CN106626049A - Cement pile and manufacturing method thereof - Google Patents

Cement pile and manufacturing method thereof Download PDF

Info

Publication number
CN106626049A
CN106626049A CN201611236908.8A CN201611236908A CN106626049A CN 106626049 A CN106626049 A CN 106626049A CN 201611236908 A CN201611236908 A CN 201611236908A CN 106626049 A CN106626049 A CN 106626049A
Authority
CN
China
Prior art keywords
cement
concrete stake
preparation
concrete
baffle plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611236908.8A
Other languages
Chinese (zh)
Inventor
历维江
历超阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo City Into Agricultural Facilities Engineering Design Co Ltd
Original Assignee
Ningbo City Into Agricultural Facilities Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo City Into Agricultural Facilities Engineering Design Co Ltd filed Critical Ningbo City Into Agricultural Facilities Engineering Design Co Ltd
Priority to CN201611236908.8A priority Critical patent/CN106626049A/en
Publication of CN106626049A publication Critical patent/CN106626049A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/76Moulds
    • B28B21/82Moulds built-up from several parts; Multiple moulds; Moulds with adjustable parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/14Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means vibrating, e.g. the surface of the material

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a cement pile and a preparation method thereof. The preparation method comprises the manufacturing steps of S1, arrangement of a production site: selecting a flat cement pavement, then, placing two baffle plates with flat surfaces on the cement pavement, parallelly arranging the two baffle plates, arranging two side templates between the two baffle plates, and forming a shaping cavity used for shaping the cement pile among the baffle plates, the side templates and the ground; S2, coating the side wall and the bottom wall of the shaping cavity with engine oil; S3, mixing and stirring proper amounts of cement ash, sandy clay, stone and water, so as to obtain concrete; S4, pouring stirred cement into the shaping cavity; S5, carrying out vibration levelling treatment on the upper surface of cement in the shaping cavity; S6, after consolidation shaping, removing the baffle plates; and S7, enabling the shaped cement pile to stand for a certain time, so as to completely shape the cement pile. According to the preparation method, engine oil is utilized, so that the cement pile can be effectively prevented from adhering to the side wall of the shaping cavity.

