CN107234707B - Roadbed slope framework construction process and mold - Google Patents

Roadbed slope framework construction process and mold Download PDF

Info

Publication number
CN107234707B
CN107234707B CN201710638956.8A CN201710638956A CN107234707B CN 107234707 B CN107234707 B CN 107234707B CN 201710638956 A CN201710638956 A CN 201710638956A CN 107234707 B CN107234707 B CN 107234707B
Authority
CN
China
Prior art keywords
concrete
mold
prefabricated
prefabricated components
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710638956.8A
Other languages
Chinese (zh)
Other versions
CN107234707A (en
Inventor
张燕清
梁道盛
董广位
阙金平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Third Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201710638956.8A priority Critical patent/CN107234707B/en
Publication of CN107234707A publication Critical patent/CN107234707A/en
Application granted granted Critical
Publication of CN107234707B publication Critical patent/CN107234707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/0009Shaping of preshaped articles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated

Abstract

The invention discloses a roadbed slope framework construction process and mold. The roadbed slope framework construction process comprises the steps that firstly, construction preparation is conducted, and a standard framework prefabricated part production place is established; secondly, mold manufacturing is conducted; thirdly, concrete mixing is conducted; fourthly, concrete enters the mold; and fifthly, concrete vibration, subsequent surface finishing and transporting, prefabricated part demolding, concrete curing, appearance inspection and spot check on prefabricated parts, packaging, stacking, database establishing, finished product displaying, training, transporting and installing are conducted. According to the roadbed slope framework construction process and mold, the small prefabricated part mold used for a roadbed slope framework is printed through the 3D printing technology, and the whole roadbed slope construction quality and efficiency are improved. In addition, a sound, unified, scientific and standard construction system is established, on one hand, durability, attractiveness, economy and practicability of the small prefabricated parts are guaranteed, on the other hand, the standard of the small prefabricated part production construction process is controllable, the engineering quality is effectively guaranteed, and therefore the popularization value is achieved.

