CN106626049A - Cement pile and manufacturing method thereof - Google Patents
Cement pile and manufacturing method thereof Download PDFInfo
- Publication number
- CN106626049A CN106626049A CN201611236908.8A CN201611236908A CN106626049A CN 106626049 A CN106626049 A CN 106626049A CN 201611236908 A CN201611236908 A CN 201611236908A CN 106626049 A CN106626049 A CN 106626049A
- Authority
- CN
- China
- Prior art keywords
- cement
- concrete stake
- preparation
- concrete
- baffle plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/76—Moulds
- B28B21/82—Moulds built-up from several parts; Multiple moulds; Moulds with adjustable parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/02—Methods or machines specially adapted for the production of tubular articles by casting into moulds
- B28B21/10—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
- B28B21/14—Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means vibrating, e.g. the surface of the material
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a cement pile and a preparation method thereof. The preparation method comprises the manufacturing steps of S1, arrangement of a production site: selecting a flat cement pavement, then, placing two baffle plates with flat surfaces on the cement pavement, parallelly arranging the two baffle plates, arranging two side templates between the two baffle plates, and forming a shaping cavity used for shaping the cement pile among the baffle plates, the side templates and the ground; S2, coating the side wall and the bottom wall of the shaping cavity with engine oil; S3, mixing and stirring proper amounts of cement ash, sandy clay, stone and water, so as to obtain concrete; S4, pouring stirred cement into the shaping cavity; S5, carrying out vibration levelling treatment on the upper surface of cement in the shaping cavity; S6, after consolidation shaping, removing the baffle plates; and S7, enabling the shaped cement pile to stand for a certain time, so as to completely shape the cement pile. According to the preparation method, engine oil is utilized, so that the cement pile can be effectively prevented from adhering to the side wall of the shaping cavity.
Description
Technical field
The present invention relates to a kind of building field, more specifically, it relates to a kind of concrete stake and preparation method thereof.
Background technology
With the continuous propulsion of Process of Urbanization Construction, high buildings and large mansions are seen everywhere.And for long-time lives in the people in city
For, therefore many people can be more likely to go to rural area to play when weekend, and Peasants Joy is risen.And most of Peasants Joy
Can all there be pond the inside, and guests are delithted with pond side and are played, but if not doing any reinforcing at the side of a pond in pond, due to
Soil is more open, in the case where long-time has visitor to walk, the soil on pond side it is possible that the phenomenon of avalanche,
So as to there is certain potential safety hazard.
In order to eliminate this potential safety hazard, many Peasants Joy can select to be built in pond edge builds a circle concrete stake, is come with this
Pond surrounding is reinforced, some unnecessary potential safety hazards are eliminated.
And it is current, the production method of concrete stake as disclosed in the Chinese patent of Application No. 200910034432.3, its
It is obtained by the following method:1. the selection of mold materials;2. the composition of mould and making;3. the making of reinforced concrete post.The party
It is polyvinyl chloride that the mold materials of method are selected, due to being not easy bonding, therefore the mistake of the whole demoulding between cement and polyvinyl chloride
Journey is very convenient, and based on this, the present invention provides another concrete stake production technology, and it adopts different manufacture methods, reaches
Facilitate the purpose of the concrete stake demoulding.
The content of the invention
The first object of the present invention is to provide a kind of preparation method of the concrete stake for facilitating the concrete stake demoulding.
The present invention above-mentioned technical purpose technical scheme is that:A kind of making side of concrete stake
Method, using following making step:
The arrangement of S1, production site:Flat cement pavement is selected, the gear of two pieces of surfacings is then placed on cement pavement
Plate, two baffle plates are arranged in parallel, and two pieces of side templates are arranged between two baffle plates, formed between baffle plate, side template and ground
The forming cavity of type concrete stake;
S2, on the side wall and diapire of forming cavity coat machine oil;
S3, by appropriate concrete grey, husky mud, stone and water mix obtain cement;
S4, the cement being stirred is poured in forming cavity;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process;
After S6, coagulation forming, baffle plate is removed;
S7, by after shaping concrete stake stand a period of time, concrete stake is thoroughly molded.