Description

Concrete stake and preparation method thereof
Technical field
The present invention relates to a kind of building field, more specifically, it relates to a kind of concrete stake and preparation method thereof.
Background technology
With the continuous propulsion of Process of Urbanization Construction, high buildings and large mansions are seen everywhere.And for long-time lives in the people in city For, therefore many people can be more likely to go to rural area to play when weekend, and Peasants Joy is risen.And most of Peasants Joy Can all there be pond the inside, and guests are delithted with pond side and are played, but if not doing any reinforcing at the side of a pond in pond, due to Soil is more open, in the case where long-time has visitor to walk, the soil on pond side it is possible that the phenomenon of avalanche, So as to there is certain potential safety hazard.
In order to eliminate this potential safety hazard, many Peasants Joy can select to be built in pond edge builds a circle concrete stake, is come with this Pond surrounding is reinforced, some unnecessary potential safety hazards are eliminated.
And it is current, the production method of concrete stake as disclosed in the Chinese patent of Application No. 200910034432.3, its It is obtained by the following method:1. the selection of mold materials;2. the composition of mould and making;3. the making of reinforced concrete post.The party It is polyvinyl chloride that the mold materials of method are selected, due to being not easy bonding, therefore the mistake of the whole demoulding between cement and polyvinyl chloride Journey is very convenient, and based on this, the present invention provides another concrete stake production technology, and it adopts different manufacture methods, reaches Facilitate the purpose of the concrete stake demoulding.
The content of the invention
The first object of the present invention is to provide a kind of preparation method of the concrete stake for facilitating the concrete stake demoulding.
The present invention above-mentioned technical purpose technical scheme is that:A kind of making side of concrete stake Method, using following making step:
The arrangement of S1, production site:Flat cement pavement is selected, the gear of two pieces of surfacings is then placed on cement pavement Plate, two baffle plates are arranged in parallel, and two pieces of side templates are arranged between two baffle plates, formed between baffle plate, side template and ground The forming cavity of type concrete stake;
S2, on the side wall and diapire of forming cavity coat machine oil;
S3, by appropriate concrete grey, husky mud, stone and water mix obtain cement;
S4, the cement being stirred is poured in forming cavity;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process;
After S6, coagulation forming, baffle plate is removed;
S7, by after shaping concrete stake stand a period of time, concrete stake is thoroughly molded.
By above-mentioned setting, during production, the cement being stirred is poured in forming cavity, machine oil can be intercepted Before cement and forming cavity side wall, and because machine oil is grease type, cement is water miscible, and between the two dissmilarity, i.e., oily It is immiscible between fat and cement, therefore grease can effectively prevent cement from sticking on the wall of forming cavity side, therefore it is solidifying in concrete stake Gu after shaping, can be very easily by baffle plate to removing, cement will not be sticked on baffle plate, and whole process is very convenient, And it is low for the requirement of place and barrier material, applicability is wide.
Preferably, reinforcing bar perforating is provided with two side templates in S1, straight reinforcing bar is selected so as to sequentially pass through Reinforcing bar perforating on two side templates.
By above-mentioned setting, when Ground arrangement is prepared, first reinforcing bar is worn on side template, it is now just now preliminary Fix, subsequently pour into toward in forming cavity after cement, after cement forming pile, can be good between reinforcing bar and concrete stake knot It is combined, good booster action can be played to the intensity of concrete stake by reinforcing bar, simultaneously as cement is complete by reinforcing bar It is bundled together, can effectively prevents reinforcing bar from occurring rotten phenomenon under long-time use.
Preferably, a steel pipe is selected in S1, the standing groove of placing steel tubes is provided with side template, steel pipe sequentially passes through two Standing groove on side template.
By above-mentioned setting, after the cement being stirred is imported in forming cavity, cement can fill full forming cavity, together When, it after band concrete stake cooling shaping, due to the presence of steel pipe, therefore can be molded by steel pipe to wrapping on concrete stake Go out a through hole, whole forming process is very convenient, it is to avoid after concrete stake machine-shaping reprocess through hole and it is strong to concrete stake Impact produced by degree.
Preferably, in S2, on the surface of steel pipe last layer machine oil is also coated with;In S6, steel pipe is also taken out from concrete stake Go out.
By above-mentioned setting, due to being also coated with machine oil on steel pipe, therefore after cement is poured into forming cavity, machine oil meeting Intercept between cement and steel pipe, so that will not adhere to each other between steel pipe and cement;After concrete stake coagulation forming, machine Oil plays good lubricant effect between concrete stake and steel pipe, therefore steel pipe can be extracted very easily from concrete stake, and Due to before with the presence of steel pipe, therefore a through hole can be molded on concrete stake, whole forming process is very convenient, it is to avoid The destruction that through hole is produced to concrete stake is reprocessed after cement forming pile, and a steel pipe can be used repeatedly, and effectively drop Low production cost;And machine oil also can play good lubrication between concrete stake and steel pipe, to steel pipe and concrete stake A certain degree of protective effect can be played.
Preferably, the leveling in S5 is processed and included:Ground is shaken with vibrator, makes cement upper surface become smooth.
By above-mentioned setting, ground is shaken by vibrator, and due to now cement not solidification, therefore in the vibrations In the presence of power, cement can also produce a certain degree of vibrations, and with the continuous vibration of cement, the upper surface of cement can be slowly Become more and more smooth.
Preferably, it is after making cement surface smooth with vibrator in S5 then by claying knife that cement upper surface is floating.
By above-mentioned setting, after the effect of vibrator, the surface of cement may or can exist a certain degree of It is rugged, therefore the smearing in cement upper surface by claying knife, the upper surface of cement can be further carried out at leveling Reason, it is ensured that the planarization on the concrete stake surface for processing.
Preferably, in S5 during floating cement, where some hollows, a certain amount of cement is filled, then is used Claying knife is floating.
It is that cement quantity is inadequate and caused where some hollows, so if wanting herein by above-mentioned setting It is floating, it may be necessary to which that back and forth smearing at this can complete many times, waste time and energy;And pass through to fill into one toward where hollow A little cement, are then carried out with claying knife again floating, you can quickly finish the purpose for filling and leading up hollow location, improve production efficiency.
Preferably, in S5, by cement upper surface flatten after, then by besom along cavity length direction in cement table Face is inswept, and the broom head of besom is made of plastics.
By above-mentioned setting, after cement upper surface is floating, now cement is not solidified, and its surface is still compared Relatively soft, and the upper surface for passing through besom in cement is inswept, and the lines of bar shaped can be formed on the one side of cement, this The lines of shape can meet the use demand of concrete column difference occasion for some algae existence, while the bar shaped lines Process is very convenient, and the production efficiency of concrete stake and production cost will not be impacted;Further, since the besom of besom Head is made of plastic, therefore during using besom, the bristle on its broom head is not easy the phenomenon for occurring coming off.
Preferably, concrete stake is stood into 1 month in S7, makes concrete stake keep moisture state during standing.
By above-mentioned setting, due to the phenomenon that cement can shrink during solidification, when shrinking when over-drying The stress of generation cracks can mixed mud, so as to certain problem occurs in the intensity for causing concrete stake, and by making cement Stake keeps the state of moistening, can effectively alleviate this problem, is so kept for one month, and cement finalizes the design almost, its have compared with High hardness, the quality of production is high.
The second object of the present invention is to provide a kind of concrete stake, and its surface easily grows some algae, reaches greening Effect.
The present invention above-mentioned technical purpose technical scheme is that:A kind of concrete stake, the cement The side of stake is formed with bar shaped lines.
By above-mentioned setting, when concrete stake is driven in pond, concrete stake is set to be provided with the one side of bar shaped lines Towards pond, the presence of these bar shaped lines, some algae can be made more preferably to be bred on concrete stake, so that water Mud stake possesses certain greening function, beautifies the environment.
In sum, the invention has the advantages that:
1. the forming cavity of concrete stake, low production cost can be constituted by baffle plate and side template;
2. the presence of machine oil, can be such that cement does not stick on the side wall of forming cavity, facilitate dividing between cement and forming cavity From;
3. bar shaped lines very easily can be gone out in the surface forming of concrete stake by besom, production process is convenient;
4. the maintenance to concrete stake is realized under moisture state, the quality and hardness of concrete stake is improved.
Description of the drawings
Fig. 1 is the structure chart after the present embodiment coagulation forming;
Fig. 2 is the structure chart after the completion of the present embodiment production site step;
Fig. 3 is the structure chart of concrete stake.
In figure:1. road surface;2. baffle plate;3rd, connecting rod;4th, reinforcing bar;5th, side template;51st, reinforcing bar perforating;6th, steel pipe;7th, it is molded Chamber;8th, concrete stake;81st, bar shaped lines;82nd, through hole.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing 1-3.
Embodiment one:
A kind of concrete stake, it passes through following making step and is obtained:
The arrangement of S1, production site:Flat cement pavement is selected, the baffle plate of two pieces of surfacings is chosen, then by two baffle plates Placement facing each other, it is ensured that two pieces of baffle plates are to be in the state being parallel to each other, and are then penetrated respectively to two pieces of baffle plates by connecting rod In, realize being relatively fixed for position between two pieces of baffle plates;Subsequently two pieces of side templates being parallel to each other are put between two pieces of baffle plates, The both sides of side template are fitted with the side wall of baffle plate, and the forming cavity of shaping cement is now formed between baffle plate, side template and ground; Reinforcing bar perforating and standing groove are provided with side template, reinforcing bar is sequentially passed through into two side templates by reinforcing bar perforating, wherein, steel Then muscle can be carried out stretching process from buying on the market to the reinforcing bar;Steel pipe is erected on two side templates by standing groove;
S2, machine oil is dipped by sponge, then forming cavity side wall is smeared by sponge, i.e., be ground, side template where the demoulding And baffle plate, so as to form one layer of machine oil layer on the side wall of forming cavity;
S3, first appropriate concrete grey, husky mud, stone mixed with water, concrete is obtained after stirring;
S4, the cement being stirred is poured in forming cavity, because now cement has a stronger mobility, therefore cement can be by Reinforcing bar, steel pipe are all enveloped;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process:First pass through jarring machine vibrations ground and baffle plate, and by There is stronger mobility in cement now, therefore under the shock effect of jarring machine, the upper surface of cement occurs necessarily The flowing of degree such that it is able to which making the upper surface of cement carries out preliminary leveling;Subsequently by manually with claying knife to cement Upper surface carries out floating, for some hollow locations, additionally adds cement, is then carried out by claying knife again floating, makes cement Surface keep it is smooth;Subsequently, one is chosen besom, the broom head of besom is by made by plastic material, by besom in water The upper surface of mud is inswept, so as to form bar shaped lines in the upper surface of cement;
After S6, coagulation forming, connecting rod is caught, baffle plate is entirely lifted, due to adhering to organic oil on baffle plate, therefore, it is possible to cement not Can stick on baffle plate;Steel pipe is pulled by tube drawing machine, so that steel pipe makes to be extracted out in the concrete stake of coagulation forming, machine oil is deposited Good lubrication can played;Subsequently, the burr of concrete stake are repaired.
S7 and then the concrete stake standing one month by coagulation forming, during this section stands, the moment keeps water State of the mud stake in moistening, effectively prevents from shrinking during theing cement solidifies and producing stress splits concrete stake generation Line.
Wherein, machine oil is shell Heineken HX2 machine oil;GT of the vibrator selected from the production of Shanghai Shuo Zhou Electronic Science and Technology Co., Ltd.s Series Pneumatic runner vibrator.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make as needed the modification without creative contribution after this specification is read to the present embodiment, but as long as at this All protected by Patent Law in the right of invention.

Claims (10)

1. a kind of preparation method of concrete stake, it is characterised in that using following making step:
The arrangement of S1, production site:Flat cement pavement is selected, the gear of two pieces of surfacings is then placed on cement pavement Plate, two baffle plates are arranged in parallel, and two pieces of side templates are arranged between two baffle plates, formed between baffle plate, side template and ground The forming cavity of type concrete stake;
S2, on the side wall and diapire of forming cavity coat machine oil;
S3, by appropriate concrete grey, husky mud, stone and water mix obtain concrete;
S4, the cement being stirred is poured in forming cavity;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process;
After S6, coagulation forming, baffle plate is removed;
S7, by after shaping concrete stake stand a period of time, concrete stake is thoroughly molded.
2. the preparation method of concrete stake according to claim 1, is characterized in that:Steel is provided with two side templates in S1 Muscle perforating, selects straight reinforcing bar so as to sequentially pass through the reinforcing bar perforating on two side templates.
3. the preparation method of concrete stake according to claim 1, is characterized in that:A steel pipe is selected in S1, on side template The standing groove of placing steel tubes is provided with, steel pipe sequentially passes through the standing groove on two side templates.
4. the preparation method of concrete stake according to claim 3, is characterized in that:In S2, it is also coated with the surface of steel pipe One layer of machine oil;In S6, steel pipe is also extracted out from concrete stake.
5. the preparation method of concrete stake according to claim 1, is characterized in that:Leveling in S5 is processed to be included:With vibration Device shakes ground, makes cement upper surface become smooth.
6. the preparation method of concrete stake according to claim 5, is characterized in that:Make cement surface smooth with vibrator in S5 Afterwards, it is then by claying knife that cement upper surface is floating.
7. the preparation method of concrete stake according to claim 6, is characterized in that:In S5 during floating cement, Where some hollows, a certain amount of cement is filled, then it is floating with claying knife.
8. the preparation method of concrete stake according to claim 1, is characterized in that:In S5, after cement upper surface is flattened, Inswept in cement surface along the length direction of cavity by besom again, the broom head of besom is made of plastics.
9. the preparation method of concrete stake according to claim 1, is characterized in that:Concrete stake is stood into 1 month in S7, quiet Concrete stake is set to keep moisture state during putting.
10. concrete stake obtained in a kind of method with described in claim 8, it is characterised in that:The side of the concrete stake is formed There is bar shaped lines.
CN201611236908.8A 2016-12-28 2016-12-28 Cement pile and manufacturing method thereof Pending CN106626049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611236908.8A CN106626049A (en) 2016-12-28 2016-12-28 Cement pile and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611236908.8A CN106626049A (en) 2016-12-28 2016-12-28 Cement pile and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN106626049A true CN106626049A (en) 2017-05-10

Family

ID=58832464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611236908.8A Pending CN106626049A (en) 2016-12-28 2016-12-28 Cement pile and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN106626049A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794916A (en) * 2017-10-18 2018-03-13 周晓红 A kind of hollow square pile cast-in-place equipment
CN108638306A (en) * 2018-05-21 2018-10-12 宁波市时进农业设施工程设计有限公司 A kind of prestressing force manufacture craft of concrete hollow fender pile

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2721359Y (en) * 2004-09-02 2005-08-31 中卫县兴水建筑建材有限责任公司水利建筑建材分公司 Cement pile forming device
CN200998888Y (en) * 2007-01-16 2008-01-02 修玉 Cement stake forming machine
CN201044968Y (en) * 2007-05-11 2008-04-09 上海中技桩业发展有限公司 Hollow concrete square pile vibration forming die
CN101653102A (en) * 2009-08-28 2010-02-24 中国水产科学研究院淡水渔业研究中心 Manufacture method for concrete stake of aquiculture escape-proof fence
CN102773918A (en) * 2012-08-24 2012-11-14 周晓伟 Manufacturing method of concrete precast pile
CN104385454A (en) * 2014-10-08 2015-03-04 威海齐德新型建材有限公司 Common threaded steel tensioning device and prefabricated square pile process
CN204894175U (en) * 2015-09-01 2015-12-23 许顺良 Precast concrete reinforcing bar side stake mould

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2721359Y (en) * 2004-09-02 2005-08-31 中卫县兴水建筑建材有限责任公司水利建筑建材分公司 Cement pile forming device
CN200998888Y (en) * 2007-01-16 2008-01-02 修玉 Cement stake forming machine
CN201044968Y (en) * 2007-05-11 2008-04-09 上海中技桩业发展有限公司 Hollow concrete square pile vibration forming die
CN101653102A (en) * 2009-08-28 2010-02-24 中国水产科学研究院淡水渔业研究中心 Manufacture method for concrete stake of aquiculture escape-proof fence
CN102773918A (en) * 2012-08-24 2012-11-14 周晓伟 Manufacturing method of concrete precast pile
CN104385454A (en) * 2014-10-08 2015-03-04 威海齐德新型建材有限公司 Common threaded steel tensioning device and prefabricated square pile process
CN204894175U (en) * 2015-09-01 2015-12-23 许顺良 Precast concrete reinforcing bar side stake mould

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794916A (en) * 2017-10-18 2018-03-13 周晓红 A kind of hollow square pile cast-in-place equipment
CN108638306A (en) * 2018-05-21 2018-10-12 宁波市时进农业设施工程设计有限公司 A kind of prestressing force manufacture craft of concrete hollow fender pile

Similar Documents

Publication Publication Date Title
CN108247812A (en) A kind of production method of precast concrete
CN106626049A (en) Cement pile and manufacturing method thereof
KR101239128B1 (en) Artificial rock wall construction method for rock climbing
CN107881902A (en) Concrete construction method and mirror surface concrete pier stud
JP4157120B2 (en) Method for producing artificial stone
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN202323614U (en) Novel pavement pit hole repairing structure
CN109371910A (en) Pad ground raising protection and construction method
CN106639123B (en) Steel construction for mixed mud building block
CN101892664B (en) Bored concrete pile group construction method of plastic honeycomb pipe retaining wall and honeycombed bored concrete pile
CN104499481B (en) A kind of prestressing force screw stake and preparation method thereof
CN206070290U (en) Subgrade drainage structures former
CN206769408U (en) A kind of novel concrete plane construction vibrator
CN113338114B (en) Polar region ice and snow runway and construction method thereof
CN109826234A (en) A kind of maintaining process of national highway inspection well cover
CN107972400A (en) A kind of production method of artificial large rockwork
CN110273340B (en) Construction method of municipal road
CN105002804A (en) Construction process of surface layer blind sidewalk of cement concrete sidewalk
CN209636780U (en) Composite pile
JP2014009439A (en) Pavement structure
CN207498833U (en) Cable-stayed bridge mass concrete box beam weight concrete structure
CN107662280A (en) A kind of production technology of new cobblestone prefabricated component
CN206693216U (en) A kind of bored concrete pile for being easy to cut pile crown
CN105599520A (en) Method for manufacturing artificial hills and other artware
CN110067171A (en) A kind of water penetration anti-settling road and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Weijiang

Inventor after: Li Chaoyang

Inventor before: Li Weijiang

Inventor before: Li Chaoyang

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510