CN107225784A - A kind of glass reinforced plastic pipe end production process - Google Patents
A kind of glass reinforced plastic pipe end production process Download PDFInfo
- Publication number
- CN107225784A CN107225784A CN201710297059.5A CN201710297059A CN107225784A CN 107225784 A CN107225784 A CN 107225784A CN 201710297059 A CN201710297059 A CN 201710297059A CN 107225784 A CN107225784 A CN 107225784A
- Authority
- CN
- China
- Prior art keywords
- layer
- reinforced plastic
- production process
- plastic pipe
- glass reinforced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29D—PRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
- B29D23/00—Producing tubular articles
- B29D23/001—Pipes; Pipe joints
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C70/00—Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
- B29C70/04—Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
- B29C70/28—Shaping operations therefor
- B29C70/30—Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
- B29C70/32—Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core on a rotating mould, former or core
Abstract
Embodiment of the invention discloses that a kind of glass reinforced plastic pipe end production process, is comprised the following steps:A) frp lining layer preparation section:Increase wear-resisting one layer of gel coat when making liner, concrete operations are in mandrel surface spraying abrasion-proof gel coat;B) winding working procedure:After after inner liner solidification, infiltration Lauxite in immersion resin storage tank, rearrangement is fitly wrapped on straight tube mould, after winding 1 layer of ring, 1 helical layer, 1 layer of ring, after winding is finished, and 60 DEG C are heated to pipeline and is solidified 20 minutes;C) external protection coating process.One layer of preferable polyurethane resin of water-tight corrosion-proof is brushed outside pipeline.
Description
Technical field
The present invention relates to glass reinforced plastic pipe production technical field, more particularly to a kind of glass reinforced plastic pipe end production process.
Background technology
GRP pipe is a kind of old metal pipeline, and its feature is light weight, and intensity is high, and corrosion resistance is strong.Fiberglass
Pipeline is one be wrapped in layer according to certain technique with glass fibre peace of the quality as resin on rotatably core
Plant pipeline.Its production technology is extremely important, and the GRP pipe produced under good production technology is by with more advanced wall pipe knot
Structure, and the effect of material is given full play to, stiffness and the life-span of pipeline are improved, therefore, it is necessary to be directed to its existing production technology
Carefully studied and improved.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing defect there is provided a kind of glass reinforced plastic pipe end production process,
Comprise the following steps:A) frp lining layer preparation section:Increase wear-resisting one layer of gel coat when making liner, concrete operations are in core
Mould surface spraying abrasion-proof gel coat;B) winding working procedure:After after inner liner solidification, infiltration Lauxite, is rearranged in immersion resin storage tank
Fitly it is wrapped on straight tube mould, after winding 1 layer of ring, 1 helical layer, 1 layer of ring, after winding is finished, pipeline is heated to
60 DEG C solidify 20 minutes;C) external protection coating process:One layer of preferable polyurethane resin of water-tight corrosion-proof is brushed outside pipeline.
Preferably, the specific steps that one layer of preferable polyurethane resin of water-tight corrosion-proof is brushed outside pipeline are also wrapped
Include, add abrasive powder in resin and aluminium powder is used as filler.
Preferably, the mass ratio of the abrasive powder and the aluminium powder is 3:4.
Preferably, product quality is also included after methods described to detect.
Preferably, the specific steps of the product quality detection include, Appearance Visual, see that whether smooth its pipe internal surface is flat
It is whole, without cracking influential on performance, layering, pin hole and bubble;Tube end should be concordant, arris impulse- free robustness, outer surface without
Open defect.
Beneficial effects of the present invention:
A kind of glass reinforced plastic pipe end production process that the present invention is provided, with higher intensity, rigidity, for agricultural resource
Develop, increase farmers' income with positive effect.
Embodiment
Technical solution of the present invention is described in detail below.
(1) preparatory process
A, equipment debugging.Conscientiously check whether equipment operation and working position normal first, be important to it is careful check resin-
Whether curing agent bi-component pump has clogging, between match whether reach design requirement;Ensure system lining, winding, repair, take off
The stable and operating accuracy of the equipment such as mould;
B, cleaning mould.It is required that die surface will accomplish that surface is put down without recessed, dust, debris and other attachments, mould is cheated
It is sliding, problematic timely repairing, maintenance;
(2) system lining process
A, lining resin are prepared.The resin formula body made by quality testing department according to working environment at that time, temperature conditionss
System carries out lining resin and dissolved, and dosage will rationally be grasped according to manufacture progress.When field condition changes, quality testing department
Should adjust formula in time with manufacturing sector, and by new formula prepare need to resin;
B, reinforcing material prepare.By design requirement by make liner need to reinforcing material be transported to specified location, it is and right
The first processing of cutting of the reinforcing materials of some wide formats is to designing width;
C, inner liner make.Inner liner making is carried out by the laying step of design requirement, should be applied during each individual layer laying
Plus rational tension force, each other appropriate overlap joint, and rolled repeatedly with combined pressure roller and drive bubble out of to ensure complete wet.
And require that each layers of reinforcement reaches the resin content requirement of design;
D, preliminary self-inspection.It has been coated with by design requirement after each layer, it is desirable to which operator carries out preliminary quality testing:Liner
Whether design thickness is reached, it is local whether to have poor glue, kiss-coating phenomenon, if to have hickie, bubble, if having, if occurring above-mentioned
Situation should be reported without delay and take treatment measures;
E, into liner far infrared deeply-curing process.
(3) far infrared deeply-curing
The GRP pipe that our factory is manufactured must all carry out far infrared deeply-curing processing, it is therefore an objective to:It can improve
The curing degree of inner liner, improves the anti-rotten heat resistance of pipeline;
(4) procedure quality is examined
Reaffirm liner bubble-free, stomata before winding, free from admixture, surfacing, resin content rationally, no hickie and
The phenomenon such as local solidification is bad.It must conscientiously check whether liner is qualified, it is underproof to forbid upper machine to wind.
(5) winding working procedure
Designed parameter is inputted into microcomputer, after after liner solidification, carried out by microcomputer control with alkali-free Non-twisting glass fibre
Reciprocating winding is until winding layer thickness.By the external protection of the resin content of specific thickness external application 100%.The resin of winding layer contains
Amount generally 35% or so, its thickness depends on the synthesis of the strength and stiffness of pipe design.
(6) it is infrared ray cured
Pipeline enters the curing conservation stage.With suitable rotating speed mould should be kept to roll in the curing process, make its uniform
Solidification.It should be noted that monitoring pipe temperature, Reasonable adjustment solidification scheme in solidification process.
(7) repair, be stripped:
When the hardness Barcol of pipeline is more than 30, pipe end is repaired.Then with hydraulic ingot stripper by pipeline and
Mould is separated, and is marked on request in its pipeline center section.
Embodiment 1:
A) frp lining layer preparation section:
Increase wear-resisting one layer of gel coat when making liner, concrete operations are (according to corrosion in mandrel surface spraying abrasion-proof gel coat
Condition determines gel coat matrix classification) after solidification, then to make surface felt, stitch-bonded felt etc. rich resin-lined.Interior electrical path length is 1.0m, mark
Quasi- part is 12.0m;Pipeline rigidity is 5,000N/m2, and pressure rating is 0.6MPa;Inner liner thickness is >=1.8mm;Most
Small hoop tensile strength and minimum axial direction tensile strength are respectively 2,178kN/m2,340kN/m2;Maximum allowable initial perpendicular is scratched
Bent deflection and maximum allowable long-term vertical deflection deflection are respectively 2% and 3%.
B) winding working procedure:
After after inner liner solidification, infiltration Lauxite in immersion resin storage tank, rearrangement is fitly wrapped on straight tube mould,
After the helical layer/1 layer ring of 1 layer of ring of winding/1, after winding is finished, 60 DEG C are heated to pipeline and is solidified 20 minutes, resin crosslinks
After solidification, as hard integral same with thermosetting compound material.
C) external protection coating process:
One layer of preferable polyurethane resin of water-tight corrosion-proof is brushed outside pipeline (to add abrasive powder in resin and aluminium powder is made
For filler).To increase the rigidity and intensity of its pipeline, the mass ratio of abrasive powder and the aluminium powder is 3:4.
Finally, pipeline quality should also be detected.The specific steps of product quality detection include, and Appearance Visual sees it
Whether pipe internal surface is smooth, without cracking influential on performance, layering, pin hole and bubble;Tube end should be concordant, side
Rib impulse- free robustness, outer surface no significant defect.
A kind of fiberglass glass reinforced plastic pipe end production process that the present invention is provided has higher intensity, rigidity, for agricultural
The exploitation of resource, increase farmers' income with positive effect.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention,
Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used
To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic.
Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the present invention's
Within protection domain.
Claims (5)
1. a kind of glass reinforced plastic pipe end production process, it is characterised in that comprise the following steps:
A) frp lining layer preparation section:
Increase wear-resisting one layer of gel coat when making liner, concrete operations are in mandrel surface spraying abrasion-proof gel coat;
B) winding working procedure:
After after inner liner solidification, infiltration Lauxite in immersion resin storage tank, rearrangement is fitly wrapped on straight tube mould, wound
After 1 layer of ring, 1 helical layer, 1 layer of ring, after winding is finished, 60 DEG C are heated to pipeline and is solidified 20 minutes;
C) external protection coating process:
One layer of preferable polyurethane resin of water-tight corrosion-proof is brushed outside pipeline.
2. a kind of glass reinforced plastic pipe end production process according to claim 1, it is characterised in that described to be brushed outside pipeline
The specific steps of one layer of preferable polyurethane resin of water-tight corrosion-proof also include, and abrasive powder and aluminium powder are added in resin as filling out
Material.
3. a kind of glass reinforced plastic pipe end production process according to claim 2, it is characterised in that the abrasive powder and described
The mass ratio of aluminium powder is 3:4.
4. a kind of glass reinforced plastic pipe end production process according to claim 1, it is characterised in that also include after methods described
Product quality is detected.
5. a kind of glass reinforced plastic pipe end production process according to claim 4, it is characterised in that the product quality detection
Specific steps include, Appearance Visual, see whether its pipe internal surface smooth, without it is influential on performance cracking, layering,
Pin hole and bubble;Tube end should be concordant, arris impulse- free robustness, outer surface no significant defect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710297059.5A CN107225784A (en) | 2017-04-28 | 2017-04-28 | A kind of glass reinforced plastic pipe end production process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710297059.5A CN107225784A (en) | 2017-04-28 | 2017-04-28 | A kind of glass reinforced plastic pipe end production process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107225784A true CN107225784A (en) | 2017-10-03 |
Family
ID=59933681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710297059.5A Pending CN107225784A (en) | 2017-04-28 | 2017-04-28 | A kind of glass reinforced plastic pipe end production process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107225784A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108248072A (en) * | 2018-01-22 | 2018-07-06 | 林欢 | A kind of glass reinforced plastic pipe end production process |
CN112793050A (en) * | 2021-02-03 | 2021-05-14 | 上海自图新材料科技有限公司 | Integrated forming die and integrated forming method for pipeline containing membrane lining composite material |
CN113524657A (en) * | 2020-04-20 | 2021-10-22 | 江苏金安电气有限公司 | Manufacturing process of glass fiber reinforced plastic sleeve |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101532592A (en) * | 2009-04-10 | 2009-09-16 | 芜湖圣弗兰玻璃钢有限公司 | Environmental protection glass-reinforced plastic pipe and production method thereof |
CN101571213A (en) * | 2009-06-04 | 2009-11-04 | 芜湖圣弗兰玻璃钢有限公司 | Preparing method of bamboo fiber winding composite tube |
CN201513637U (en) * | 2009-04-10 | 2010-06-23 | 芜湖圣弗兰玻璃钢有限公司 | Environmental protection glass-reinforced plastic pipe |
CN101947803A (en) * | 2010-02-09 | 2011-01-19 | 芜湖圣弗兰玻璃钢有限公司 | Method for preparing straight bamboo splint reinforced bamboo composite pipe |
CN201925670U (en) * | 2010-12-03 | 2011-08-10 | 奉玉贞 | FRP (fiber reinforced plastic) wear-resisting pipe |
CN202327397U (en) * | 2011-11-17 | 2012-07-11 | 新疆广水管道有限公司 | Bamboo composite pressure pipe |
CN205350714U (en) * | 2016-01-21 | 2016-06-29 | 昆明中天达玻璃钢开发有限公司 | Fiber -reinforced plastic process pipeline |
-
2017
- 2017-04-28 CN CN201710297059.5A patent/CN107225784A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101532592A (en) * | 2009-04-10 | 2009-09-16 | 芜湖圣弗兰玻璃钢有限公司 | Environmental protection glass-reinforced plastic pipe and production method thereof |
CN201513637U (en) * | 2009-04-10 | 2010-06-23 | 芜湖圣弗兰玻璃钢有限公司 | Environmental protection glass-reinforced plastic pipe |
CN101571213A (en) * | 2009-06-04 | 2009-11-04 | 芜湖圣弗兰玻璃钢有限公司 | Preparing method of bamboo fiber winding composite tube |
CN101947803A (en) * | 2010-02-09 | 2011-01-19 | 芜湖圣弗兰玻璃钢有限公司 | Method for preparing straight bamboo splint reinforced bamboo composite pipe |
CN201925670U (en) * | 2010-12-03 | 2011-08-10 | 奉玉贞 | FRP (fiber reinforced plastic) wear-resisting pipe |
CN202327397U (en) * | 2011-11-17 | 2012-07-11 | 新疆广水管道有限公司 | Bamboo composite pressure pipe |
CN205350714U (en) * | 2016-01-21 | 2016-06-29 | 昆明中天达玻璃钢开发有限公司 | Fiber -reinforced plastic process pipeline |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108248072A (en) * | 2018-01-22 | 2018-07-06 | 林欢 | A kind of glass reinforced plastic pipe end production process |
CN111688235A (en) * | 2018-01-22 | 2020-09-22 | 林欢 | Preparation method of glass fiber reinforced plastic pipeline |
CN113524657A (en) * | 2020-04-20 | 2021-10-22 | 江苏金安电气有限公司 | Manufacturing process of glass fiber reinforced plastic sleeve |
CN112793050A (en) * | 2021-02-03 | 2021-05-14 | 上海自图新材料科技有限公司 | Integrated forming die and integrated forming method for pipeline containing membrane lining composite material |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104633378B (en) | Ultraviolet light solidification soft pipe lining old pipeline repairing technology | |
CN107225784A (en) | A kind of glass reinforced plastic pipe end production process | |
CN105715882B (en) | A kind of small-bore bamboo coiled composite tube and its manufacturing method | |
CN106671453A (en) | Manufacturing method of multi-layer composite eccentric wear preventing continuous sucker rod | |
CN104787998A (en) | Production process of glass fiber reinforced plastic septic tank and production equipment for glass fiber reinforced plastic septic tank | |
CN104953530A (en) | Sand glass reinforced plastic cable protection pipe and production method thereof | |
CN101947803A (en) | Method for preparing straight bamboo splint reinforced bamboo composite pipe | |
CN105003209A (en) | Sucker rod with composite spiral abrasion-resistant layer, manufacturing device and manufacturing method | |
CN101532592A (en) | Environmental protection glass-reinforced plastic pipe and production method thereof | |
CN109571994A (en) | GRP pipe and production technology | |
CN107984772A (en) | The processing technology of new glass fibre reinforced plastic | |
CN104339664A (en) | Preparation method of carbon fiber composite material lifting arm for truck cane | |
CN104033724B (en) | Bamboo is wound around the preparation method of combined vertical storage tank | |
CN104044276B (en) | The manufacture method of glass reinforced plastic pipe | |
CN113898798A (en) | Internal pressure resistant fiber braided winding pultrusion composite pipe and preparation method thereof | |
CN104044274B (en) | A kind of preparation method of the wear-and corrosion-resistant composite delivery pipeline of high bond strength | |
RU175376U1 (en) | Composite stand | |
RU2630798C1 (en) | Equipment for forming products of polymer composite materials and method of its manufacture | |
CN104565677B (en) | A kind of erosion resistant coating protection structure of directional drilling crossing segment pipe and preparation method thereof | |
JPH06328577A (en) | Fiber reinforced resin tubular member and production thereof | |
CN108790212A (en) | The method for preparing composite cylinder using composite fibre | |
CN103526880A (en) | Manufacturing method for FRP constraint PVC pipe-steel pipe internal filling concrete fireproof combination column | |
CN106891544A (en) | A kind of hydraulic cylinder of compound carbon fibers cylinder barrel | |
CN113601873A (en) | Preparation method of glass fiber reinforced plastic pipeline | |
TWI596264B (en) | Reinforcement jacket and concrete columns of the reinforcement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |
|