CN107227720A - Structure for constructing fish and water ecological channel by using tributaries - Google Patents

Structure for constructing fish and water ecological channel by using tributaries Download PDF

Info

Publication number
CN107227720A
CN107227720A CN201610174676.1A CN201610174676A CN107227720A CN 107227720 A CN107227720 A CN 107227720A CN 201610174676 A CN201610174676 A CN 201610174676A CN 107227720 A CN107227720 A CN 107227720A
Authority
CN
China
Prior art keywords
tributary
downstream
fish
reservoir area
communication channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610174676.1A
Other languages
Chinese (zh)
Inventor
徐海洋
陈国柱
孙显春
唐忠波
夏豪
王孙高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201610174676.1A priority Critical patent/CN107227720A/en
Publication of CN107227720A publication Critical patent/CN107227720A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/08Fish passes or other means providing for migration of fish; Passages for rafts or boats
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/08Fish passes or other means providing for migration of fish; Passages for rafts or boats
    • E02B8/085Devices allowing fish migration, e.g. fish traps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a structure for constructing a fish and water ecological channel by using branches, which comprises a reservoir area (1) and a downstream river channel (3) which are separated by a dam (2), wherein the downstream river channel (3) is distributed with downstream branches (4); a communicating channel (6) is arranged between the reservoir area (1) or the reservoir area branch (5) and the downstream branch (4). The invention constructs the fish and water ecological channel by using the tributaries, has no influence on the hydraulic and hydroelectric hub engineering, can meet the requirement of communication between upstream and downstream of the fish, and is particularly suitable for high-head hydropower engineering. The method has positive effects on reducing the influence of water-power hydraulic engineering on fish migration and promoting the ecological protection of rivers.

Description

A kind of utilization tributary built the structure of fish and Ecology passage
Technical field
The present invention relates to the structure that a kind of utilization tributary built fish and Ecology passage, belong to fish protection technical field.
Background technology
Dam and sluice-gate engineering is built, and natural river is blocked in various degree, has blocked the migration of fish, cause the population quantity of migration fishes to decline to a great extent.For protection migration fishes; various countries are while dam and burrock is built; according to the characteristics of engineering and the demand of fish protection has built various types of fish pass structures, such as fish pass, imitative nature passage, transporting something containerized fish system, fish lift and fish lock are up with the river property migrant that helps to trace back.
It is applied to weir more fish pass, and often needs to be combined with dam, it is larger on work arrangement influence, and also the part dam type such as arch dam can not then lay because of the factor such as flood discharge safety or both sides landform.High dam needs to build considerably long fish pass come gradient of dissolving, cross the effect of fish it is difficult to ensure that.
Fish lock, fish lift, transporting something containerized fish system are only transported through to fish, and the aquatic ecosystem of dam site upstream and downstream is actually still blocked.Wherein fish lock, fish lift are equally existed the problem of dam is combined.Transporting something containerized fish system is then due to being related to the auxiliary of the professional facilities such as boat for collection and transportation of fish, and the manufacture of these facilities and operation have certain limitation, and is valley river course for downstream, and due to the reason such as current are anxious, river surface is narrow, fish gathering operation is difficult to implement.It can be seen that, effective fish, and the connection of aquatic ecosystem is to face global problem at present excessively how is realized between high dam reservoir upstream and downstream.
The content of the invention
It is an object of the invention to; the structure that a kind of utilization tributary built fish and Ecology passage is provided; with the demand for meeting fish migration and connecting upstream and downstream aquatic ecosystem; played a positive role to coordinate the contradiction between Hydraulic and Hydro-Power Engineering and ecological environmental protection, so as to overcome the deficiencies in the prior art.
The technical proposal of the invention is realized in this way:
A kind of utilization tributary of the present invention built fish and the structure of Ecology passage is, the structure includes downstream tributary is distributed with reservoir area and the downstream river course separated through dam, downstream river course;It is communicated between reservoir area or the reservoir area tributary and downstream tributary of reservoir area.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, was communicated between the reservoir area and downstream tributary through communication channel connection.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, was communicated between the reservoir area tributary and downstream tributary through communication channel connection.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, and the communication channel is artificial fish pass, imitative nature river course or open channel form.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, and one end that the communication channel is connected with reservoir area is provided with collection attracting system.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, and the downstream tributary or reservoir area tributary are respectively positioned near dam, and the tributary flow in downstream tributary or reservoir area tributary is more than 1m3/s.
Foregoing utilization tributary was built in the structure of fish and Ecology passage, and the communication channel, which is located at downstream tributary one end and is less than, is located at reservoir area or reservoir area tributary one end, and the gradient of communication channel is between 0.5 ‰~3%.
With the above mentioned technical proposal, compared with prior art, the present invention built fish and Ecology passage to the present invention using tributary, and water conservancy and hydropower multi-purpose project is not influenceed, and the requirement that fish upstream and downstream is exchanged can be met, be particularly suitable for use in high water head Hydraulic and Hydro-Power Engineering.Influence for reduction water power hydraulic engineering to fish migration, promoting the ecological protection in river has positive effect.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the structural representation of the embodiment of the present invention 2.
Mark in figure for:1- reservoir areas, 2- dams, 3- downstream river courses, 4- downstreams tributary, 5- reservoir areas tributary, 6- communication channels, 7- collection attracting systems.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as any limitation of the invention.
A kind of utilization tributary of the present invention built the structure of fish and Ecology passage, as illustrated in fig. 1 and 2, including the reservoir area 1 separated through dam 2 and downstream river course 3, and downstream tributary 4 is distributed with downstream river course 3;6 are communicated between reservoir area 1 or reservoir area tributary 5 and downstream tributary 4.Connected between reservoir area 1 and downstream tributary 4 through communication channel 6.6 are communicated between reservoir area tributary 5 and downstream tributary 4.Communication channel 6 is artificial fish pass, imitative nature river course or open channel form.One end that communication channel 6 is connected with reservoir area 1 is provided with collection attracting system 7.Downstream tributary 4 and reservoir area tributary 5 are respectively positioned near dam 2, and tributary flow is relatively stable and more than 1m3/s.Communication channel 6, which is located at the one end of downstream tributary 4 and is less than, is located at reservoir area 1 or the one end of reservoir area tributary 5, and the gradient of communication channel 6 is between 0.5 ‰~3%.
The invention mainly comprises tributary, communication channel 6 and collection attracting system 7;Tributary includes downstream tributary 4 and reservoir area tributary 5, downstream tributary 4 or reservoir area tributary 5 are close near dam 2, under normal conditions, ultimate range between downstream tributary 4 or reservoir area tributary 5 and dam 2 is no more than 5 kilometers, the tributary flow in downstream tributary 4 or reservoir area tributary 5 is relatively stable and more than 1m3/s, the initiating terminal of communication channel 6 is located at drop of the section of downstream tributary 4 without larger drop, and the fish composition in downstream tributary 4 is as similar with the fish composition in downstream river course 3 as possible.Due to the remittance of the flow of downstream tributary 4, there is good inducing action to downstream fish, quite a few fish can trace back along downstream tributary 4.The initiating terminal of communication channel 6 is located on downstream tributary 4, and terminal section is located at reservoir area 1 or reservoir area tributary 5, and destination terminal elevation is higher than initiating terminal elevation, and the gradient of communication channel 6 is no more than 3%, typically between 0.5 ‰ to 3%.The terminal of communication channel 6 section can be located at reservoir area or storehouse tail above flowing water section, can also be located on reservoir area tributary 5.Communication channel 6 can be using diversified forms such as open channel, fish pass, and such as gradient is larger, need to consider energy dissipation measure.If the terminal section of communication channel 6 is located at reservoir area 1, the luffing of reservoir operating level need to be considered, using layering import or the multiple imports of construction, and using collection attracting system 7.
Embodiments of the invention 1
As shown in Figure 1, include the downstream river course 3 in the downstream of dam 2, downstream river course 3 is provided with downstream tributary 4, and downstream tributary 4 is connected through communication channel 6 with reservoir area 1, the junction of communication channel 6 and reservoir area 1 is provided with collection attracting system 7, and collection attracting system 7 can be directly using collection attracting system architecture traditional in the prior art.When it is implemented, dam is selected in the upstream vicinity close to downstream tributary 4 as far as possible.The initiating terminal of communication channel 6 is located on downstream tributary 4, and terminal section is located at the storehouse tail of reservoir area 1, and destination terminal elevation is higher than initiating terminal elevation, and the gradient of communication channel is 1% or so.Communication channel uses in open channel, open channel and is provided with dividing plate.
Embodiments of the invention 2
As shown in Fig. 2 including the reservoir area tributary 5 positioned at the upstream of dam 2 and the downstream tributary 4 positioned at the downstream of dam 2.Reservoir area tributary 5 and downstream tributary 4 are located at the same side of dam 2, and move towards substantially similar or intersect as far as possible.Communication channel 6 is set between two tributaries, and communication channel 6 is using the form for imitating nature river course or fish pass.Communication channel 6 is connected one end elevation with reservoir area tributary 5 and is higher than the one end being connected with downstream tributary 4, and the gradient of communication channel 6 is no more than 2%.The downstream river course 3 of dam 2 is that fish can smoothly reach reservoir area 1 along downstream tributary 4, communication channel 6 in natural section, downstream river course 3.

Claims (7)

1. a kind of utilization tributary built the structure of fish and Ecology passage, including through dam(2)The reservoir area of separation(1)And downstream river course(3), downstream river course(3)On downstream tributary is distributed with(4);It is characterized in that:In reservoir area(1)Or reservoir area(1)Reservoir area tributary(5)With downstream tributary(4)Between be communicated with(6).
2. the structure of fish and Ecology passage was built using tributary according to claim 1, it is characterised in that:The reservoir area(1)With downstream tributary(4)Between through communication channel(6)Connection is communicated.
3. the structure of fish and Ecology passage was built using tributary according to claim 1, it is characterised in that:The reservoir area tributary(5)With downstream tributary(4)Between through communication channel(6)Connection is communicated.
4. the structure of fish and Ecology passage was built using tributary according to claim 1, it is characterised in that:The communication channel(6)For artificial fish pass, imitative nature river course or open channel form.
5. the structure of fish and Ecology passage was built using tributary according to claim 1, it is characterised in that:The communication channel(6)With reservoir area(1)One end of connection is provided with collection attracting system(7).
6. the structure of fish and Ecology passage was built using tributary according to claim 1, it is characterised in that:The downstream tributary(4)Or reservoir area tributary(5)It is respectively positioned on dam(2)Near, downstream tributary(4)Or reservoir area tributary(5)Tributary flow be more than 1m3/s。
7. the structure of fish and Ecology passage was built using tributary according to claim 6, it is characterised in that:The communication channel(6)Positioned at downstream tributary(4)One end, which is less than, is located at reservoir area(1)Or reservoir area tributary(5)One end, communication channel(6)Gradient be 0.5 ‰~3% between.
CN201610174676.1A 2016-03-25 2016-03-25 Structure for constructing fish and water ecological channel by using tributaries Pending CN107227720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610174676.1A CN107227720A (en) 2016-03-25 2016-03-25 Structure for constructing fish and water ecological channel by using tributaries

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610174676.1A CN107227720A (en) 2016-03-25 2016-03-25 Structure for constructing fish and water ecological channel by using tributaries

Publications (1)

Publication Number Publication Date
CN107227720A true CN107227720A (en) 2017-10-03

Family

ID=59932928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610174676.1A Pending CN107227720A (en) 2016-03-25 2016-03-25 Structure for constructing fish and water ecological channel by using tributaries

Country Status (1)

Country Link
CN (1) CN107227720A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230297A (en) * 2019-07-08 2019-09-13 上海勘测设计研究院有限公司 Ecological fishway for river network in plain areas
CN111395279A (en) * 2020-04-20 2020-07-10 中国电建集团贵阳勘测设计研究院有限公司 Ecological scheduling system suitable for backtracking of fishes laying adhesive eggs
CN113638378A (en) * 2021-08-23 2021-11-12 广州市城市规划勘测设计研究院 Continuous flow ecological bypass type nature-imitated fishway
CN116289787A (en) * 2022-12-08 2023-06-23 中国电建集团贵阳勘测设计研究院有限公司 Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020187006A1 (en) * 2001-05-01 2002-12-12 Burns Gordon Charles Migratory fish bypass channel with natural features
US20040165955A1 (en) * 2001-12-26 2004-08-26 Davis Robert E. Migratory fish channel associated with one or more dams in a river
CN104294803A (en) * 2014-10-23 2015-01-21 四川大学 Winding type fishway
CN205475131U (en) * 2016-03-25 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Structure for constructing fish and water ecological channel by using tributaries

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020187006A1 (en) * 2001-05-01 2002-12-12 Burns Gordon Charles Migratory fish bypass channel with natural features
US20040165955A1 (en) * 2001-12-26 2004-08-26 Davis Robert E. Migratory fish channel associated with one or more dams in a river
CN104294803A (en) * 2014-10-23 2015-01-21 四川大学 Winding type fishway
CN205475131U (en) * 2016-03-25 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Structure for constructing fish and water ecological channel by using tributaries

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董哲仁, 中国水利水电出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230297A (en) * 2019-07-08 2019-09-13 上海勘测设计研究院有限公司 Ecological fishway for river network in plain areas
CN111395279A (en) * 2020-04-20 2020-07-10 中国电建集团贵阳勘测设计研究院有限公司 Ecological scheduling system suitable for backtracking of fishes laying adhesive eggs
CN111395279B (en) * 2020-04-20 2022-03-29 中国电建集团贵阳勘测设计研究院有限公司 Ecological scheduling system suitable for backtracking of fishes laying adhesive eggs
CN113638378A (en) * 2021-08-23 2021-11-12 广州市城市规划勘测设计研究院 Continuous flow ecological bypass type nature-imitated fishway
CN116289787A (en) * 2022-12-08 2023-06-23 中国电建集团贵阳勘测设计研究院有限公司 Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system
CN116289787B (en) * 2022-12-08 2024-05-24 中国电建集团贵阳勘测设计研究院有限公司 Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system

Similar Documents

Publication Publication Date Title
CN107227720A (en) Structure for constructing fish and water ecological channel by using tributaries
CN105951660B (en) Comprehensive protection system for fish habitat of upstream and downstream and main and branch streams of reservoir
CN203575255U (en) Novel water conservancy irrigation device
CN105257454B (en) A kind of water channeling type swirling water current electricity generation system
CN105155484A (en) Method for reconstructing temporary diversion tunnel into permanent flood discharge facility
CN205475131U (en) Structure for constructing fish and water ecological channel by using tributaries
CN204825802U (en) Compound line type overflow weir
CN201943053U (en) Flow-guiding and flood-discharging hole structure
CN201358449Y (en) Circulating tube type hydropower station
CN101368380B (en) Roughening and energy dissipating method for flood discharging groove
CN101392509A (en) North system engineering for drought resisting reconstruction of yellow river by diverting water in yangtze river from the south to the north
CN101251078A (en) Application of low ebb electricity in water-utilization project
CN204849678U (en) Novel butyl dam structure
CN210712716U (en) Multi-reservoir automatic joint regulation type reservoir
CN205688411U (en) Upstream and downstream fish dam-crossing alternating current device
CN105862686A (en) Upstream and downstream fish dam-crossing alternating current device
CN110485362A (en) More automatic joint debugging formula reservoirs in library
CN206408582U (en) Water conservancy diversion structure structure
CN202323893U (en) Hydroelectric power station capable of being built densely
CN207092036U (en) A kind of Diversion system of hydropower station layout pattern
CN209429082U (en) Diversion tunnel is used as the reconstruction structure of two drain caverns
CN102518094A (en) Hydroelectric generating set technical water supply system of hydroelectric station for sediment-laden river
CN102352617B (en) Bulb-tubular hydropower station plant diverting constructing method
CN205662903U (en) Water conservancy diversion water -retaining structure that by stages sluices
CN204458190U (en) A kind of water generating circulatory system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003

RJ01 Rejection of invention patent application after publication