wallboard
Technical field
The present invention relates to construction engineering technical field, specifically a kind of fabrication and installation method of prefabricated sandwich wallboard.
Background technology
General, with the progress of building trade science and technology, architectural industrialization has turned into the inexorable trend that building trade is changed. The main application product of architectural industrialization has:Precast stair, truss superimposed sheet, prefabricated outer wall panel, prefabricated lining, prefabricated air-conditioning plate And prefabricated balcony etc..Prefabricated outer wall panel mounting technique is applied to big mode structure prefabricated outer wall panel installing engineering in Side fascia.It is existing The duration of prefabricated panel under technology is oversize, it is impossible to good cooperation monolithic architecture construction, is brought necessarily to monolithic architecture engineering The influence of degree.In order to eliminate the influence in terms of these, it would be highly desirable to which demand behaviors meet the prefabricated sandwich wall of modern architecture standard The fabrication and installation method of plate.
The content of the invention
The technical assignment of the present invention is that there is provided a kind of fabrication and installation side of prefabricated sandwich wallboard for solution the deficiencies in the prior art Method.
The technical scheme is that realize in the following manner, the fabrication and installation method of the prefabricated sandwich wallboard is including outer The construction of leaf wall, warming plate laying, connector are installed, the construction of internal lobe wall, maintenance, the demoulding, handling, each processing step is specifically:
A, the construction of siphonal lobe wall:
Process flow:Die station and mold cleaning → siphonal lobe wall mould positioning and assembly → brushing releasing agent → siphonal lobe wall reinforced mesh Enter mould → built-in fitting positioning, installation → siphonal lobe wall concreting → to vibrate;
(1)After the completion of die station and mold cleaning, rubble, wall brick or chamfering bar can be installed according to production requirement;
(2)The thickness of outer concrete should provide covering cover to reinforcement enough, and meet the enough anchorage lengths of connector;
(3)Slump before concreting should be controlled in 130~180mm;Slump can be by adding in concrete proportioning Enter water reducer;
(4)Outer concrete maximum cobble-stone diameter should be within 20mm;
(5)Surface is closed flat after vibratory compaction;
B, warming plate laying:
After the completion of siphonal lobe wall concrete-face closure, warming plate laying work can be carried out in plane by being vibrated in siphonal lobe wall;
(1)According to set typesetting form warming plate should be put from one end of wallboard to other end order;
(2)After first warming plate is put well, next warming plate is placed on above previous plate and then design attitude is slided into simultaneously Immediately preceding one, to prevent concrete to be splashed into space;
(3)Space is avoided the occurrence of between warming plate;
C, connector are installed
Operating procedure:Connector installation → fastness inspection → gap is filled up;
(1)Install:
After the completion of warming plate laying, connector is inserted on the warming plate in pre-drilled hole immediately, with the part of connector Depthkeeping degree plastic ferrule closely top to insulation plate surface;Then each connector is reversed 90 °, connector is trampled with pin The warming plate of surrounding anchors to reinforce the concrete of connector end;In addition, when being incubated plate thickness more than 75mm, it is necessary to use Concrete flat slab vibrator or special pneumatic vibrator vibrate in warming plate upper surface to each connector;Note connection The arrangement of part should not intentionally facing one direction, preferably random arrangement;
(2)Fastness is checked:
Temporarily take out the connector near every piece of warming plate corner and centre and check end built-in degree, wet water mortar should cover Cover the whole surface in all examined connector ends;
If inspection has no problem, connector is turned back in foramen primum and applies local pressure or mechanical oscillation again;If inspection Look into unqualified, applied more pressure on warming plate or apply more mechanical oscillation on each connector, then the company of reexamining Fitting periphery it is larger range of it is all close on connector, be embedded in ends until cement mortar covers all connectors;
(3)Gap is filled up
On pouring before layer concrete, the warming plate gap more than 3mm, gap and space injection polyurathamc are checked;
D, the construction of internal lobe wall
Process flow:Die station and mold cleaning → internal lobe wall mould positioning and assembly → brushing releasing agent or retarder → internal lobe wall Bar-mat reinforcement enter the positioning of mould → built-in fitting, installation → internal lobe wall concreting → vibrate → receipts face polishes;
Key control point:
(1)To shorten flow beat, the assembly of internal lobe wall mould, brushing retarder can be carried out in advance, that bar-mat reinforcement enters mould, built-in fitting is fixed The process that position is installed, when secondary pour on integral hoisting to siphonal lobe wall mould;
(2)The retarder brushing time is at least 30 minutes with the secondary time interval that pours;
(3)Carried out after lower-layer concrete has some strength it is secondary pour, prevent warming plate from floating;
(4)Process of vibrating is forbidden to touch connector;
E, maintenance, the demoulding, handling
