Device is filled up in a kind of wall gap for building
Technical field
The present invention relates to construction machinery equipment technical field, device is filled up in specifically a kind of wall gap for building.
Background technique
Building machinery is the general name of mechanical equipment used in engineering construction and town and country construction, it includes excavating machinery, shovels soil fortune
Defeated machinery, compacting machinary, crane tool, piling machinery, pavement construction machinery, concreting machinery, concrete product is mechanical, reinforcing bar
Grade prestressing force is mechanical, finishing machinery, a variety of mechanical compositions such as aerial operation machine.It is that building machinery is normal that device is filled up in wall gap
One of tool, but traditional wall gap for building is filled up device and is not equipped with to gap progress clearing function, causes
The effect of remaining many impurity in gap, affect the quality of filling up in gap, while not being equipped with filler repairing on gap, influences
The aesthetics of wall.
Summary of the invention
The purpose of the present invention is to provide a kind of wall gaps for building to fill up device, to solve building in the prior art
Device is filled up with wall gap be not equipped with and clearing function is carried out to gap, cause to remain many impurity in gap, affect seam
Gap fills up quality, while the effect of be not equipped with filler repairing on gap, the problem of influencing the aesthetics of wall.
To achieve the above object, the invention provides the following technical scheme: device is filled up in a kind of wall gap for building, including
Support base and belt, support column is equipped at the center of the support base, and the inside of the support column is equipped with square hole, institute
It states and is fixed with commutating tooth on square hole, the support column is equipped with first gear column, second gear column and third sprocket, and described the
One sprocket is located at the top of second gear column, and the third sprocket is located at the lower section of second gear column, the first gear
The side of column is fixed with elongate posts, and the inside of the elongate posts is equipped with bolt hole, is connected with stud, the spiral shell in the bolt hole
The side of column is fixed with fixed block, and the side of the fixed block is equipped with scraper plate, and the side of the second gear column is fixed with filling
Agent storage tank, the side of the third sprocket is fixed with telescopic rod, between the elongate posts, filler storage tank and telescopic rod
It is connected with connecting rod, the telescopic rod side is fixed with fixed link, and the side of the fixed link is fixed with connector, the connection
The side of head is equipped with steel ball, and the other side of the first gear column, second gear column and third sprocket is respectively and fixedly provided with small-sized
Rotating wheel.
Preferably, the side of the support column is equipped with large-scale rotating wheel, the large size rotating wheel and first gear column, second
Sprocket and third sprocket are sequentially connected by belt, are equipped with wind on the large size rotating wheel.
Preferably, the bottom end of the filler storage tank is fixed with booster pump, and the side of filler storage tank is equipped with spray
Mouth.
Preferably, anti-skidding pedestal is installed at the extension angle of the bottom end of the support base four.
Preferably, the surface of the steel ball is equipped with potassium steel layer.
Preferably, the commutating tooth engages connection with first gear column, second gear column and third sprocket.
Preferably, there are three the scraper plate is set altogether, and adjacent to scrape plate spacing equal.
Compared with prior art, utstanding substantial characteristics and significant improvement of the present invention are: structure of the invention science
Rationally, easy to use efficient;Due to what is connected between elongate posts, filler storage tank and telescopic rod by connecting rod, ensure that
The compactness connected between elongate posts, filler storage tank and telescopic rod avoids loosening in long-time use process
Phenomenon affects the efficiency that wall is filled up;Since large-scale rotating wheel and first gear column, second gear column and third sprocket are logical
Belt transmission connection is crossed, the movement that large-scale rotating wheel keeps three sprockets synchronous is shaken manually, guarantees the effect that wall gap is filled up
Rate;The length for manually adjusting telescopic rod, make steel ball be in gap be suitable for position, facilitate steel ball by gap dust and
Impurity is cleaned out, and provides good basis for subsequent gap filling, while the potassium steel layer of steel ball surface is with good
Wearability avoids steel ball from working long hours and is damaged, and extends the service life of steel ball;Stud passes through with elongate posts Inner bolt holes
It is threadedly coupled, keeps the fixed block of stud side easy to disassemble and replace, and the scraper plate of fixed block side three can be by gap two sides
Filler clear up scraped clean, guarantee the cleaning aesthetics of wall, improve the practicability that device is filled up in wall gap.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is blade structure schematic diagram of the invention;
Fig. 3 is square hole structural schematic diagram of the invention;
Fig. 4 is steel ball structure schematic diagram of the invention.
In figure: the anti-skidding pedestal of 1- support base, 2-, 3- telescopic rod, 4- fixed link, 5- booster pump, 6- filler storage tank,
7- nozzle, 8- elongate posts, 9- connecting rod, 10- support column, 11- first gear column, 12- second gear column, 13- third sprocket,
The small-sized rotating wheel of 14-, 15- belt, 16- wind, 17- large size rotating wheel, 18- bolt hole, 19- stud, 20- fixed block, 21-
Scraper plate, 22- square hole, 23- commutating tooth, 24- connector, 25- potassium steel layer, 26- steel ball.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-4, in the embodiment of the present invention, device, including 1 He of support base are filled up in a kind of wall gap for building
Belt 15, is equipped with support column 10 at the center of support base 1, and the inside of support column 10 is equipped with square hole 22, on square hole 22
It is fixed with commutating tooth 23, support column 10 is equipped with first gear column 11, second gear column 12 and third sprocket 13, first gear column
11 are located at the top of second gear column 12, and third sprocket 13 is located at the lower section of second gear column 12, and the one of first gear column 11
Side is fixed with elongate posts 8, and the inside of elongate posts 8 is equipped with bolt hole 18, is connected with stud 19, the side of stud 19 in bolt hole 18
It is fixed with fixed block 20, the side of fixed block 20 is equipped with scraper plate 21, and stud 19 is connected through a screw thread with 8 Inner bolt holes 18 of elongate posts
, keep the fixed block 20 of 19 side of stud easy to disassemble and replaces, and fixed block 20 side three scraper plate 21 can be by gap two sides
Filler clear up scraped clean, guarantee the cleaning aesthetics of wall, the side of second gear column 12 is fixed with filler storage
Tank 6, the side of third sprocket 13 are fixed with telescopic rod 3, are connected between elongate posts 8, filler storage tank 6 and telescopic rod 3
Connecting rod 9 ensure that elongate posts due to passing through what connecting rod 9 connected between elongate posts 8, filler storage tank 6 and telescopic rod 3
8, the compactness connected between filler storage tank 6 and telescopic rod 3 avoids what is loosened in long-time use process from showing
As, the efficiency that wall is filled up is affected, 3 side of telescopic rod is fixed with fixed link 4, and the side of fixed link 4 is fixed with connector 24,
The side of connector 24 is equipped with steel ball 26, manually adjusts the length of telescopic rod 3, and steel ball 26 is made to be in the position in gap being suitable for
Set, facilitate steel ball 26 by gap dust and impurity clean out, provide good basis for subsequent gap filling,
The other side of one sprocket 11, second gear column 12 and third sprocket 13 is respectively and fixedly provided with small-sized rotating wheel 14, support column 10
Side is equipped with large-scale rotating wheel 17, and large-scale rotating wheel 17 and first gear column 11, second gear column 12 and third sprocket 13 are logical
Cross the transmission connection of belt 15, wind 16 be installed on large-scale rotating wheel 17, due to large-scale rotating wheel 17 and first gear column 11,
Second gear column 12 and third sprocket 13 are sequentially connected by belt 15, and shaking large-scale rotating wheel 17 manually makes three sprockets
Synchronous movement guarantees the efficiency that wall gap is filled up, and the bottom end of filler storage tank 6 is fixed with booster pump 5, and filler is deposited
The side of storage tank 6 is equipped with nozzle 7, is equipped with anti-skidding pedestal 2 at the extension angle of bottom end four of support base 1, the surface of steel ball 26 is set
There is potassium steel layer 25, commutating tooth 23 engages connection with first gear column 11, second gear column 12 and third sprocket 13, and scraper plate 21 is total
If there are three, and adjacent 21 spacing of scraper plate is equal.
The working principle of the invention is: will fill up device and is moved to specified position, holds wind 16 and drive large-scale turn
The rotation of driving wheel 17, and large-scale rotating wheel 17 passes through belt with first gear column 11, second gear column 12 and third sprocket 13
15 transmission connection, can drive three sprockets simultaneously it is downward or run up, adjust telescopic rod 3 collapsing length,
It is located at steel ball 16 in the gap of wall, then steel ball 16 cleans out the residue in gap, and booster pump 5 stores filler
Tank 6 applies pressure, and filler is sprayed onto gap from nozzle 7, and the fixed block 20 of 8 side of elongate posts moves up and down, and makes fixed block 20
One side scraper plate 21 scrapes gap on wall, and extra filler is cleaned out, and guarantees the aesthetics of wall, makes wall
It is stronger that device applicability is filled up in gap.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.