CN107237513B - Device is filled up in a kind of wall gap for building - Google Patents

Device is filled up in a kind of wall gap for building Download PDF

Info

Publication number
CN107237513B
CN107237513B CN201710689096.0A CN201710689096A CN107237513B CN 107237513 B CN107237513 B CN 107237513B CN 201710689096 A CN201710689096 A CN 201710689096A CN 107237513 B CN107237513 B CN 107237513B
Authority
CN
China
Prior art keywords
fixed
column
gear column
filled
sprocket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710689096.0A
Other languages
Chinese (zh)
Other versions
CN107237513A (en
Inventor
唐云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Evergreen New Material Technology Co Ltd
Original Assignee
Evergreen New Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Evergreen New Material Technology Co Ltd filed Critical Evergreen New Material Technology Co Ltd
Priority to CN201710689096.0A priority Critical patent/CN107237513B/en
Publication of CN107237513A publication Critical patent/CN107237513A/en
Application granted granted Critical
Publication of CN107237513B publication Critical patent/CN107237513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of wall gaps for building to fill up device, including support base and belt, support column is installed at the center of the support base, the inside of the support column is equipped with square hole, commutating tooth is fixed on the square hole, the support column is equipped with first gear column, the side of the first gear column is fixed with elongate posts, the inside of the elongate posts is equipped with bolt hole, stud is connected in the bolt hole, the side of the third sprocket is fixed with telescopic rod, the telescopic rod side is fixed with fixed link, the side of the fixed link is fixed with connector, the side of the connector is equipped with steel ball.The present invention, manually adjust the length of telescopic rod, steel ball is set to be in the position in gap being suitable for, facilitate steel ball by gap dust and impurity clean out, good basis is provided for subsequent gap filling, the potassium steel layer of steel ball surface has good wearability simultaneously, avoids steel ball from working long hours and is damaged.

Description

Device is filled up in a kind of wall gap for building
Technical field
The present invention relates to construction machinery equipment technical field, device is filled up in specifically a kind of wall gap for building.
Background technique
Building machinery is the general name of mechanical equipment used in engineering construction and town and country construction, it includes excavating machinery, shovels soil fortune Defeated machinery, compacting machinary, crane tool, piling machinery, pavement construction machinery, concreting machinery, concrete product is mechanical, reinforcing bar Grade prestressing force is mechanical, finishing machinery, a variety of mechanical compositions such as aerial operation machine.It is that building machinery is normal that device is filled up in wall gap One of tool, but traditional wall gap for building is filled up device and is not equipped with to gap progress clearing function, causes The effect of remaining many impurity in gap, affect the quality of filling up in gap, while not being equipped with filler repairing on gap, influences The aesthetics of wall.
Summary of the invention
The purpose of the present invention is to provide a kind of wall gaps for building to fill up device, to solve building in the prior art Device is filled up with wall gap be not equipped with and clearing function is carried out to gap, cause to remain many impurity in gap, affect seam Gap fills up quality, while the effect of be not equipped with filler repairing on gap, the problem of influencing the aesthetics of wall.
To achieve the above object, the invention provides the following technical scheme: device is filled up in a kind of wall gap for building, including Support base and belt, support column is equipped at the center of the support base, and the inside of the support column is equipped with square hole, institute It states and is fixed with commutating tooth on square hole, the support column is equipped with first gear column, second gear column and third sprocket, and described the One sprocket is located at the top of second gear column, and the third sprocket is located at the lower section of second gear column, the first gear The side of column is fixed with elongate posts, and the inside of the elongate posts is equipped with bolt hole, is connected with stud, the spiral shell in the bolt hole The side of column is fixed with fixed block, and the side of the fixed block is equipped with scraper plate, and the side of the second gear column is fixed with filling Agent storage tank, the side of the third sprocket is fixed with telescopic rod, between the elongate posts, filler storage tank and telescopic rod It is connected with connecting rod, the telescopic rod side is fixed with fixed link, and the side of the fixed link is fixed with connector, the connection The side of head is equipped with steel ball, and the other side of the first gear column, second gear column and third sprocket is respectively and fixedly provided with small-sized Rotating wheel.
Preferably, the side of the support column is equipped with large-scale rotating wheel, the large size rotating wheel and first gear column, second Sprocket and third sprocket are sequentially connected by belt, are equipped with wind on the large size rotating wheel.
Preferably, the bottom end of the filler storage tank is fixed with booster pump, and the side of filler storage tank is equipped with spray Mouth.
Preferably, anti-skidding pedestal is installed at the extension angle of the bottom end of the support base four.
Preferably, the surface of the steel ball is equipped with potassium steel layer.
Preferably, the commutating tooth engages connection with first gear column, second gear column and third sprocket.
Preferably, there are three the scraper plate is set altogether, and adjacent to scrape plate spacing equal.
Compared with prior art, utstanding substantial characteristics and significant improvement of the present invention are: structure of the invention science Rationally, easy to use efficient;Due to what is connected between elongate posts, filler storage tank and telescopic rod by connecting rod, ensure that The compactness connected between elongate posts, filler storage tank and telescopic rod avoids loosening in long-time use process Phenomenon affects the efficiency that wall is filled up;Since large-scale rotating wheel and first gear column, second gear column and third sprocket are logical Belt transmission connection is crossed, the movement that large-scale rotating wheel keeps three sprockets synchronous is shaken manually, guarantees the effect that wall gap is filled up Rate;The length for manually adjusting telescopic rod, make steel ball be in gap be suitable for position, facilitate steel ball by gap dust and Impurity is cleaned out, and provides good basis for subsequent gap filling, while the potassium steel layer of steel ball surface is with good Wearability avoids steel ball from working long hours and is damaged, and extends the service life of steel ball;Stud passes through with elongate posts Inner bolt holes It is threadedly coupled, keeps the fixed block of stud side easy to disassemble and replace, and the scraper plate of fixed block side three can be by gap two sides Filler clear up scraped clean, guarantee the cleaning aesthetics of wall, improve the practicability that device is filled up in wall gap.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is blade structure schematic diagram of the invention;
Fig. 3 is square hole structural schematic diagram of the invention;
Fig. 4 is steel ball structure schematic diagram of the invention.
In figure: the anti-skidding pedestal of 1- support base, 2-, 3- telescopic rod, 4- fixed link, 5- booster pump, 6- filler storage tank, 7- nozzle, 8- elongate posts, 9- connecting rod, 10- support column, 11- first gear column, 12- second gear column, 13- third sprocket, The small-sized rotating wheel of 14-, 15- belt, 16- wind, 17- large size rotating wheel, 18- bolt hole, 19- stud, 20- fixed block, 21- Scraper plate, 22- square hole, 23- commutating tooth, 24- connector, 25- potassium steel layer, 26- steel ball.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-4, in the embodiment of the present invention, device, including 1 He of support base are filled up in a kind of wall gap for building Belt 15, is equipped with support column 10 at the center of support base 1, and the inside of support column 10 is equipped with square hole 22, on square hole 22 It is fixed with commutating tooth 23, support column 10 is equipped with first gear column 11, second gear column 12 and third sprocket 13, first gear column 11 are located at the top of second gear column 12, and third sprocket 13 is located at the lower section of second gear column 12, and the one of first gear column 11 Side is fixed with elongate posts 8, and the inside of elongate posts 8 is equipped with bolt hole 18, is connected with stud 19, the side of stud 19 in bolt hole 18 It is fixed with fixed block 20, the side of fixed block 20 is equipped with scraper plate 21, and stud 19 is connected through a screw thread with 8 Inner bolt holes 18 of elongate posts , keep the fixed block 20 of 19 side of stud easy to disassemble and replaces, and fixed block 20 side three scraper plate 21 can be by gap two sides Filler clear up scraped clean, guarantee the cleaning aesthetics of wall, the side of second gear column 12 is fixed with filler storage Tank 6, the side of third sprocket 13 are fixed with telescopic rod 3, are connected between elongate posts 8, filler storage tank 6 and telescopic rod 3 Connecting rod 9 ensure that elongate posts due to passing through what connecting rod 9 connected between elongate posts 8, filler storage tank 6 and telescopic rod 3 8, the compactness connected between filler storage tank 6 and telescopic rod 3 avoids what is loosened in long-time use process from showing As, the efficiency that wall is filled up is affected, 3 side of telescopic rod is fixed with fixed link 4, and the side of fixed link 4 is fixed with connector 24, The side of connector 24 is equipped with steel ball 26, manually adjusts the length of telescopic rod 3, and steel ball 26 is made to be in the position in gap being suitable for Set, facilitate steel ball 26 by gap dust and impurity clean out, provide good basis for subsequent gap filling, The other side of one sprocket 11, second gear column 12 and third sprocket 13 is respectively and fixedly provided with small-sized rotating wheel 14, support column 10 Side is equipped with large-scale rotating wheel 17, and large-scale rotating wheel 17 and first gear column 11, second gear column 12 and third sprocket 13 are logical Cross the transmission connection of belt 15, wind 16 be installed on large-scale rotating wheel 17, due to large-scale rotating wheel 17 and first gear column 11, Second gear column 12 and third sprocket 13 are sequentially connected by belt 15, and shaking large-scale rotating wheel 17 manually makes three sprockets Synchronous movement guarantees the efficiency that wall gap is filled up, and the bottom end of filler storage tank 6 is fixed with booster pump 5, and filler is deposited The side of storage tank 6 is equipped with nozzle 7, is equipped with anti-skidding pedestal 2 at the extension angle of bottom end four of support base 1, the surface of steel ball 26 is set There is potassium steel layer 25, commutating tooth 23 engages connection with first gear column 11, second gear column 12 and third sprocket 13, and scraper plate 21 is total If there are three, and adjacent 21 spacing of scraper plate is equal.
The working principle of the invention is: will fill up device and is moved to specified position, holds wind 16 and drive large-scale turn The rotation of driving wheel 17, and large-scale rotating wheel 17 passes through belt with first gear column 11, second gear column 12 and third sprocket 13 15 transmission connection, can drive three sprockets simultaneously it is downward or run up, adjust telescopic rod 3 collapsing length, It is located at steel ball 16 in the gap of wall, then steel ball 16 cleans out the residue in gap, and booster pump 5 stores filler Tank 6 applies pressure, and filler is sprayed onto gap from nozzle 7, and the fixed block 20 of 8 side of elongate posts moves up and down, and makes fixed block 20 One side scraper plate 21 scrapes gap on wall, and extra filler is cleaned out, and guarantees the aesthetics of wall, makes wall It is stronger that device applicability is filled up in gap.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (6)

1. device, including support base (1) and belt (15) are filled up in a kind of wall gap for building, it is characterised in that: the branch It supports and is equipped with support column (10) at the center of pedestal (1), the inside of the support column (10) is equipped with square hole (22), described rectangular It is fixed on hole (22) commutating tooth (23), the support column (10) is equipped with first gear column (11), second gear column (12) and the Three sprockets (13), the first gear column (11) are located at the top of second gear column (12), third sprocket (13) position It is fixed with elongate posts (8) in the side of the lower section of second gear column (12), the first gear column (11), the elongate posts (8) Inside be equipped with bolt hole (18), is connected with stud (19) in the bolt hole (18), the side of the stud (19) is fixed with The side of fixed block (20), the fixed block (20) is equipped with scraper plate (21), and the side of the second gear column (12), which is fixed with, to be filled out It fills agent storage tank (6), the side of the third sprocket (13) is fixed with telescopic rod (3), and the elongate posts (8), filler are deposited It is connected between storage tank (6) and telescopic rod (3) connecting rod (9), telescopic rod (3) side is fixed with fixed link (4), described solid The side of fixed pole (4) is fixed with connector (24), and the side of the connector (24) is equipped with steel ball (26), the first gear The other side of column (11), second gear column (12) and third sprocket (13) is respectively and fixedly provided with small-sized rotating wheel (14);The support The side of column (10) is equipped with large-scale rotating wheel (17), the large size rotating wheel (17) and first gear column (11), second gear column (12) it is sequentially connected with third sprocket (13) by belt (15), wind is installed on the large size rotating wheel (17) (16).
2. device is filled up in a kind of wall gap for building according to claim 1, it is characterised in that: the filler storage The bottom end of tank (6) is fixed with booster pump (5), and the side of filler storage tank (6) is equipped with nozzle (7).
3. device is filled up in a kind of wall gap for building according to claim 1, it is characterised in that: the support base (1) anti-skidding pedestal (2) are installed at the extension angle of bottom end four.
4. device is filled up in a kind of wall gap for building according to claim 1, it is characterised in that: the steel ball (26) Surface is equipped with potassium steel layer (25).
5. device is filled up in a kind of wall gap for building according to claim 1, it is characterised in that: the commutating tooth (23) with First gear column (11), second gear column (12) and third sprocket (13) engagement connection.
6. device is filled up in a kind of wall gap for building according to claim 1, it is characterised in that: the scraper plate (21) is altogether If there are three, and adjacent scraper plate (21) spacing is equal.
CN201710689096.0A 2017-08-13 2017-08-13 Device is filled up in a kind of wall gap for building Active CN107237513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710689096.0A CN107237513B (en) 2017-08-13 2017-08-13 Device is filled up in a kind of wall gap for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710689096.0A CN107237513B (en) 2017-08-13 2017-08-13 Device is filled up in a kind of wall gap for building

Publications (2)

Publication Number Publication Date
CN107237513A CN107237513A (en) 2017-10-10
CN107237513B true CN107237513B (en) 2019-05-10

Family

ID=59988751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710689096.0A Active CN107237513B (en) 2017-08-13 2017-08-13 Device is filled up in a kind of wall gap for building

Country Status (1)

Country Link
CN (1) CN107237513B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756283B (en) * 2018-05-29 2020-11-13 广东碧通防水补强技术应用工程有限公司 Cutting and grouting device for repairing wall cracks
CN111877794A (en) * 2018-10-25 2020-11-03 杭州富阳飞尚装饰工程有限公司 Supporting type floor gap filling auxiliary assembly
CN111155780B (en) * 2019-09-02 2021-05-07 广东博智林机器人有限公司 Screw hole plugging robot and building system with same
CN110952464B (en) * 2019-12-20 2020-10-27 江苏骏豪建设工程有限公司 Bridge pier repairing and reinforcing construction method
CN111894297B (en) * 2020-07-06 2022-07-22 五冶集团上海有限公司 Hole patching device for building construction
CN113006514B (en) * 2021-02-24 2022-08-05 上海建为历保科技股份有限公司 Ancient building green brick wall protection is with repairing device of rectifying

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH686091A5 (en) * 1992-07-21 1995-12-29 Heinz Jaun Device for injecting binder into masonry cracks
EP0831187A1 (en) * 1996-09-19 1998-03-25 Hayashi Kensetsu Kogyo Kabushiki Kaisha An injection plug device for injecting concrete repairing agent into a concrete structure and a connector
CN205025067U (en) * 2015-08-12 2016-02-10 上海绿地建设(集团)有限公司 A pointer that is used for outer wall argil face brick and building block
CN106088556A (en) * 2016-08-02 2016-11-09 鄂星峄 A kind of mosaic tiles high density joint filling device
CN106088554A (en) * 2016-08-09 2016-11-09 南京润屹电子科技有限公司 A kind of mud scraper plate for the old and new's body of wall fissure of displacement apparatus of plastering

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050051278A1 (en) * 2003-09-09 2005-03-10 Dobson Michael L. Apparatus and method for applying tape to wall board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH686091A5 (en) * 1992-07-21 1995-12-29 Heinz Jaun Device for injecting binder into masonry cracks
EP0831187A1 (en) * 1996-09-19 1998-03-25 Hayashi Kensetsu Kogyo Kabushiki Kaisha An injection plug device for injecting concrete repairing agent into a concrete structure and a connector
CN205025067U (en) * 2015-08-12 2016-02-10 上海绿地建设(集团)有限公司 A pointer that is used for outer wall argil face brick and building block
CN106088556A (en) * 2016-08-02 2016-11-09 鄂星峄 A kind of mosaic tiles high density joint filling device
CN106088554A (en) * 2016-08-09 2016-11-09 南京润屹电子科技有限公司 A kind of mud scraper plate for the old and new's body of wall fissure of displacement apparatus of plastering

Also Published As

Publication number Publication date
CN107237513A (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN107237513B (en) Device is filled up in a kind of wall gap for building
CN106088530B (en) Large area method for constructing terrace
CN205238292U (en) Stirring mixes abundant high -efficient mixer
CN210080281U (en) Slurry storage pool with automatic cleaning function
CN202882773U (en) Long spiral drilling machine and automatic soil cleaning device thereof
CN209277563U (en) A kind of civil engineering even device of concrete vibration
CN110744702A (en) Multifunctional pouring equipment and use method thereof
CN111594187A (en) Road tunnel engineering construction method
CN113266155B (en) Building site is top laying device for building
CN207826199U (en) A kind of cleaning device suitable for subway engineering vehicle
CN211415673U (en) Multifunctional pouring equipment
CN108043844A (en) A kind of construction site concrete mud bucket cleaning device
CN215101574U (en) High-bearing single-beam portal crane
CN210207651U (en) Sand screening device for building
CN209011834U (en) A kind of slag cleaning device and the rock tunnel(ling) machine with the slag cleaning device
CN208167464U (en) One kind, which is repaired the roads, divides device with cement mixing
CN210067465U (en) Device for cleaning sundries on surface of template
CN209652854U (en) A kind of highway construction curing means
CN205314136U (en) Brush wall ware that underground continuous wall connects
CN202625205U (en) Scraper blade for scraper
CN215835822U (en) High-efficient formula grape unearthed clear soil leveler
CN221016290U (en) Grouting machine
CN218655117U (en) Spraying device for bridge and pier stud
CN203569501U (en) Sweeper
CN212923568U (en) Multidirectional scraping and taking rake system with double-layer truss structure rotary scraper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190412

Address after: 530022 No. D2, 25th floor, Building A, Xinxing Building, 93 Minority Avenue, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Applicant after: Evergreen New Material Technology Co Ltd

Address before: 530022 No. 1 Kangle Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Applicant before: Tang Yunlong

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 530105 No. 19 Anping Road, Overseas Chinese Investment Zone, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: CHANGRONG NEW MATERIAL TECHNOLOGY Co.,Ltd.

Address before: 530022 No. D2, 25th floor, Building A, Xinxing Building, 93 Minority Avenue, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: CHANGRONG NEW MATERIAL TECHNOLOGY Co.,Ltd.