By above-mentioned setting, during production, the cement being stirred is poured in forming cavity, machine oil can be intercepted
Before cement and forming cavity side wall, and because machine oil is grease type, cement is water miscible, and between the two dissmilarity, i.e., oily
It is immiscible between fat and cement, therefore grease can effectively prevent cement from sticking on the wall of forming cavity side, therefore it is solidifying in concrete stake
Gu after shaping, can be very easily by baffle plate to removing, cement will not be sticked on baffle plate, and whole process is very convenient,
And it is low for the requirement of place and barrier material, applicability is wide.
Preferably, reinforcing bar perforating is provided with two side templates in S1, straight reinforcing bar is selected so as to sequentially pass through
Reinforcing bar perforating on two side templates.
By above-mentioned setting, when Ground arrangement is prepared, first reinforcing bar is worn on side template, it is now just now preliminary
Fix, subsequently pour into toward in forming cavity after cement, after cement forming pile, can be good between reinforcing bar and concrete stake knot
It is combined, good booster action can be played to the intensity of concrete stake by reinforcing bar, simultaneously as cement is complete by reinforcing bar
It is bundled together, can effectively prevents reinforcing bar from occurring rotten phenomenon under long-time use.
Preferably, a steel pipe is selected in S1, the standing groove of placing steel tubes is provided with side template, steel pipe sequentially passes through two
Standing groove on side template.
By above-mentioned setting, after the cement being stirred is imported in forming cavity, cement can fill full forming cavity, together
When, it after band concrete stake cooling shaping, due to the presence of steel pipe, therefore can be molded by steel pipe to wrapping on concrete stake
Go out a through hole, whole forming process is very convenient, it is to avoid after concrete stake machine-shaping reprocess through hole and it is strong to concrete stake
Impact produced by degree.
Preferably, in S2, on the surface of steel pipe last layer machine oil is also coated with;In S6, steel pipe is also taken out from concrete stake
Go out.
By above-mentioned setting, due to being also coated with machine oil on steel pipe, therefore after cement is poured into forming cavity, machine oil meeting
Intercept between cement and steel pipe, so that will not adhere to each other between steel pipe and cement;After concrete stake coagulation forming, machine
Oil plays good lubricant effect between concrete stake and steel pipe, therefore steel pipe can be extracted very easily from concrete stake, and
Due to before with the presence of steel pipe, therefore a through hole can be molded on concrete stake, whole forming process is very convenient, it is to avoid
The destruction that through hole is produced to concrete stake is reprocessed after cement forming pile, and a steel pipe can be used repeatedly, and effectively drop
Low production cost;And machine oil also can play good lubrication between concrete stake and steel pipe, to steel pipe and concrete stake
A certain degree of protective effect can be played.
Preferably, the leveling in S5 is processed and included:Ground is shaken with vibrator, makes cement upper surface become smooth.
By above-mentioned setting, ground is shaken by vibrator, and due to now cement not solidification, therefore in the vibrations
In the presence of power, cement can also produce a certain degree of vibrations, and with the continuous vibration of cement, the upper surface of cement can be slowly
Become more and more smooth.
Preferably, it is after making cement surface smooth with vibrator in S5 then by claying knife that cement upper surface is floating.
By above-mentioned setting, after the effect of vibrator, the surface of cement may or can exist a certain degree of
It is rugged, therefore the smearing in cement upper surface by claying knife, the upper surface of cement can be further carried out at leveling
Reason, it is ensured that the planarization on the concrete stake surface for processing.
Preferably, in S5 during floating cement, where some hollows, a certain amount of cement is filled, then is used
Claying knife is floating.
It is that cement quantity is inadequate and caused where some hollows, so if wanting herein by above-mentioned setting
It is floating, it may be necessary to which that back and forth smearing at this can complete many times, waste time and energy;And pass through to fill into one toward where hollow
A little cement, are then carried out with claying knife again floating, you can quickly finish the purpose for filling and leading up hollow location, improve production efficiency.
Preferably, in S5, by cement upper surface flatten after, then by besom along cavity length direction in cement table
Face is inswept, and the broom head of besom is made of plastics.
By above-mentioned setting, after cement upper surface is floating, now cement is not solidified, and its surface is still compared
Relatively soft, and the upper surface for passing through besom in cement is inswept, and the lines of bar shaped can be formed on the one side of cement, this
The lines of shape can meet the use demand of concrete column difference occasion for some algae existence, while the bar shaped lines
Process is very convenient, and the production efficiency of concrete stake and production cost will not be impacted;Further, since the besom of besom
Head is made of plastic, therefore during using besom, the bristle on its broom head is not easy the phenomenon for occurring coming off.
