CN107255040A CN201710585375.2A CN201710585375A CN107255040A CN 107255040 A CN107255040 A CN 107255040A CN 201710585375 A CN201710585375 A CN 201710585375A CN 107255040 A CN107255040 A CN 107255040A
Authority
CN
China
Prior art keywords
air duct
air
memory
shell
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710585375.2A
Other languages
Chinese (zh)
Other versions
CN107255040B (en
Inventor
荔军
李志强
康富军
陈明军
姚卓飞
魏鹏飞
侯胜光
田军君
连志斌
李健康
石磊
郭成保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi World Saifudi Technology Co Ltd
Taiyuan Institute of China Coal Technology and Engineering Group
Shanxi Tiandi Coal Mining Machinery Co Ltd
Original Assignee
Shanxi World Saifudi Technology Co Ltd
Taiyuan Institute of China Coal Technology and Engineering Group
Shanxi Tiandi Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi World Saifudi Technology Co Ltd, Taiyuan Institute of China Coal Technology and Engineering Group, Shanxi Tiandi Coal Mining Machinery Co Ltd filed Critical Shanxi World Saifudi Technology Co Ltd
Priority to CN201710585375.2A priority Critical patent/CN107255040B/en
Publication of CN107255040A publication Critical patent/CN107255040A/en
Application granted granted Critical
Publication of CN107255040B publication Critical patent/CN107255040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/04Air ducts
    • E21F1/06Duct connections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/006Ventilation at the working face of galleries or tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/02Suspension devices for tubes or the like, e.g. for ventilating ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Ventilation (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention belongs to coal mine roadway driving servicing unit technical field, to solve to waste time and energy using artificial grafting air duct during coal mine roadway driving, influence the technical problem of drivage efficiency, there is provided a kind of air duct mobile device for colliery speedy drivage, including slide rail, pulley, chain, air duct memory, front end air feed air duct and air duct support, slide rail is hung on back, some pulleys slided along slide rail are set on slide rail, air duct memory, which is arranged on, to be reprinted on aircraft tail shelf, storage has the air duct that some compressions are folded in air duct memory, the upper end of chain is connected with pulley, lower end is connected with air duct, the air duct of air duct memory front end is connected with one end of front end air feed air duct, the other end of front end air feed air duct is arranged at development machine panoramic table, the air duct of air duct memory rear end is connected with entering air duct.Using the present invention without manually frequent grafting air duct again, driving less important work efficiency is improved, coal miner subsidiary operation time and the amount of labour is reduced.