Description

A kind of roadbed side slope skeleton construction technology and mold
Technical field
The present invention relates to a kind of roadbed side slope skeleton construction technology and molds.
Background technique
Skeleton slope protection refers in highway, Railway Bed Slope, uses concrete or the frame-type structure of mortar flag stone formation Object is built, grass planting protection, collapses to prevent roadbed side slope from slipping, be the component part of roadbed, belong to the protection works of roadbed among frame.Mesh Before, it is conventionally employed sizing punching block or wooden model pour at the scene the small prefabricated components of slope protection skeleton mode tended to standardization apply Work, with the continuous development of science and technology, this kind of method manifests drawback: first, big using standardized construction investment ratio, mold is not It can recycle;Second, work progress requires height to operator, manual operation is improper, it is easy to lead to voids and pits, truncation Arrisdefect;Third, prefabricated components transport, installation waste are seriously;Fourth, being also easier to side slope caused by occurring because of heavy rain, flood after building up The occurrence of slope surfaces damaged or destroyed by floods such as collapsing, roadbed side slope sliding.In production practice, it is accordingly arranged although unit in charge of construction actively takes Raising construction quality is applied, but can still find small-sized structures breakage and roadbed damaged or destroyed by flood phenomenon in on-the-spot investigation, therefore be badly in need of A kind of fruitful solution targetedly, new is implemented for it.
Summary of the invention
It is an object of the present invention to overcome Traditional foundations side slope skeleton small-sized prefabricated member installation process to waste, it is not inconsistent The requirement of standardization construction, can not carry out concentration pre-casting management, and provides a kind of roadbed side slope skeleton being simple and efficient and apply Work technique.
To achieve the above object, the present invention proposes a kind of roadbed side slope skeleton construction technology, it include the steps that be:
Step 1 carries out preparation of construction;According to standardized construction standard, standardized prefabricated skeleton component production field is established Institute, to facilitate side slope to carry out concentration pre-casting, storage and calling with prefabricated skeleton component;
Step 2, mold manufacture;Using the plastic mould of 3D printer printing side slope prefabricated skeleton component, and control mould Has dimensional accuracy in ± 0.05mm;
Step 3, concrete mixing;According to design requirement, mixer centralized mixing is used in prefabricated skeleton component Workplace, During mixing, material of marching into the arena is detected at any time, it is ensured that material qualification and stay in grade;Before concrete stirring, raw material are carried out Water content detection, it is ensured that the accuracy of match ratio data inspects the slump by random samples in concrete whipping process at any time, guarantees that it can be filled Divide stirring;
Step 4, concrete enter mould;The mold of the prefabricated components printed is placed on a vibration table, and according to design requirement pair In a mold whether placement steel mesh is accepted or rejected, and the hopper by temporarily storing concrete is directed at mold and carries out discharging, discharging When should once fill, there is not allowed that discontinuously add phenomenon, to avoid the subsequent addition of concrete part because of time of vibration deficiency, out Existing bubble and voids and pits;
Step 5, concrete vibration;It is using shake table that the vibratory concrete in mold is uniform after the completion of entering mould to concrete;
Step 6 receives face, transport;Vibration terminates, after mold is transported to maintenance area together with the concrete structure of its inside together, point Class is stored and putty knife is used to carry out receipts face, guarantees concrete surfacing;
Step 7, prefabricated components demoulding;Using salad oil as release agent;Using being manually demolded, when demoulding, guarantees coagulation Soil is vacantly not more than 5cm away from ground level;After demoulding, after cleaning to mold, release agent is smeared again, repeats step 4 extremely Step 7 carries out concrete structure prefabricated;
Step 8, concrete curing;Concrete structure prefabricated components after demoulding are covered using geotextiles, and to prefabricated components Sprinkling maintenance is responsible for by special messenger;It is required that covering curing is not less than 7 days;
Step 9 carries out visual examination and sampling observation to prefabricated components;After prefabricated components demoulding to the appearance of each component into Row checks that prefabricated components appearance requirement lines are straight, surfacing, no honeycomb, pitted skin, arrisdefect;To reaching 28 days intensity and set It carries out spot-check and breaking inspection, detection intensity, size and internal reinforcing bar situation in respect of the prefabricated components of reinforcing bar;Detect underproof batch It is destroyed;
Step 10 is packaged, piles up, builds database;The finished product prefabricated components for having reached some strength and qualification are beaten Packet processing, to save space and convenient transportation;Prefabricated components separate stacking by model, type;In real-time update finished product database Data record;
Step 11, finished product show, train;To reach assembled standardization, construction personnel is shown in finished product show area Model is assembled, and hands over installation key control point: including installing, preceding opposite side slope surface examination, groove depth, line style is straight, does not design seam It is smooth with platform drop-over that the prefabricated components of position will carry out jointing, the prefabricated components that bear down on one;
Step 12, transport, installation;In-site installation construction is filled out with roadbed, the construction speed of excavation construction side is synchronous, live slope After face is checked and accepted, and scene is verified using rangefinder, in conjunction with the data model of the mold of 3D printing, accurately calculates slope surface Area and prefabricated components quantity carry out application transport number to prefabricated skeleton component Workplace to prefabricated components actually required Amount, Workplace personnel carry out outbound and record and updated in the database by microcomputer, will be transported with fork truck to the packing at scene Prefabricated components carry out classification and discharge, and avoid breaking breakage in prefabricated part hanging transportational process;It is carried out through slope construction troop Installation, it is ensured that slope protection in time, stablize, preventing to install lack of standardization leads to slope wash;
Mold includes upper die and lower die, and the upper mold includes the first rectangular channel, and first rectangular channel includes the first toe lasting With with the first toe lasting face and the first parallel rear side, first toe lasting and the first rear side are the length of first rectangular channel Side is connected separately with the first left side and the first right side between first toe lasting and the left and right ends of first rear side, described Side lower section in first front, rear, left and right is connected with the first slot bottom, along first toe lasting to the direction of the first rear side, described the On the lateral surface of first rear side of one rectangular channel with the second of the second rectangular channel the left side being equipped with and second are right helps and the One end of two slot bottoms connects, and the second left side and the second right side are parallel to each other, the second left side and the second right side and the The other end of two slot bottoms is connect with the second rear side, and the middle section of the second left side and the second right side and second slot bottom is close The axis with the described second left side and the second right side and second slot bottom is connected on the lateral wall of second rear side side To vertical U-shaped baffle, the U-shaped baffle includes the lateral wall being connected respectively in the described second left side and the second right side Left otic placode and auris dextra plate and the vertical plate being correspondingly connected on the outside of the bottom of second slot bottom, second slot bottom are parallel to One slot bottom and absolute altitude are higher than first slot bottom, and the lower edge of the vertical plate is located on the extended surface of first slot bottom.
In this way, in order to reduce Standardization Construction construction investment ratio, avoiding installation process in the construction of roadbed side slope skeleton Waste small prefabricated components, by introduce 3D printing technique, the small-sized prefabricated member that roadbed side slope skeleton is used is printed it is high-strength Plastic shape-forming mold effectively avoids manufactured prefabricated components from burr occur, and the bad phenomenons such as voids and pits may be implemented to produce More perfect prefabricated components out.By each prefabricated components of standard, the mouth of bonding being equipped with using it be may be implemented more complete Beauty is bonded, to realize the promotion to entire roadbed side slope construction quality and efficiency.In addition, by establishing standardized skeleton Prefabricated components Workplace realizes the side slope concentration pre-casting of prefabricated skeleton component, storage and calling;Also utilize ranging technology And module management system, concentration pre-casting is carried out to entire roadbed side slope skeleton work progress and is managed and controlled, it is established that sound, system One, scientific and normal construction system.
In addition, can have following additional technical characteristic according to embodiments of the present invention:
According to one embodiment of present invention, it is specifically included in step 3, the slump is controlled in 70-90mm, and mixer is every Tray concrete mixing time is controlled in 120s.
According to one embodiment of present invention, in step 5, the time of vibration to concrete structure prefabricated components is 60 seconds;Vibration Platform power of motor is between 1.2kw~1.5kw.
According to one embodiment of present invention, in step 10, wherein the stacking of arched framework prefabricated components is no more than 8 layers, lid Plate stacking is no more than 5 layers.
The lower die includes bottomless rectangle frame, and the rectangle frame includes the left side of third and third is right helps and with described the The rear end of the three left third toe lastings for helping to connect with the front end of the right side of third, the left side of third and the right side of third passes through bolt respectively Both ends activity with third rear side is hinged, and the third toe lasting includes the first U type slot being equipped with, first U type slot It is matched with the first left side of the first rectangular channel of the upper mold and the first right side and the first slot bottom, the third rear side includes The second U type slot being equipped with, in first U type slot to the direction of second U type slot, in the third rear side The bracket consistent with the bore of the second U type slot is connected in second U type slot, the bracket includes and the second U type slot The left side of the bracket of connection and the right side of bracket and bracket base, second U type slot and the bracket respectively with it is described on The lower edge cooperation of the left otic placode of the U-shaped baffle and the outer edge of auris dextra plate and vertical plate of mould.