Component is secondary pour after the completion of, setting time carries out precuring and steam-cured on request;
During the demoulding, the unnecessary concrete slag of panel edges is removed at utmost to reduce cold-heat bridge, if component is hung out using flat Mould, should use the first pushing tow component of external force to be allowed to and mould separating, it is to avoid to produce excessive absorption affinity between component and mould and lead Cause protection damage layer;After the demoulding, washing face is rinsed immediately;
Component rollover, erect after, be transported to stockyard, can be using keeping flat or piling bin assist type is stood up.
The thermal conductivity factor of warming plate is less than or equal to 0.040W/ (mK), and volume ratio water absorption rate is less than or equal to 0.3%.
Warming plate uses extruded sheet.
Produced beneficial effect is the present invention compared with prior art:
The fabrication and installation method of the prefabricated sandwich wallboard applies the division of labor section that sandwich type wall panel is divided into siphonal lobe wall, warming plate and internal lobe wall Work, and siphonal lobe wall, warming plate and internal lobe wall three are subjected to anchor connection using connector, construct by different level, it is effectively successively solid Determine siphonal lobe wall and internal lobe wall, position of the warming plate between siphonal lobe wall and internal lobe wall also obtains good fixation, it is to avoid after construction Dislocation, the generation for the phenomenon such as come off, fracture.
Sandwich type wall panel is operated using prefabricated form of construction work, effectively shortens the duration, construction quality is effectively ensured, it is to avoid be whole Body Construction Schedule produces conflict, effectively reduces labor intensity, effectively improves Construction Quality, makes quality control effective In the range of, accomplish good quality control.
The fabrication and installation method of the prefabricated sandwich wallboard is reasonable in design, simple in construction, safe and reliable, easy to use, be easy to Safeguard, have good value for applications.
Embodiment
The fabrication and installation method to the prefabricated sandwich wallboard of the present invention is described in detail below below.
The fabrication and installation method of the prefabricated sandwich wallboard of the present invention includes the construction of siphonal lobe wall, warming plate laying, connector peace Dress, internal lobe wall are constructed, conserved, being stripped, handling, and each processing step is specifically:
A, the construction of siphonal lobe wall:
Process flow:Die station and mold cleaning → siphonal lobe wall mould positioning and assembly → brushing releasing agent → siphonal lobe wall reinforced mesh Enter mould → built-in fitting positioning, installation → siphonal lobe wall concreting → to vibrate;
(1)After the completion of die station and mold cleaning, rubble, wall brick or chamfering bar can be installed according to production requirement;
(2)The thickness of outer concrete should provide covering cover to reinforcement enough, and meet the enough anchorage lengths of connector;
(3)Slump before concreting should be controlled in 130~180mm;Slump can be by adding in concrete proportioning Enter water reducer;
(4)Outer concrete maximum cobble-stone diameter should be within 20mm;
(5)Surface is closed flat after vibratory compaction;
B, warming plate laying:
After the completion of siphonal lobe wall concrete-face closure, warming plate laying work can be carried out in plane by being vibrated in siphonal lobe wall;
(1)According to set typesetting form warming plate should be put from one end of wallboard to other end order;
(2)After first warming plate is put well, next warming plate is placed on above previous plate and then design attitude is slided into simultaneously Immediately preceding one, to prevent concrete to be splashed into space;
(3)Space is avoided the occurrence of between warming plate;
C, connector are installed
Operating procedure:Connector installation → fastness inspection → gap is filled up;
(1)Install:
After the completion of warming plate laying, connector is inserted on the warming plate in pre-drilled hole immediately, with the part of connector Depthkeeping degree plastic ferrule closely top to insulation plate surface;Then each connector is reversed 90 °, connector is trampled with pin The warming plate of surrounding anchors to reinforce the concrete of connector end;In addition, when being incubated plate thickness more than 75mm, it is necessary to use Concrete flat slab vibrator or special pneumatic vibrator vibrate in warming plate upper surface to each connector;Note connection The arrangement of part should not intentionally facing one direction, preferably random arrangement;
(2)Fastness is checked:
Temporarily take out the connector near every piece of warming plate corner and centre and check end built-in degree, wet water mortar should cover Cover the whole surface in all examined connector ends;
If inspection has no problem, connector is turned back in foramen primum and applies local pressure or mechanical oscillation again;If inspection Look into unqualified, applied more pressure on warming plate or apply more mechanical oscillation on each connector, then the company of reexamining Fitting periphery it is larger range of it is all close on connector, be embedded in ends until cement mortar covers all connectors;
(3)Gap is filled up
On pouring before layer concrete, the warming plate gap more than 3mm, gap and space injection polyurathamc are checked;
D, the construction of internal lobe wall
Process flow:Die station and mold cleaning → internal lobe wall mould positioning and assembly → brushing releasing agent or retarder → internal lobe wall Bar-mat reinforcement enter the positioning of mould → built-in fitting, installation → internal lobe wall concreting → vibrate → receipts face polishes;