Preferably, concrete stake is stood into 1 month in S7, makes concrete stake keep moisture state during standing.
By above-mentioned setting, due to the phenomenon that cement can shrink during solidification, when shrinking when over-drying
The stress of generation cracks can mixed mud, so as to certain problem occurs in the intensity for causing concrete stake, and by making cement
Stake keeps the state of moistening, can effectively alleviate this problem, is so kept for one month, and cement finalizes the design almost, its have compared with
High hardness, the quality of production is high.
The second object of the present invention is to provide a kind of concrete stake, and its surface easily grows some algae, reaches greening
Effect.
The present invention above-mentioned technical purpose technical scheme is that:A kind of concrete stake, the cement
The side of stake is formed with bar shaped lines.
By above-mentioned setting, when concrete stake is driven in pond, concrete stake is set to be provided with the one side of bar shaped lines
Towards pond, the presence of these bar shaped lines, some algae can be made more preferably to be bred on concrete stake, so that water
Mud stake possesses certain greening function, beautifies the environment.
In sum, the invention has the advantages that:
1. the forming cavity of concrete stake, low production cost can be constituted by baffle plate and side template;
2. the presence of machine oil, can be such that cement does not stick on the side wall of forming cavity, facilitate dividing between cement and forming cavity
From;
3. bar shaped lines very easily can be gone out in the surface forming of concrete stake by besom, production process is convenient;
4. the maintenance to concrete stake is realized under moisture state, the quality and hardness of concrete stake is improved.
Description of the drawings
Fig. 1 is the structure chart after the present embodiment coagulation forming;
Fig. 2 is the structure chart after the completion of the present embodiment production site step;
Fig. 3 is the structure chart of concrete stake.
In figure:1. road surface;2. baffle plate;3rd, connecting rod;4th, reinforcing bar;5th, side template;51st, reinforcing bar perforating;6th, steel pipe;7th, it is molded
Chamber;8th, concrete stake;81st, bar shaped lines;82nd, through hole.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing 1-3.
Embodiment one:
A kind of concrete stake, it passes through following making step and is obtained:
The arrangement of S1, production site:Flat cement pavement is selected, the baffle plate of two pieces of surfacings is chosen, then by two baffle plates
Placement facing each other, it is ensured that two pieces of baffle plates are to be in the state being parallel to each other, and are then penetrated respectively to two pieces of baffle plates by connecting rod
In, realize being relatively fixed for position between two pieces of baffle plates;Subsequently two pieces of side templates being parallel to each other are put between two pieces of baffle plates,
The both sides of side template are fitted with the side wall of baffle plate, and the forming cavity of shaping cement is now formed between baffle plate, side template and ground;
Reinforcing bar perforating and standing groove are provided with side template, reinforcing bar is sequentially passed through into two side templates by reinforcing bar perforating, wherein, steel
Then muscle can be carried out stretching process from buying on the market to the reinforcing bar;Steel pipe is erected on two side templates by standing groove;
S2, machine oil is dipped by sponge, then forming cavity side wall is smeared by sponge, i.e., be ground, side template where the demoulding
And baffle plate, so as to form one layer of machine oil layer on the side wall of forming cavity;
S3, first appropriate concrete grey, husky mud, stone mixed with water, concrete is obtained after stirring;
S4, the cement being stirred is poured in forming cavity, because now cement has a stronger mobility, therefore cement can be by
Reinforcing bar, steel pipe are all enveloped;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process:First pass through jarring machine vibrations ground and baffle plate, and by
There is stronger mobility in cement now, therefore under the shock effect of jarring machine, the upper surface of cement occurs necessarily
The flowing of degree such that it is able to which making the upper surface of cement carries out preliminary leveling;Subsequently by manually with claying knife to cement
Upper surface carries out floating, for some hollow locations, additionally adds cement, is then carried out by claying knife again floating, makes cement
Surface keep it is smooth;Subsequently, one is chosen besom, the broom head of besom is by made by plastic material, by besom in water
The upper surface of mud is inswept, so as to form bar shaped lines in the upper surface of cement;
After S6, coagulation forming, connecting rod is caught, baffle plate is entirely lifted, due to adhering to organic oil on baffle plate, therefore, it is possible to cement not
Can stick on baffle plate;Steel pipe is pulled by tube drawing machine, so that steel pipe makes to be extracted out in the concrete stake of coagulation forming, machine oil is deposited
Good lubrication can played;Subsequently, the burr of concrete stake are repaired.
S7 and then the concrete stake standing one month by coagulation forming, during this section stands, the moment keeps water
State of the mud stake in moistening, effectively prevents from shrinking during theing cement solidifies and producing stress splits concrete stake generation
Line.
Wherein, machine oil is shell Heineken HX2 machine oil;GT of the vibrator selected from the production of Shanghai Shuo Zhou Electronic Science and Technology Co., Ltd.s
Series Pneumatic runner vibrator.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make as needed the modification without creative contribution after this specification is read to the present embodiment, but as long as at this
All protected by Patent Law in the right of invention.
Claims (10)
1. a kind of preparation method of concrete stake, it is characterised in that using following making step:
The arrangement of S1, production site:Flat cement pavement is selected, the gear of two pieces of surfacings is then placed on cement pavement
Plate, two baffle plates are arranged in parallel, and two pieces of side templates are arranged between two baffle plates, formed between baffle plate, side template and ground
The forming cavity of type concrete stake;
S2, on the side wall and diapire of forming cavity coat machine oil;
S3, by appropriate concrete grey, husky mud, stone and water mix obtain concrete;
S4, the cement being stirred is poured in forming cavity;
S5, to the cement upper surface in forming cavity carry out vibrate leveling process;
After S6, coagulation forming, baffle plate is removed;
S7, by after shaping concrete stake stand a period of time, concrete stake is thoroughly molded.
2. the preparation method of concrete stake according to claim 1, is characterized in that:Steel is provided with two side templates in S1
Muscle perforating, selects straight reinforcing bar so as to sequentially pass through the reinforcing bar perforating on two side templates.
3. the preparation method of concrete stake according to claim 1, is characterized in that:A steel pipe is selected in S1, on side template
The standing groove of placing steel tubes is provided with, steel pipe sequentially passes through the standing groove on two side templates.
4. the preparation method of concrete stake according to claim 3, is characterized in that:In S2, it is also coated with the surface of steel pipe
One layer of machine oil;In S6, steel pipe is also extracted out from concrete stake.
5. the preparation method of concrete stake according to claim 1, is characterized in that:Leveling in S5 is processed to be included:With vibration
Device shakes ground, makes cement upper surface become smooth.
6. the preparation method of concrete stake according to claim 5, is characterized in that:Make cement surface smooth with vibrator in S5
Afterwards, it is then by claying knife that cement upper surface is floating.
7. the preparation method of concrete stake according to claim 6, is characterized in that:In S5 during floating cement,
Where some hollows, a certain amount of cement is filled, then it is floating with claying knife.
8. the preparation method of concrete stake according to claim 1, is characterized in that:In S5, after cement upper surface is flattened,
Inswept in cement surface along the length direction of cavity by besom again, the broom head of besom is made of plastics.
9. the preparation method of concrete stake according to claim 1, is characterized in that:Concrete stake is stood into 1 month in S7, quiet
Concrete stake is set to keep moisture state during putting.
10. concrete stake obtained in a kind of method with described in claim 8, it is characterised in that:The side of the concrete stake is formed
There is bar shaped lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611236908.8A CN106626049A (en) | 2016-12-28 | 2016-12-28 | Cement pile and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611236908.8A CN106626049A (en) | 2016-12-28 | 2016-12-28 | Cement pile and manufacturing method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106626049A true CN106626049A (en) | 2017-05-10 |
Family
ID=58832464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611236908.8A Pending CN106626049A (en) | 2016-12-28 | 2016-12-28 | Cement pile and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106626049A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107794916A (en) * | 2017-10-18 | 2018-03-13 | 周晓红 | A kind of hollow square pile cast-in-place equipment |
CN108638306A (en) * | 2018-05-21 | 2018-10-12 | 宁波市时进农业设施工程设计有限公司 | A kind of prestressing force manufacture craft of concrete hollow fender pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2721359Y (en) * | 2004-09-02 | 2005-08-31 | 中卫县兴水建筑建材有限责任公司水利建筑建材分公司 | Cement pile forming device |
CN200998888Y (en) * | 2007-01-16 | 2008-01-02 | 修玉 | Cement stake forming machine |
CN201044968Y (en) * | 2007-05-11 | 2008-04-09 | 上海中技桩业发展有限公司 | Hollow concrete square pile vibration forming die |
CN101653102A (en) * | 2009-08-28 | 2010-02-24 | 中国水产科学研究院淡水渔业研究中心 | Manufacture method for concrete stake of aquiculture escape-proof fence |
CN102773918A (en) * | 2012-08-24 | 2012-11-14 | 周晓伟 | Manufacturing method of concrete precast pile |
CN104385454A (en) * | 2014-10-08 | 2015-03-04 | 威海齐德新型建材有限公司 | Common threaded steel tensioning device and prefabricated square pile process |
CN204894175U (en) * | 2015-09-01 | 2015-12-23 | 许顺良 | Precast concrete reinforcing bar side stake mould |
-
2016
- 2016-12-28 CN CN201611236908.8A patent/CN106626049A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2721359Y (en) * | 2004-09-02 | 2005-08-31 | 中卫县兴水建筑建材有限责任公司水利建筑建材分公司 | Cement pile forming device |
CN200998888Y (en) * | 2007-01-16 | 2008-01-02 | 修玉 | Cement stake forming machine |
CN201044968Y (en) * | 2007-05-11 | 2008-04-09 | 上海中技桩业发展有限公司 | Hollow concrete square pile vibration forming die |
CN101653102A (en) * | 2009-08-28 | 2010-02-24 | 中国水产科学研究院淡水渔业研究中心 | Manufacture method for concrete stake of aquiculture escape-proof fence |
CN102773918A (en) * | 2012-08-24 | 2012-11-14 | 周晓伟 | Manufacturing method of concrete precast pile |
CN104385454A (en) * | 2014-10-08 | 2015-03-04 | 威海齐德新型建材有限公司 | Common threaded steel tensioning device and prefabricated square pile process |
CN204894175U (en) * | 2015-09-01 | 2015-12-23 | 许顺良 | Precast concrete reinforcing bar side stake mould |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107794916A (en) * | 2017-10-18 | 2018-03-13 | 周晓红 | A kind of hollow square pile cast-in-place equipment |
CN108638306A (en) * | 2018-05-21 | 2018-10-12 | 宁波市时进农业设施工程设计有限公司 | A kind of prestressing force manufacture craft of concrete hollow fender pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108247812A (en) | A kind of production method of precast concrete | |
CN106626049A (en) | Cement pile and manufacturing method thereof | |
KR101239128B1 (en) | Artificial rock wall construction method for rock climbing | |
CN107881902A (en) | Concrete construction method and mirror surface concrete pier stud | |
JP4157120B2 (en) | Method for producing artificial stone | |
CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
CN202323614U (en) | Novel pavement pit hole repairing structure | |
CN109371910A (en) | Pad ground raising protection and construction method | |
CN106639123B (en) | Steel construction for mixed mud building block | |
CN101892664B (en) | Bored concrete pile group construction method of plastic honeycomb pipe retaining wall and honeycombed bored concrete pile | |
CN104499481B (en) | A kind of prestressing force screw stake and preparation method thereof | |
CN206070290U (en) | Subgrade drainage structures former | |
CN206769408U (en) | A kind of novel concrete plane construction vibrator | |
CN113338114B (en) | Polar region ice and snow runway and construction method thereof | |
CN109826234A (en) | A kind of maintaining process of national highway inspection well cover | |
CN107972400A (en) | A kind of production method of artificial large rockwork | |
CN110273340B (en) | Construction method of municipal road | |
CN105002804A (en) | Construction process of surface layer blind sidewalk of cement concrete sidewalk | |
CN209636780U (en) | Composite pile | |
JP2014009439A (en) | Pavement structure | |
CN207498833U (en) | Cable-stayed bridge mass concrete box beam weight concrete structure | |
CN107662280A (en) | A kind of production technology of new cobblestone prefabricated component | |
CN206693216U (en) | A kind of bored concrete pile for being easy to cut pile crown | |
CN105599520A (en) | Method for manufacturing artificial hills and other artware | |
CN110067171A (en) | A kind of water penetration anti-settling road and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Weijiang Inventor after: Li Chaoyang Inventor before: Li Weijiang Inventor before: Li Chaoyang |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |
|
RJ01 | Rejection of invention patent application after publication |