It is connected with and described second on the middle section inner sidewall of the second left side and the second right side and second slot bottom The left side reinforcement baffle vertical with the second right side and second slot bottom.
The small-sized prefabricated member mold that this programme is used using 3D printing technique printing roadbed side slope skeleton, is realized to entire The promotion of roadbed side slope construction quality and efficiency.In addition, by establishing standardized prefabricated skeleton component Workplace, realization pair The side slope concentration pre-casting of prefabricated skeleton component, storage and calling;Also by mold manufacture, concrete manufacture, maintenance, pile up, examine, Storage, outbound, install a system link controlled, establish and improve, construction system uniformly, scientific and normal, on the one hand protect It is durable beautiful and economical and practical small-sized prefabricated member is hindered, the mark on the other hand also doing small-sized prefabricated member production and construction process It will definitely control, effective guarantee construction quality, therefore there is promotional value.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures Obviously and it is readily appreciated that,
Fig. 1 is a kind of roadbed side slope skeleton construction technology process schematic diagram;
Fig. 2 is a kind of lower die schematic diagram of the mold of roadbed side slope skeleton construction technology;
Fig. 3 is a kind of upper mold schematic diagram of the mold of roadbed side slope skeleton construction technology;
Fig. 4 is the A-A` of Fig. 2 lower die to schematic cross-sectional view;
Fig. 5 is the B-B` of Fig. 3 upper mold to schematic cross-sectional view;
Fig. 6 is the schematic diagram of U-shaped baffle;
Fig. 7 is the upper and lower mould assembling schematic diagram of Fig. 2 and Fig. 3;
Wherein, the left side of 101. thirds, the left side of 102. brackets, 103. second U type slots, 104. bracket bases, 105. brackets Right side, 106. third rear sides, the right side of 107. thirds, 108. first U type slots, 109. third toe lastings, 110. rectangle frames, 111. insert Pin, 201. left otic placodes, 202. second rear sides, 203. vertical plates, 204. auris dextra plates, 205. second right sides, 206. second slot bottoms, 207. First right side, 208. first slot bottoms, 209. first toe lastings, 210. first rear sides, 211. first left sides, 212. reinforce baffle, 213. second left sides.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.Below with reference to Attached drawing further illustrates;
Highway (railway) side slope is frequently with herringbone or circular skeleton construction technology, and to improve technique, my unit is in tall building It has explored in husky expressway construction practice for small-size concrete prefabricated components modular construction method, by using construction Standardized prefabricated skeleton component Workplace is designed printing high strength plastics shaper using 3D, modular small is prefabricated Element precast installation solves small-sized prefabricated member appearance quality, improves construction technology.With Fujian Province's high speed The fast-developing and standardized popularization of Highway Cause, but discovery is investigated in practice: small-sized prefabricated member breakage, damaged or destroyed by flood are still In the presence of, it is therefore desirable to a set of more sound, uniformly, scientific and normal construction system is established, to ensure small-sized prefabricated member engineering Quality illustrates a kind of roadbed side slope skeleton construction technology in Fig. 1, it include the steps that be:
Step 1 carries out preparation of construction;According to standardized construction standard, standardized prefabricated skeleton component production field is established Institute, to facilitate side slope to carry out concentration pre-casting, storage and calling with prefabricated skeleton component;
Step 2, mold manufacture;Using the plastic mould of 3D printer printing side slope prefabricated skeleton component, and control mould Has dimensional accuracy in ± 0.05mm;The thickness of groove bottom of mold is not less than 3mm, and lateral wall thickness is not less than 4mm, can be in the non-of mold Rib is reinforced in setting on working face, reinforces rib spacing and is not more than 5cm;
Step 3, concrete mixing;According to design requirement, mixer centralized mixing is used in prefabricated skeleton component Workplace, During mixing, material of marching into the arena is detected at any time, it is ensured that material qualification and stay in grade;Before concrete stirring, raw material are carried out Water content detection, it is ensured that the accuracy of match ratio data inspects the slump by random samples in concrete whipping process at any time, guarantees that it can be filled Divide stirring;Here, match ratio data according to the regulation of existing technical standard and should meet design requirement.
Step 4, concrete enter mould;The mold of the prefabricated components printed is placed on a vibration table, and according to design requirement pair In a mold whether placement steel mesh is accepted or rejected, and the hopper by temporarily storing concrete is directed at mold and carries out discharging, discharging When should once fill, there is not allowed that discontinuously add phenomenon, to avoid the subsequent addition of concrete part because of time of vibration deficiency, out Existing bubble and voids and pits;
Step 5, concrete vibration;It is using shake table that the vibratory concrete in mold is uniform after the completion of entering mould to concrete; Shake table height is conveniently advisable with manual operation;
Step 6 receives face, transport;Vibration terminates, after mold is transported to maintenance area together with the concrete structure of its inside together, point Class is stored and putty knife is used to carry out receipts face, guarantees concrete surfacing;
Step 7, prefabricated components demoulding;Using salad oil as release agent;Using being manually demolded, when demoulding, guarantees coagulation Soil is vacantly not more than 5cm away from ground level;After demoulding, after cleaning to mold, release agent is smeared again, repeats step 4 extremely Step 7 carries out concrete structure prefabricated;
Step 8, concrete curing;Concrete structure prefabricated components after demoulding are covered using geotextiles, and to prefabricated components Sprinkling maintenance is responsible for by special messenger;It is required that covering curing is not less than 7 days;
Step 9 carries out visual examination and sampling observation to prefabricated components;After prefabricated components demoulding to the appearance of each component into Row checks that prefabricated components appearance requirement lines are straight, surfacing, no honeycomb, pitted skin, arrisdefect;To reaching 28 days intensity and set It carries out spot-check and breaking inspection, detection intensity, size and internal reinforcing bar situation in respect of the prefabricated components of reinforcing bar;Detect underproof batch It is destroyed;
Step 10 is packaged, piles up, builds database;The finished product prefabricated components for having reached some strength and qualification are beaten Packet processing, to save space and convenient transportation;Prefabricated components separate stacking by model, type;In real-time update finished product database Data record;
Step 11, finished product show, train;To reach assembled standardization, construction personnel is shown in finished product show area Model is assembled, and hands over installation key control point: including installing, preceding opposite side slope surface examination, groove depth, line style is straight, does not design seam It is smooth with platform drop-over that the prefabricated components of position will carry out jointing, the prefabricated components that bear down on one;
Step 12, transport, installation;In-site installation construction is filled out with roadbed, the construction speed of excavation construction side is synchronous, live slope After face is checked and accepted, and scene is verified using rangefinder, in conjunction with the data model of the mold of 3D printing, accurately calculates slope surface Area and prefabricated components quantity carry out application transport number to prefabricated skeleton component Workplace to prefabricated components actually required Amount, Workplace personnel carry out outbound and record and updated in the database by microcomputer, will be transported with fork truck to the packing at scene Prefabricated components carry out classification and discharge, and avoid breaking breakage in prefabricated part hanging transportational process;It is carried out through slope construction troop Installation, it is ensured that slope protection in time, stablize, preventing to install lack of standardization leads to slope wash.
It is specifically included in step 3, slump control exists in 70-90mm, the every tray concrete mixing time control of mixer 120s。
In step 5, the time of vibration to concrete structure prefabricated components is 60 seconds;Shake table power of motor between 1.2kw~ 1.5kw。
In step 10, wherein the stacking of arched framework prefabricated components is no more than 8 layers, and cover board stacking is no more than 5 layers.
Fig. 2 is directed to a kind of existing frequently-used concrete structure prefabricated components into Fig. 7, also targetedly provides a kind of roadbed The mold of side slope skeleton construction technology, it includes upper die and lower die, and the upper mold includes the first rectangular channel, first rectangular channel Including the first toe lasting 209 and with 209 face of the first toe lasting and the first parallel rear side 210, after first toe lasting 209 and first Side 210 is the long side of first rectangular channel, between first toe lasting 209 and the left and right ends of first rear side 210 It is connected separately with the first left side 211 and the first right side 207, the first front, rear, left and right side lower section is connected with the first slot bottom 208, along the direction of 209 to the first rear side 210 of the first toe lasting, in first rear side 210 of first rectangular channel Lateral surface on connect with one end of the second of the second rectangular channel the left side 213 being equipped with and the second right side 205 and the second slot bottom 206 It connects, the second left side 213 and the second right side 205 are parallel to each other, the second left side 213 and the second right side 205 and second The other end of slot bottom 206 is connect with the second rear side 202, the second left side 213 and the second right side 205 and second slot bottom 206 middle section is connected with and the described second left side 213 and the second right side on the lateral wall of 202 side of the second rear side 205 and second slot bottom 206 axially vertical U-shaped baffle, the U-shaped baffle includes being connected respectively described the It the left otic placode 201 of the lateral wall of two left sides 213 and the second right side 205 and auris dextra plate 204 and is correspondingly connected in second slot Vertical plate 203 on the outside of the bottom at bottom 206, second slot bottom 206 is parallel to the first slot bottom 208 and absolute altitude is higher than first slot The lower edge at bottom 208, the vertical plate 203 is located on the extended surface of first slot bottom 208.This ensure that prefabricated components is upper Under the height unanimous circumstances on surface.Oral area of bonding is constructed using the elevation difference of the second slot bottom 206 and the first slot bottom 208, and And when bonding, the cooperation Altitude of each mouth of bonding is consistent, substantially increase in this way slope surface resist it is damaged, damaged or destroyed by flood Ability.
The lower die includes bottomless rectangle frame 110, and the rectangle frame 110 includes the left side 101 of third and the right side 107 of third And with the third toe lasting 109 that connect of front end of the left side 101 of the third and the right side 107 of third, the third is left to help 101 and the The rear end of three right sides 107 passes through bolt 111 respectively and the both ends activity of third rear side 106 is hinged, and the third toe lasting 109 wraps Include the first U type slot 108 being equipped with, the first left side 211 of first U type slot 108 and the first rectangular channel of the upper mold It is matched with the first right side 207 and the first slot bottom 208, the third rear side 106 includes the second U type slot 103 being equipped with, edge In first U type slot to the direction of second U type slot, in the second U type slot 103 of the third rear side 106 It is connected with the bracket consistent with the bore of the second U type slot 103, the bracket includes the support connecting with the second U type slot 103 The left side 102 of slot and the right side 105 and bracket base 104 of bracket, second U type slot 103 and the bracket respectively with institute State the lower edge cooperation of the left otic placode 201 of the U-shaped baffle and the outer edge of auris dextra plate 204 and vertical plate 203 of upper mold.
It is described second it is left side 213 and second it is right side 205 and second slot bottom 206 middle section inner sidewall on be connected with The second left side 213 and the second right side 205 and the vertical reinforcement baffle 212 of second slot bottom 206.In addition, to reinforce The integral strength of mold, can be in the inner sidewall for the first front, rear, left and right side for constituting first rectangular channel, the second rectangular channel Second it is left side 213, second it is right side 205 and second rear side 202 inner sidewall, U-shaped baffle towards second rear side 202 one Side surface, the rectangle frame 110 being made of the left side 101 of third and the right side 107 of third and third toe lasting 109, third rear side 106 The bracket of outer frame side wall and the bracket it is left side 102 and bracket it is right side 105 and bracket base 104 back to the U-shaped gear Reinforcement rib is respectively set on the lateral wall of the mating surface of plate.
It by the way that upper and lower mould is worked good, and disposes on a vibration table, vibration is completed after concrete enters mould, passes through upper mold Slid with the relative level of lower die, upper die and lower die cooperation position made to change, when position of the U-shaped baffle on bracket not Together, it may be implemented to precast the different concrete structure prefabricated components of rim of the mouth length of bonding, can be had in this way according to on-the-spot investigation situation It is targetedly bonded the dynamics of bonding of mouth by enhancing prefabricated components, the abilities such as side slope damaged or destroyed by flood, component breakage are resisted in raising.Demoulding When, using salad oil as release agent, and using being manually demolded, firstly, upper mold is removed, and the bolt 111 in lower die is pulled out Out, separate the left side 101 of third and the right side 107 of third with the both ends of the third rear side 106 of rear end, first by the left side of lower die third 101 and the right side 107 of third and vertical with the third toe lasting 109 that connect of front end of the left side 101 of the third and the right side 107 of third It is demoulded on direction, guarantees that concrete suspension Ullage ground level is not more than 5cm;Again by third rear side 106 together with bracket horizontal cross Demoulding.Such step is the concrete shape feature for this kind of concrete structure, ensures the complete of the rim of the mouth of bonding of this kind of Prefabricated Concrete structure It is whole, after the completion of demoulding, upper and lower mould is cleaned, smears release agent again, it is using bolt 111 that lower die grafting is good, repeat into This kind of concrete structure of row it is prefabricated.
In addition data acquisition can also be carried out using scanning device side slope site contour, and then establish in step 2 The mathematical model of site contour, using 3D printer according to the mathematical model of generation, each region of corresponding site contour, difference The mold of each prefabricated components used in printing;Prefabricated components produced will in this way corresponded with scene, Realize the construction of the roadbed side slope skeleton of more accurate and economic highway or railway.It can thoroughly avoid generating in this way and transport When prefabricated components are to scene, the case where more fortune will cause the waste of prefabricated components, few fortune that will increase freight volume generation.
In the description of this specification, the description of reference term " one embodiment " etc. means to combine the embodiment or example Particular features, structures, materials, or characteristics described are included at least one embodiment or example of the invention.In this explanation In book, schematic expression of the above terms be may not refer to the same embodiment or example.Moreover, the specific spy of description Sign, structure, material or feature can be combined in any suitable manner in any one or more of the embodiments or examples.Although The embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: it is of the invention not departing from These embodiments can be carried out with a variety of change, modification, replacement and modification in the case where principle and objective, the scope of the present invention by Claim and its equivalent limit.

Claims (6)

1. a kind of roadbed side slope skeleton construction technology, which is characterized in that it include the steps that be:
Step 1 carries out preparation of construction;According to standardized construction standard, standardized prefabricated skeleton component Workplace is established, To facilitate side slope to carry out concentration pre-casting, storage and calling with prefabricated skeleton component;
Step 2, mold manufacture;Using the plastic mould of 3D printer printing side slope prefabricated skeleton component, and control mold ruler Very little precision is in ± 0.05mm;
Step 3, concrete mixing;According to design requirement, mixed in prefabricated skeleton component Workplace precasting yard using mixer concentration It makes, during mixing, detects material of marching into the arena at any time, it is ensured that material qualification and stay in grade;Concrete stirring before, to raw material into Row water content detection, it is ensured that the accuracy of match ratio data inspects the slump by random samples in concrete whipping process at any time, guarantees that it can It is sufficiently stirred;
Step 4, concrete enter mould;The molds of the prefabricated components printed is placed on a vibration table, and according to design requirement to whether Placement steel mesh is accepted or rejected in a mold, and the hopper by temporarily storing concrete is directed at mold and carries out discharging, and when discharging answers Once fill, there is not allowed that discontinuously add phenomenon, to avoid the subsequent addition of concrete part because of time of vibration deficiency, there is gas Bubble and voids and pits;
Step 5, concrete vibration;It is using shake table that the vibratory concrete in mold is uniform after the completion of entering mould to concrete;
Step 6 receives face, transport;Vibration terminates, and after mold is transported to maintenance area together with the concrete structure of its inside together, classification is deposited It puts and putty knife is used to carry out receipts face, guarantee concrete surfacing;
Step 7, prefabricated components demoulding;Using salad oil as release agent;Using being manually demolded, when demoulding, guarantees concrete suspension Ullage ground level is not more than 5cm;After demoulding, after cleaning to mold, release agent is smeared again, repeats step 4 to step Seven pairs of concrete structures carry out prefabricated;
Step 8, concrete curing;Concrete structure prefabricated components after demoulding are covered using geotextiles, and to prefabricated components by special People is responsible for sprinkling maintenance;It is required that covering curing is not less than 7 days;
Step 9 carries out visual examination and sampling observation to prefabricated components;The appearance of each component is examined after prefabricated components demoulding It looks into, prefabricated components appearance requirement lines are straight, surfacing, no honeycomb, pitted skin, arrisdefect;Have to reaching 28 days intensity and designing The prefabricated components of reinforcing bar carry out spot-check and breaking inspection, detection intensity, size and internal reinforcing bar situation;Underproof batch is detected to carry out It destroys;
Step 10 is packaged, piles up, builds database;The finished product prefabricated components for having reached some strength and qualification are carried out at packing Reason, to save space and convenient transportation;Prefabricated components separate stacking by model, type;Number in real-time update finished product database According to record;
Step 11, finished product show, train;To reach assembled standardization, demonstration spelling is carried out to construction personnel in finished product show area Dress, and hand over installation key control point: including installing, preceding opposite side slope surface examination, groove depth, line style is straight, does not design seaming position Prefabricated components to carry out jointing, the prefabricated components that bear down on one smooth with platform drop-over;
Step 12, transport, installation;In-site installation construction is filled out with roadbed, the construction speed of excavation construction side is synchronous, and live slope surface is tested After receipts, and scene is verified using rangefinder, in conjunction with the data model of the mold of 3D printing, accurately calculates slope surface area And prefabricated components quantity, application transport quantity is carried out to prefabricated skeleton component Workplace to prefabricated components actually required, it is raw Production facility personnel carries out outbound and records and updated in the database by microcomputer, will be transported with fork truck to the prefabricated structure of packing at scene Part carries out classification and discharges, and avoids breaking breakage in prefabricated part hanging transportational process;Through slope construction, troop is installed, really Protect slope protection in time, stablize, preventing to install lack of standardization leads to slope wash;
Mold includes upper die and lower die, the upper mold include the first rectangular channel, first rectangular channel include the first toe lasting and with First toe lasting face and the first parallel rear side, first toe lasting and the first rear side are the long side of first rectangular channel, Be connected separately between first toe lasting and the left and right ends of first rear side first it is left side and the first right side, described first Side lower section in front, rear, left and right is connected with the first slot bottom, along first toe lasting to the direction of the first rear side, in first square On the lateral surface of first rear side of shape slot with the second of the second rectangular channel the left side being equipped with and second are right helps and the second slot One end connection at bottom, the second left side and the second right side are parallel to each other, the second left side and the second right side and the second slot The other end at bottom is connect with the second rear side, and the second left side is with the middle section of the second right side and second slot bottom close to described It is connected on the lateral wall of second rear side side and hangs down with the axial direction of the described second left side and the second right side and second slot bottom Straight U-shaped baffle, the U-shaped baffle include the left ear for being connected respectively the lateral wall in the described second left side and the second right side Plate and auris dextra plate and the vertical plate being correspondingly connected on the outside of the bottom of second slot bottom, second slot bottom are parallel to the first slot Bottom and absolute altitude are higher than first slot bottom, and the lower edge of the vertical plate is located on the extended surface of first slot bottom.
2. a kind of roadbed side slope skeleton construction technology according to claim 1, which is characterized in that specifically wrapped in step 3 It includes, slump control is in 70-90mm, and the every tray concrete mixing time control of mixer is in 120s.
3. a kind of roadbed side slope skeleton construction technology according to claim 2, which is characterized in that in step 5, to concrete knot The time of vibration of structure prefabricated components is 60 seconds;Shake table power of motor is between 1.2kw~1.5kw.
4. a kind of roadbed side slope skeleton construction technology according to claim 3, which is characterized in that in step 10, hogging Shape prefabricated skeleton component stacking is no more than 8 layers, and cover board stacking is no more than 5 layers.
5. the mold of roadbed side slope skeleton construction technology according to claim 1, which is characterized in that the lower die includes nothing The rectangle frame at bottom, the rectangle frame include the left side of third and the right side of third and the front end with the third left side and the right side of third The third toe lasting of connection, the left side of third pass through the both ends moveable hinge of bolt and third rear side with the rear end of the right side of third respectively Connection, the third toe lasting includes the first U type slot being equipped with, the first rectangular channel of first U type slot and the upper mold First it is left side and first it is right side and the first slot bottom match, the third rear side includes the second U type slot being equipped with, along institute State in the first U type slot to the direction of second U type slot, be connected in the second U type slot of the third rear side and The consistent bracket of the bore of second U type slot, the bracket include that the left side of bracket connecting with the second U type slot and bracket are right Side and bracket base, second U type slot and the bracket left otic placode with the U-shaped baffle of the upper mold respectively With the lower edge cooperation of the outer edge and vertical plate of auris dextra plate.
6. the mold of roadbed side slope skeleton construction technology according to claim 5, which is characterized in that it is described second it is left side and Second it is right side and second slot bottom middle section inner sidewall on be connected with described second it is left side and second it is right help and it is described The vertical reinforcement baffle of second slot bottom.
CN201710638956.8A 2017-07-31 2017-07-31 Roadbed slope framework construction process and mold Active CN107234707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710638956.8A CN107234707B (en) 2017-07-31 2017-07-31 Roadbed slope framework construction process and mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710638956.8A CN107234707B (en) 2017-07-31 2017-07-31 Roadbed slope framework construction process and mold

Publications (2)

Publication Number Publication Date
CN107234707A CN107234707A (en) 2017-10-10
CN107234707B true CN107234707B (en) 2019-06-25

Family

ID=59988294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710638956.8A Active CN107234707B (en) 2017-07-31 2017-07-31 Roadbed slope framework construction process and mold

Country Status (1)

Country Link
CN (1) CN107234707B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900087A (en) * 2011-07-26 2013-01-30 王建军 Slope protection mold for cast-in-place ecological slope protection
CN103336854A (en) * 2013-05-13 2013-10-02 河海大学 Modeling method of three-dimensional finite element model of high slope
CN103600494A (en) * 2013-11-05 2014-02-26 尚晓峰 Three-dimensional printing technology based rapid prototyping manufacturing method for resin mold
CN204819880U (en) * 2015-08-15 2015-12-02 天津达通建材有限公司 Bank protection brick die utensil is leveled off on slope

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140272284A1 (en) * 2013-03-15 2014-09-18 David M. Franke Multi zone cementitious product and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900087A (en) * 2011-07-26 2013-01-30 王建军 Slope protection mold for cast-in-place ecological slope protection
CN103336854A (en) * 2013-05-13 2013-10-02 河海大学 Modeling method of three-dimensional finite element model of high slope
CN103600494A (en) * 2013-11-05 2014-02-26 尚晓峰 Three-dimensional printing technology based rapid prototyping manufacturing method for resin mold
CN204819880U (en) * 2015-08-15 2015-12-02 天津达通建材有限公司 Bank protection brick die utensil is leveled off on slope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
路堤边坡新型混凝土预制件骨架护坡施工方法;王晓霞、罗栩、毕书春;《公路工程》;20110831;第36卷(第4期);第131页-135页

Also Published As

Publication number Publication date
CN107234707A (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN103732367B (en) Vibrating grid for the charging car of block machine
CN210308385U (en) Automatic pouring device for cement precast block
CN102448689A (en) Mobile self-contained stone-making and concrete- processing factory
CN207290457U (en) A kind of foam concrete demoulding equipment
CN112936559B (en) Concrete small-sized prefabricated part quality improvement method based on whole process accompanied
CN106079049A (en) The pouring mould and pour using method of a kind of board-like concrete reinforcement locating piece
CN107234707B (en) Roadbed slope framework construction process and mold
CN209179785U (en) A kind of new type formwork for Middle Wall of Multi-Arch Highway Tunnel concreting
HU211366B (en) Apparatus for high-productive prefabrication of form-accurate concrete elements
CN108556129A (en) A kind of cement block casts vehicle automatically
CN106564114A (en) Factorial construction technology for small prefabricated components
CN107415042A (en) A kind of foam concrete demoulding equipment
CN108705652B (en) Manufacturing device and method of cement concrete prefabricated part
JP2011207596A (en) Counterweight and method of manufacturing the same
RU2686886C2 (en) Method and device for casting powels
CN102046730B (en) Methods of manufacturing formaldehyde-free molded products and related parts
CN108956226B (en) Large-size cement soil test piece forming device and forming method
JP2829216B2 (en) Concrete casting method and casting chute in reverse winding method
CN210910457U (en) Reinforced concrete slope protection production device
CN207606978U (en) A kind of road pit-hole is filled up with bi-component concrete process equipment
CN206618755U (en) A kind of experimental rig for being used to examine apparent mass of clear concrete
CN207376882U (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold
CN106626049A (en) Cement pile and manufacturing method thereof
EP1187709B1 (en) Concrete product and method and apparatus for producing a concrete product
CN106985259A (en) A kind of foamed concrete mould of vibration compacting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant