CN107230162A - Equipment alteration treating method and apparatus based on production management system - Google Patents

Equipment alteration treating method and apparatus based on production management system Download PDF

Info

Publication number
CN107230162A
CN107230162A CN201710357906.2A CN201710357906A CN107230162A CN 107230162 A CN107230162 A CN 107230162A CN 201710357906 A CN201710357906 A CN 201710357906A CN 107230162 A CN107230162 A CN 107230162A
Authority
CN
China
Prior art keywords
equipment
account
typing
module
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710357906.2A
Other languages
Chinese (zh)
Inventor
李文明
李文娟
李耀鹏
王丹
马国雷
韩宝卿
李宝萍
何松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd, Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710357906.2A priority Critical patent/CN107230162A/en
Publication of CN107230162A publication Critical patent/CN107230162A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

The invention discloses a kind of equipment alteration treating method and apparatus based on production management system.Wherein, this method includes:Typing and the equipment figure and equipment account of distribution apparatus;Receive the instruction modified to equipment figure and/or equipment account;According to the instruction modified to equipment figure and/or equipment account, the modification of the application information and receiving of stopping using as a servant equipment to equipment figure and/or equipment account is sent to scheduling system, preserves and issues amended equipment figure and/or equipment account.Occurs the technical problem of data redundancy when being safeguarded respectively due to multiple operation systems when the present invention solves equipment alteration in the prior art.

Description

Equipment alteration treating method and apparatus based on production management system
Technical field
The present invention relates to power domain, in particular to a kind of equipment alteration processing side based on production management system Method and device.
Background technology
The Eleventh Five-Year Plan period, State Grid Corporation of China has built up production management system (PMS), marketing system (CMS), adjusted respectively Degree system (OMS), ERP (Enterprise Resources Plan) systems simultaneously carry out comprehensive practical application, in terms of basic data application and fusion, Realize between the data sharing to ERP-PM (device management module) by source of PMS of power network power transmission and transforming equipment, other each systems Defeated change power distribution network resource data and marketing resource data are voluntarily safeguarded that basic data maintenance is present by each system according to application demand There is inconsistent phenomenon in multiple sources, each system data.
For effectively lifting PMS, ERP, CMS, OMS application level and the practical level of system, each system data is realized The target of shared and business cooperation, the inconsistent present situation of data found based on current company PMS and battalion's auxiliary tone insertion construction, is needed Carry out each operation system data control comprehensively, but lack more comprehensive multi-service cooperative device unusual fluctuation supervisor at present System, the development for work in every brings larger repetitive operation and difficulty.
Information system by modes such as business cooperation and data sharings by the every comprehensive insertion of production management business of company, But because the reason such as different, professional sex differernce of dimension that each information system is managed, the inevasible substantial amounts that generate Redundant data, and can simultaneously be safeguarded in multiple information systems with category information, and data interaction is carried out, mass data redundancy is produced, In such cases, the uniformity and accuracy of data can turn into the important of the data sharing of each information system business cooperation of restriction again Influence factor, it is impossible to effectively given play to the advantage of integration of information system.
Due to there is data redundancy when multiple operation systems are safeguarded respectively during for above-mentioned equipment alteration in the prior art Problem, not yet proposes effective solution at present.
The content of the invention
The embodiments of the invention provide a kind of equipment alteration treating method and apparatus based on production management system, with least Solve in the prior art equipment alteration when due to there is the technical problem of data redundancy when multiple operation systems are safeguarded respectively.
There is provided a kind of equipment alteration processing side based on production management system for one side according to embodiments of the present invention Method, including:Typing and the equipment figure and equipment account of distribution apparatus;Receive and equipment figure and/or equipment account are carried out The instruction of modification;According to the instruction modified to equipment figure and/or equipment account, sent to scheduling system and stop using as a servant equipment The modification of application information and receiving to equipment figure and/or equipment account, preserves and issues amended equipment figure and/or set Standby account.
Another aspect according to embodiments of the present invention, additionally provides a kind of equipment alteration processing based on production management system Device, including:Typing module, for typing and the equipment figure and equipment account of distribution apparatus;First receiving module, is used for Receive the instruction modified to equipment figure and/or equipment account;First processing module, for according to equipment figure and/ Or the instruction that equipment account is modified, to scheduling system send stop use as a servant equipment application information and receive to equipment figure and/ Or the modification of equipment account, preserve and issue amended equipment figure and/or equipment account.
Another aspect according to embodiments of the present invention, additionally provides a kind of storage medium, and storage medium includes the journey of storage Sequence, wherein, when program is run control storage medium where equipment perform claim requirement 1 to 5 in any one based on production The equipment alteration processing method of management system.
Another aspect according to embodiments of the present invention, additionally provides a kind of processor, it is characterised in that processor is used to transport Line program, wherein, perform claim requires the equipment alteration based on production management system of any one in 1 to 5 when program is run Processing method.
Another aspect according to embodiments of the present invention, additionally provides a kind of terminal, including:Typing module, for typing simultaneously The equipment figure and equipment account of distribution apparatus;First receiving module, enters for receiving to equipment figure and/or equipment account The instruction of row modification;First processing module, for according to the instruction modified to equipment figure and/or equipment account, to tune Degree system sends the modification of the application information and receiving of stopping using as a servant equipment to equipment figure and/or equipment account, preserves and issues and repaiies Equipment figure and/or equipment account after changing;Processor, processor operation program, wherein, for from typing mould when program is run The data of block, the first receiving module and first processing module output perform following process step:First step, typing is concurrently laid Standby equipment figure and equipment account, second step receive the instruction modified to equipment figure and/or equipment account, And third step, according to the instruction modified to equipment figure and/or equipment account, sent to scheduling system and stop using as a servant equipment Application information and receive modification to equipment figure and/or equipment account, preserve and issue amended equipment figure and/or Equipment account.
Another aspect according to embodiments of the present invention, additionally provides a kind of terminal, including:Typing module, for typing simultaneously The equipment figure and equipment account of distribution apparatus;First receiving module, enters for receiving to equipment figure and/or equipment account The instruction of row modification;First processing module, for according to the instruction modified to equipment figure and/or equipment account, to tune Degree system sends the modification of the application information and receiving of stopping using as a servant equipment to equipment figure and/or equipment account, preserves and issues and repaiies Equipment figure and/or equipment account after changing;Storage medium, for storage program, wherein, program is operationally for from typing The data of module, the first receiving module and first processing module output perform following process step:First step, typing is simultaneously issued The equipment figure and equipment account of equipment, second step receive the finger modified to equipment figure and/or equipment account Order, and third step, according to the instruction modified to equipment figure and/or equipment account, send to scheduling system and stop labour Modification of the application information and receiving of equipment to equipment figure and/or equipment account, preserves and issues amended equipment figure And/or equipment account.
In embodiments of the present invention, typing and the equipment figure and equipment account of distribution apparatus are passed through;Receive to equipment The instruction that figure and/or equipment account are modified;According to the instruction modified to equipment figure and/or equipment account, to Scheduling system sends the modification of the application information and receiving of stopping using as a servant equipment to equipment figure and/or equipment account, preserves and issues Amended equipment figure and/or equipment account, the present invention are led on the premise of the present situation of power informatization system is taken into full account Cross production management system and reached the purpose handled equipment alteration, pass through and equipment alteration pipe is carried out in production management system Reason, realizes procedure and standardized management on line, further improves the integrated efficiency between each system, effectively support each business Collaboration and data sharing, and then there is number when being safeguarded respectively due to multiple operation systems when solving equipment alteration in the prior art According to the technical problem of redundancy.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of signal of equipment alteration processing method based on production management system according to embodiments of the present invention Figure;
Fig. 2 is a kind of optional equipment alteration processing method based on production management system according to embodiments of the present invention Schematic diagram;And
Fig. 3 is a kind of signal of equipment alteration processing unit based on production management system according to embodiments of the present invention Figure.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model that the present invention is protected Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or the intrinsic other steps of equipment or unit.
Embodiment 1
It is real there is provided a kind of method of equipment alteration processing method based on production management system according to embodiments of the present invention Apply example, it is necessary to explanation, the step of the flow of accompanying drawing is illustrated can such as one group computer executable instructions meter Performed in calculation machine system, and, although logical order is shown in flow charts, but in some cases, can be with difference Shown or described step is performed in order herein.
Fig. 1 is the equipment alteration processing method according to embodiments of the present invention based on production management system, as shown in figure 1, This method comprises the following steps:
The equipment figure and equipment account of step S102, typing and distribution apparatus;
Step S104, receives the instruction modified to equipment figure and/or equipment account;
Step S106, according to the instruction modified to equipment figure and/or equipment account, sends to scheduling system and stops labour Modification of the application information and receiving of equipment to equipment figure and/or equipment account, preserves and issues amended equipment figure And/or equipment account.
In embodiments of the present invention, typing and the equipment figure and equipment account of distribution apparatus are passed through;Receive to equipment The instruction that figure and/or equipment account are modified;According to the instruction modified to equipment figure and/or equipment account, to Scheduling system sends the modification of the application information and receiving of stopping using as a servant equipment to equipment figure and/or equipment account, preserves and issues Amended equipment figure and/or equipment account, the present invention are led on the premise of the present situation of power informatization system is taken into full account Cross production management system and reached the purpose handled equipment alteration, pass through and equipment alteration pipe is carried out in production management system Reason, realizes procedure and standardized management on line, makes management to equipment alteration more specification, rigorous, further improves each Integrated efficiency between system, effectively supports each business cooperation and data sharing, and then solve equipment alteration in the prior art When due to there is the technical problem of data redundancy when multiple operation systems are safeguarded respectively.
In a kind of optional embodiment, equipment alteration can include equipment and increase newly or putting equipment in service.
Specifically, before new equipment puts into operation, as-constructed drawing is issued to the Ministry of Construction of company into scheduling system and O&M is examined Portion is repaiied, and the request slip that will put into operation is sent to scheduling system, and the request slip transmission that puts into operation can be specifically set in production management system Button, after user clicks on, production management system receives the instruction for the application information that the equipment that puts into operation is sent to scheduling system, puts into operation Before, the equipment changing application that figure is safeguarded is created by dispatching draftsman, and according to as-constructed drawing and the corresponding nameplate of equipment, it is complete Into the graphic plotting of newly added equipment, and before putting into operation, submission equipment director carries out the examination & verification of figure.Equipment director must be Put into operation the previous day, the latest issued equipment changing application for the same day of putting into operation, by map releasing to scene.Draftsman draws geographical map It is another in PMS2.0 afterwards to build the electric system's figure of drawing tasks generation, on the day of power cut construction, submit regulation and control long (member).Dinger or tune Degree person must complete the examination & verification and issue that electricity is figure on the day of putting equipment in service.While graphing, equipment director according to The as-constructed drawing that the Ministry of Construction submits, creates Unit account of plant.And according to device class, in corresponding time limit, issue machine account.
Specifically, newly added equipment figure and machine account safeguard that specific rules can specifically set as follows:
Newly added equipment figure:For graphic plotting in newly-increased station:Newly-built 10 kilovolts and above transformer station, switchyard, distribution Stand:Figure is drawn in advance independently of cable engineering in general station.Dispatch draftsman before putting into operation 5 days according to the Ministry of Construction provide it is effective Drawing (including wiring and formal nameplate) completes the typing of figure and completes the association of equipment nameplate.Carry within 3 days before putting equipment in service Examination & verification is handed over, central station (with fortune class) completes figure examination & verification for 1 day at least before putting into operation and issued.For cable graphic plotting:For 10 kilovolts and above overhead line, are positioned on shaft tower and equipment.By dispatching draftsman according to Request for Change and geographical map before and after electricity system In close on the drafting of shaft tower position Primary Location, after being accurately positioned after scene, by equipment director's adjustment position;For 10 kilovolts and Above cable, by dispatching draftsman according to the Request for Change super line of drafting, and ensure topologically correct in advance before and after electricity system.Scheduling is drawn Member is drawn after super line, should notify cable class or mapping company.After mapping by mapping company complete in systems electric power replace, The amendment of the actual trend of figure cable, cable run ownership is managed to set;Wherein, only required for the figure of cable apparatus before putting into operation Draw issue.
Newly added equipment account maintenance principles:For transmission facility:The transmission facility machine account newly put into operation must be 10 after putting into operation In a few days input system, and by auditing and issuing;For transformer:The machine account of the transformer newly put into operation must put into operation Input system in 5 days, and by auditing and issuing afterwards;For controller switching equipment:The platform of the controller switching equipment (containing low pressure) newly put into operation Account must after putting into operation input system in 10 days, and by auditing and issuing.
In a kind of optional embodiment, when equipment alteration can include the modification of electricity system, wherein electricity system modification is specifically included Machine account modification, circuit are cut and changed and equipment changing three types.
Specifically, after O&M maintenance portion or Ministry of Construction's site inspection, drawing before and after electricity is and becoming while start-stop labour application More scheme, stop labour application thereafter by PMS (being specifically as follows PMS2.0) circulations to the system of scheduling, Altered Graphs are written before and after electric system Give scheduling system, by drawing and stop using as a servant application after scheduling system audit, and drawing is delivered into scheduling draftsman, draftsman presses According to Altered Graphs before and after electricity system geographical map, system diagram modification are completed in editor's state of PMS2.0 systems.And 5 days before formal put into operation will Geographical map delivers equipment director examination & verification, and electricity system figure transfers to regulation and control group leader or regulation and control person to be audited and in the examination & verification on the day of putting into operation Complete and issue.
Specifically, while graphing, creating Unit account of plant.And according to device class, in corresponding time limit It is interior, issue machine account.Electricity system change figure and account safeguard that specific rules can be as follows:
Electricity system change figure maintenance regulation:For 10 kilovolts and the above have electricity system change stop multiple labour engineering:Scheduling is drawn Member does sth. in advance to draw in the reconfiguration that geographical map editor state completes geographical map according to Request for Change before and after electricity system, on the day of power cut construction, Submit equipment director;Draftsman draws the another electric system of drawing tasks generation that builds after geographical map and schemed, and on the day of power cut construction, submits Regulation and control are long (member).Common engineering, equipment director need to complete the examination & verification of figure in the same day, issue, special engineering, such as:Engineering knot The beam time, engineering reconfiguration amount was especially big too late, can postpone till next day (no matter next day is working day or day off) issue, but Issuing time must not be later than next day 12:00.There are the work such as the accident maintenance of electricity system change for 10 kilovolts and the above:Dispatcher exists Accident maintenance completes, when value, temporary marker (cut-offfing board etc.) to be carried out on electricity system figure, until the wiring of electricity system recovers;Have after such as rushing to repair Permanent electric system changes, and same day Request for Change before and after dispatcher's manual drawing electricity system, the same day or next day intermodulation degree draftsman completes Geographical map is changed and electric system's figure change, after scheduling draftsman's drafting is finished, submits transport inspection department equipment director and regulation and control to grow immediately (member) audits and issued.
Electricity system change machine account safeguards specific rules for transmission facility:Just transmission facility machine account more must terminate in engineering Input system in 10 days after scene is put into operation, and by auditing and issuing;For transformer:Just the machine account of transformer more Input system in 5 days must be terminated after scene is put into operation in engineering, and by auditing and issuing;For controller switching equipment:Just more The machine account of controller switching equipment must terminate after scene is put into operation input system in 10 days in engineering, and by auditing and issuing.
In a kind of optional embodiment, in step S102 the equipment figure and equipment account of typing and distribution apparatus it Before, method also includes:
Step S202, obtains the name plate information of equipment;
Step S204, name plate information is associated with equipment.
Specifically, before new equipment puts into operation, as-constructed drawing is issued to the Ministry of Construction of company into scheduling system and O&M is examined Portion is repaiied, and the request slip that will put into operation is sent to scheduling system, equipment director is according to drawing first to the nameplate Shen for submitting newly added equipment Please be single, after after nameplate reply, production management system gets the name plate information of equipment, and is set up between name plate information and equipment Incidence relation.
In a kind of specific embodiment, as shown in Fig. 2 PMS represents production management system in Fig. 2, OMS represents scheduling system System, i.e. scheduling system issue scheduling nameplate equipment name plate information, equipment is newly-increased or during putting equipment in service in production management system System can create equipment account and equipment figure, and subsequently putting equipment in service is checked by scheduling system, including consistent to data Property monitoring, situations such as in the event of the modification of electricity system, be provided with figure number consistency check interface etc. in production management system, Ke Yi Figure, the account of equipment are created, changed and issued in production management system.
In a kind of optional embodiment, in step S102 the equipment figure and equipment account of typing and distribution apparatus it Afterwards, method also includes:
Step S302, receives the instruction of retired equipment;
Step S304, it is determined that treating the type of retired equipment;
Step S306, treat retired equipment be station equipment in the case of, delete station equipment equipment figure and The equipment account of retired station equipment.
Specifically, after station equipment confirms that equipment need are retired, directly can be deleted in the graphic;Then machine account is walked retired Flow.
In a kind of optional embodiment, after the type of retired equipment is treated in determination in step S304, method also includes: Step S402, in the case where treating that retired equipment is cable apparatus, the equipment figure for the cable apparatus that stops.
Specifically, cable apparatus can include stopping, discard, retired state, that is, after the cable that stops, it can not be deleted in figure Remove, equipment is not deleted, switch to dormant state, scene may continue to employ.
In a kind of optional embodiment, in step S102 the equipment figure and equipment account of typing and distribution apparatus it Before, method also includes:Step S502, receives the instruction for the application information that the equipment that puts into operation is sent to scheduling system.
Embodiment 2
It is real there is provided a kind of product of equipment alteration processing unit based on production management system according to embodiments of the present invention Example is applied, Fig. 3 is the equipment alteration processing unit according to embodiments of the present invention based on production management system, as shown in figure 3, the dress Put including typing module, the first receiving module and first processing module, wherein, typing module, for typing and distribution apparatus Equipment figure and equipment account;First receiving module, for receiving the finger modified to equipment figure and/or equipment account Order;First processing module, for according to the instruction modified to equipment figure and/or equipment account, being sent to scheduling system Stop the modification of the application information and receiving of labour equipment to equipment figure and/or equipment account, preserve and issue amended equipment Figure and/or equipment account.
In embodiments of the present invention, the typing of typing module and the equipment figure and equipment account of distribution apparatus are passed through;The One receiving module receives the instruction modified to equipment figure and/or equipment account;First processing module is according to equipment drawing The instruction that shape and/or equipment account are modified, the application information for stopping using as a servant equipment is sent to scheduling system and is received to equipment drawing The modification of shape and/or equipment account, is preserved and issues amended equipment figure and/or equipment account, and the present invention is fully being examined On the premise of the present situation for considering power informatization system, the purpose to equipment alteration processing has been reached by production management system, led to The progress equipment alteration management in production management system is crossed, procedure and standardized management on line is realized, further improves each Integrated efficiency between system, effectively supports each business cooperation and data sharing, and then solve equipment alteration in the prior art When due to there is the technical problem of data redundancy when multiple operation systems are safeguarded respectively.
Herein it should be noted that above-mentioned typing module, the first receiving module and first processing module correspond to embodiment 1 In step S102 to step S106, above-mentioned module is identical with the example realized of step and application scenarios of correspondence, but does not limit In the disclosure of that of above-described embodiment 1.It should be noted that above-mentioned module can be at such as one group as a part of of device Performed in the computer system of computer executable instructions.
In a kind of optional embodiment, device also includes acquisition module and relating module, wherein, acquisition module is used for Before the equipment figure and equipment account of the typing of typing module and distribution apparatus, the name plate information of equipment is obtained;Associate mould Block, for name plate information to be associated with equipment.
Herein it should be noted that the step S202 that above-mentioned acquisition module and relating module correspond in embodiment 1 is extremely walked Rapid S204, above-mentioned module is identical with example and application scenarios that the step of correspondence is realized, but it is public to be not limited to the institute of above-described embodiment 1 The content opened.It should be noted that above-mentioned module can be in such as one group computer executable instructions as a part of of device Computer system in perform.
In a kind of optional embodiment, device also includes the second receiving module, determining module and Second processing module, its In, the second receiving module, for after the equipment figure and equipment account of the typing of typing module and distribution apparatus, reception to be moved back Use as a servant the instruction of equipment;Determining module, the type of retired equipment is treated for determination;Second processing module, for treating retired In the case that equipment is station equipment, the equipment figure of station equipment and the equipment account of retired station equipment are deleted.
Herein it should be noted that above-mentioned two receiving module, determining module and Second processing module correspond in embodiment 1 Step S302 to step S306, above-mentioned module is identical with the example realized of step and application scenarios of correspondence, but is not limited to The disclosure of that of above-described embodiment 1.It should be noted that above-mentioned module can be in such as one group meter as a part of of device Performed in the computer system of calculation machine executable instruction.
In a kind of optional embodiment, device also includes the 3rd processing module, for determining to treat retired in determining module Equipment type after, treat retired equipment be cable apparatus in the case of, the equipment figure for the cable apparatus that stops.
Herein it should be noted that above-mentioned 3rd processing module correspond to embodiment 1 in step S402, above-mentioned module with The example that the step of correspondence is realized is identical with application scenarios, but is not limited to the disclosure of that of above-described embodiment 1.Need explanation , above-mentioned module can hold as a part of of device in the computer system of such as one group computer executable instructions OK.
In a kind of optional embodiment, device also includes:Sending module, in the typing of typing module and distribution apparatus Equipment figure and equipment account before, send the application information of equipment of putting into operation to scheduling system.
Herein it should be noted that above-mentioned sending module correspond to embodiment 1 in step S502, above-mentioned module with it is corresponding The step of the example realized it is identical with application scenarios, but be not limited to the disclosure of that of above-described embodiment 1.Need explanation It is that above-mentioned module can be performed as a part of of device in the computer system of such as one group computer executable instructions.
Embodiment 3
According to embodiments of the present invention there is provided a kind of product embodiments of storage medium, the storage medium includes storage Program, wherein, equipment performs the above-mentioned equipment alteration based on production management system where controlling storage medium when program is run Processing method.
Embodiment 4
According to embodiments of the present invention there is provided a kind of product embodiments of processor, the processor is used for operation program, its In, program performs the above-mentioned equipment alteration processing method based on production management system when running.
Embodiment 5
According to embodiments of the present invention there is provided a kind of product embodiments of terminal, the terminal connects including typing module, first Receive module, first processing module and processor, wherein, typing module, for typing and distribution apparatus equipment figure and set Standby account;First receiving module, for receiving the instruction modified to equipment figure and/or equipment account;First processing mould Block, for according to the instruction modified to equipment figure and/or equipment account, the application for stopping using as a servant equipment to be sent to scheduling system The modification of information and receiving to equipment figure and/or equipment account, preserves and issues amended equipment figure and/or table of equipment Account;Processor, processor operation program, wherein, for being handled from typing module, the first receiving module and first when program is run The data of module output perform following process step:The equipment figure and equipment account of first step, typing and distribution apparatus, Second step, receives the instruction modified to equipment figure and/or equipment account, and third step, according to equipment drawing The instruction that shape and/or equipment account are modified, the application information for stopping using as a servant equipment is sent to scheduling system and is received to equipment drawing The modification of shape and/or equipment account, preserves and issues amended equipment figure and/or equipment account.
Embodiment 6
According to embodiments of the present invention there is provided a kind of product embodiments of terminal, the terminal connects including typing module, first Receive module, first processing module and storage medium, wherein, typing module, for typing and distribution apparatus equipment figure and Equipment account;First receiving module, for receiving the instruction modified to equipment figure and/or equipment account;First processing Module, for according to the instruction modified to equipment figure and/or equipment account, the Shen for stopping using as a servant equipment to be sent to scheduling system Information and modification to equipment figure and/or equipment account please be received, preserve and issue amended equipment figure and/or equipment Account;Storage medium, for storage program, wherein, program is operationally for from typing module, the first receiving module and first The data of processing module output perform following process step:The equipment figure and equipment of first step, typing and distribution apparatus Account, second step receives the instruction modified to equipment figure and/or equipment account, and third step, set according to Dui The instruction that standby figure and/or equipment account are modified, the application information for stopping using as a servant equipment is sent to scheduling system and receiving pair is set The modification of standby figure and/or equipment account, preserves and issues amended equipment figure and/or equipment account.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed through Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized using in the form of SFU software functional unit and as independent production marketing or used When, it can be stored in a computer read/write memory medium.Understood based on such, technical scheme is substantially The part contributed in other words to prior art or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are to cause a computer Equipment (can for personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of equipment alteration processing method based on production management system, it is characterised in that including:
Typing and the equipment figure and equipment account of distribution apparatus;
Receive the instruction modified to the equipment figure and/or the equipment account;
According to the instruction modified to the equipment figure and/or the equipment account, send and stop described in labour to scheduling system Modification of the application information and receiving of equipment to the equipment figure and/or the equipment account, preserves and issues amended The equipment figure and/or the equipment account.
2. according to the method described in claim 1, it is characterised in that the equipment figure and equipment account of typing and distribution apparatus Before, methods described also includes:
Obtain the name plate information of the equipment;
The name plate information is associated with the equipment.
3. according to the method described in claim 1, it is characterised in that the equipment figure and equipment account of typing and distribution apparatus Afterwards, methods described also includes:
Receive the instruction of the retired equipment;
It is determined that treating the type of the retired equipment;
In the case where treating that the retired equipment is station equipment, delete the equipment figure of the station equipment and move back Use as a servant the equipment account of the station equipment.
4. method according to claim 3, it is characterised in that it is determined that after treating the type of the retired equipment, it is described Method also includes:
In the case where treating that the retired equipment is cable apparatus, the equipment figure for the cable apparatus that stops.
5. according to the method described in claim 1, it is characterised in that the equipment figure and equipment account of typing and distribution apparatus Before, methods described also includes:
Receive the instruction for the application information that the equipment that puts into operation is sent to the scheduling system.
6. a kind of equipment alteration processing unit based on production management system, it is characterised in that including:
Typing module, for typing and the equipment figure and equipment account of distribution apparatus;
First receiving module, for receiving the instruction modified to the equipment figure and/or the equipment account;
First processing module, for according to the instruction modified to the equipment figure and/or the equipment account, to scheduling System, which is sent, stops using as a servant the modification of the application information of the equipment and receiving to the equipment figure and/or the equipment account, protects Deposit and issue the amended equipment figure and/or the equipment account.
7. a kind of storage medium, it is characterised in that the storage medium includes the program of storage, wherein, in described program operation When control the storage medium where in equipment perform claim requirement 1 to 5 described in any one based on production management system Equipment alteration processing method.
8. a kind of processor, it is characterised in that the processor is used for operation program, wherein, right of execution when described program is run Profit requires the equipment alteration processing method based on production management system described in any one in 1 to 5.
9. a kind of terminal, it is characterised in that including:
Typing module, for typing and the equipment figure and equipment account of distribution apparatus;
First receiving module, for receiving the instruction modified to the equipment figure and/or the equipment account;
First processing module, for according to the instruction modified to the equipment figure and/or the equipment account, to scheduling System, which is sent, stops using as a servant the modification of the application information of the equipment and receiving to the equipment figure and/or the equipment account, protects Deposit and issue the amended equipment figure and/or the equipment account;
Processor, the processor operation program, wherein, for from the typing module, described first when described program is run Receiving module and the data of first processing module output perform following process step:First step, typing and distribution apparatus Equipment figure and equipment account, second step, receive and the equipment figure and/or the equipment account modified Instruction, and third step, according to the instruction modified to the equipment figure and/or the equipment account, be to scheduling System, which is sent, to stop using as a servant the modification of the application information of the equipment and receiving to the equipment figure and/or the equipment account, preserves And issue the amended equipment figure and/or the equipment account.
10. a kind of terminal, it is characterised in that including:
Typing module, for typing and the equipment figure and equipment account of distribution apparatus;
First receiving module, for receiving the instruction modified to the equipment figure and/or the equipment account;
First processing module, for according to the instruction modified to the equipment figure and/or the equipment account, to scheduling System, which is sent, stops using as a servant the modification of the application information of the equipment and receiving to the equipment figure and/or the equipment account, protects Deposit and issue the amended equipment figure and/or the equipment account;
Storage medium, for storage program, wherein, described program from the typing module, described first operationally for connecing The data for receiving module and first processing module output perform following process step:First step, typing and distribution apparatus Equipment figure and equipment account, second step receive the finger modified to the equipment figure and/or the equipment account Order, and third step, according to the instruction modified to the equipment figure and/or the equipment account, to scheduling system Send and stop using as a servant the modification of the application information of the equipment and receiving to the equipment figure and/or the equipment account, preserve simultaneously Issue the amended equipment figure and/or the equipment account.
CN201710357906.2A 2017-05-19 2017-05-19 Equipment alteration treating method and apparatus based on production management system Pending CN107230162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710357906.2A CN107230162A (en) 2017-05-19 2017-05-19 Equipment alteration treating method and apparatus based on production management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710357906.2A CN107230162A (en) 2017-05-19 2017-05-19 Equipment alteration treating method and apparatus based on production management system

Publications (1)

Publication Number Publication Date
CN107230162A true CN107230162A (en) 2017-10-03

Family

ID=59934302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710357906.2A Pending CN107230162A (en) 2017-05-19 2017-05-19 Equipment alteration treating method and apparatus based on production management system

Country Status (1)

Country Link
CN (1) CN107230162A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110032552A (en) * 2019-03-27 2019-07-19 国网山东省电力公司青岛供电公司 Standardized system and method based on equipment alteration information and scheduling online updating
CN110909525A (en) * 2019-11-19 2020-03-24 云南电网有限责任公司信息中心 System and method for realizing automatic comparison of standing book information

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101499109A (en) * 2008-07-24 2009-08-05 杨志华 Power distribution management information graphic system
CN104616101A (en) * 2015-01-19 2015-05-13 国家电网公司 Integrated power grid resource model and construction and maintenance method
CN104951905A (en) * 2015-07-16 2015-09-30 中国神华能源股份有限公司 Equipment dynamic ledger management system
CN105447611A (en) * 2014-11-21 2016-03-30 国家电网公司 OMS equipment transaction management and control information system supported by GID platform
CN105550810A (en) * 2015-12-10 2016-05-04 国网四川省电力公司成都供电公司 Operation and alteration management method for power grid equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101499109A (en) * 2008-07-24 2009-08-05 杨志华 Power distribution management information graphic system
CN105447611A (en) * 2014-11-21 2016-03-30 国家电网公司 OMS equipment transaction management and control information system supported by GID platform
CN104616101A (en) * 2015-01-19 2015-05-13 国家电网公司 Integrated power grid resource model and construction and maintenance method
CN104951905A (en) * 2015-07-16 2015-09-30 中国神华能源股份有限公司 Equipment dynamic ledger management system
CN105550810A (en) * 2015-12-10 2016-05-04 国网四川省电力公司成都供电公司 Operation and alteration management method for power grid equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110032552A (en) * 2019-03-27 2019-07-19 国网山东省电力公司青岛供电公司 Standardized system and method based on equipment alteration information and scheduling online updating
CN110032552B (en) * 2019-03-27 2023-02-28 国网山东省电力公司青岛供电公司 Standardization system and method based on equipment transaction information and scheduling online update
CN110909525A (en) * 2019-11-19 2020-03-24 云南电网有限责任公司信息中心 System and method for realizing automatic comparison of standing book information

Similar Documents

Publication Publication Date Title
CN103197952B (en) The management system and method disposed for application system maintenance based on cloud infrastructure
CN106844198A (en) Distributed dispatching automation test platform and method
US20040064356A1 (en) Workflow method and system therefor
CN104240037A (en) Remote bid evaluation system and method
CN106570659A (en) Asset equipment management method and system
CN105700938A (en) Multithread processing data method and device
CN106276457B (en) The method of elevator data management
CN105447611A (en) OMS equipment transaction management and control information system supported by GID platform
CN104731657A (en) Resource scheduling method and system
CN111245642A (en) Method and device for acquiring dependency relationship between multiple systems and electronic equipment
CN107463357A (en) Task scheduling system, dispatching method, Simulation of Brake system and emulation mode
CN109462508A (en) Node deployment method, device and storage medium
CN107230162A (en) Equipment alteration treating method and apparatus based on production management system
CN107071013A (en) A kind of the service response method and service system of intelligent substation access regulation and control main website
CN111030983A (en) Data processing method and device based on distributed distribution and related equipment
CN111967789A (en) Debugging system is transferred in distribution automation terminal warehouse debugging
CN106502796A (en) A kind of software development test platform, system and using method
CN102655518A (en) Service processing system and method
CN108230052A (en) A kind of invoice issuing and method for uploading and system
CN110570158A (en) power grid standing book electronic transfer method and system and computer readable storage medium
CN108090655A (en) For smart allocation process method, module and the system of garment production
CN112685199A (en) Message queue repairing method and device, computer equipment and storage medium
CN115271678A (en) Construction information processing method, electronic device, and computer-readable medium
CN108875974B (en) Method for automatically generating production plan by electric power station equipment
CN103856459B (en) Data transmission method and system in multi-nuclear power project instrument control design verification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003

RJ01 Rejection of invention patent application after publication