Key control point:
(1)To shorten flow beat, the assembly of internal lobe wall mould, brushing retarder can be carried out in advance, that bar-mat reinforcement enters mould, built-in fitting is fixed The process that position is installed, when secondary pour on integral hoisting to siphonal lobe wall mould;
(2)The retarder brushing time is at least 30 minutes with the secondary time interval that pours;
(3)Carried out after lower-layer concrete has some strength it is secondary pour, prevent warming plate from floating;
(4)Process of vibrating is forbidden to touch connector;
E, maintenance, the demoulding, handling
Component is secondary pour after the completion of, setting time carries out precuring and steam-cured on request;
During the demoulding, the unnecessary concrete slag of panel edges is removed at utmost to reduce cold-heat bridge, if component is hung out using flat Mould, should use the first pushing tow component of external force to be allowed to and mould separating, it is to avoid to produce excessive absorption affinity between component and mould and lead Cause protection damage layer;After the demoulding, washing face is rinsed immediately;
Component rollover, erect after, be transported to stockyard, can be using keeping flat or piling bin assist type is stood up.
The thermal conductivity factor of warming plate is less than or equal to 0.040W/ (mK), and volume ratio water absorption rate is less than or equal to 0.3%.
Warming plate uses extruded sheet.
F, form removal and component mark
(1)Prefabricated components reach the 75% of concrete crushing strength design load, and can be stripped or tear open during not less than 15N/ mm Mould.Strength of mould stripping is defined by laboratory to the compression strength testing result of maintaining test block with same condition.
(2)Component form removal carries out form removal according to the form removal order of side mould design drawing, it is to avoid prefabricated components are caused with damage.
(3)Mould should sequentially be removed according to mould structure, vibration component mode form removal must not be used.
(4)Before prefabricated components lifting, it should confirm that the coupling part between component and mould can be lifted by crane after removing completely.
(5)The suspension centre of prefabricated components lifting is set in addition to intensity should meet design requirement, should also meet prefabricated components steady The requirement of lifting, component lifting preferably lifts up into row with 4~6 points.
(6)The component code scheme of system is set up before component production, specifies special messenger to carry out component sign work, work progress Middle Quality Inspector should be checked component sign in time.
(7)Every component should be encoded by design requirement, component code in its surface full position after the component demoulding Material therefor application Environmental Protective Water-paint or plastics patch mould etc. can remove material.
G, stacking and transport
(1)Low flat car is selected in prefabricated components transport, and car is provided with special frame, there is reliable stabilizing member measure.Prefabricated components Concrete strength reaches can transport outward during design strength.
(2)Prefabricated outer wall panel is transported using vertical vertical-type, and prefabricated balcony plate, precast stair use flat transporting.
(3)Prefabricated components are transported to behind job site, and heap is set respectively by specification, kind, position used, lifting sequence .Scene refute put stockyard be arranged on crane work in the range of, passage is set between stacking.
(4)Live transport routes and stacking stockyard are first smooth solid, and have drainage measure.Haulage vehicle enters job site Road, the movement requirement of prefabricated components need to be met.In the range of discharge, lifting work, there must not be barrier, and there need to be satisfaction pre- The place that component processed is used in turn.
(5)Prefabricated outer wall panel is using inserting or by the mode of putting, and piling bin has enough rigidity, and pad is firm.Stockyard will Stacked adjacent frame is linked to be entirety, and prefabricated outer wall panel faces outwardly exterior trim, to weaknesses such as connection sealing rod, height mouth, wall corners Position, strengthens protecting using sizing protection cushion block or the attached external member of specialized type.
(6)Precast stair can should be leveled up, pad, each layer pad answers consistency from top to bottom, most using mode is stacked between layers One layer of pad answers elongated setting below.Stack the number of plies and not should be greater than 5 layers.
Quality control:
Prefabricated components should be from mould, making material(Cement, reinforcing bar, sand, stone, additive etc.), steel bar meter and installation, built-in fitting Early stage quality control is carried out in terms of installation;Finished product prefabricated components are main from block-by-block inspection in terms of presentation quality, physical dimension. The relevant informations such as component impression quality, physical dimension and finished product member work certificate should be improved after having checked.
The consistency check of component drawing number and actual components.The produces day that prefabricated components are indicated at obvious position Phase, component model, production unit and component production unit are checked and accepted mark and checked.To the built-in fitting, joint bar, hole to be provided of component Specification, position and quantity meet the standard of design drawing and checked.