Description

A kind of air duct mobile device for colliery speedy drivage
Technical field
The invention belongs to coal mine roadway driving servicing unit technical field, and in particular to a kind of for colliery speedy drivage Air duct mobile device.
Background technology
Existing driving face in coal mine air duct move mode:Air feed air duct is individually hung in tunnel side with development machine, when When development machine carries out cutting drilling depth forward movement, distance of the air feed air duct air outlet away from working face becomes larger, and arrives working face Air quantity is tapered into, therefore when development machine moves forward certain distance, just must artificial grafting air duct.At present using common pick Enter mode daily footage generally all more than 5 meters, to ensure the minimum wind supply quantity of working face, it is necessary to the daily even artificial grafting of per tour Air duct, wastes time and energy, and influences drivage efficiency.In particular with Quick Driving Technology progress, driving highest daily footage is up to 100 meters More than, to ensure the minimum wind supply quantity of working face, it is necessary to the multiple artificial grafting air duct of per tour, the less important work of artificial grafting air duct The operation enthusiasm of coal miner is not only directly affected, drivage efficiency is also directly affected.
The content of the invention
The present invention is solves the technology of drivage efficiency of being wasted time and energy, influenceed using artificial grafting air duct during coal mine roadway driving There is provided a kind of air duct mobile device for colliery speedy drivage for problem.
The technical solution adopted by the present invention is as follows:
A kind of air duct mobile device for colliery speedy drivage, including slide rail, pulley, chain, air duct memory, front end air feed Air duct and air duct support, the slide rail hanging set some pulleys slided along slide rail, institute on back on the slide rail State air duct memory to be arranged on reprinting aircraft tail shelf, storage has the air ducts that some compressions are folded, the chain in air duct memory Upper end be connected respectively with pulley, the lower end of chain is each passed through air duct memory and the air duct phase being stored in air duct memory Even, the air duct can be skidded off along the rear end of air duct reservoir under external force, and the air duct of the air duct memory front end is with before One end of air feed air duct is held to be connected, the other end of front end air feed air duct is arranged at development machine panoramic table by air duct support, preceding The interlude of air feed air duct is held to be arranged on by air duct support on elevating conveyor, the air duct of air duct memory rear end is with entering air duct phase Even.
The air duct reservoir includes shell, air channel, air duct storage section, chain channel, axial baffle, bolt and air duct and connected Connect section, the shell and air channel are the hollow cylindrical structure of both ends open, and air channel is arranged in shell, air channel and shell it Between cavity store section for air duct, air duct compression is set in after folding in air duct storage section, and the top of shell is along enclosure axis One is set to be easy to the strip chain channel that chain is passed through to direction, the front end of the chain channel is blind end, and rear end is to open Mouthful end, the openend of chain channel extends to the rear end end of shell, and the axial baffle is loop configuration, axial baffle it is interior Circular diameter and the internal diameter in air channel match, and the outside diameter of axial baffle is less than the internal diameter of shell, and the axial baffle passes through spiral shell Bolt is fixed on the rear end end of shell, and the air duct linkage section is arranged on the front portion of shell, and air duct linkage section stores section with air duct Interior front end air duct is connected.
The rear end end of the shell sets some air duct baffle plates along its circle spacing, and the air duct baffle plate is equipped with torsion bullet Spring, one end of air duct baffle plate is hinged on the circumference of outer casing back end, and the other end is pressed on the air duct on the outside of air duct memory.
The outer casing underpart is provided with base.
Beneficial effects of the present invention:
1. the air duct of certain length is stored in by the present invention in advance by designing the air duct memory with air duct store function In air duct memory, air duct memory is arranged on transfer conveyor tail frame, rear end is connected with the original air duct in ore deposit side, and front end is renewed Connect at a part of air duct to development machine panoramic table.So when development machine, which carries out cutting drilling depth, to be moved forward, it is stored in air duct and deposits The air duct of storage can be skidded off slowly, until all skidding off, without manually frequent grafting air duct again, improve driving less important work Efficiency, reduces coal miner subsidiary operation time and the amount of labour.
2. the present invention is extended at development machine panoramic table always due to air duct memory front end continued access air duct, work as development machine When carrying out cutting drilling depth forward movement, air outlet is constant always away from working face distance, and the air quantity to working face is constant all the time.And pass System air duct move mode:When development machine is moved forward, air outlet is becoming larger away from working face distance, to the air quantity of working face Taper into.Compared to more traditional air duct move mode, the air quantity to working face is constant all the time, required without ensureing minimum air quantity Power of fan is small, energy-conservation.
3. being designed with the air duct memory of the present invention and specializing in the chain channel that chain passes through, air duct memory is stored in Air duct can the moment be hung on slide rail in chain channel by chain, it is ensured that air duct skids off process and skids off behind place air duct and protects Maintain an equal level straight, do not bend, while without manually operating.
4. being designed with reducible air duct baffle plate on the air duct memory of the present invention, it can prevent from being stored in air duct memory Air duct run into tunnel and have skidding off without reason during the gradient.
Brief description of the drawings
Fig. 1 is digging laneway fundamental diagram of the invention;
Fig. 2 is air duct memory front view;
Fig. 3 is air duct memory top view;
Fig. 4 is air duct memory side view;
Fig. 5 is air duct memory sectional view;
In figure:1- working faces, 2- air outlets, 3- development machines, 4- front ends air feed air duct, 5- air ducts support, 6- slide rails, 7- is reprinted Machine, 8- air duct memories, 9- reprints aircraft tail shelf, 10- chains, 11- pulleys, 12- air ducts, 13- backs, the connection of 8.1- air ducts Section, 8.2- shells, 8.3- bases, 8.4- chain channels, 8.5- air duct baffle plates, 8.6- axial baffles, 8.7- bolts, 8.8- wind Road, 8.9- air ducts storage section.
Embodiment
As shown in figure 1, a kind of air duct mobile device for colliery speedy drivage, including slide rail 6, pulley 11, chain 10, Air duct memory 8, front end air feed air duct 4 and air duct support 5, the slide rail 6 is hung on back 13, on the slide rail 6 Some pulleys 11 slided along slide rail 6 are set, and the air duct memory 8, which is arranged on, to be reprinted on aircraft tail shelf 9, in air duct memory 8 Storage has the air duct 12 that some compressions are folded, and the upper end of the chain 10 is connected with pulley 11 respectively, the lower end difference of chain 10 It is connected through air duct memory 8 with the air duct 12 being stored in air duct memory 8, the air duct 12 under external force can be along wind The rear end of cylinder reservoir 8 is skidded off, and the air duct 12 of the front end of air duct memory 8 is connected with one end of front end air feed air duct 4, front end The other end of air feed air duct 4 is arranged at the panoramic table of development machine 3 by air duct support 5, and the interlude of front end air feed air duct 4 passes through Air duct support 5 is arranged on elevating conveyor 7, and the air duct 12 of the rear end of air duct memory 8 is connected with entering air duct.
As shown in Fig. 2,3,4,5, the air duct reservoir 8 includes shell 8.2, air channel 8.8, air duct storage section 8.9, chain Passage 8.4, axial baffle 8.6, bolt 8.7 and air duct linkage section 8.1, the shell 8.2 and air channel 8.8 are both ends open Hollow cylindrical structure, air channel 8.8 is arranged in shell 8.2, and the cavity between air channel 8.8 and shell 8.2 is that air duct stores section 8.9, the air duct 12 compression is set in after folding in air duct storage section 8.9, and the top of shell 8.2 is along the axial direction of shell 8.2 One is set to be easy to the strip chain channel 8.4 that chain 10 is passed through, the front end of the chain channel 8.4 is blind end, and rear end is Openend, the openend of chain channel 8.4 extends to the rear end end of shell 8.2, and the axial baffle 8.6 is loop configuration, The interior circular diameter and the internal diameter in air channel 8.8 of axial baffle 8.6 match, and the outside diameter of axial baffle 8.6 is less than shell 8.2 Internal diameter, the axial baffle 8.6 is fixed on the rear end end of shell 8.2, the air duct linkage section 8.1 by bolt 8.7 The front portion of shell 8.2 is arranged on, air duct linkage section 8.1 stores the front end air duct 12 in section 8.9 with air duct and is connected.
It is described outer in order to prevent the air duct 12 being stored in air duct memory 8 runs into tunnel from having skidding off without reason during the gradient The rear end end of shell 8.2 sets some air duct baffle plates 8.5 along its circle spacing, and the air duct baffle plate 8.5 is equipped with torque spring, wind One end of cylinder baffle plate 8.5 is hinged on the circumference of the rear end end of shell 8.2, and the other end is pressed in the air duct in the outside of air duct memory 8 On 12.
For the ease of air duct memory is arranged on elevating conveyor, the bottom of shell 8.2 is provided with base 8.3.
The present invention assembling and use:
The first step:Chain 10 is hung up properly at each suspension ring for the air duct 12 for needing to store;
Second step:The air duct baffle plate 8.5 equipped with torque spring is pulled open, bolt is turned on, by the axial baffle on air duct memory 8 8.6 pull down, it would be desirable to which air duct 12 and chain 10 compression of storage, which are folded, loads air duct memory 8, and air duct stores installed in air duct In air duct storage section 8.9 in device 8, chain 10 is passed through in the chain channel 8.4 in air duct memory 8, and axial baffle 8.6 is filled On, screw on bolt.Pull out one and save air duct 12 and chain 10 to the outside of air duct memory 8, air duct baffle plate 8.5 is resetted and pushes down air duct 12, prevent air duct 12 from axially scurrying out.
3rd step:Operated according to first two steps, the air duct memory 8 for having stored air duct 12 is prepared into two pieces.One passes through spiral shell Bolt is fixed on transfer conveyor tail frame 9, and the upper end of chain 10 is hung on pulley 11.Another give over to it is standby.
4th step:Several slide rails 6 are hung in back 13 by sliding chain 10, leading portion slide rail away from working face 1 away from As forward as possible from the case where not influenceing condition of construction, rear end slide rail is saved beyond air duct memory one.
5th step:The one end of front end air feed air duct 4 is attached with air duct linkage section 8.1 on air duct memory 8, the other end It is arranged on by air duct support 5 at the panoramic table of development machine 3, interlude is arranged on elevating conveyor 7 by air duct support 5.
6th step:The section air duct and the existing air duct in ore deposit side that are exposed at air duct memory 8 are attached, the existing wind in ore deposit side Cylinder it is fresh it is distinguished and admirable can by the air channel 8.8 in air duct memory 8, then pass through front end air feed air duct 4 reach working face;Entirely Installation process is completed.
7th step:When development machine carries out cutting drilling depth forward movement, front end air feed air duct 4 and air duct memory 8 and driving Machine is without relative motion, as development machine is moved forward together, and the air duct 12 being stored in air duct memory 8 is provided due to development machine Tractive force overcomes the spring resistance of air duct baffle plate 8.5 enough, and air duct is slowly skidded off outside toward air duct memory 8, simultaneously because air duct By chain hanging on pulley, achievable air duct skids off process steadily, and the air duct amount of skidding off is basic and development machine enters dipstick metering phase Together, skidding off rear air duct can still ensure generally flat, not bend, and realize normal steady ventilation.
8th step:In maintenance crew, after development machine is stopped, the slide rail of the rear end of transfer conveyor tail 9 is pulled down to be arranged on and leaned on Nearly working face 1 is foremost.It will be deposited when development machine carries out cutting drilling depth forward movement distance more than the air duct 12 of air duct memory 8 During reserves, give over to the standby air duct memory 8 for having stored air duct 12 by another and existing air duct memory 8 is replaced, i.e., Next circulation can be carried out.

Claims (4)

1. a kind of air duct mobile device for colliery speedy drivage, it is characterised in that:Including slide rail(6), pulley(11), chain (10), air duct memory(8), front end air feed air duct(4)With air duct support(5), the slide rail(6)Hanging is in back(13) On, the slide rail(6)It is upper to set some along slide rail(6)The pulley of slip(11), the air duct memory(8)Installed in elevating conveyor Tailstock(9)On, air duct memory(8)Interior storage has the air duct that some compressions are folded(12), the chain(10)Upper end difference With pulley(11)It is connected, chain(10)Lower end be each passed through air duct memory(8)With being stored in air duct memory(8)Interior wind Cylinder(12)It is connected, the air duct(12)Under external force can be along air duct reservoir(8)Rear end skid off, the air duct memory (8)The air duct of front end(12)With front end air feed air duct(4)One end be connected, front end air feed air duct(4)The other end pass through air duct Support(5)Installed in development machine(3)At panoramic table, front end air feed air duct(4)Interlude supported by air duct(5)Installed in turn Carrier aircraft(7)On, air duct memory(8)The air duct of rear end(12)It is connected with entering air duct.
2. a kind of air duct mobile device for colliery speedy drivage according to claim 1, it is characterised in that:The wind Cylinder reservoir(8)Including shell(8.2), air channel(8.8), air duct storage section(8.9), chain channel(8.4), axial baffle (8.6), bolt(8.7)With air duct linkage section(8.1), the shell(8.2)And air channel(8.8)It is the open circles of both ends open Column structure, air channel(8.8)It is arranged on shell(8.2)It is interior, air channel(8.8)With shell(8.2)Between cavity be air duct storage Section(8.9), the air duct(12)Compression is set in air duct storage section after folding(8.9)It is interior, shell(8.2)Top along shell (8.2)Axial direction sets one to be easy to chain(10)The strip chain channel passed through(8.4), the chain channel(8.4)'s Front end is blind end, and rear end is openend, chain channel(8.4)Openend extend to shell(8.2)Rear end end, it is described Axial baffle(8.6)For loop configuration, axial baffle(8.6)Interior circular diameter and air channel(8.8)Internal diameter match, axially gear Plate(8.6)Outside diameter be less than shell(8.2)Internal diameter, the axial baffle(8.6)Pass through bolt(8.7)It is fixed on shell (8.2)Rear end end, the air duct linkage section(8.1)It is arranged on shell(8.2)Front portion, air duct linkage section(8.1)With wind Cylinder storage section(8.9)Interior front end air duct(12)It is connected.
3. a kind of air duct mobile device for colliery speedy drivage according to claim 2, it is characterised in that:It is described outer Shell(8.2)Rear end end along its circle spacing, some air duct baffle plates are set(8.5), the air duct baffle plate(8.5)Equipped with torsion Spring, air duct baffle plate(8.5)One end be hinged on shell(8.2)On the circumference of rear end end, the other end is pressed in air duct memory (8)The air duct in outside(12)On.
4. a kind of air duct mobile device for colliery speedy drivage according to Claims 2 or 3, it is characterised in that:Institute State shell(8.2)Bottom is provided with base(8.3).
CN201710585375.2A 2017-07-18 2017-07-18 Air duct moving device for rapid tunneling of coal mine Active CN107255040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710585375.2A CN107255040B (en) 2017-07-18 2017-07-18 Air duct moving device for rapid tunneling of coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710585375.2A CN107255040B (en) 2017-07-18 2017-07-18 Air duct moving device for rapid tunneling of coal mine

Publications (2)

Publication Number Publication Date
CN107255040A true CN107255040A (en) 2017-10-17
CN107255040B CN107255040B (en) 2023-08-15

Family

ID=60025158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710585375.2A Active CN107255040B (en) 2017-07-18 2017-07-18 Air duct moving device for rapid tunneling of coal mine

Country Status (1)

Country Link
CN (1) CN107255040B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112623655A (en) * 2020-12-17 2021-04-09 重庆工程职业技术学院 Automatic coal mine tunnel coal conveying system
CN113513358A (en) * 2021-07-26 2021-10-19 太原理工大学 Unmanned automatic emergency discharge system for high-concentration gas in roadway
CN114109424A (en) * 2021-11-08 2022-03-01 中国煤炭科工集团太原研究院有限公司 Roadway driving equipment
CN114810182A (en) * 2022-06-24 2022-07-29 山西天地赛福蒂科技有限公司 Automatic extension device for coal mine air supply duct and use method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1291384A (en) * 1961-06-07 1962-04-20 Selz Geb Device for picking up the contents of a silo from the top
JP2000345800A (en) * 1999-06-03 2000-12-12 Taisei Corp Exhausting type automatic air duct extending device
JP2003056300A (en) * 2001-08-21 2003-02-26 Mcm:Kk Air duct housing/holding device and air duct housing/ holding method
JP2004308111A (en) * 2003-04-01 2004-11-04 Kajima Corp Extensible air duct
CN201526343U (en) * 2009-11-12 2010-07-14 永贵能源开发有限责任公司 Standardized hanger for wind barrel
CN102251791A (en) * 2011-06-17 2011-11-23 重庆工程职业技术学院 Folded ventilation duct assembly
CN102383800A (en) * 2011-11-28 2012-03-21 单淑花 Dust removing device for tunneling machine
CN103046948A (en) * 2013-01-15 2013-04-17 中国矿业大学 Device and method for preventing coal drilling and cutting or gas emission
CN104420880A (en) * 2013-08-27 2015-03-18 成都众成新型复合材料有限公司 Negative-pressure air drum system and mounting method thereof
CN204225888U (en) * 2014-10-23 2015-03-25 山西中煤华晋能源有限责任公司 Efficient comprehensive dust-prevention system suitable for quick fully-mechanized excavation working surface of difficult-to-wet coal seam
CN106194235A (en) * 2016-09-09 2016-12-07 西安科技大学 Manual type colliery tunneling ventilation air duct air outlet regulation device
CN205895295U (en) * 2016-06-15 2017-01-18 中国煤炭科工集团太原研究院有限公司 Accuse dirt device with annular crosswind way
CN206129311U (en) * 2016-11-03 2017-04-26 攀枝花市钛海科技有限责任公司 A three air funnels for double fan ventilation system
CN207261031U (en) * 2017-07-18 2018-04-20 中国煤炭科工集团太原研究院有限公司 A kind of air duct mobile device for colliery speedy drivage

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1291384A (en) * 1961-06-07 1962-04-20 Selz Geb Device for picking up the contents of a silo from the top
JP2000345800A (en) * 1999-06-03 2000-12-12 Taisei Corp Exhausting type automatic air duct extending device
JP2003056300A (en) * 2001-08-21 2003-02-26 Mcm:Kk Air duct housing/holding device and air duct housing/ holding method
JP2004308111A (en) * 2003-04-01 2004-11-04 Kajima Corp Extensible air duct
CN201526343U (en) * 2009-11-12 2010-07-14 永贵能源开发有限责任公司 Standardized hanger for wind barrel
CN102251791A (en) * 2011-06-17 2011-11-23 重庆工程职业技术学院 Folded ventilation duct assembly
CN102383800A (en) * 2011-11-28 2012-03-21 单淑花 Dust removing device for tunneling machine
CN103046948A (en) * 2013-01-15 2013-04-17 中国矿业大学 Device and method for preventing coal drilling and cutting or gas emission
CN104420880A (en) * 2013-08-27 2015-03-18 成都众成新型复合材料有限公司 Negative-pressure air drum system and mounting method thereof
CN204225888U (en) * 2014-10-23 2015-03-25 山西中煤华晋能源有限责任公司 Efficient comprehensive dust-prevention system suitable for quick fully-mechanized excavation working surface of difficult-to-wet coal seam
CN205895295U (en) * 2016-06-15 2017-01-18 中国煤炭科工集团太原研究院有限公司 Accuse dirt device with annular crosswind way
CN106194235A (en) * 2016-09-09 2016-12-07 西安科技大学 Manual type colliery tunneling ventilation air duct air outlet regulation device
CN206129311U (en) * 2016-11-03 2017-04-26 攀枝花市钛海科技有限责任公司 A three air funnels for double fan ventilation system
CN207261031U (en) * 2017-07-18 2018-04-20 中国煤炭科工集团太原研究院有限公司 A kind of air duct mobile device for colliery speedy drivage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李俊峰;刘斌;: "综掘工作面综合防尘系统的研制与应用", no. 03 *
王涛;程子华;崔石磊;: "煤巷炮掘工作面综合防尘实践", no. 04 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112623655A (en) * 2020-12-17 2021-04-09 重庆工程职业技术学院 Automatic coal mine tunnel coal conveying system
CN112623655B (en) * 2020-12-17 2021-07-06 重庆工程职业技术学院 Automatic coal mine tunnel coal conveying system
CN113513358A (en) * 2021-07-26 2021-10-19 太原理工大学 Unmanned automatic emergency discharge system for high-concentration gas in roadway
CN114109424A (en) * 2021-11-08 2022-03-01 中国煤炭科工集团太原研究院有限公司 Roadway driving equipment
CN114810182A (en) * 2022-06-24 2022-07-29 山西天地赛福蒂科技有限公司 Automatic extension device for coal mine air supply duct and use method
WO2023246280A1 (en) * 2022-06-24 2023-12-28 山西天地赛福蒂科技有限公司 Coal mine air-supply air duct automatic extending apparatus and using method

Also Published As

Publication number Publication date
CN107255040B (en) 2023-08-15

Similar Documents

Publication Publication Date Title
CN107255040A (en) A kind of air duct mobile device for colliery speedy drivage
CN207261031U (en) A kind of air duct mobile device for colliery speedy drivage
CN102418540B (en) Hydraulic eight-arm anchor rod drill carriage for coal mine
CN102278131B (en) Duct piece conveying device for shield construction of tunnel with diameter of less than 6 meters and operation method
CN206309413U (en) A kind of development machine roof bolter mechanism
CN106948756B (en) A kind of portable sampling drill
CN108705947A (en) A kind of New-energy electric vehicle
CN202266295U (en) Duct piece conveying device for shield construction of tunnels with diameters smaller than six meters
CN116241258A (en) Intelligent emulsion explosive charging trolley and construction method
CN106629134A (en) Underground mine continuous ore drawing equipment
CN203667334U (en) Horizontal-type backward-feeding fixed garbage compression equipment
CN205930755U (en) Mine car push -and -pull instrument
CN115822448A (en) Multifunctional drilling machine suitable for coal bed gas exploration and development under multiple coal bed conditions
CN209163750U (en) A kind of novel drill rod box management system
CN214609796U (en) Coal conveying sliding frame for coal mine tunneling
CN202250094U (en) Square-box tunnel boring machine
CN109236207A (en) A kind of novel drill rod box system
CN104405384B (en) Deep-hole high-efficient driving method and deep-hole high-efficient driving system
CN214365859U (en) Drilling machine with assembled power unit
CN205116054U (en) Car is put to traffic awl cloth and cloth awl mechanism thereof
CN211167002U (en) Raw materials conveyer for building engineering
CN202645586U (en) Mine car material-taking apparatus with hydraulic drive
CN202250102U (en) Material supply device of pulp shooting machine
CN203008384U (en) Concrete conveying pipe storage and transport device and concrete pumping device
CN206141722U (en) Telescopic tricycle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant