CN107245982A - A kind of construction method of mud-flat soil pond protecting slope - Google Patents

A kind of construction method of mud-flat soil pond protecting slope Download PDF

Info

Publication number
CN107245982A
CN107245982A CN201710564538.9A CN201710564538A CN107245982A CN 107245982 A CN107245982 A CN 107245982A CN 201710564538 A CN201710564538 A CN 201710564538A CN 107245982 A CN107245982 A CN 107245982A
Authority
CN
China
Prior art keywords
pond
slope
ring beam
mud
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710564538.9A
Other languages
Chinese (zh)
Other versions
CN107245982B (en
Inventor
李全杰
徐钢春
徐生
聂志娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengtai Environmental Protection Technology Development Co., Ltd
Original Assignee
Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences filed Critical Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences
Priority to CN201710564538.9A priority Critical patent/CN107245982B/en
Publication of CN107245982A publication Critical patent/CN107245982A/en
Application granted granted Critical
Publication of CN107245982B publication Critical patent/CN107245982B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/128Coherent linings made on the spot, e.g. cast in situ, extruded on the spot

Abstract

The invention discloses a kind of construction method of mud-flat soil pond protecting slope, this method uses step-by-step construction, each step short construction period, the work progress Zhong Tang ridge are stepped, big current will not be assembled, and draining is unobstructed, thus during ability to resist splash erosion it is strong, can effectively avoid slopes from caving in downslide.The step type of this protective slope structure, can ensure the stability on pond top half cement bank protection basis for a long time, and then ensure that the stability and durability of protective slope structure.Pond protecting slope the latter half is nylon wire bank protection, does not influence microorganism in soil to carry out mass exchange with water body, while pond shape stability is ensured, self-purification capacity of the pond to water body in the pool is remained to greatest extent.

Description

A kind of construction method of mud-flat soil pond protecting slope
Technical field
The invention belongs to technical field of aquaculture, more particularly to a kind of applying for mud-flat soil piscina bank protection Work method.
Background technology
During aqiuculrue, pond protecting slope is particularly important, and pond protecting slope mainly plays maintenance pond shape, and extension pond uses the longevity The effect such as life and holding bottom material of pond for breeding Ecological Stabilization.Such as the pond of not bank protection, especially mud-flat soil, by stormy waves beating and The impact of fish body and erosion is gnawed, easily cause Chi Geng to cave in.Chi Geng landslides can reduce the actual grade in fish pond, and bottom of pond mud can also add Thickness, while reduction fish pond productivity, adds the probability of aquatic kind morbidity, thus pond protecting slope is particularly important.
Existing pond protecting slope mainly using overall bank protection, in bank protection building process, is integrally compacted using slopes, this Construction method, it is very impracticable in mud-flat soil pond, rainstorm weather is especially run into, rainwash easily causes slopes to collapse Collapse.And the method for the bank protection that the present invention is announced, using step-by-step construction, each step short construction period is not influenceing construction speed While can avoid rainstorm weather, the work progress Zhong Tang ridge are stepped, will not assemble big current, and draining is unobstructed, therefore During ability to resist splash erosion it is strong, can effectively avoid slopes from caving in downslide.The step type of this protective slope structure, can be protected for a long time The stability on pond top half cement bank protection basis is demonstrate,proved, and then ensure that the stability and durability of protective slope structure.Pond is protected Slope the latter half is nylon wire bank protection, does not influence microorganism in soil to carry out mass exchange with water body, is ensureing that pond shape is steady While qualitative, self-purification capacity of the pond to water body in the pool is remained to greatest extent.
The content of the invention
It is an object of the invention to provide a kind of construction method of mud-flat soil pond protecting slope, its technical scheme is as follows:
A kind of construction method of mud-flat soil pond protecting slope, comprises the following steps:
Step 1, side Horizon, calibration is high:The natural Horizon in place is surveyed, pond protecting slope top surface absolute altitude is determined, short group of the earthwork flattens the pond ridge Face;
Step 2, first time unwrapping wire:Top curve is being placed towards pond lateral direction from pool inner side suitable for reading, then in top curve level Lower collar thread is placed in the ground vertically downward in direction with the domatic plane interaction locations in pond on the inside of towards pond;
Step 3, collar tie beam plane is repaiied:By pond, top surface absolute altitude is defined, along top curve towards the side in pond direction under dig and accomplish Upper collar tie beam platform, lower ring beam platform is repaiied along the side in lower collar thread dorsad pond;
Step 4, second of unwrapping wire:The first diatom is placed in top curve parallel direction, in the first diatom horizontal direction and lower ring beam The second diatom is placed on the lower ring beam platform of the intersection of platform vertical direction;
Step 5, slope between collar tie beam is repaiied:The first diatom and the second diatom according to set by step 4 carry out repairing slope;
Step 6, third time unwrapping wire:On the basis of the first diatom, level is domatic with pond downwards perpendicular to the ground to pond direction The 3rd diatom is put in intersection;
Step 7, collar tie beam position is fixed:The trigonum that the plane formed vertically downward along the 3rd diatom is surrounded with lower ring beam plane Soil is cut out, and by lower ring beam platform plane equating;
Step 8, template-setup:In upper collar tie beam platform together with being vertically arranged respectively on lower ring beam platform template, upper collar tie beam platform Template with respect to step 4 the first diatom towards on the outside of pond position set;The template of lower ring beam platform and upper collar tie beam platform Template between form the mold cavity for casting concrete;
Step 9, slope is repaiied:The slope equating between template;
Step 10, wire-tie, spread steel wire:Collar tie beam and lower ring beam reinforcing bar on bundle, the upper steel ring beam of is formationed and lower steel ring beam, paving steel wire Net, steel wire is covered with slope between collar tie beam, is connected with upper steel ring beam and lower steel ring beam;
Step 11, pouring concrete:The casting concrete on upper steel ring beam, lower steel ring beam and slope therebetween;
Step 12, nylon wire is spread:In upper steel ring beam, lower steel ring beam and slope upper berth nylon wire therebetween.
Further, it can not enter according to earthwork in-fighting in the construction method of described mud-flat soil pond protecting slope, step 1 Principle determine pond protecting slope top surface absolute altitude.
Further, the gradient is 1 in the construction method of described mud-flat soil pond protecting slope, step 5:2.
Further, the slope equating between template in the construction method of described mud-flat soil pond protecting slope, step 9, protect It is 0.1 meter to demonstrate,prove slope concrete thickness.
Further, steel wire mesh is 1 centimetre in the construction method of described mud-flat soil pond protecting slope, step 10.
Further, steel wire, upper steel ring beam are with in the construction method of described mud-flat soil pond protecting slope, step 10 Equal laying depth is 0.01m bed course under steel ring beam.
Further, the intensity system of casting concrete in the construction method of described mud-flat soil pond protecting slope, step 11 Number is C25.
Further, the side of nylon wire uses nailing in the construction method of described mud-flat soil pond protecting slope, step 12 It is fixed.
Further, by nylon wire during being laid in the construction method of described mud-flat soil pond protecting slope, step 12 It is rolled onto pond suitable for reading, according to pond actual grade, machinery repaiies slope, is compacted the nylon wire fixed with soil, and poured mixed Mouth builds platform towards pond direction under solidifying pedosphere beam, and along platform to pond bottom slope equating, nylon wire is dropped down bottom along slope court Pave, last machinery, which fetches earth, to be compacted into.
In the bank protection and construction method in the mud-flat soil pond that the present invention is provided, work progress, the big rainy day can be effectively reduced Gas washes away the domatic difficulty of construction caused in pond, is in particular in that construction procedure 2-7 is not settled at one go, but step-by-step construction, If settled at one go, as run into heavy rain weather halfway, rainwater can wash away to the plane base trimmed, cause mixed mud Native bank protection basis is unstable, and uneven subsidence is easily caused in use, service life is influenceed, if distribution construction, rain Water washes away smaller on smooth good basis influence, is the good pond shield of a kind of relatively low cost, service life length, protection effect Slope mode, it is practical, with significant economic and social benefit.
Brief description of the drawings
Fig. 1 is the flow chart of the construction method of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 2 is construction method step 2 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 3 is construction method step 4 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 4 is construction method step 6 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 5 is construction method step 7 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 6 is construction method step 8 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 7 is construction method step 10 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 8 is construction method step 11 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Fig. 9 is construction method step 12 schematic diagram of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1;
Figure 10 is finally constituted obtained bank protection for the construction method of the mud-flat soil pond protecting slope described in the embodiment of the present invention 1 and shown It is intended to;
In figure 2 above-Figure 10,1 is line position suitable for reading, and 2 be lower collar thread position, and 3 be first of line position, and 4 be the second diatom position Put, 5 be the 3rd road line position, and 6 be upper collar tie beam platform, and 7 be lower ring beam platform, and 8 be upper collar tie beam platform template, and 9 is flat for lower ring beam Platform template, 10 be upper steel ring beam, and 11 be lower steel ring beam, and 12 be steel wire, and 13 be the nylon wire fixed, and 14 be the side of equating Slope, 15 be the pool ridge, and 16 be pool bottom.
Embodiment:
The construction method of the mud-flat soil pond protecting slope provided below in conjunction with accompanying drawing the present invention is further described.
Embodiment 1
The present embodiment provides a kind of construction method of mud-flat soil pond protecting slope, its flow chart as shown in figure 1, including 12 steps Suddenly, it is specific as follows:
Step 1, geodetic is put down, and calibration is high:Survey the natural Horizon in place, it is therefore an objective to can not enter with reference to live earthwork in-fighting, heavy rain, The composite factors such as plum rain season internal drainage, overall appearance, fixed all pond protecting slope top surface absolute altitudes.Short group of the earthwork, leveling is all Pond ridge face.
Step 2, first time unwrapping wire:Then mouth line, distance are being put towards 1 meter of position of pond lateral direction from pool inner side suitable for reading The interaction locations of top curve level towards the position plane and the domatic plane in pond vertically downward in 2.1 meters of direction on the inside of pond are put down Mouth line(As shown in Fig. 21 is line position suitable for reading, 2 be lower collar thread position).
Step 3, collar tie beam plane is repaiied:Collar tie beam plane is built, top surface absolute altitude is defined by pond, along top curve inner side(Towards pond The direction on the pool)Dig 0.25 meter downwards and build collar tie beam platform, along lower collar thread outside(Dorsad pond direction)Repair lower ring beam platform, platform It is wide 0.5 meter, upper 0.67 meter of lower platform vertical height.
Step 4, second of unwrapping wire:First diatom is put to 0.75 meter of pond direction position according to the parallel Horizon of top curve, away from The second diatom is put with lower ring beam platform intersection in the position of first 1.34 meters of diatom horizontal direction vertically downward(As shown in figure 3,3 It is second line position for first of line position, 4).
Step 5, slope between collar tie beam is repaiied:The first diatom put according to step 4 and the second diatom carry out repairing slope, and the gradient is 1:2, Length of grade is 1.5 meters.
Step 6, third time unwrapping wire.Be defined by the first diatom of step 4, the vertical Horizon in position from level to 0.75 meter of pond The 3rd diatom is put in the intersection domatic with pond downwards(As shown in figure 4,5 be the 3rd road line position).
Step 7, collar tie beam position is fixed:Diging up the line put along step 6, formed plane encloses with lower ring beam plane vertically downward Into trigonum soil, and lower ring beam platform plane equating(As shown in figure 5,6 be upper collar tie beam platform, 7 be lower ring beam platform).
Step 8, template-setup:Be vertically arranged one of template respectively in upper and lower collar tie beam platform, the template of upper collar tie beam platform from The diatom of step 4 first is to outside pond 0.55 meter;The template of lower ring beam platform and apart 1.6 meters of the template level of upper collar tie beam platform, Mold cavity is formed between two templates, for casting concrete.Form height is 0.25 meter.It is 1.5 meters to ensure length of grade.(Such as Fig. 6 institutes Show, 8 be upper collar tie beam platform template, and 9 be lower ring beam platform template).
Step 9, slope is repaiied:Manually the slope equating between template, it is ensured that slope concrete thickness is 0.1 meter.
Step 10, wire-tie, spread steel wire:Steel ring beam and lower steel ring beam in upper and lower ring beam reinforcing steel bar, formation are pricked, section is 0.25*0.25 meters, steel wire is spread, 1 centimetre of steel wire mesh, effect is anti-distress in concrete, and steel wire is covered with slope between collar tie beam, It is connected with upper steel ring beam and lower steel ring beam.The bed course that thickness is 0.01m is spread below steel wire and steel ring beam.(As shown in fig. 7,10 are Upper steel ring beam, 11 be lower steel ring beam, and 12 be steel wire).
Step 11, pouring concrete:It is C25's that strength factor is poured on upper steel ring beam, lower steel ring beam and slope therebetween Concrete(Before pouring concrete, using broken ceramic tile by the padded 2-3cm of steel ring beam;When pouring mixed mud, steel wire need to be lifted with cleek Net, it is ensured that steel fabric sheet is completed to wrap up by concrete.);(As shown in Figure 8)
Step 12, nylon wire is spread:The nylon wire that width is 4 meters is customized, nylon cloth aperture is 40 mesh, with a width of 2 centimetres of plastics Press strip, the centre of collar tie beam side is pressed in by the long side of nylon wire, then is fixed with a length of 2.5 centimetres of nailing, and nailing spacing is 0.25 meter.Nylon wire is rolled onto to pond is suitable for reading, according to pond actual grade, machinery repaiies slope, with soil by the nylon wire fixed Compacting, and mouth builds wide 0.2 meter of platform towards pond direction in the case where pouring dark solidifying pedosphere beam, along platform to pond bottom slope Equating.Nylon wire is dropped down bottom along slope court to pave, last machinery, which fetches earth, to be compacted into(Shown in Fig. 9,13 nylon to fix Net, 14 be the side slope of equating).
The schematic diagram for the mud-flat soil pond protecting slope that above construction method is obtained is as shown in Figure 10, wherein 15 be the pool ridge, 16 For pool bottom.

Claims (9)

1. a kind of construction method of mud-flat soil pond protecting slope, it is characterised in that comprise the following steps:
Step 1, side Horizon, calibration is high:The natural Horizon in place is surveyed, pond protecting slope top surface absolute altitude is determined, short group of the earthwork flattens the pond ridge Face;
Step 2, first time unwrapping wire:Top curve is being placed towards pond lateral direction from pool inner side suitable for reading, then in top curve level Lower collar thread is placed in the ground vertically downward in direction with the domatic plane interaction locations in pond on the inside of towards pond;
Step 3, collar tie beam plane is repaiied:By pond, top surface absolute altitude is defined, along top curve towards the side in pond direction under dig and accomplish Upper collar tie beam platform, lower ring beam platform is repaiied along the side in lower collar thread dorsad pond;
Step 4, second of unwrapping wire:The first diatom is placed in top curve parallel direction, in the first diatom horizontal direction and lower ring beam The second diatom is placed on the lower ring beam platform of the intersection of platform vertical direction;
Step 5, slope between collar tie beam is repaiied:The first diatom and the second diatom according to set by step 4 carry out repairing slope;
Step 6, third time unwrapping wire:On the basis of the first diatom, level is domatic with pond downwards perpendicular to the ground to pond direction The 3rd diatom is put in intersection;
Step 7, collar tie beam position is fixed:The trigonum that the plane formed vertically downward along the 3rd diatom is surrounded with lower ring beam plane Soil is cut out, and by lower ring beam platform plane equating;
Step 8, template-setup:In upper collar tie beam platform together with being vertically arranged respectively on lower ring beam platform template, upper collar tie beam platform Template with respect to step 4 the first diatom towards on the outside of pond position set;The template of lower ring beam platform and upper collar tie beam platform Template between form the mold cavity for casting concrete;
Step 9, slope is repaiied:The slope equating between template;
Step 10, wire-tie, spread steel wire:Collar tie beam and lower ring beam reinforcing bar on bundle, the upper steel ring beam of is formationed and lower steel ring beam, paving steel wire Net, steel wire is covered with slope between collar tie beam, is connected with upper steel ring beam and lower steel ring beam;
Step 11, pouring concrete:The casting concrete on upper steel ring beam, lower steel ring beam and slope therebetween;
Step 12, nylon wire is spread:In upper steel ring beam, lower steel ring beam and slope upper berth nylon wire therebetween.
2. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that according to soil in step 1 The principle that square in-fighting can not entered determines pond protecting slope top surface absolute altitude.
3. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that the gradient is in step 5 1:2。
4. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that template in step 9 Between slope equating, it is ensured that slope concrete thickness be 0.1 meter.
5. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that steel wire in step 10 Mesh is 1 centimetre.
6. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that steel wire in step 10 Equal laying depth is 0.01m bed course under net, upper steel ring beam and lower steel ring beam.
7. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that poured in step 11 mixed The strength factor for coagulating soil is C25.
8. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that nylon wire in step 12 Side fixed using nailing.
9. the construction method of mud-flat soil pond protecting slope according to claim 1, it is characterised in that laid in step 12 Nylon wire is rolled onto to pond is suitable for reading, according to pond actual grade, machinery repaiies slope in journey, with soil by the nylon wire pressure fixed It is real, and mouth builds platform towards pond direction under institute's pouring concrete collar tie beam, along platform to pond bottom slope equating, nylon wire Bottom is dropped down along slope court to pave, last machinery, which fetches earth, to be compacted into.
CN201710564538.9A 2017-07-12 2017-07-12 A kind of construction method of mud-flat soil pond protecting slope Active CN107245982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710564538.9A CN107245982B (en) 2017-07-12 2017-07-12 A kind of construction method of mud-flat soil pond protecting slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710564538.9A CN107245982B (en) 2017-07-12 2017-07-12 A kind of construction method of mud-flat soil pond protecting slope

Publications (2)

Publication Number Publication Date
CN107245982A true CN107245982A (en) 2017-10-13
CN107245982B CN107245982B (en) 2019-05-10

Family

ID=60014913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710564538.9A Active CN107245982B (en) 2017-07-12 2017-07-12 A kind of construction method of mud-flat soil pond protecting slope

Country Status (1)

Country Link
CN (1) CN107245982B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114487343A (en) * 2021-12-29 2022-05-13 河海大学 Microbial action-based tidal trench bank collapse research system and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105274965A (en) * 2015-11-15 2016-01-27 中国水产科学研究院黄海水产研究所 Slope protection structure of aquaculture pond and construction method for slope protection structure
KR101605332B1 (en) * 2015-08-18 2016-03-22 주식회사 토영기술단 Construction method of stabilizing slope area using mineral fiber fabric form

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101605332B1 (en) * 2015-08-18 2016-03-22 주식회사 토영기술단 Construction method of stabilizing slope area using mineral fiber fabric form
CN105274965A (en) * 2015-11-15 2016-01-27 中国水产科学研究院黄海水产研究所 Slope protection structure of aquaculture pond and construction method for slope protection structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114487343A (en) * 2021-12-29 2022-05-13 河海大学 Microbial action-based tidal trench bank collapse research system and method

Also Published As

Publication number Publication date
CN107245982B (en) 2019-05-10

Similar Documents

Publication Publication Date Title
CN206143569U (en) Formula of stirring of shaking is slipform by oneself
CN104074199B (en) Underwater bearing platform construction method
CN103774616B (en) From the Ecological Retaining Wall construction method that embedded block is built by laying bricks or stones
CN105297714B (en) Bored concrete pile pile cover and stake integrative construction device and method
CN104328766A (en) Ecological stone cage net box retaining wall and construction method
CN108283080A (en) It is a kind of to set pond from ecology is poured for sponge city
CN206157508U (en) Light soil roadbed structure
CN109113129A (en) A kind of construction method of irrigation and drainage system and canal for water conveyance
CN105649093A (en) Arch fixing rack for highway/railway tunnel and manufacturing method of arch fixing rack
CN111074844A (en) Construction method of ecological interlocking revetment of river channel
CN111778941A (en) High-standard farmland channel construction method and structure
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN108277777A (en) Wave wall substep pouring construction process
CN212405094U (en) High water content clay fill foundation drainage system
CN107245982B (en) A kind of construction method of mud-flat soil pond protecting slope
CN109137873A (en) A method of wet and soft foundation is handled using precast square pile
CN112854254A (en) Construction method for existing railway field level subgrade support in deep artificial waste slag area
CN218112215U (en) Artificial landscape mountain for coastal irrigation and soil filling area
CN110331735A (en) A kind of tower crane mounting structure for coastal region soft layer
CN205975653U (en) Independent bearing platform structure of soil child mould construction
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN204238176U (en) Ecotypic Stone Mesh-box net cage barricade
CN106758852A (en) Across foundation pit enclosure to support beam trestle construction technology
CN111335336A (en) Slope greening construction auxiliary device is administered to massif
CN108103937A (en) Utilize the cast-in-place box beam construction method of native loose tool substitution falsework

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200422

Address after: 214000 No.111, Gaoyun Road, Binhu Economic Development Zone, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Hengtai Environmental Protection Technology Development Co., Ltd

Address before: 214081, No. 9, Shanshui East Road, Binhu District, Jiangsu, Wuxi

Patentee before: FRESHWATER FISHERIES RESEARCH CENTER OF CHINESE ACADEMY OF FISHERY SCIENCES

TR01 Transfer of patent right