Claims (4)

1. the fabrication and installation method of prefabricated sandwich wallboard, it is characterised in that the production technology includes the construction of siphonal lobe wall, warming plate paving If, connector install, the construction of internal lobe wall, maintenance, the demoulding, handling, each workshop section's processing step is specifically:
A, the construction of siphonal lobe wall:
Process flow:Die station and mold cleaning → siphonal lobe wall mould positioning and assembly → brushing releasing agent → siphonal lobe wall reinforced mesh Enter mould → built-in fitting positioning, installation → siphonal lobe wall concreting → to vibrate;
B, warming plate laying:
After the completion of siphonal lobe wall concrete-face closure, warming plate laying work can be carried out in plane by being vibrated in siphonal lobe wall;
C, connector are installed
Operating procedure:Connector installation → fastness inspection → gap is filled up;
(1)Install:
After the completion of warming plate laying, connector is inserted on the warming plate in pre-drilled hole immediately;Connector is used for anchor connection Siphonal lobe wall and warming plate and internal lobe wall;
(2)Fastness is checked:
Temporarily take out the connector near every piece of warming plate corner and centre and check end built-in degree, wet water mortar should cover Cover the whole surface in all examined connector ends;
(3)Gap is filled up
Before upper strata internal lobe wall concrete is poured, the warming plate gap more than 3mm, gap and the poly- ammonia of space injection foaming are checked Ester;
D, the construction of internal lobe wall
Process flow:Die station and mold cleaning → internal lobe wall mould positioning and assembly → brushing releasing agent or retarder → internal lobe wall Bar-mat reinforcement enter the positioning of mould → built-in fitting, installation → internal lobe wall concreting → vibrate → receipts face polishes;
E, maintenance, the demoulding, handling
Component is secondary pour after the completion of, carry out precuring and steam-cured;
During the demoulding, the unnecessary concrete slag of panel edges is removed;After the demoulding, washing face is rinsed immediately;
Component rollover, erect after, be transported to stockyard, can be using keeping flat or piling bin assist type is stood up.
2. the fabrication and installation method of prefabricated sandwich wallboard, it is characterised in that the production technology includes the construction of siphonal lobe wall, warming plate paving If, connector install, the construction of internal lobe wall, maintenance, the demoulding, handling, each processing step is specifically:
A, the construction of siphonal lobe wall:
Process flow:Die station and mold cleaning → siphonal lobe wall mould positioning and assembly → brushing releasing agent → siphonal lobe wall reinforced mesh Enter mould → built-in fitting positioning, installation → siphonal lobe wall concreting → to vibrate;
(1)After the completion of die station and mold cleaning, rubble, wall brick or chamfering bar can be installed according to production requirement;
(2)The thickness of outer concrete should provide covering cover to reinforcement enough, and meet the enough anchorage lengths of connector;
(3)Slump before concreting should be controlled in 130~180mm;Slump can be by adding in concrete proportioning Enter water reducer;
(4)Outer concrete maximum cobble-stone diameter should be within 20mm;
(5)Surface is closed flat after vibratory compaction;
B, warming plate laying:
After the completion of siphonal lobe wall concrete-face closure, warming plate laying work can be carried out in plane by being vibrated in siphonal lobe wall;
(1)According to set typesetting form warming plate should be put from one end of wallboard to other end order;
(2)After first warming plate is put well, next warming plate is placed on above previous plate and then design attitude is slided into simultaneously Immediately preceding one, to prevent concrete to be splashed into space;
(3)Space is avoided the occurrence of between warming plate;
C, connector are installed
Operating procedure:Connector installation → fastness inspection → gap is filled up;
(1)Install:
After the completion of warming plate laying, connector is inserted on the warming plate in pre-drilled hole immediately, with the part of connector Depthkeeping degree plastic ferrule closely top to insulation plate surface;Then each connector is reversed 90 °, connector is trampled with pin The warming plate of surrounding anchors to reinforce the concrete of connector end;In addition, when being incubated plate thickness more than 75mm, it is necessary to use Concrete flat slab vibrator or special pneumatic vibrator vibrate in warming plate upper surface to each connector;Note connection The arrangement of part should not intentionally facing one direction, preferably random arrangement;
(2)Fastness is checked:
Temporarily take out the connector near every piece of warming plate corner and centre and check end built-in degree, wet water mortar should cover Cover the whole surface in all examined connector ends;
If inspection has no problem, connector is turned back in foramen primum and applies local pressure or mechanical oscillation again;If inspection Look into unqualified, applied more pressure on warming plate or apply more mechanical oscillation on each connector, then the company of reexamining Fitting periphery it is larger range of it is all close on connector, be embedded in ends until cement mortar covers all connectors;
(3)Gap is filled up
On pouring before layer concrete, the warming plate gap more than 3mm, gap and space injection polyurathamc are checked;
D, the construction of internal lobe wall
Process flow:Die station and mold cleaning → internal lobe wall mould positioning and assembly → brushing releasing agent or retarder → internal lobe wall Bar-mat reinforcement enter the positioning of mould → built-in fitting, installation → internal lobe wall concreting → vibrate → receipts face polishes;
Key control point:
(1)To shorten flow beat, the assembly of internal lobe wall mould, brushing retarder can be carried out in advance, that bar-mat reinforcement enters mould, built-in fitting is fixed The process that position is installed, when secondary pour on integral hoisting to siphonal lobe wall mould;
(2)The retarder brushing time is at least 30 minutes with the secondary time interval that pours;
(3)Carried out after lower-layer concrete has some strength it is secondary pour, prevent warming plate from floating;
(4)Process of vibrating is forbidden to touch connector;
E, maintenance, the demoulding, handling
Component is secondary pour after the completion of, setting time carries out precuring and steam-cured on request;
During the demoulding, the unnecessary concrete slag of panel edges is removed at utmost to reduce cold-heat bridge, if component is hung out using flat Mould, should use the first pushing tow component of external force to be allowed to and mould separating, it is to avoid to produce excessive absorption affinity between component and mould and lead Cause protection damage layer;After the demoulding, washing face is rinsed immediately;
Component rollover, erect after, be transported to stockyard, can be using keeping flat or piling bin assist type is stood up.
3. the fabrication and installation method of prefabricated sandwich wallboard according to claim 1 or 2, it is characterised in that:Warming plate is led Hot coefficient is less than or equal to 0.040W/ (mK), and volume ratio water absorption rate is less than or equal to 0.3%.
4. the fabrication and installation method of prefabricated sandwich wallboard according to claim 1 or 2, it is characterised in that:Warming plate is used Extruded sheet.
CN201710481405.5A 2017-06-22 2017-06-22 The fabrication and installation method of prefabricated sandwich wallboard Active CN107268878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710481405.5A CN107268878B (en) 2017-06-22 2017-06-22 The fabrication and installation method of prefabricated sandwich wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710481405.5A CN107268878B (en) 2017-06-22 2017-06-22 The fabrication and installation method of prefabricated sandwich wallboard

Publications (2)

Publication Number Publication Date
CN107268878A true CN107268878A (en) 2017-10-20
CN107268878B CN107268878B (en) 2019-08-02

Family

ID=60068039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710481405.5A Active CN107268878B (en) 2017-06-22 2017-06-22 The fabrication and installation method of prefabricated sandwich wallboard

Country Status (1)

Country Link
CN (1) CN107268878B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN108149815A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 A kind of image decorating wall and its production method
CN108149838A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 A kind of novel prefabricated stainless steel thermal-insulation connecting piece exterior wall and production method
CN108756027A (en) * 2018-06-28 2018-11-06 美好建筑装配科技有限公司 A kind of sandwich heat preservation overlapped shear wall and its construction technology
CN108858665A (en) * 2018-07-16 2018-11-23 北京市住宅产业化集团股份有限公司 A kind of porcelain plate facing is counter to beat molding external wall panel/hanging plate production technology
CN109372128A (en) * 2018-11-02 2019-02-22 山东海龙建筑科技有限公司 Exterior wall limit connector, assembling type outer wall and processing method and construction installation method
CN110670796A (en) * 2019-08-19 2020-01-10 安徽润安景汇建筑工程有限公司 Construction process of heat insulation board with truss rib connecting piece
CN111993532A (en) * 2020-08-31 2020-11-27 重庆纤维研究设计院股份有限公司 Concrete prefabricated outer wall containing insulation board and preparation method thereof
CN113878708A (en) * 2020-07-03 2022-01-04 江苏东曌建筑产业创新发展研究院有限公司 Assembly type construction equipment and use method
CN114000646A (en) * 2021-11-05 2022-02-01 沈阳玖弘建筑科技有限公司 Reverse-beating integrated wallboard of precast concrete composite heat-insulation template and preparation method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110614718B (en) * 2019-09-30 2021-06-04 泰安市骏鸣住宅工业科技有限公司 Production process of precast concrete shear wall external wall panel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906843A (en) * 2010-06-04 2010-12-08 徐泽樟 Process for manufacturing sandwich wall panel
CN102650152A (en) * 2012-05-14 2012-08-29 中国十七冶集团有限公司 Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN105544851A (en) * 2015-12-10 2016-05-04 上海宝岳住宅工业有限公司 Prefabricated sandwich thermal-insulation laminated wallboard and manufacturing method
CN106351396A (en) * 2016-10-26 2017-01-25 中国二十二冶集团有限公司 Connecting structure for built-in heat-insulating plate of sandwich heat-insulating external wallboard and wall concrete layer and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906843A (en) * 2010-06-04 2010-12-08 徐泽樟 Process for manufacturing sandwich wall panel
CN102650152A (en) * 2012-05-14 2012-08-29 中国十七冶集团有限公司 Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN105544851A (en) * 2015-12-10 2016-05-04 上海宝岳住宅工业有限公司 Prefabricated sandwich thermal-insulation laminated wallboard and manufacturing method
CN106351396A (en) * 2016-10-26 2017-01-25 中国二十二冶集团有限公司 Connecting structure for built-in heat-insulating plate of sandwich heat-insulating external wallboard and wall concrete layer and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN108149815A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 A kind of image decorating wall and its production method
CN108149838A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 A kind of novel prefabricated stainless steel thermal-insulation connecting piece exterior wall and production method
CN108756027A (en) * 2018-06-28 2018-11-06 美好建筑装配科技有限公司 A kind of sandwich heat preservation overlapped shear wall and its construction technology
CN108858665A (en) * 2018-07-16 2018-11-23 北京市住宅产业化集团股份有限公司 A kind of porcelain plate facing is counter to beat molding external wall panel/hanging plate production technology
CN109372128A (en) * 2018-11-02 2019-02-22 山东海龙建筑科技有限公司 Exterior wall limit connector, assembling type outer wall and processing method and construction installation method
CN110670796A (en) * 2019-08-19 2020-01-10 安徽润安景汇建筑工程有限公司 Construction process of heat insulation board with truss rib connecting piece
CN113878708A (en) * 2020-07-03 2022-01-04 江苏东曌建筑产业创新发展研究院有限公司 Assembly type construction equipment and use method
CN111993532A (en) * 2020-08-31 2020-11-27 重庆纤维研究设计院股份有限公司 Concrete prefabricated outer wall containing insulation board and preparation method thereof
CN114000646A (en) * 2021-11-05 2022-02-01 沈阳玖弘建筑科技有限公司 Reverse-beating integrated wallboard of precast concrete composite heat-insulation template and preparation method

Also Published As

Publication number Publication date
CN107268878B (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN107268878B (en) The fabrication and installation method of prefabricated sandwich wallboard
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN106346595A (en) Vertical molding mold and system and application method for concrete utility tunnel
CN110439137A (en) Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN110258848A (en) A kind of construction method of building energy conservation CL composite shear wall
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN104499498B (en) A kind of construction method of mass concrete building
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
CN106182359A (en) The concrete list storehouse horizontal mould of pipe gallery, system and piping lane molding methods
CN213952303U (en) Basement outer wall post-cast strip assembled protection wall construction structures
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN111997232A (en) Construction method of concrete steel wire net rack disassembly-free template heat preservation system
CN105113706A (en) Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method
CN115198781A (en) Construction method of super-large-area concrete anti-cracking and anti-floating structure
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN205444590U (en) Cast -in -place compound incubation concrete shear force wall
CN110747762A (en) Cement member crossing highway and its installation method
CN107237448B (en) The prefabricated interior fill concrete wallboard of one kind and its manufacturing method
CN114961047A (en) Novel construction method of composite concrete shear wall structure
CN101851899B (en) H-type prestressed concrete column and production method thereof
CN113716905A (en) High-strength vibration-free concrete and method for pouring concrete at end of arched beam
CN206477251U (en) Transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN111825420A (en) GRC cement board and preparation method thereof
Donahey et al. Effects of Construction Procedures on Bond in Bridge Decks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200116

Address after: Room 202, floor 2, office R & D center, 23881 Panwang Road, Longshan street, Zhangqiu District, Jinan City, Shandong Province

Patentee after: China Construction Technology (Jinan) Co., Ltd.

Address before: 250100 No. 89 Industrial South Road, Lixia District, Shandong, Ji'nan

Patentee before: The First Company of China Eighth Engineering Bureau Ltd.

TR01 Transfer of patent right