CN107264563A - Framework and the track train with the framework - Google Patents
Framework and the track train with the framework Download PDFInfo
- Publication number
- CN107264563A CN107264563A CN201610210987.9A CN201610210987A CN107264563A CN 107264563 A CN107264563 A CN 107264563A CN 201610210987 A CN201610210987 A CN 201610210987A CN 107264563 A CN107264563 A CN 107264563A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- curb girder
- framework
- riser
- seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61F—RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
- B61F5/00—Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
- B61F5/50—Other details
- B61F5/52—Bogie frames
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The present invention provides a kind of framework, including two curb girders and two crossbeams being arranged between described two curb girders, each crossbeam is connected with the sidepiece of the corresponding curb girder, connected between the crossbeam and the curb girder by crossbeam connecting seat, the crossbeam connecting seat is located at curb girder and the high-stress area of crossbeam junction.It is so designed that and is intended to, improving the attachment structure between crossbeam and curb girder, high-stress area being arranged on a transition seat, transition seat is a forging in addition, and forging possesses more preferable mechanical performance compared with weldment.On this basis, the present invention also provides a kind of track train with the curb girder.
Description
Technical field
The present invention relates to rail vehicle truck technical field of structures, more particularly to a kind of framework with
And the track train with the framework.
Background technology
Bogie is divided into power truck and trailer bogie, and it is most heavy in rail vehicle system
Whether one of building block wanted, its structure design rationally directly affects the riding quality of vehicle,
Power performance and security performance.
The bogie that we design for this must meet following requirement:
Carrying:Bear the weight of bogie above various pieces;
It is oriented to:Orbit with ensureing vehicle safety;
Buffering:Relax impact of the guideway irregularity to vehicle, it is ensured that vehicle has good operation
Stationarity:
Draw (power truck):Ensure that necessary track sticks together, and production at rail contact
Raw tractive effort at wheel rim passes to car body;
Braking:Produce necessary brake force so that vehicle slows down or stopped in predetermined distance.
In bogie, one system suspension arrangement is its important component, single stage suspension again
Device is arranged between axle box and framework, and its main function is to relax guideway irregularity to vehicle
Impact, it is ensured that operation stability and stationarity, and make when ensureing vehicle by curve wheel to return
Turn flexible.
At the same time the part connected between crossbeam and curb girder, is mostly that crossbeam is inserted directly into side
Beam, causes on curb girder that the stress of load is huge, if things go on like this easily causes potential safety hazard.Meanwhile,
The annexation of draw beam and crossbeam is also unreasonable, and drawing pull bar directly passes through a plate and crossbeam
Connection.
The content of the invention
In order to solve the above technical problems, the purpose of the present invention is for a kind of framework of offer and with this
The track train of framework.
A kind of framework, including two curb girders and two horizontal strokes being arranged between described two curb girders
Beam, each crossbeam is connected with the sidepiece of the corresponding curb girder, the crossbeam and the curb girder
Between connected by crossbeam connecting seat, the crossbeam connecting seat is located at curb girder and crossbeam junction
High-stress area.
Preferably, the transition seat available for connecting cross beam is provided with the inside of the curb girder, it is described
Crossbeam connecting seat includes the first riser, the second riser and the transition seat for fixing the crossbeam;
First riser and second riser toward each other be fixedly installed on the curb girder
Upper cover plate and lower cover between;
The upper plate and lower plate of the curb girder extend and first riser, described second respectively inwards
Riser and transition seat formation closing chamber.
Preferably, first riser includes two pieces of small vertical plates, and two pieces of small vertical plates are along institute
The thickness direction for stating curb girder is arranged at grade, and is fixedly connected between two pieces of small vertical plates;
The groove for welding is offered on the side that two pieces of small vertical plates are contacted each other.
Preferably, the butting grooves for positioning crossbeam, the horizontal stroke are provided with the transition seat
Beam and the butting grooves grafting.
Preferably, drawing pull bar connecting seat, the drawing pull bar connection are provided with the curb girder
Seat includes crossbeam connecting portion and drawing pull bar connecting portion, the generally described crossbeam of the weldment
With arc-shaped;The drawing pull bar connecting portion below the crossbeam connecting portion, and with it is described
Crossbeam connecting portion is integrally formed, and the drawing pull bar connecting portion offers perforate direction perpendicular to institute
State the connecting hole on crossbeam direction.
Preferably, the cross section of the crossbeam connecting portion is trapezoidal, and trapezoidal longer one side is with leading
Draw draw rod attachment part connection.
Preferably, the drawing pull bar connecting seat is forging.
Present invention also provides a kind of track train, including the bogie with framework, wherein structure
Frame is the framework that the application is limited.
Due to above-mentioned setting, the application has following features:
In the preferred scheme of the present invention, the attachment structure between crossbeam and curb girder is improved, will be big
Stressed zone is arranged on a transition seat, and transition seat is a forging in addition, and forging is compared with weldment
Possess more preferable mechanical performance.
In another preferred scheme of the present invention, the connected mode of drawing pull bar and crossbeam is made
Further optimization, designs a drawing pull bar connecting seat, the advantage of this structure is that it holds for this
Set, structure is more reasonable, connected more steady along its Impact direction by the welding direction of pulling force
It is fixed.
Brief description of the drawings
Fig. 1 is the primary spring seat first angle dimensional structure diagram of the present invention;
Fig. 2 is the primary spring seat second angle dimensional structure diagram of the present invention;
Fig. 3 is that the curb girder of the present invention and primary spring coordinate first angle dimensional structure diagram;
Fig. 4 is that the curb girder of the present invention and primary spring coordinate second angle dimensional structure diagram;
Fig. 5 is the framework assembling side structure schematic view of the present invention;
Fig. 6 is the curb girder and beam engagement configuration schematic diagram of the present invention;
Fig. 7 is the curb girder and beam engagement structural representation of the present invention;
Fig. 8 is the drawing pull bar connecting seat and drawing pull bar fit structure schematic diagram of the present invention;
Fig. 9 is A portions partial enlargement structural representation in Fig. 8;
Figure 10 is the drawing pull bar connecting seat first angle structural representation of the present invention;
Figure 11 is the drawing pull bar connecting seat second angle structural representation of the present invention.
In figure:
1st, lower cover;2nd, bent plate;3rd, flat board;4th, installing plate;5th, through hole;6th, install
Hole;7th, casing;8th, air spring;9th, backing plate;10th, curb girder;10.1st, curb girder inner vertical plate;
10.2nd, curb girder outer vertical plate;11st, primary spring;12nd, primary spring seat;13rd, riser;13.1、
First riser;13.2nd, the second riser;13.3, small vertical plate;14th, crossbeam;15th, slope is docked
Mouthful;16th, transition seat;17th, upper cover plate;18th, lower cover;19th, rail level;20th, traction is drawn
Bar connecting seat;21st, drawing pull bar;22nd, draw beam;23rd, crossbeam connecting portion;24th, draw
Draw rod attachment part;25th, connecting hole;27th, through hole;28th, crossbeam connecting seat.
Embodiment
In order that those skilled in the art more fully understands technical scheme, tie below
Closing the drawings and specific embodiments, the present invention is described in further detail.
In one embodiment in this application, as shown in Figure 3,4, illustrate in figure 3
The schematic perspective view of curb girder 10, illustrate in Fig. 4 curb girder 10 another angle it is vertical
Body structural representation.A kind of curb girder 10 in the application, the top of curb girder 10 is used for carrying sky
Gas spring 8, is fixedly installed backing plate 9 between curb girder 10 and air spring 8, backing plate 9 it is upper
Surface is made using machining, and this backing plate 9 preferably has circle, but should not be limited to this shape.
Wherein for the addition of backing plate 9, there is following good effect:Air bullet on curb girder 10
Backing plate 9 is added between spring 8 and curb girder 10.Because the area of upper cover plate 17 of curb girder 10 is big, together
When subsequent technique in also have weld the step for, in process easily cause punching shear,
The reduction of flatness is caused, while weld seam can also cause the height above left and right curb girder 10 to differ
Cause, ultimately result in after compartment is installed it cannot be guaranteed that car body left and right sides height inconsistent.For this I
Add backing plate 9 herein, backing plate 9 one can make it that the installation site of air spring 8 is smooth,
Ensure installation quality, while reducing pressure of the air spring 8 to the top surface of curb girder 10;Two lead to
Cross the thickness of adjustment backing plate 9, it is ensured that the distance of the upper surface of backing plate 9 to rail level 19 is consistent,
Ensure that car body is in the state of relative level with this.
As shown in Figure 3,4, the guide pillar 26 being adapted to air spring 8 is inserted with curb girder 10,
The top of guide pillar 26 is concordant with the upper surface of curb girder 10;The middle part of backing plate 9 is offered and guide pillar
Between the through hole 27 of 26 connections, and the covering guide pillar 26 of backing plate 9 and the upper surface of curb girder 10
Seam crossing, backing plate 9 can cover seam crossing, improve rate of pressurization, in order to avoid so that dust steam
Into internal cavity, corrosion is caused.
In the application another embodiment, further optimize on the basis of said structure
The structure of primary spring seat 12, as shown in figure 1, illustrating primary spring seat 12 in Fig. 1
An angle stereogram, in figure we can see that primary spring seat 12 overall shape
State.The top of primary spring seat 12 is a flat board 3, flat board 3 along the one of its length direction
Side, smoothly extension forms one piece of bent plate 2 downwards;It is a casing 7, case in the lower section of bent plate 2
The bottom of body 7 is lower cover 1, and lower cover 1 extends to both sides respectively along its width;
The centre of lower cover 1 offers mounting hole 6, and the week side of boss of lower cover 1 is offered for connecting
Connect the through hole 5 of single stage suspension;The opposite side of flat board is installing plate 4, installing plate 4 it is wide along it
Degree direction extends to both sides respectively;Offered in the week side of boss of installing plate 4 for connecting single stage suspension
Through hole 5, and provided with mounting hole;Installing plate 4 extends to both sides respectively along its width
Development length is identical.
Formed because primary spring seat 12 is integrated casting, its top surface relative smooth, in weldering
When connecing, two ends of curb girder 10 are welded to, the bottom surface of primary spring seat 12 is provided with
Two installation sites, for installing primary spring 11, during installation, by primary spring 11 and one
It is that the mounting hole 6 and through hole 5 reserved on spring base 12 are aligned, is then fastened by bolts.
As the supplement to Fig. 1, as shown in Fig. 2 to illustrate primary spring seat 12 another by Fig. 2
The schematic perspective view of an outer angle, in this figure we can clearly find out, primary spring
The top surface of seat 12 is seamlessly transitted, such a transmission being provided with beneficial to load, while can also be clear
Clear finds out that installing plate 4 is concordant with the top of flat board 3, and such setting reduces ramp, main
If in order to preferably be welded with curb girder 10, reducing the thickness of weld seam, increase intensity.Together
When installing plate 4 thickness be preferably capable of thickness more than flat board 3, due to installing plate 4 it is long when
Between receive huge pressure effect, the raising and the impact resistance that are designed with beneficial to intensity of thickening
Improve.
As shown in figure 5, Fig. 5 is bogie side structure schematic view, we can understand wherein
See, backing plate 9 arrive rail level 19 between position relationship, the main function of backing plate 9 is exactly to adjust
The top surface of backing plate 9 is the distance between to cabinet face so that the air spring 8 on the curb girder 10 of the left and right sides
It is highly consistent, ensure that compartment is more smoothly operated on rail level 19 with this.
The bogie that also proposed in the application in a kind of track train, such a track train includes
Curb girder 10, above-mentioned technical proposal is constituted such a curb girder 10 again, applies the car body of such a curb girder 10
More existing car body compartment smoothness is more preferable, while 12 stress of primary spring seat in bogie are more
Uniformly, rigidity is more balanced.
As shown in fig. 6, on the basis of above-described embodiment, we are also to curb girder 10 and crossbeam 14
Between the part of connection be optimized, in the prior art, the connection of crossbeam 14 and curb girder 10
Relation is, by perforate on the left and right directions in Figure 5 of curb girder 10, crossbeam 14 then to be inserted into it
In, it is fixed using the mode of welding machine, such a mode defect is extremely obvious, by high-stress area
Concentrate in welded joints, it is well known that the intensity of weld seam is less than mother metal, because such a design method
The existing defects on bulk strength, while when whole device works, the interior plate of curb girder 10 is also
The power of a bending can be received so that the stress on curb girder 10 is increased, and accelerates the strain of metal.
In order to solve the above-mentioned technical problem we have proposed following technical scheme:
The inner side of curb girder 10 is provided with the crossbeam connecting seat 28 available for connecting cross beam 14, and crossbeam connects
Joint chair 28 includes the first riser 13.1, the second riser 13.2 and the mistake for fixing the crossbeam 14
Cross seat 16;First riser 13.1 and the second riser 13.2 it is relative to each other be fixedly installed on the side
Between the upper cover plate 17 and lower cover 18 of beam 10;The upper cover plate 17 and lower cover 18 of curb girder 10 and
One riser 13.1, the second riser 13.2 and the formation closing chamber of transition seat 16.Typically we use weldering
Connect this mode to be fixed, but be not limited to such a form.
As the further optimization to the above-mentioned connected mode of crossbeam 14, we are by the first riser 13.1
It is set to two pieces of small vertical plates 13.3, thickness side of two pieces of small vertical plates 13.3 along the curb girder 10
To arranging at grade, during welding, first by the second riser 13.2 and curb girder
The small vertical plate 13.3 of one of them, is then welded on inside curb girder 10 by 10 welding, and this block is small vertical
The top margin of plate 13.3 is welded with upper cover plate 17, and base is welded with lower cover 18, side and curb girder 10
Inner panel welding, then again welding transition seat 16, define one opening casing 7, lead to
Crossing at opening can weld to inside, form welding by both sides, intensity is improved with this, finally
Remaining one piece of small vertical plate 13.3 is welded at last opening, welding installs crossbeam after terminating
14, crossbeam 14 is welded with transition seat 16.
There are the following problems between crossbeam 14 and transition seat 16, because crossbeam 14 is tubulose,
It is this we in casting transition seat 16 during welding, it is difficult to be welded on the center of transition seat 16
When, a butting grooves 15 are together processed thereon, while being aided with weld jig.This structure
Facilitate the center that crossbeam 14 is accurately welded to transition seat 16 so that integral device is more
It is stable.
Schematic diagram when we illustrate crossbeam 14 with the assembling of curb girder 10 from top in the figure 7, from
We can be clearly seen that 13.1 points of the first riser is two pieces of small vertical plates 13.3 in figure.
The characteristics of a kind of track train, such a track train are proposed in the application is, in car body
The curb girder 10 described in text is applied in bogie, is in the junction of crossbeam 14 of curb girder 10, one
Spring base 12 and the junction of air spring 8 are optimized, and are that this such a track train has more
Stable the characteristics of.
More optimize in detail as to above-mentioned embodiment, we also draw in crossbeam 14 with traction
The place of bar 21 has carried out more deep optimization.
Middle part is provided with to be provided with draw beam 22, draw beam 22 and led in framework in the prior art
Be pulled bar 21, and drawing pull bar 21 is fixedly connected with crossbeam 14, in drawing pull bar 21 and crossbeam 14
Junction is one piece of one piece of plate body arranged along the length direction of crossbeam 14, is offered on plate body
Hole, for being installed with draw beam 22, the defect of such a design is, when drawing pull bar 21
When being exerted a force to this plate body, the another part of plate body is fixedly connected with crossbeam 14, is this plate body two
End can produce a kind of power of bending, while general by being welded on weld seam between plate body and crossbeam 14
On be applied with pulling force, it is more likely that welding seam breaking can be made, cause the accident generation.
For this, we devise a kind of solution more optimized, as shown in Figure 8,9, figure
In illustrate drawing pull bar connecting seat 20 be provided with curb girder 10, the drawing pull bar connecting seat
20 include crossbeam connecting portion 23 and drawing pull bar connecting portion 24, and crossbeam connecting portion 23 is generally horizontal
Beam 14 matches arc-shaped;Drawing pull bar connecting portion 24 is located at below the connecting portion of crossbeam 14, and with
Crossbeam connecting portion 23 is integrally formed, and drawing pull bar connecting portion 24 is offered perpendicular to crossbeam 14
Connecting hole 25 on direction.
On the basis of above-mentioned design, the cross section of crossbeam connecting portion 23 be it is trapezoidal, it is trapezoidal
Top is shorter to be connected with crossbeam;It is trapezoidal following longer to be connected with drawing pull bar connecting portion 24.
Wherein drawing pull bar connecting seat 20 is preferably forging.Compared with casting, metal is by forging
Its institutional framework and mechanical property can be improved after processing.Forging method hot-working is passed through by cast sturcture
Deformation due to metal and recrystallization after deformation, are changed into original large dendritic crystal and columnar grain
Crystal grain is thinner, isometric recrystallized structure of uniform size, make original segregation in steel ingot, it is loose,
The compactings such as stomata, slag inclusion and soldering, its tissue become even closer, improve the plasticity of metal
And mechanical property.
For this, we also proposed a kind of track train, and such a track train is drawn using above-mentioned traction
The structure design of bar connecting seat 20, such a structure stress is more balanced, during design structure, it is considered to
The directionality problem of stress is arrived, structure is more reasonable, and intensity is higher.
It should be clear that structure, ratio, size depicted in this specification institute accompanying drawings etc., is only used
To coordinate the content disclosed in specification, so that those skilled in the art is understood with reading, and
It is not used to limit enforceable qualifications of the invention, therefore does not have technical essential meaning, appoints
What modification of structure, the change of proportionate relationship or adjustment of size, is not influenceing institute's energy of the present invention
Under effect of generation and the purpose that can reach, all should still it fall in disclosed technology
In the range of Rong get Neng is covered.Meanwhile, in this specification it is cited as " on ", " under ", " left side ",
The term of " right side ", " centre " etc., is merely convenient to understanding for narration, and is not used to limit this hair
Bright enforceable scope, being altered or modified for its relativeness, technology contents are being changed without essence
Under, when being also considered as enforceable category of the invention.
Carried out to curb girder provided by the present invention and using the track train of this curb girder above
It is discussed in detail.Specific case used herein is carried out to the principle and embodiment of the present invention
Illustrate, the explanation of above example is only intended to help the method and its core that understand the present invention to think
Think.It should be pointed out that for those skilled in the art, not departing from this hair
On the premise of bright principle, some improvement and modification can also be carried out to the present invention, these improve and
Modification is also fallen into the protection domain of the claims in the present invention.
Claims (8)
1. a kind of framework, including two curb girders and be arranged between described two curb girders two
Crossbeam, each crossbeam is connected with the sidepiece of the corresponding curb girder, it is characterised in that:It is described
Connected between crossbeam and the curb girder by crossbeam connecting seat, the crossbeam connecting seat is located at curb girder
With the high-stress area of crossbeam junction.
2. the framework as described in any in claim 1, it is characterised in that:The curb girder
Inner side is provided with the crossbeam connecting seat available for connecting cross beam, and the crossbeam connecting seat includes first
Riser, the second riser and the transition seat for fixing the crossbeam;
First riser and second riser toward each other be fixedly installed on the curb girder
Upper plate and lower plate between;
The upper plate and lower plate of the curb girder and first riser, second riser and the mistake
Cross seat formation closing chamber.
3. framework as claimed in claim 2, it is characterised in that:First riser includes
Two pieces of small vertical plates, thickness direction of two pieces of small vertical plates along the curb girder is at grade
Arrangement, and be fixedly connected between two pieces of small vertical plates;Two pieces of small vertical plates are contacted each other
Side on offer groove for welding.
4. framework as claimed in claim 3, it is characterised in that:In the crossbeam mounting seat
It is provided with the butting grooves for positioning crossbeam, the crossbeam and the butting grooves grafting.
5. framework as described in claim 4, it is characterised in that:Set on the curb girder
There is drawing pull bar connecting seat, the drawing pull bar connecting seat includes crossbeam connecting portion and drawing pull bar
Connecting portion, the generally described crossbeam matching arc-shaped of the weldment;The drawing pull bar connection
Portion is located at below the crossbeam connecting portion, and is integrally formed with the crossbeam connecting portion, described to lead
Draw draw rod attachment part and offer connecting hole of the perforate direction on the crossbeam direction.
6. framework as described in claim 5, it is characterised in that:The crossbeam connecting portion
Cross section to be trapezoidal, trapezoidal longer one side is connected with drawing pull bar connecting portion.
7. curb girder as described in claim 6, it is characterised in that:The drawing pull bar connects
Joint chair is forging.
8. a kind of track train, including the bogie with framework, it is characterised in that described
Framework is the framework any one of claim 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610210987.9A CN107264563A (en) | 2016-04-06 | 2016-04-06 | Framework and the track train with the framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610210987.9A CN107264563A (en) | 2016-04-06 | 2016-04-06 | Framework and the track train with the framework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107264563A true CN107264563A (en) | 2017-10-20 |
Family
ID=60051852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610210987.9A Pending CN107264563A (en) | 2016-04-06 | 2016-04-06 | Framework and the track train with the framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107264563A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109357895A (en) * | 2018-09-12 | 2019-02-19 | 中车长春轨道客车股份有限公司 | The dedicated framework of train mould measurement simulates support device |
CN109396371A (en) * | 2018-11-16 | 2019-03-01 | 宣化钢铁集团有限责任公司 | A kind of continuous casting walking cooling bank |
CN110979375A (en) * | 2019-12-20 | 2020-04-10 | 中车长春轨道客车股份有限公司 | Axle box built-in side beam based on novel series of spring seats |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201472406U (en) * | 2009-08-11 | 2010-05-19 | 南车青岛四方机车车辆股份有限公司 | Composite axle box positioning device for railway vehicle |
CN201544979U (en) * | 2009-09-25 | 2010-08-11 | 中国北车集团大连机车车辆有限公司 | Connecting seat for circular steel tube cross beams of framework |
CN101973282A (en) * | 2010-09-28 | 2011-02-16 | 长春轨道客车股份有限公司 | Truck-frame side beam and crossbeam connecting joint totally-butted structure and assembly-welding process method |
CN202016477U (en) * | 2011-03-24 | 2011-10-26 | 南车株洲电力机车有限公司 | High-speed inter-city train bogie framework suitable for meter gauge |
CN202186397U (en) * | 2011-07-15 | 2012-04-11 | 长春轨道客车股份有限公司 | Structure of gearbox lifting rod seat of bogie framework |
CN202783226U (en) * | 2012-07-20 | 2013-03-13 | 长春轨道客车股份有限公司 | B-type subway axle-disc braking trailer bogie |
CN103625496A (en) * | 2013-01-22 | 2014-03-12 | 南车青岛四方机车车辆股份有限公司 | Secondary suspension device of railway vehicle bogie |
CN203580970U (en) * | 2013-10-25 | 2014-05-07 | 广州电力机车有限公司 | Standard rail large wheel diameter eight-axle electric locomotive bogie adopting intermediate frameworks |
CN104554321A (en) * | 2014-12-23 | 2015-04-29 | 长春轨道客车股份有限公司 | Bogie for A-type broad-gauge metro vehicle |
CN204355067U (en) * | 2014-12-16 | 2015-05-27 | 南车青岛四方机车车辆股份有限公司 | A kind of secondary suspension device used for rail vehicle |
CN204399185U (en) * | 2015-02-11 | 2015-06-17 | 青岛三合山精密铸造有限公司 | A kind of metro bogie primary spring seat with sand cleaning hole |
CN104859670A (en) * | 2015-02-05 | 2015-08-26 | 南车青岛四方机车车辆股份有限公司 | Bogie for mounting traction motor in flexible suspending manner |
CN205601853U (en) * | 2016-04-06 | 2016-09-28 | 中车长春轨道客车股份有限公司 | Framework and have rail train of this framework |
-
2016
- 2016-04-06 CN CN201610210987.9A patent/CN107264563A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201472406U (en) * | 2009-08-11 | 2010-05-19 | 南车青岛四方机车车辆股份有限公司 | Composite axle box positioning device for railway vehicle |
CN201544979U (en) * | 2009-09-25 | 2010-08-11 | 中国北车集团大连机车车辆有限公司 | Connecting seat for circular steel tube cross beams of framework |
CN101973282A (en) * | 2010-09-28 | 2011-02-16 | 长春轨道客车股份有限公司 | Truck-frame side beam and crossbeam connecting joint totally-butted structure and assembly-welding process method |
CN202016477U (en) * | 2011-03-24 | 2011-10-26 | 南车株洲电力机车有限公司 | High-speed inter-city train bogie framework suitable for meter gauge |
CN202186397U (en) * | 2011-07-15 | 2012-04-11 | 长春轨道客车股份有限公司 | Structure of gearbox lifting rod seat of bogie framework |
CN202783226U (en) * | 2012-07-20 | 2013-03-13 | 长春轨道客车股份有限公司 | B-type subway axle-disc braking trailer bogie |
CN103625496A (en) * | 2013-01-22 | 2014-03-12 | 南车青岛四方机车车辆股份有限公司 | Secondary suspension device of railway vehicle bogie |
CN203580970U (en) * | 2013-10-25 | 2014-05-07 | 广州电力机车有限公司 | Standard rail large wheel diameter eight-axle electric locomotive bogie adopting intermediate frameworks |
CN204355067U (en) * | 2014-12-16 | 2015-05-27 | 南车青岛四方机车车辆股份有限公司 | A kind of secondary suspension device used for rail vehicle |
CN104554321A (en) * | 2014-12-23 | 2015-04-29 | 长春轨道客车股份有限公司 | Bogie for A-type broad-gauge metro vehicle |
CN104859670A (en) * | 2015-02-05 | 2015-08-26 | 南车青岛四方机车车辆股份有限公司 | Bogie for mounting traction motor in flexible suspending manner |
CN204399185U (en) * | 2015-02-11 | 2015-06-17 | 青岛三合山精密铸造有限公司 | A kind of metro bogie primary spring seat with sand cleaning hole |
CN205601853U (en) * | 2016-04-06 | 2016-09-28 | 中车长春轨道客车股份有限公司 | Framework and have rail train of this framework |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109357895A (en) * | 2018-09-12 | 2019-02-19 | 中车长春轨道客车股份有限公司 | The dedicated framework of train mould measurement simulates support device |
CN109357895B (en) * | 2018-09-12 | 2020-05-22 | 中车长春轨道客车股份有限公司 | Special framework simulation supporting device for train modal test |
CN109396371A (en) * | 2018-11-16 | 2019-03-01 | 宣化钢铁集团有限责任公司 | A kind of continuous casting walking cooling bank |
CN110979375A (en) * | 2019-12-20 | 2020-04-10 | 中车长春轨道客车股份有限公司 | Axle box built-in side beam based on novel series of spring seats |
CN110979375B (en) * | 2019-12-20 | 2021-03-16 | 中车长春轨道客车股份有限公司 | Axle box built-in side beam based on novel series of spring seats |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104097654B (en) | Locomotive front end composition structure and the rail vehicle of switching mechanism can be installed | |
CN104057969B (en) | A kind of 100% modern city tramcar floats car vehicle body bottom frame | |
CN104015745A (en) | Chassis of body of hundred-percent modern city tramcar | |
CN107264563A (en) | Framework and the track train with the framework | |
CN104527690A (en) | Railway truck chassis | |
CN105015571B (en) | Chassis of low-floor trailer body | |
CN104787072A (en) | Low-floor railway vehicle chassis structure | |
CN203920759U (en) | A kind of 100% modern city tramway train vehicle body bottom frame | |
CN107264559A (en) | Curb girder and the track train with the curb girder | |
CN205601848U (en) | Curb girder and have rail train of this curb girder | |
CN2825388Y (en) | Traction and bolster device for tank car without underframe | |
CN107264564A (en) | Framework and the track train with the framework | |
CN205601853U (en) | Framework and have rail train of this framework | |
CN109109899B (en) | Bogie frame of heavy-duty train for large-tonnage narrow-gauge tunnel engineering | |
CN103625492B (en) | Aluminum alloy bodywork of rail vehicle hanging beam | |
CN205652143U (en) | Framework and have rail train of this framework | |
CN106696980B (en) | Railway red ball bogie bolster | |
CN201287250Y (en) | Base frame stretching device for assembling rail passenger car body | |
CN207510505U (en) | A kind of full aluminium chassis frame | |
CN206231401U (en) | A kind of chassis of rail vehicle equipment suspension arrangement and chassis apparatus mounting structure | |
CN206155059U (en) | Mounting structure of control arm and sub vehicle frame | |
CN204548119U (en) | Mount pad and Undercarriage structure is cut with scissors under low-floor rail vehicle | |
CN206456372U (en) | Railway red ball bogie bolster | |
CN201220668Y (en) | Steel structured framework of underframe of broad gauge passenger car | |
CN205417640U (en) | Railway truck chassis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |