Prior art keywords
plate
modification
list
equipment alteration
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910237949.6A
Other languages
Chinese (zh)
Other versions
CN110032552B (en
Inventor
芮树玲
公伟勇
史先好
罗鲁东
戚安国
孙小涵
齐仁磊
鞠雪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910237949.6A priority Critical patent/CN110032552B/en
Publication of CN110032552A publication Critical patent/CN110032552A/en
Application granted granted Critical
Publication of CN110032552B publication Critical patent/CN110032552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of based on equipment alteration information and dispatches the standardized system and method for online updating, belongs to technical field of power systems.System of the present invention includes equipment alteration list generating portion and scheduling operation plate updates part, and simple interface is illustrated, and realizes that standardization is drawn, can call mutually with OMS system, PMS system and web edition scheduling operation system.This system produces the equipment alteration list of unified standard, plate modification list, circulates on all lines of process, and has the function of that quick search, access plate modification are single.Make plate change procedure easedization, standardization by establishing the model database of unified standardization, transferring the technological means such as mode using the hyperlink of GIS information, OMS and web edition scheduling operation system, allow user it is more intuitive it is convenient carry out plate modification process circulation, reduce plate modification wrong probability.This system is signed after trace, plate modification list are filed by executor and can be looked into.

Description

Standardized system and method based on equipment alteration information and scheduling online updating
Technical field
The present invention relates to a kind of based on equipment alteration information and dispatches the standardized system and method for online updating, belongs to electricity Force system technical field.
Background technique
In the routine work of power supply company, equipment alteration is the work that most common one kind is urgently handled in grid maintenance work Condition.Equipment alteration list can embody situation of change of field device, including shaft tower, cable, on-pole switch, ring network cabinet etc. all one Secondary device is usually drawn according to the actual situation and is proposed by field personnel modification application, then passes through OMS (Outage Management System) system and PMS (Power Management System) system are reported and submitted to be grasped to scheduling Make personnel.Dispatcher refines the content of equipment alteration list according to scheduling plate demand, draws conventionally by manual method It is single to produce new plate modification, and passes to automation O&M class.As shown in Figure 1, on this basis, automating operation maintenance personnel pair Original scheduling operation figure is modified.After modification, plate modification is single to be finally sent back at dispatcher, carries out filing guarantor It deposits.
In real work, the work to operating process contain Field Force reconnoitre locally produce equipment alteration list, scheduling Member's manual drawing plate modification is single, automation operation maintenance personnel modifies scheduling operation system and dispatcher checks scheduling operation system 4 steps such as correctness of modification, process is cumbersome, and process cycle is longer, and needs largely communication and co-ordination.In this base On plinth, more it should be noted that due to equipment alteration list abundant in content multiplicity and different operator there may be draw Make the difference of habit, therefore, actual equipment alteration list in terms of content there may be the part for being easy to misread, form and symbol Not unified enough problem may also be showed in expression, increase the interpreting blueprints difficulty and coordination of links especially dispatcher Cost.In addition to this, traditionally plate modification is singly that the papery document of manual drawing is easy to lose, deposit there is enormous amount It puts to take up space and verifies a series of notable defects such as difficulty with the later period.
Summary of the invention
In view of the foregoing defects the prior art has, it is online based on equipment alteration information and scheduling that the invention proposes one kind The standardized system and method for update establish the standardization figure based on grid equipment artwork resource, operation of power networks operating system Version change system.Using the artwork after unified standardized format, it can directly transfer web edition scheduling operation system and PMS system obtains It takes wiring diagram to carry out plate modification, forms the circulation process of unified standard.
Standardized system of the present invention based on equipment alteration information and scheduling online updating, including equipment alteration list Generating portion and scheduling operation plate update part, in which:
Equipment alteration list generating portion, including equipment alteration specification module, PMS system call interface module, graphics module, Drawing people information module, GIS module, drawing tool module, unusual fluctuation list generate the time;
Scheduling operation plate updates part, including transformer substation voltage grade and name module, line voltage distribution grade and title Module, drawing people information module, drawing specification module, the single generation time module of plate modification, scheduling operation system modification are front/rear Plate module, Web editions scheduling operation system call interface modules, drawing tool modules.
Preferably, the equipment alteration list generating portion, by the foundation of the symbol database of unified standardization, by building The model database of vertical unified standardization transfers mode using the hyperlink of GIS information, OMS and web edition scheduling operation system Etc. technological means make plate change procedure easedization, standardization, allow more intuitive convenient the progresss plate modification of user to flow The circulation of journey reduces the wrong probability of plate modification.
Preferably, equipment alteration list and plate modification are singly incorporated into same system by the system, form unification Circulate process;All processes are realized and are circulated on line, can check that equipment alteration list and plate modification are single in links.
Preferably, the system directly carries out transferring utilization to PMS system and web edition scheduling operation system, sets to drafting Standby mobile single process is simplified;Unified drafting standards and tool are established, the standardization pipe of equipment alteration list is realized Reason;OMS system transfers the mobile single content of this devices in system, and equipment movement, maintenance plan single process in synchronous OMS.
Preferably, each link is required to executor's signature confirmation in the system, accomplishes have trace that can look into;After filing According to line voltage distribution grade and transformer substation voltage grade progress classification storage, setting is looked into for equipment alteration list and plate modification individual palpation Wol function carries out inquiry access according to keyword and modification time.
The method of the present invention realized based on equipment alteration information and the standardized system for dispatching online updating, including Following steps:
Step 1: being updated based on patterned plate and graphical standardisation:
To modeling tool integration, process, provide based on it is graphical configure and management function, user get information about The extraction of data, conversion process;
Step 2: rule-based drawing is inspected: to distinct device, different connection types in power grid, being provided data and is controlled Reason mechanism then effectively guarantees the integrality of data, uniqueness, accurate by the foundation of the symbol database of unified standardization Property, legitimacy, consistency;
Step 3: web edition scheduling operation system and PMS system are called directly:
Using the query function of PMS system and web edition scheduling operation system, hyperlink is established, this system calls directly Line alignment figure and power network line wiring diagram, convenient to make a report on to field personnel's progress unusual fluctuation list, dispatcher directly exchanges The mode of connection before electric grid operating system modification is intercepted, forms plate modification front and back comparison, and automation O&M is improved Class's modification efficiency;
Step 4: with OMS seamless interfacing, including following small step:
Step 1: OMS system calls directly the document content of equipment alteration list and plate modification list, formed with tour sheet Link, facilitates dispatching of power netwoks person to be consulted;
Step 2: Field Force utilizes terminal device in such a system, filled out according to on-site actual situations and different condition This part is write, generating device unusual fluctuation list is sent to scheduling operation plate and updates part, and scheduled overhaul Dan Zhi in OMS system Chain link is connected to this part;
Step 3: dispatcher generates plate modification list according to the equipment alteration list that scene is sent, repaired in scheduling operation system Plate module calls directly route wiring diagram in web edition scheduling operation system before changing, and on this basis, utilizes drawing tools mould Block forms plate after scheduling operation system modification, and gives this modification single-shot to automation O&M class, is scheduled operating system and connects The modification of line mode.
The beneficial effects of the present invention are: the standardization of the present invention based on equipment alteration information and scheduling online updating System and method, by establishing the model database of unified standardization, utilizing GIS information, OMS and web edition scheduling operation system The hyperlink of system transfers the technological means such as mode and makes plate change procedure easedization, standardization, allows the more intuitive side of user Just the circulation of progress plate modification process, reduces the wrong probability of plate modification.This system passes through executor's signature trace, figure The form that can be consulted after the single filing of version modification accomplish plate modification have record, it is traceable, can inquire.
Detailed description of the invention
Fig. 1 is that traditional scheduler person's plate updates standardized system flow diagram.
Fig. 2 is novel system operating unit and flow chart.
Fig. 3 is this system overall framework figure.
Fig. 4 is that equipment alteration generates single part interface schematic diagram.
Fig. 5 is that scheduling operation plate updates part interface schematic diagram.
Specific embodiment
In order to which the object of the invention, technical solution is more clearly understood, below with reference to embodiment, the present invention is made further It is described in detail.
Embodiment 1:
As shown in Fig. 2, the standardized system of the present invention based on equipment alteration information and scheduling online updating, builds Be based on grid equipment artwork resource, the standardization plate change system of operation of power networks operating system.Utilize unified format standard Artwork after change, can directly transfer web edition scheduling operation system and PMS system obtains wiring diagram and carries out plate modification, form system The circulation process of one standard.
As described in Figure 3, the standardized system of the present invention based on equipment alteration information and scheduling online updating, packet Include two large divisions: equipment alteration list generating portion and scheduling operation plate update part.
As shown in figure 4, equipment alteration list generating portion:
Field personnel configures hand-held terminal device, can directly be drawn, be drawn using hand-held terminal device at the scene Field connection figure in PMS system picture library can be called when figure, on this basis in the drawing tool that provides in this system drawn System.Field device modification part is distinguished using color, is defaulted as red in the present system.Staff's modification finishes laggard The unusual fluctuation list content that row signature confirmation, unified drawing tool and the technological means for transferring picture library generate is simple and clear.
Generalized information system can be linked in this part, and visualization is realized to the environment of setting, facilitates staff to live practical Situation is grasped and understood, and wiring diagram is had pictureization.
With OMS seamless interfacing, this system carries out chain with equipment alteration module in OMS system in equipment alteration single process It connecing, working relation people equipment alteration module and scheduled overhaul Dan Zhongjun in OMS system can directly add this equipment alteration list, And can the mobile process of OMS system equipment it is synchronous, carry out relevant person in charge signature confirmation, avoid repeated work, improve power grid Scheduled overhaul working efficiency.
As shown in figure 5, scheduling operation plate updates part:
In this section, module can be inspected after dispatcher's acquisition equipment alteration list by plate to be singly reduced to equipment movement Scheduling plate mode.
Plate is inspected in module and is defined to form standard artwork to the equipment needed in scheduling operating system.This module can Matching comparison is carried out with equipment in content, with itself artwork in the mobile list of automatically retrieval equipment, is automatically extracted in equipment alteration list The equipment such as switch, ring network cabinet, route filter out unwanted equipment in scheduling plate, the plate blank after generating a Simple drawing. Dispatcher generates part after plate modification on this basis using modifying in drawing tool.
Scheduling operation system diagram is modified in order to facilitate automation operation maintenance personnel, before this system is scheduled operating system modification Comparison diagram afterwards, plate can be existed by line name, the power transformation station name filled in this module before scheduling operation system diagram is modified Wiring diagram is transferred in web edition scheduling operation system, dispatcher intercepts wherein effective part.
This part also has drawing people signature module, and generation repairs the parts such as single time, the later period is facilitated to be inquired.
Plate modification is carried out at automatic O&M class is sent to after raw plate modification list, is only had in automation modification link This plate is modified after modification and send back to dispatcher's audit link on single line by the plate function of checking typing.Dispatcher's core After errorless to scheduling operating system modification, signature filing.
This system is equipped with inquiry search-read function, and user can pass through line name and voltage class, power transformation station name and electricity The keywords such as pressure grade and plate modification list generate time range to be inquired the plate filed modification list and set It is standby mobile single, and ' execution ' printed words are indicated on filing plate list and equipment alteration list.
Embodiment 2:
The method of the present invention realized based on equipment alteration information and the standardized system for dispatching online updating, including Following steps:
Step 1: being updated based on patterned plate and graphical standardisation:
To modeling tool integration, process, provide based on it is graphical configure and management function, user get information about The extraction of data, conversion process;
Step 2: rule-based drawing is inspected: to distinct device, different connection types in power grid, being provided data and is controlled Reason mechanism then effectively guarantees the integrality of data, uniqueness, accurate by the foundation of the symbol database of unified standardization Property, legitimacy, consistency;
Step 3: web edition scheduling operation system and PMS system are called directly:
Using the query function of PMS system and web edition scheduling operation system, hyperlink is established, this system calls directly Line alignment figure and power network line wiring diagram, convenient to make a report on to field personnel's progress unusual fluctuation list, dispatcher directly exchanges The mode of connection before electric grid operating system modification is intercepted, forms plate modification front and back comparison, and automation O&M is improved Class's modification efficiency;
Step 4: with OMS seamless interfacing, including following small step:
Step 1: OMS system calls directly the document content of equipment alteration list and plate modification list, formed with tour sheet Link, facilitates dispatching of power netwoks person to be consulted;
Step 2: Field Force utilizes terminal device in such a system, filled out according to on-site actual situations and different condition This part is write, generating device unusual fluctuation list is sent to scheduling operation plate and updates part, and scheduled overhaul Dan Zhi in OMS system Chain link is connected to this part;
Step 3: dispatcher generates plate modification list according to the equipment alteration list that scene is sent, repaired in scheduling operation system Plate module calls directly route wiring diagram in web edition scheduling operation system before changing, and on this basis, utilizes drawing tools mould Block forms plate after scheduling operation system modification, and gives this modification single-shot to automation O&M class, is scheduled operating system and connects The modification of line mode.
The present invention is by establishing the model database of unified standardization, utilizing GIS information, OMS and web edition scheduling operation The hyperlink of system transfers the technological means such as mode and makes plate change procedure easedization, standardization, makes user more intuitive The convenient circulation for carrying out plate modification process, reduces the wrong probability of plate modification.This system by executor sign trace, The form that can be consulted after the single filing of plate modification accomplishes that plate modification has record, can be traced, can inquire;It can be widely used in electric power System application.
The foregoing is merely presently preferred embodiments of the present invention and oneself, not with the present invention for limitation, it is all in essence of the invention Made impartial modifications, equivalent substitutions and improvements etc., should be included in patent covering scope of the invention within mind and principle.

Claims (6)

1. a kind of standardized system based on equipment alteration information and scheduling online updating, which is characterized in that including equipment alteration Single generating portion and scheduling operation plate update part, in which:
Equipment alteration list generating portion, including equipment alteration specification module, PMS system call interface module, graphics module, drawing People's information module, GIS module, drawing tool module, unusual fluctuation list generate the time;
Scheduling operation plate updates part, including transformer substation voltage grade and name module, line voltage distribution grade and name module, Drawing people information module, drawing specification module, the single generation time module, the front/rear plate of scheduling operation system modification of plate modification Module, Web editions scheduling operation system call interface modules, drawing tool modules.
2. the standardized system according to claim 1 based on equipment alteration information and scheduling online updating, feature exist In the equipment alteration list generating portion, by the foundation of the symbol database of unified standardization, by establishing unified standardization Model database, transfer the technological means such as mode using the hyperlink of GIS information, OMS and web edition scheduling operation system and make Plate change procedure easedization, standardization, allow user it is more intuitive it is convenient carry out plate modification process circulation, reduce The wrong probability of plate modification.
3. the standardized system according to claim 1 based on equipment alteration information and scheduling online updating, feature exist In equipment alteration list and plate modification are singly incorporated into same system by the system, form unified circulation process;It is all Process is realized and is circulated on line, can check that equipment alteration list and plate modification are single in links.
4. the standardized system according to claim 1 based on equipment alteration information and scheduling online updating, feature exist In the system directly carries out transferring utilization to PMS system and web edition scheduling operation system, to the mobile single mistake of rendering apparatus Cheng Jinhang simplifies;Unified drafting standards and tool are established, the standardized management of equipment alteration list is realized;OMS system tune Take the mobile single content of this devices in system, and equipment movement, maintenance plan single process in synchronous OMS.
5. the standardized system according to claim 1 based on equipment alteration information and scheduling online updating, feature exist In each link is required to executor's signature confirmation in the system, accomplishes have trace that can look into;To after filing equipment alteration list and Plate modifies individual palpation and carries out classification storage according to line voltage distribution grade and transformer substation voltage grade, and search-read function is inquired in setting, according to Keyword and modification time carry out inquiry access.
6. a kind of method realized based on equipment alteration information and the standardized system for dispatching online updating, which is characterized in that packet Include following steps:
Step 1: being updated based on patterned plate and graphical standardisation:
To modeling tool integration, process, provide based on it is graphical configure and management function, user get information about data Extraction, conversion process;
Step 2: rule-based drawing is inspected: to distinct device, different connection types in power grid, being provided data and is administered machine System then effectively guarantees integrality, uniqueness, the accuracy, conjunction of data by the foundation of the symbol database of unified standardization Method, consistency;
Step 3: web edition scheduling operation system and PMS system are called directly:
Using the query function of PMS system and web edition scheduling operation system, hyperlink is established, this system calls directly route Figure and power network line wiring diagram are moved towards, convenient to make a report on to field personnel's progress unusual fluctuation list, dispatcher is directly to calling The mode of connection before electric grid operating system modification is intercepted, forms plate modification front and back comparison, is improved automation O&M class and is repaired Change efficiency;
Step 4: with OMS seamless interfacing, including following small step:
Step 1: OMS system calls directly the document content of equipment alteration list and plate modification list, chain is formed with tour sheet It connects, dispatching of power netwoks person is facilitated to be consulted;
Step 2: Field Force utilizes terminal device in such a system, this is filled according to on-site actual situations and different condition Part, generating device unusual fluctuation list are sent to scheduling operation plate and update part, and the direct chain of scheduled overhaul list in OMS system It is connected to this part;
Step 3: dispatcher generates plate modification list according to the equipment alteration list that scene is sent, before scheduling operation system modification Plate module calls directly route wiring diagram in web edition scheduling operation system, and on this basis, utilizes drawing tools module shape Automation O&M class is given at plate after scheduling operation system modification, and by this modification single-shot, is scheduled operating system wiring side The modification of formula.
CN201910237949.6A 2019-03-27 2019-03-27 Standardization system and method based on equipment transaction information and scheduling online update Active CN110032552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910237949.6A CN110032552B (en) 2019-03-27 2019-03-27 Standardization system and method based on equipment transaction information and scheduling online update

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910237949.6A CN110032552B (en) 2019-03-27 2019-03-27 Standardization system and method based on equipment transaction information and scheduling online update

Publications (2)

Publication Number Publication Date
CN110032552A true CN110032552A (en) 2019-07-19
CN110032552B CN110032552B (en) 2023-02-28

Family

ID=67236796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910237949.6A Active CN110032552B (en) 2019-03-27 2019-03-27 Standardization system and method based on equipment transaction information and scheduling online update

Country Status (1)

Country Link
CN (1) CN110032552B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112506903A (en) * 2020-12-02 2021-03-16 苏州龙石信息科技有限公司 Data quality representation method using sample line

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK38576A (en) * 1976-01-30 1977-07-31 Int Standard Electric Corp ANSWERING EVENTS
CN101782908A (en) * 2009-01-21 2010-07-21 佛山市顺德区顺达电脑厂有限公司 Method for sharing tour schedule and service platform and system thereof
US8680358B1 (en) * 2013-02-27 2014-03-25 Amt International, Inc. Methods for removing heavy hydrocarbons from extractive solvents
CN104600840A (en) * 2014-12-30 2015-05-06 国家电网公司 Intelligent dispatching and mis-operation preventing management system and method
CN104616101A (en) * 2015-01-19 2015-05-13 国家电网公司 Integrated power grid resource model and construction and maintenance method
US20150324329A1 (en) * 2011-09-19 2015-11-12 Fisher-Rosemount Systems, Inc. Inferential process modeling, quality prediction and fault detection using multi-stage data segregation
CN105447611A (en) * 2014-11-21 2016-03-30 国家电网公司 OMS equipment transaction management and control information system supported by GID platform
CN105550810A (en) * 2015-12-10 2016-05-04 国网四川省电力公司成都供电公司 Operation and alteration management method for power grid equipment
CN107230162A (en) * 2017-05-19 2017-10-03 国家电网公司 Equipment alteration treating method and apparatus based on production management system
CN108229816A (en) * 2017-12-30 2018-06-29 国网浙江省电力公司杭州供电公司 Management method is matched by the battalion of Internet of Things networking based on distributed management
CN108876445A (en) * 2018-05-31 2018-11-23 华北电力大学 A kind of data interoperation application based on battalion's distribution end-equipment common information model
CN109376468A (en) * 2018-11-21 2019-02-22 国网四川省电力公司绵阳供电公司 The drawing methods of electrical power distribution automatization system PMS model pel

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK38576A (en) * 1976-01-30 1977-07-31 Int Standard Electric Corp ANSWERING EVENTS
CN101782908A (en) * 2009-01-21 2010-07-21 佛山市顺德区顺达电脑厂有限公司 Method for sharing tour schedule and service platform and system thereof
US20150324329A1 (en) * 2011-09-19 2015-11-12 Fisher-Rosemount Systems, Inc. Inferential process modeling, quality prediction and fault detection using multi-stage data segregation
US8680358B1 (en) * 2013-02-27 2014-03-25 Amt International, Inc. Methods for removing heavy hydrocarbons from extractive solvents
CN105447611A (en) * 2014-11-21 2016-03-30 国家电网公司 OMS equipment transaction management and control information system supported by GID platform
CN104600840A (en) * 2014-12-30 2015-05-06 国家电网公司 Intelligent dispatching and mis-operation preventing management system and method
CN104616101A (en) * 2015-01-19 2015-05-13 国家电网公司 Integrated power grid resource model and construction and maintenance method
CN105550810A (en) * 2015-12-10 2016-05-04 国网四川省电力公司成都供电公司 Operation and alteration management method for power grid equipment
CN107230162A (en) * 2017-05-19 2017-10-03 国家电网公司 Equipment alteration treating method and apparatus based on production management system
CN108229816A (en) * 2017-12-30 2018-06-29 国网浙江省电力公司杭州供电公司 Management method is matched by the battalion of Internet of Things networking based on distributed management
CN108876445A (en) * 2018-05-31 2018-11-23 华北电力大学 A kind of data interoperation application based on battalion's distribution end-equipment common information model
CN109376468A (en) * 2018-11-21 2019-02-22 国网四川省电力公司绵阳供电公司 The drawing methods of electrical power distribution automatization system PMS model pel

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
GUANGSHEJIA等: "Program management organization maturity integrated model for mega construction programs in China", 《INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT》 *
加一的修炼场: "调度管理系统平台OMS——调度计划版块", 《HTTPS://WWW.JIANSHU.COM/P/3B14D0C0454B》 *
林森: "智能电网中信息交互总线系统设计与应用", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
王强等: "基于EXT的调度生产管理系统", 《第十九届输配电研讨会论文集》 *
苏艳飞: "配网保护定值整定计算管理系统的研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112506903A (en) * 2020-12-02 2021-03-16 苏州龙石信息科技有限公司 Data quality representation method using sample line
CN112506903B (en) * 2020-12-02 2024-02-23 苏州龙石信息科技有限公司 Data quality representation method using specimen line

Also Published As

Publication number Publication date
CN110032552B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN102929911B (en) Substation and scheduling station method of integrated modeling
CN102832703B (en) Transformer station and scheduling station model fast conversion method based on model conversion machine
CN101394106B (en) Method for implementing network five defending locking system of transforming plant without person on duty
CN101714241A (en) System for automatically generating single-wire tidal current diagram of large-screen power transmission network during power scheduling
CN106815681B (en) Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof
CN102411649B (en) Method for interchanging designs by using general model of intelligent device
CN102779156B (en) Configuration method for database of communication device in digital substation
CN103546541B (en) Remote data based on intelligent telecontrol communication machine subscribes to dissemination method
CN103078920B (en) A kind of message on-line testing system based on IEC61968 ESB
CN105447611A (en) OMS equipment transaction management and control information system supported by GID platform
CN104866613A (en) Method for establishing three-dimensional component model database of power grid equipment and facility
CN105719078A (en) Holographic flow management method based on business flow butt joint and state monitoring
CN106355256A (en) Multivariate visualization overhaul management system
CN102437644A (en) Distribution transformer long-distance monitoring system based on GPRS (general packet radio service)
CN102916489A (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN104915794A (en) Multi-time-state full-service unified modeling method based on model center
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
CN110032552A (en) Standardized system and method based on equipment alteration information and scheduling online updating
CN101895154A (en) Main and distribution network model splicing method and system in distribution network automation system
CN109376468B (en) Mapping method of PMS model graphic element of power distribution automation system
CN109710669B (en) Method for improving accuracy of full power grid model data based on check rule base
CN108695849A (en) Boss station integrated modelling system and method based on wide-area services bus
CN101719634A (en) Substation patrolling, checking and recording management system
CN106897525A (en) The intellectualizing system platform and method of a kind of energy internet communication planning and designing
CN111105208B (en) Data communication method for source side power plant control logic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant